CN106378890A - Preparation method of rubber sealing component for car - Google Patents

Preparation method of rubber sealing component for car Download PDF

Info

Publication number
CN106378890A
CN106378890A CN201510463764.9A CN201510463764A CN106378890A CN 106378890 A CN106378890 A CN 106378890A CN 201510463764 A CN201510463764 A CN 201510463764A CN 106378890 A CN106378890 A CN 106378890A
Authority
CN
China
Prior art keywords
preparation
time
temperature
rubber seal
turns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510463764.9A
Other languages
Chinese (zh)
Inventor
何俊龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI YOUBAO PLASTIC RUBBER PRODUCT Co Ltd
Original Assignee
SHANGHAI YOUBAO PLASTIC RUBBER PRODUCT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI YOUBAO PLASTIC RUBBER PRODUCT Co Ltd filed Critical SHANGHAI YOUBAO PLASTIC RUBBER PRODUCT Co Ltd
Priority to CN201510463764.9A priority Critical patent/CN106378890A/en
Publication of CN106378890A publication Critical patent/CN106378890A/en
Pending legal-status Critical Current

Links

Landscapes

  • Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)

Abstract

The invention discloses a preparation method of a rubber sealing component for a car; the preparation method of the rubber sealing component for the car includes the steps of mixing, strip cutting, molding, deburring, secondary baking, maintenance, packing, product discharging, and process quality control. The prepared product has high quality, can carry out processizing mass production, and can meet quality requirements of cars, aerospace, bathroom accessories and other industries; the deburring method of the preparation method comprises an automatic deburring machine and burr freezing besides traditional artificial deburring, the deburring technology is improved, and a technical support is provided for ensuring high quality.

