CN106372451B - 电力需量计算方法 - Google Patents
电力需量计算方法 Download PDFInfo
- Publication number
- CN106372451B CN106372451B CN201610993051.8A CN201610993051A CN106372451B CN 106372451 B CN106372451 B CN 106372451B CN 201610993051 A CN201610993051 A CN 201610993051A CN 106372451 B CN106372451 B CN 106372451B
- Authority
- CN
- China
- Prior art keywords
- demand
- load
- metering point
- month
- demand metering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G16—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
- G16Z—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
- G16Z99/00—Subject matter not provided for in other main groups of this subclass
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
一种电力需量计算方法,涉及电力系统技术领域,所解决的是降低客户用电成本的技术问题。该方法先获取每个需量计量点在当前月的负荷信息,再获取参考月中具有最大需量值的需量计量点的负荷信息作为参考样本,再找出转移变化率最小的可接入需量计量点实施负荷转移,然后再对参考月的历史负荷值进行更新,然后再计算负荷转移后每个需量计量点在参考月的每日最大负荷值及每个需量计量点在参考月中的日负荷最大值;然后再计算出每个需量计量点在参考月的月最大负荷值,再根据计算结果计算出下一个周期可申报的实际月最大需量。本发明提供的方法,能有效减小月最大电力需量。
Description
技术领域
本发明涉及电力系统技术,特别是涉及一种电力需量计算方法的技术。
背景技术
电力需量是指一个规定时间间隔内的功率平均值,最大电力需量是指在规定的时间周期内所记录的电力需量最大值。采用最大电力需量计算基本电费的计费方式, 可以促进大工业用户调节用电负荷,能平衡负荷,压缩尖峰负荷,保持当地电压稳定,也可促进用户少支出基本电费,是提高企业经济效益的措施之一。
当同一个变压器的大工业用户的计量线路电表数目超过1个时,其电力需量是多块电表分别计算,然后总加。合理分布负荷,可以减少总的需量值,提高用户的设备使用效率,减少线路最大负载,降低用电成本。但是目前还没有行之有效的电力需量计算法。
发明内容
针对上述现有技术中存在的缺陷,本发明所要解决的技术问题是提供一种能有效减小月最大电力需量,降低客户用电成本的电力需量计算方法。
为了解决上述技术问题,本发明所提供的一种电力需量计算方法,其特征在于,具体步骤如下:
1)获取每个需量计量点在当前月的负荷信息,并将负荷信息划分为可转移负荷Lz及不可转移负荷Luz两类;
如果一个负荷除了当前为其供电的需量计量点之外,还能由其他的需量计量点为其供电,则将该负荷归入可转移负荷Lz类;
如果一个负荷只能由当前为其供电的需量计量点进行供电,则将该负荷归入不可转移负荷Luz类;
2)选取当前月以前的任意一个历史月作为参考月,选出参考月中具有最大需量值的需量计量点i,获取需量计量点i在参考月的最大需量值Pmax.i,并从需量计量点i在参考月的负荷信息中,选出需量值在最大需量值Pmax.i的80%以上的负荷信息,并对选出的负荷信息按照每间隔5分钟一个数据点的方式进行分解,分解公式为:
Px(i,t) = Lz(i,t)+Luz(i,t)
其中,Px(i,t)为需量计量点i在参考月的t时刻的负荷值,Lz(i,t)为需量计量点i在参考月的t时刻的可转移负荷的负荷值,Luz(i,t)为需量计量点i在参考月的t时刻的不可转移负荷的负荷值;
3)每间隔1440分钟,把需量计量点i中负荷值最大的可转移负荷分别纳入其他可接入的需量计量点,并计算各个可接入需量计量点的转移变化率,找出转移变化率最小的可接入需量计量点m,可接入需量计量点的转移变化率的计算公式如下:
f(j,t) = Py(j,t) / Pmax.j
Py(j,t) = Lz(j,t) + Luz(j,t) + Lz1(i,t)
其中,f(j,t)为需量计量点j在参考月的t时刻的转移变化率,Pmax.j为需量计量点j在参考月的最大需量值,Py(j,t)为需量计量点j在参考月的t时刻的负荷值,Lz(j,t)为需量计量点j在参考月的t时刻的可转移负荷的负荷值,Luz(j,t)为需量计量点j在参考月的t时刻的不可转移负荷的负荷值,Lz1(i,t)为需量计量点i中的在参考月的t时刻具有最大负荷值的可转移负荷的负荷值;
4)实施负荷转移,将需量计量点i中负荷值最大的可转移负荷纳入可接入需量计量点m,并对参考月的历史负荷值进行更新,令:
Px(i,t) = Luz(i,t) + Lz(i,t) - Lz1(i,t)
Px(m,t) = Luz(m,t) + Lz(m,t) + Lz1(i,t)
其中,Px(m,t)为需量计量点m在参考月的t时刻的负荷值,Lz(m,t)为需量计量点m在参考月的t时刻的可转移负荷的负荷值,Luz(m,t)为需量计量点m在参考月的t时刻的不可转移负荷的负荷值;
