CN106382863B - Bomb fast opened docking facilities - Google Patents
Bomb fast opened docking facilities Download PDFInfo
- Publication number
- CN106382863B CN106382863B CN201610916605.4A CN201610916605A CN106382863B CN 106382863 B CN106382863 B CN 106382863B CN 201610916605 A CN201610916605 A CN 201610916605A CN 106382863 B CN106382863 B CN 106382863B
- Authority
- CN
- China
- Prior art keywords
- follower
- connecting rod
- directing plate
- plate
- handle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42B—EXPLOSIVE CHARGES, e.g. FOR BLASTING, FIREWORKS, AMMUNITION
- F42B33/00—Manufacture of ammunition; Dismantling of ammunition; Apparatus therefor
- F42B33/001—Devices or processes for assembling ammunition, cartridges or cartridge elements from parts
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- General Engineering & Computer Science (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The invention discloses a kind of bomb fast opened docking facilities, including to picking up and pushing up traveller instrument, to picking up including directing plate, hand handle and follower, directing plate includes left directing plate and right directing plate, hand handle includes left hand handle and right handgrip, left directing plate and right directing plate are connected with left hand handle and right handgrip respectively, first connecting rod is respectively arranged between left directing plate and right directing plate, second connecting rod and third connecting rod, it is arranged with connecting shaft between first connecting rod and second connecting rod in parallel, connecting shaft both ends are respectively arranged with fixed plate, fixed plate is connected by connecting plate with wheel, it is arranged with follower axle between second connecting rod and the third connecting rod in parallel, follower is provided with follower axle, push up traveller kit bracket part, connecting rod and handle, arcuate member and handle are respectively welded at the both ends of connecting rod.The present invention can be rapidly completed the docking of powder charge body and projectile tail, easy to operate, time saving and energy saving, have good economic benefit.
Description
Technical field:
The present invention relates to a kind of docking facilities, more particularly to a kind of bomb fast opened docking facilities.
Background technology:
The bombs such as domestic bomb are usually by powder charge body mounted in playing in cage, and projectile tail is in the iron packing case of square, on-hook
Need that cage unpacking will be played before use, take out powder charge body and be docking together with projectile tail and by them, complete this work, army is always
There is no special equipment, one end of bomb powder charge body is paved with rod when usually docking, then docked with projectile tail, and
Bomb sliding post does not have specific purpose tool, causes attendant's labor intensity big, Wartime Ammunition Support operating efficiency is low, is unfavorable for fighting capacity
Generation.
The content of the invention:
The technical problems to be solved by the invention are:A kind of overcome the deficiencies in the prior art, there is provided easy to operate, time saving province
The bomb fast opened docking facilities of power.
It is of the invention to be for the technical solution adopted for solving the technical problem:
A kind of bomb fast opened docking facilities, including to picking up and pushing up traveller instrument, described pair pick up including directing plate,
Hand handle and follower, the directing plate include left directing plate and right directing plate, and the hand handle includes left hand handle and right handgrip, described
Left directing plate and the right directing plate are connected with the left hand handle and the right handgrip respectively, and the left directing plate and the right side are drawn
First connecting rod, second connecting rod and third connecting rod are respectively arranged between guide plate, between the first connecting rod and the second connecting rod
It is arranged with connecting shaft in parallel, the connecting shaft both ends are respectively arranged with fixed plate, and the fixed plate is connected by connecting plate and wheel
Connect, be arranged with follower axle between the second connecting rod and the third connecting rod in parallel, support bullet is provided with the follower axle
Plate, baffle plate is provided with above guiding Board position on the left hand handle and the right handgrip, lower section is provided with riser.
The follower has two, is left follower and right follower respectively, the first support is provided among the follower
Diving board axis hole, the follower axle is provided with the first follower axis hole, the follower axle both ends pass through left follower respectively
It is fixed on after right follower on left directing plate and right directing plate, the follower both ends are respectively arranged with pulley hole, pulley hole
On be provided with pulley, the follower is that have the middle long plank shape for having certain radian.
The connecting shaft both ends are arranged on left directing plate and right directing plate by fixed plate respectively, and the directing plate is L
Type structure, first connecting rod hole, second connecting rod hole, the second follower axis hole and third connecting rod are disposed with the directing plate
Hole.