Description

The preparation method of automobile rubber seal
Technical field
The present invention relates to a kind of preparation method, more particularly to a kind of preparation method of automobile rubber seal.
Background technology
Rubber seal be widely used in automobile, boat too, the industry such as bathroom, these applications are especially high to security requirement, therefore very strict to the quality requirements of the rubber seal that supplier produces.With the preparation method of traditional view, it is difficult to meet the requirement of client.
Content of the invention
The technical problem to be solved is to provide a kind of preparation method of automobile rubber seal, its product quality is high, procedure batch production can be carried out, disclosure satisfy that automobile, boat too, the quality requirements of the industry such as bathroom, and the method for preparation method burr removing also includes automatic edge demounting machine and freezing burr in addition to Traditional Man tears burr open, improve the technology of burr removing, for ensureing high-quality offer technical support.
The present invention is to solve above-mentioned technical problem by following technical proposals:A kind of preparation method of automobile rubber seal is it is characterised in that the preparation method of described automobile rubber seal comprises the following steps:
Step one, banbury temperature feeds intake and accelerator when rising to 80 DEG C, closes hatch door and starts glue stuff compounding, the activity duration sets 3 minutes;
Step 2, mixing step, takes out sizing material and enters mill mixing, keep bowl temperature to be less than 70 DEG C, prevent sizing material incipient scorch, the activity duration maintains about at 3 minutes;
Step 3, slice cooling is parked;
Step 4, cutting step, carry out cutting operation after sizing material cooling, standard bar is 22.0g again, tolerance is ± 0.5g, and so far sizing material preparation completes;
Step 5, forming step, enter forming machine sulfurating stage, board tonnage is 500 tons, and temperature is set as 174 DEG C, and pressure is set as 200kg/cm2,, cure time is set as 130sec;
Step 6, burr removing step, after after semi-finished product depanning, small lot turns sequence, carry out automatic edge demounting machine burr removing process, speed setting is 20 turns/min, and the time is set as 90sec, completes product and separated with waste wool side, for making product quality more perfect, arrange freezing burr operation further, temperature is set as -90 DEG C, speed setting is 6500 turns/min, time is set as 10min, and particle selection is 45#;
Step 7, two bake;
Step 8, maintenance, shipment.
Preferably, the major parameter of described mixing step is as follows:Banbury temperature keeps below 120 DEG C, and the time is 3~5min, and mill temperature keeps below 70 DEG C, and the time is 3~5min.
Preferably, the major parameter of described forming step is as follows:Temperature is 174~180 DEG C, and pressure is 100~200kg/cm2, the time is 120~200sec.
Preferably, described burr removing step is automatic edge demounting machine technique, and major parameter is as follows:Rotating speed is 20~35 turns/min, and the time is 90sec, and bolter specification is Φ 8mm~Φ 45mm.
Preferably, described burr removing step is freezing burr technique, and major parameter is as follows:Temperature is -90 DEG C, 6000~7000 turns/min of rotating speed, and the time is 10~12min, particle specification 30~45#.
The positive effect of the present invention is:The product quality of present invention preparation is high, procedure batch production can be carried out, disclosure satisfy that automobile, boat too, the quality requirements of the industry such as bathroom, and the method for preparation method burr removing also includes automatic edge demounting machine and freezing burr in addition to Traditional Man tears burr open, improve the technology of burr removing, for ensureing high-quality offer technical support.The quality of production of the present invention is reliable and stable, and production process control ability is strong, focuses on inexpensive theory, and emphasis holds the various demands of client, and the adaptability to changes that demand is changed greatly, can shorten the delivery cycle effectively.
Brief description
Fig. 1 is the flow chart of the preparation method of automobile rubber seal of the present invention.
Specific embodiment
As shown in figure 1, the preparation method of automobile rubber seal of the present invention includes mixing, cutting, molding, burr removing, two roasting, maintenance, packaging, shipment, the several step of process quality control.
The preparation method of automobile rubber seal of the present invention comprises the following steps that:
Step one, banbury temperature feeds intake and accelerator when rising to 80 DEG C, closes hatch door and starts glue stuff compounding, the activity duration sets 3 minutes;
Step 2, mixing step, takes out sizing material and enters mill mixing, keep bowl temperature to be less than 70 DEG C, prevent sizing material incipient scorch, the activity duration maintains about at 3 minutes;
Step 3, slice cooling is parked;
Step 4, cutting step, carry out cutting operation after sizing material cooling, standard bar is 22.0g again, tolerance is ± 0.5g, and so far sizing material preparation completes;
Step 5, forming step, enter forming machine sulfurating stage, board tonnage is 500 tons, and temperature is set as 174 DEG C, and pressure is set as 200kg/cm2,, cure time is set as 130sec;
Step 6, burr removing step, after after semi-finished product depanning, small lot turns sequence, carry out automatic edge demounting machine burr removing process, speed setting is 20 turns/min, and the time is set as 90sec, completes product and separated with waste wool side, for making product quality more perfect, arrange freezing burr operation further, temperature is set as -90 DEG C, speed setting is 6500 turns/min, time is set as 10min, and particle selection is 45#;
Step 7, two bake;
Step 8, maintenance, shipment.
The major parameter of described mixing step is as follows:Banbury temperature keeps below 120 DEG C, and the time is 3~5min, and mill temperature keeps below 70 DEG C, and the time is 3~5min.The major parameter of described forming step is as follows:Temperature is 174~180 DEG C, and pressure is 100~200kg/cm2, the time is 120~200sec.Described burr removing step is automatic edge demounting machine technique, and major parameter is as follows:Rotating speed is 20~35 turns/min, and the time is 90sec, and bolter specification is Φ 8mm~Φ 45mm.Described burr removing step is freezing burr technique, and major parameter is as follows:Temperature is -90 DEG C, 6000~7000 turns/min of rotating speed, and the time is 10~12min, particle specification 30~45#.
Quality of the present invention is high, procedure batch production can be carried out, disclosure satisfy that automobile, boat too, the quality requirements of the industry such as bathroom, and the method for preparation method burr removing also includes automatic edge demounting machine and freezing burr in addition to Traditional Man tears burr open, improve the technology of burr removing, for ensureing high-quality offer technical support.
Those skilled in the art can carry out various remodeling and change to the present invention.Therefore, present invention covers falling into various remodeling and change in the range of appending claims and its equivalent.