5)以15分钟为间隔,将参考月中的每天分成96个计算时间点,计算经步骤4的负荷转移后,每个需量计量点在参考月的每日最大负荷值,及每个需量计量点在参考月中的日负荷最大值;
6)根据每个需量计量点在参考月的每日最大负荷值,计算出每个需量计量点在参考月的月最大负荷值,并将计算结果作为需量计量点i在当前月的月最大需量估算值PXmax.i;
7)计算下一个周期可申报的实际月最大需量,具体计算公式为:
MDy = MDx-△P
△P=Pmax.i-PXmax.i
其中,MDy为需量计量点i的下一个周期可申报的实际月最大需量,MDx为需量计量点i的下一个周期需要申报的月最大需量。
本发明提供的电力需量计算方法,从月最大需量的计量点出发,找到可转移的最大负荷线路,进行负荷转移,重新计算每月的最大负荷,求出每月的最大需量,能有效减小月最大电力需量,降低客户用电成本。
附图说明
图1是本发明实施例的电力需量计算方法的流程图。
具体实施方式
以下结合附图说明对本发明的实施例作进一步详细描述,但本实施例并不用于限制本发明,凡是采用本发明的相似结构及其相似变化,均应列入本发明的保护范围,本发明中的顿号均表示和的关系。
如图1所示,本发明实施例所提供的一种电力需量计算方法,其特征在于,具体步骤如下:
1)获取每个需量计量点在当前月的负荷信息,并将负荷信息划分为可转移负荷Lz及不可转移负荷Luz两类;
如果一个负荷除了当前为其供电的需量计量点之外,还能由其他的需量计量点为其供电,则将该负荷归入可转移负荷Lz类;
如果一个负荷只能由当前为其供电的需量计量点进行供电,则将该负荷归入不可转移负荷Luz类;
2)选取当前月以前的任意一个历史月作为参考月,选出参考月中具有最大需量值的需量计量点i,获取需量计量点i在参考月的最大需量值Pmax.i,并从需量计量点i在参考月的负荷信息中,选出需量值在最大需量值Pmax.i的80%以上的负荷信息,并对选出的负荷信息按照每间隔5分钟一个数据点的方式进行分解,分解公式为:
Px(i,t) = Lz(i,t)+Luz(i,t)
其中,Px(i,t)为需量计量点i在参考月的t时刻的负荷值,Lz(i,t)为需量计量点i在参考月的t时刻的可转移负荷的负荷值,Luz(i,t)为需量计量点i在参考月的t时刻的不可转移负荷的负荷值;
3)每间隔1440分钟,把需量计量点i中负荷值最大的可转移负荷分别纳入其他可接入的需量计量点,并计算各个可接入需量计量点的转移变化率,找出转移变化率最小的可接入需量计量点m,可接入需量计量点的转移变化率的计算公式如下:
f(j,t) = Py(j,t) / Pmax.j
Py(j,t) = Lz(j,t) + Luz(j,t) + Lz1(i,t)
其中,f(j,t)为需量计量点j在参考月的t时刻的转移变化率,Pmax.j为需量计量点j在参考月的最大需量值,Py(j,t)为需量计量点j在参考月的t时刻的负荷值,Lz(j,t)为需量计量点j在参考月的t时刻的可转移负荷的负荷值,Luz(j,t)为需量计量点j在参考月的t时刻的不可转移负荷的负荷值,Lz1(i,t)为需量计量点i中的在参考月的t时刻具有最大负荷值的可转移负荷的负荷值;
4)实施负荷转移,将需量计量点i中负荷值最大的可转移负荷纳入可接入需量计量点m,并对参考月的历史负荷值进行更新,令:
Px(i,t) = Luz(i,t) + Lz(i,t) - Lz1(i,t)
Px(m,t) = Luz(m,t) + Lz(m,t) + Lz1(i,t)
其中,Px(m,t)为需量计量点m在参考月的t时刻的负荷值,Lz(m,t)为需量计量点m在参考月的t时刻的可转移负荷的负荷值,Luz(m,t)为需量计量点m在参考月的t时刻的不可转移负荷的负荷值;
使得需量计量点m的可转移负荷的负荷值变为Lz1(i,t) + Lz(m,t),需量计量点i的可转移负荷的负荷值变为Lz(i,t) - Lz1(i,t);
5)以15分钟为间隔,将参考月中的每天分成96个计算时间点,计算经步骤4的负荷转移后,每个需量计量点在参考月的每日最大负荷值,及每个需量计量点在参考月中的日负荷最大值;
6)根据每个需量计量点在参考月的每日最大负荷值,计算出每个需量计量点在参考月的月最大负荷值,并将计算结果作为需量计量点i在当前月的月最大需量估算值PXmax.i;
7)计算下一个周期可申报的实际月最大需量,具体计算公式为:
MDy = MDx-△P
△P=Pmax.i-PXmax.i
其中,MDy为需量计量点i的下一个周期可申报的实际月最大需量,MDx为需量计量点i的下一个周期需要申报的月最大需量。
Claims (1)
1.一种电力需量计算方法,其特征在于,具体步骤如下:
1)获取每个需量计量点在当前月的负荷信息,并将负荷信息划分为可转移负荷Lz及不可转移负荷Luz两类;
如果一个负荷除了当前为其供电的需量计量点之外,还能由其他的需量计量点为其供电,则将该负荷归入可转移负荷Lz类;
如果一个负荷只能由当前为其供电的需量计量点进行供电,则将该负荷归入不可转移负荷Luz类;
2)选取当前月以前的任意一个历史月作为参考月,选出参考月中具有最大需量值的需量计量点i,获取需量计量点i在参考月的最大需量值Pmax.i,并从需量计量点i在参考月的负荷信息中,选出需量值在最大需量值Pmax.i的80%以上的负荷信息,并对选出的负荷信息按照每间隔5分钟一个数据点的方式进行分解,分解公式为:
Px(i,t) = Lz(i,t)+Luz(i,t)
其中,Px(i,t)为需量计量点i在参考月的t时刻的负荷值,Lz(i,t)为需量计量点i在参考月的t时刻的可转移负荷的负荷值,Luz(i,t)为需量计量点i在参考月的t时刻的不可转移负荷的负荷值;