The riser has two, is separately positioned on the left hand the front and rear end between the right handgrip, described
Left hand at the rear end end with the right handgrip being provided with certain radian.
The powder charge body to be docked is set on the follower, powder charge body to utilize push up the assistance of traveller instrument with
Docking, top traveller kit bracket part, connecting rod and the handle, arcuate member and handle point is fixed in the projectile tail to be docked
The both ends of connecting rod are not welded on.
The connecting rod includes fourth link, the 5th connecting rod and six-bar linkage, and fourth link one end is connected with handle, the other end
Twisted connection is carried out by the 5th connecting rod and six-bar linkage, the other end of six-bar linkage is connected with arcuate member.
The present invention positive beneficial effect be:
1st, design of the invention facilitates the docking of powder charge body and projectile tail, can complete the fast opened docking of bomb, real
Show the quick guarantee of aircraft ammunition, and the short distance that can be also used for bomb after bomb docking is completed to picking up is transported,
Guarantee is provided to army's outfield bomb, in addition, behind aircraft band impact land, the present invention can also be used to take apart bomb, by powder charge
Body puts back to bullet cage.
2nd, present invention top traveller instrument and the design operation to picking up are convenient, time saving and energy saving, reduce the labor of attendant
Fatigue resistance, Wartime Ammunition Support operating efficiency is improved, enhance the fighting capacity of army, there is higher defense economy benefit.
Brief description of the drawings:
Fig. 1 is the structural representation to picking up in bomb fast opened docking facilities of the present invention;
Fig. 2 is Fig. 1 top view;
Fig. 3 is the guiding plate structure schematic diagram in Fig. 1;
Fig. 4 is the follower structural representation in Fig. 1;
Fig. 5 is the structural representation that traveller instrument is pushed up in bomb fast opened docking facilities of the present invention.
Embodiment:
The present invention is made further explanation and description with specific embodiment below in conjunction with the accompanying drawings:
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5:In figure, 1- directing plates, 2- hand handles, 3- followers, 4- first connecting rods, 5-
Second connecting rod, 6- third connecting rods, 7- connecting shafts, 8- fixed plates, 9- connecting plates, 10- wheels, 11- follower axles, 12- baffle plates,
13- risers, 14- the first follower axis holes, 15- pulley holes, 16- pulleys, 17- arcuate members, 18- fourth links, 19- the 5th connect
Bar, 20- six-bar linkages, 21- handles, 22- first connecting rods hole, 23- second connecting rods hole, 24- third connecting rods hole, 25- the second support bullets
Board shaft hole, the left directing plates of 1-1-, the right directing plates of 1-2-, 2-1- left hand handles, 2-2- right handgrips, the left followers of 3-1-, the right supports of 3-2-
Diving board.
Embodiment:A kind of bomb fast opened docking facilities, including to picking up and pushing up traveller instrument, to picking up including guiding
Plate 1, hand handle 2 and follower 3, directing plate 1 include left directing plate 1-1 and right directing plate 1-2, and hand handle 2 includes left hand 2-1 and the right side
Hand handle 2-2, left directing plate 1-1 and right directing plate 1-2 are respectively connected 2-1 and right handgrip 2-2 with left hand, left directing plate 1-1 and
First connecting rod 4, second connecting rod 5 and third connecting rod 6, first connecting rod 4 and second connecting rod 5 are respectively arranged between right directing plate 1-2
Between be arranged with connecting shaft 7 in parallel, the both ends of connecting shaft 7 are respectively arranged with fixed plate 8, and fixed plate 8 passes through connecting plate 9 and wheel 10
Connection, is arranged with follower axle 11 in parallel, follower 3 is provided with follower axle 11 between second connecting rod 5 and third connecting rod 6,
For left hand baffle plate 12 is provided with above the position of directing plate 1 on 2-1 and right handgrip 2-2, lower section is provided with riser 13.
Follower 3 has two, is left follower 3-1 and right follower 3-2 respectively, the first support is provided among follower 3
Diving board axis hole 14, follower axle 11 is provided with the first follower axis hole 14, the both ends of follower axle 11 pass through left follower respectively
It is fixed on after 3-1 and right follower 3-2 on left directing plate 1-1 and right directing plate 1-2, the both ends of follower 3 are respectively arranged with pulley
Hole 15, pulley 16 is provided with pulley hole 15, and follower 3 is that have the middle long plank shape for having certain radian.