Claims (5)

1. a kind of preparation method of automobile rubber seal is it is characterised in that the preparation method of described automobile rubber seal comprises the following steps:
Step one, banbury temperature feeds intake and accelerator when rising to 80 DEG C, closes hatch door and starts glue stuff compounding, the activity duration sets 3 minutes;
Step 2, mixing step, takes out sizing material and enters mill mixing, keep bowl temperature to be less than 70 DEG C, prevent sizing material incipient scorch, the activity duration maintains about at 3 minutes;
Step 3, slice cooling is parked;
Step 4, cutting step, carry out cutting operation after sizing material cooling, standard bar is 22.0g again, tolerance is ± 0.5g, and so far sizing material preparation completes;
Step 5, forming step, enter forming machine sulfurating stage, board tonnage is 500 tons, and temperature is set as 174 DEG C, and pressure is set as 200kg/cm2,, cure time is set as 130sec;
Step 6, burr removing step, after after semi-finished product depanning, small lot turns sequence, carry out automatic edge demounting machine burr removing process, speed setting is 20 turns/min, and the time is set as 90sec, completes product and separated with waste wool side, for making product quality more perfect, arrange freezing burr operation further, temperature is set as -90 DEG C, speed setting is 6500 turns/min, time is set as 10min, and particle selection is 45#;
Step 7, two bake;
Step 8, maintenance, shipment.
2. the preparation method of automobile rubber seal as claimed in claim 1 is it is characterised in that the major parameter of described mixing step is as follows:Banbury temperature keeps below 120 DEG C, and the time is 3~5min, and mill temperature keeps below 70 DEG C, and the time is 3~5min.
3. the preparation method of automobile rubber seal as claimed in claim 1 is it is characterised in that the major parameter of described forming step is as follows:Temperature is 174~180 DEG C, and pressure is 100~200kg/cm2, the time is 120~200sec.
4., it is characterised in that described burr removing step is automatic edge demounting machine technique, major parameter is as follows for the preparation method of automobile rubber seal as claimed in claim 1:Rotating speed is 20~35 turns/min, and the time is 90sec, and bolter specification is Φ 8mm~Φ 45mm.
5., it is characterised in that described burr removing step is freezing burr technique, major parameter is as follows for the preparation method of automobile rubber seal as claimed in claim 1:Temperature is -90 DEG C, 6000~7000 turns/min of rotating speed, and the time is 10~12min, particle specification 30~45#.
CN201510463764.9A 2015-08-02 2015-08-02 Preparation method of rubber sealing component for car Pending CN106378890A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510463764.9A CN106378890A (en) 2015-08-02 2015-08-02 Preparation method of rubber sealing component for car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510463764.9A CN106378890A (en) 2015-08-02 2015-08-02 Preparation method of rubber sealing component for car

Publications (1)

Publication Number Publication Date
CN106378890A true CN106378890A (en) 2017-02-08

Family

ID=57916188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510463764.9A Pending CN106378890A (en) 2015-08-02 2015-08-02 Preparation method of rubber sealing component for car

Country Status (1)

Country Link
CN (1) CN106378890A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108406910A (en) * 2018-02-12 2018-08-17 苏州佳世达电通有限公司 Former and pick and place jig
CN115322588A (en) * 2022-08-19 2022-11-11 成都鸿图超越工程技术有限公司 Preparation method of sealing element of sensor of Internet of things
CN116080098A (en) * 2023-01-08 2023-05-09 广东贝洛新材料科技有限公司 Pipe cutting process after mould pressing