3)每间隔1440分钟,把需量计量点i中负荷值最大的可转移负荷分别纳入其他可接入的需量计量点,并计算各个可接入需量计量点的转移变化率,找出转移变化率最小的可接入需量计量点m,可接入需量计量点的转移变化率的计算公式如下:
f(j,t) = Py(j,t) / Pmax.j
Py(j,t) = Lz(j,t) + Luz(j,t) + Lz1(i,t)
其中,f(j,t)为需量计量点j在参考月的t时刻的转移变化率,Pmax.j为需量计量点j在参考月的最大需量值,Py(j,t)为需量计量点j在参考月的t时刻的负荷值,Lz(j,t)为需量计量点j在参考月的t时刻的可转移负荷的负荷值,Luz(j,t)为需量计量点j在参考月的t时刻的不可转移负荷的负荷值,Lz1(i,t)为需量计量点i中的在参考月的t时刻具有最大负荷值的可转移负荷的负荷值;
4)实施负荷转移,将需量计量点i中负荷值最大的可转移负荷纳入可接入需量计量点m,并对参考月的历史负荷值进行更新,令:
Px(i,t) = Luz(i,t) + Lz(i,t) - Lz1(i,t)
Px(m,t) = Luz(m,t) + Lz(m,t) + Lz1(i,t)
其中,Px(m,t)为需量计量点m在参考月的t时刻的负荷值,Lz(m,t)为需量计量点m在参考月的t时刻的可转移负荷的负荷值,Luz(m,t)为需量计量点m在参考月的t时刻的不可转移负荷的负荷值;
5)以15分钟为间隔,将参考月中的每天分成96个计算时间点,计算经步骤4的负荷转移后,每个需量计量点在参考月的每日最大负荷值,及每个需量计量点在参考月中的日负荷最大值;
6)根据每个需量计量点在参考月的每日最大负荷值,计算出每个需量计量点在参考月的月最大负荷值,并将计算结果作为需量计量点i在当前月的月最大需量估算值PXmax.i;
7)计算下一个周期可申报的实际月最大需量,具体计算公式为:
MDy = MDx-△P
△P=Pmax.i-PXmax.i
其中,MDy为需量计量点i的下一个周期可申报的实际月最大需量,MDx为需量计量点i的下一个周期需要申报的月最大需量。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610993051.8A CN106372451B (zh) | 2016-11-11 | 2016-11-11 | 电力需量计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610993051.8A CN106372451B (zh) | 2016-11-11 | 2016-11-11 | 电力需量计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106372451A CN106372451A (zh) | 2017-02-01 |
CN106372451B true CN106372451B (zh) | 2020-11-06 |
Family
ID=57894629
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610993051.8A Active CN106372451B (zh) | 2016-11-11 | 2016-11-11 | 电力需量计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106372451B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109740853B (zh) * | 2018-12-05 | 2021-01-05 | 新奥数能科技有限公司 | 一种用电需量分析方法、装置、可读介质及电子设备 |
CN115856422B (zh) * | 2023-02-27 | 2023-06-06 | 中电装备山东电子有限公司 | 一种电能表需量计算方法及系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102208807A (zh) * | 2011-01-25 | 2011-10-05 | 中国电力科学研究院 | 基于精确量测负荷数据的中低压配电网能效评估方法 |
CN103208085A (zh) * | 2012-12-31 | 2013-07-17 | 苏州太谷能源管理股份有限公司 | 企业用电提高负荷率与降低最大需量的分析智能系统 |
CN103870886A (zh) * | 2014-03-03 | 2014-06-18 | 上海申瑞继保电气有限公司 | 企业用电月最大需量的预测方法 |
US20140330442A1 (en) * | 2011-11-10 | 2014-11-06 | Kabushiki Kaisha Toshiba | Operation planning system and method for creating operation plan |
CN105023114A (zh) * | 2015-08-12 | 2015-11-04 | 上海申瑞继保电气有限公司 | 多用户电力用户端的负荷需量费用分摊方法 |
-
2016
- 2016-11-11 CN CN201610993051.8A patent/CN106372451B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102208807A (zh) * | 2011-01-25 | 2011-10-05 | 中国电力科学研究院 | 基于精确量测负荷数据的中低压配电网能效评估方法 |
US20140330442A1 (en) * | 2011-11-10 | 2014-11-06 | Kabushiki Kaisha Toshiba | Operation planning system and method for creating operation plan |