The both ends of connecting shaft 7 are arranged on left directing plate 1-1 and right directing plate 1-2 by fixed plate 8 respectively, and directing plate 1 is L
Type structure, first connecting rod hole 22 is disposed with directing plate 1, second connecting rod hole 23, the second follower axis hole 25 and the 3rd connect
Rod aperture 24, riser 13 have two, are separately positioned on left hand the front and rear end between 2-1 and right handgrip 2-2, left hand is 2-1
Certain radian is provided with right handgrip 2-2 rear end end.
The powder charge body to be docked is set on follower 3, and powder charge body will utilize assistance and the institute for pushing up traveller instrument
Docking, top traveller kit bracket part 17, connecting rod and handle 21, arcuate member 17 and handle 21 is fixed in the projectile tail to be docked
It is respectively welded at the both ends of connecting rod.
Connecting rod includes fourth link 18, the 5th connecting rod 19 and six-bar linkage 20, and the one end of fourth link 18 is connected with handle 21,
The other end carries out twisted connection by the 5th connecting rod 19 and six-bar linkage 20, and the other end and the arcuate member 17 of six-bar linkage 20 connect
Connect.
In use, will be placed to picking up first to erect, directing plate 1 is contacted to earth, and powder charge body is lifted out and is put into from bullet cage and is drawn
On guide plate 1, then a pin slams follower axle 11 and with hand handle 2 is pressed after hand, will be laid flat to picking up, powder charge body can be rolled into support bullet
On plate 3, follower 3 and pulley 16 are used for holding up bomb and making powder charge body rotate in the above, to be docked with projectile tail, right
Shift bomb traveller onto specified location using pushing up traveller instrument when connecing, to after connecting can short distance transport bomb, transport
Position is needed, will slowly be holded up to picking up, bomb is rolled into ground by directing plate.
It is described above, only it is the preferred embodiments of the present invention, any formal limitation is not made to the present invention, it is all
It is any simple modification, equivalent change and modification made according to the technical spirit of the present invention to above example, still falls within
In the protection domain of technical solution of the present invention.
Claims (6)
1. a kind of bomb fast opened docking facilities, including to picking up and pushing up traveller instrument, it is characterized in that:Described pair pick up including
Directing plate, hand handle and follower, the directing plate include left directing plate and right directing plate, and the hand handle includes left hand handle and the right hand
, the left directing plate and the right directing plate are connected with the left hand handle and the right handgrip respectively, the left directing plate and
First connecting rod, second connecting rod and third connecting rod, the first connecting rod and described second are respectively arranged between the right directing plate
It is arranged with connecting shaft between connecting rod in parallel, the connecting shaft both ends are respectively arranged with fixed plate, and the fixed plate passes through connecting plate
It is connected with wheel, is arranged with follower axle between the second connecting rod and the third connecting rod in parallel, is set on the follower axle
Follower is equipped with, is provided with baffle plate above guiding Board position on the left hand handle and the right handgrip, lower section is provided with vertical
Plate.
2. bomb fast opened docking facilities according to claim 1, it is characterized in that:The follower has two, respectively
It is left follower and right follower, the first follower axis hole is provided among the follower, is set on the first follower axis hole
There is the follower axle, the follower axle both ends after left follower and right follower respectively by being fixed on left directing plate and the right side
On directing plate, the follower both ends are respectively arranged with pulley hole, and pulley is provided with pulley hole, and the follower is that centre has
The long plank shape of certain radian.
3. bomb fast opened docking facilities according to claim 1, it is characterized in that:The connecting shaft both ends pass through respectively
Fixed plate is arranged on left directing plate and right directing plate, and the directing plate is L-type structure, and is disposed with the directing plate
One tie rod holes, second connecting rod hole, the second follower axis hole and third connecting rod hole.
4. bomb fast opened docking facilities according to claim 1, it is characterized in that:The riser has two, sets respectively
Put in the left hand the front and rear end between the right handgrip, the left hand is at the rear end end with the right handgrip
It is provided with certain radian.