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102010533A (en) * 2010-11-29 2011-04-13 江苏兴华胶带股份有限公司 Method for preparing cellular structure rubber elastomer
CN103289146A (en) * 2013-04-26 2013-09-11 焦作市万瑞轮胎辅料有限公司 Rotary-shaft-shaped rubber sealing ring and production technology thereof
CN104086902A (en) * 2014-07-02 2014-10-08 安徽宁国尚鼎橡塑制品有限公司 High-temperature-resistant rubber sealing ring for automobiles
CN104403147A (en) * 2014-11-04 2015-03-11 陕西科隆能源科技有限公司 Preparation process of ultralow-temperature-resistant mixing material
CN104893117A (en) * 2015-05-11 2015-09-09 苏州国泰科技发展有限公司 Production technology of low-hardness rubber sealing elements for automobile shock absorbers

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102010533A (en) * 2010-11-29 2011-04-13 江苏兴华胶带股份有限公司 Method for preparing cellular structure rubber elastomer
CN103289146A (en) * 2013-04-26 2013-09-11 焦作市万瑞轮胎辅料有限公司 Rotary-shaft-shaped rubber sealing ring and production technology thereof
CN104086902A (en) * 2014-07-02 2014-10-08 安徽宁国尚鼎橡塑制品有限公司 High-temperature-resistant rubber sealing ring for automobiles
CN104403147A (en) * 2014-11-04 2015-03-11 陕西科隆能源科技有限公司 Preparation process of ultralow-temperature-resistant mixing material
CN104893117A (en) * 2015-05-11 2015-09-09 苏州国泰科技发展有限公司 Production technology of low-hardness rubber sealing elements for automobile shock absorbers

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘印文;刘振华: "第八章 橡胶密封制品的修整及再生技术", 《橡胶密封制品实用加工技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108406910A (en) * 2018-02-12 2018-08-17 苏州佳世达电通有限公司 Former and pick and place jig
CN115322588A (en) * 2022-08-19 2022-11-11 成都鸿图超越工程技术有限公司 Preparation method of sealing element of sensor of Internet of things
CN116080098A (en) * 2023-01-08 2023-05-09 广东贝洛新材料科技有限公司 Pipe cutting process after mould pressing

Similar Documents

Publication Publication Date Title
CN103991217B (en) A kind of 3D printing forming method
CN106378890A (en) Preparation method of rubber sealing component for car
CN102626996A (en) Forming technology and preparation method of bicolor sole
CN203816583U (en) Continuous granulation system of waste tire pyrolytic carbon black
WO2011085535A1 (en) Pet bottle lid and manufacturing method thereof
US20090166928A1 (en) Method and apparatus for molding roofing products with back gating
CN105619640A (en) Preparation method for thermoplastic powdery paint
CN106147049A (en) A kind of pressure pot rubber liner and preparation method thereof
CN101787177A (en) Blue phenolic moulding plastic and preparation method thereof
CN204209858U (en) Novel air-cooled granulating system
CN103418795A (en) Micro-sealing method using vacuum and high pressure
CN103756165A (en) Preparation method of rubber softwood material
CN110216854A (en) A kind of processing technology of blister packaging
CN109514786B (en) Polytetrafluoroethylene powder forming machine and forming method thereof
CN204640591U (en) A kind of feed hopper being convenient to charging
CN101935422A (en) One-step sulphurating rubber-refining method
CN102558745A (en) Processing modifier for acrylonitrile-butadiene-styrene/polycarbonate (ABS/PC) alloy waste injection plastic and using method for processing modifier
CN101497222A (en) Non-isothermal vulcanizing method for curing bladder
CN107774885A (en) The preparation method of anti-sintering precoated sand
CN102528961A (en) Method for polypropylene waste film filament material mixed refining aggregate processing
CN108215041A (en) A kind of production method with chipware thick rubber products
CN102205593A (en) Method for preparing rubber stopper without die-splitting side
CN103980571A (en) Impact and high temperature resistant rubber material, production method and preparation method thereof
CN207072565U (en) Produce the anti-bridge formation hopper of functional master batch
CN208615271U (en) A kind of wood-plastic board extruder easy to use

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170208

WD01 Invention patent application deemed withdrawn after publication