CN103208085A (zh) * | 2012-12-31 | 2013-07-17 | 苏州太谷能源管理股份有限公司 | 企业用电提高负荷率与降低最大需量的分析智能系统 |
CN103870886A (zh) * | 2014-03-03 | 2014-06-18 | 上海申瑞继保电气有限公司 | 企业用电月最大需量的预测方法 |
CN105023114A (zh) * | 2015-08-12 | 2015-11-04 | 上海申瑞继保电气有限公司 | 多用户电力用户端的负荷需量费用分摊方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106372451A (zh) | 2017-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Nagarajan et al. | Design and strategy for the deployment of energy storage systems in a distribution feeder with penetration of renewable resources | |
Dzobo et al. | Investigating the use of probability distribution functions in reliability-worth analysis of electric power systems | |
WO2014092821A1 (en) | Systems and methods for minimizing energy costs for a power consumption system that has access to off-grid resources | |
Ibrahim et al. | System wide MV distribution network technical losses estimation based on reference feeder and energy flow model | |
US10496060B2 (en) | Power management system and method for power management | |
US20170271915A1 (en) | Energy Demand Monitoring System and Smart micro-Grid Controller | |
AU2013234386A1 (en) | Method and system for demand response management | |
CN104156893A (zh) | 一种基于虚拟储能技术的峰谷时段计算方法 | |
CN106372451B (zh) | 电力需量计算方法 | |
JP2015015865A (ja) | サーバ装置及び電力需給制御方法 | |
KR101961703B1 (ko) | Ess의 운영장치 및 그 운영방법 | |
KR101163561B1 (ko) | 실시간 전기요금 표시 장치 및 그 방법 | |
CN103413217A (zh) | 预付费系统的控制方法及控制装置 | |
Härtel et al. | Cost assessment of storage options in a region with a high share of network congestions | |
CN107392442B (zh) | 低压变电所用户能耗评估方法 | |
Kersting et al. | Load allocation based upon automatic meter readings | |
Abud et al. | A modified Bass model to calculate PVDG hosting capacity in LV networks | |
CN103185834A (zh) | 电子式电能表和用于存储其数据的方法 | |
KR101744576B1 (ko) | 중소형 분산 에너지 저장장치를 활용한 소비 전력 운영 시스템 | |
CN104332994A (zh) | 配电网的供电平衡方法 | |
CN110045196B (zh) | 高压供电线路管理线损排查方法 | |
CN104766226A (zh) | 一种基于分时电价策略的电网安全稳定计算方法 | |
Dong et al. | A research of real-time pricing mechanism and its characteristics | |
JP5777839B1 (ja) | 発電量推定装置および発電量推定方法 | |
Keyhani et al. | Real-time simulation of demand side management and vehicle to grid power flow in a smart distribution grid |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Chang Inventor after: Dai Lijun Inventor before: Li Chang |
|
GR01 | Patent grant | ||
GR01 | Patent grant |