5. bomb fast opened docking facilities according to claim 1, it is characterized in that:To set and want on the follower
The powder charge body of docking, powder charge body will utilize the assistance for pushing up traveller instrument that docking, institute is fixed with the projectile tail to be docked
Top traveller kit bracket part, connecting rod and handle are stated, arcuate member and handle are respectively welded at the both ends of connecting rod.
6. bomb fast opened docking facilities according to claim 5, it is characterized in that:The connecting rod include fourth link,
5th connecting rod and six-bar linkage, fourth link one end are connected with handle, and the other end is twisted by the 5th connecting rod and six-bar linkage
Connection is closed, the other end of six-bar linkage is connected with arcuate member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610916605.4A CN106382863B (en) | 2016-10-21 | 2016-10-21 | Bomb fast opened docking facilities |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610916605.4A CN106382863B (en) | 2016-10-21 | 2016-10-21 | Bomb fast opened docking facilities |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106382863A CN106382863A (en) | 2017-02-08 |
CN106382863B true CN106382863B (en) | 2017-11-14 |
Family
ID=57958778
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610916605.4A Active CN106382863B (en) | 2016-10-21 | 2016-10-21 | Bomb fast opened docking facilities |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106382863B (en) |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201834035U (en) * | 2010-07-19 | 2011-05-18 | 凯迈(洛阳)测控有限公司 | Trolley for testing gliding projectile tail capsule |
ES1076246Y (en) * | 2011-01-27 | 2012-05-18 | Embention Sist S Inteligentes S L | SUBSTRUCTURE FOR SUPPORT, TRANSPORTATION AND LAUNCH OF PROJECTILES OR LOADS |
DE102011050282B3 (en) * | 2011-05-11 | 2012-09-13 | Krauss-Maffei Wegmann Gmbh & Co. Kg | Apparatus and method for portioning a propellant charge |
RU2509043C1 (en) * | 2012-11-07 | 2014-03-10 | Открытое акционерное общество "Невское проектно-конструкторское бюро" | Air-delivered munition storage rack |
RU2546728C1 (en) * | 2014-03-13 | 2015-04-10 | Открытое акционерное общество "Невское проектно-конструкторское бюро" | Pressing mechanism for holding aerially dispensed munitions |
CN206192195U (en) * | 2016-10-21 | 2017-05-24 | 中国人民解放军空军第一航空学院 | Bomb interfacing apparatus that unseals fast |
-
2016
- 2016-10-21 CN CN201610916605.4A patent/CN106382863B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106382863A (en) | 2017-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207345880U (en) | A kind of generator conveying arrangement with shock-absorbing function | |
CN106891921A (en) | A kind of damping type transport vehicle | |
CN203332160U (en) | Sport equipment transporting trolley | |
CN206192195U (en) | Bomb interfacing apparatus that unseals fast | |
CN106382863B (en) | Bomb fast opened docking facilities | |
CN102294116A (en) | Breaststroke sliding plate | |
CN205451617U (en) | Catapult | |
CN202289392U (en) | Breaststroke slider | |
CN204230690U (en) | A kind of resistance to compression rain-tight comprehensive distribution box | |
CN208167691U (en) | A kind of gardens lake surface refuse collector | |
CN206454242U (en) | A kind of conveyer of new sports equipment | |
CN209585298U (en) | A kind of large-span prestressed beam-string structure drag-line support welding sphere joints | |
CN209650312U (en) | A kind of rice seedling transport device | |
CN206287119U (en) | A kind of anchor shaft anchor cable storage rack of underground movable | |
CN207624478U (en) | A kind of large size is readily transported formula transformer | |
CN203924860U (en) | X shaped form iron tower of power transmission line | |
CN209156448U (en) | A kind of logistics rapid sorting device | |
CN206963783U (en) | A kind of canned mousetrap | |
CN204684518U (en) | A kind of hand basket placing fire hose and hydraulic giant | |
CN202267413U (en) | Device for setting off flying fireworks and with guide bar | |
CN202785296U (en) | Seven-segment grab bucket special for wood chips | |
CN207956044U (en) | Large-scale quadrotor drone wheel undercarriage | |
CN104032999B (en) | X shaped form iron tower of power transmission line | |
王符 | An Unbalanced Triangle: Discursive Analysis of American Buffalo | |
CN208340072U (en) | Bradyseism nonirrigated farmland traditional type skiing idler wheel training board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |