CN104156893A - 一种基于虚拟储能技术的峰谷时段计算方法 - Google Patents

一种基于虚拟储能技术的峰谷时段计算方法 Download PDF

Info

Publication number
CN104156893A
CN104156893A CN201410407964.8A CN201410407964A CN104156893A CN 104156893 A CN104156893 A CN 104156893A CN 201410407964 A CN201410407964 A CN 201410407964A CN 104156893 A CN104156893 A CN 104156893A
Authority
CN
China
Prior art keywords
power
peak
load
virtual energy
energy storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410407964.8A
Other languages
English (en)
Inventor
於砚福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410407964.8A priority Critical patent/CN104156893A/zh
Publication of CN104156893A publication Critical patent/CN104156893A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种基于虚拟储能技术的峰谷时段计算方法,由电力用户智能电表获取用户信息及历史负荷数据;计算电力用户年用电负荷在24个时段分布权重;计算电力用户月用电负荷在24个时段分布权重;计算电力用户周用电负荷在24个时段分布权重;根据电力用户年、月、周用电负荷在24个时段分布权重,预测电力用户日24个时段尖峰平谷用电负荷分布;将电力用户日24个尖锋谷平用电负荷预测时段作为虚拟储能控制技术的用电参数,对用电负荷进行错峰控制。本发明实现了电力用户峰谷时段精准预测,利用虚拟储能控制技术,可有效降低电网峰段用电量,提高电网谷段用电量,使电网削峰填谷效率最大化。

Description

一种基于虚拟储能技术的峰谷时段计算方法
技术领域
[0001] 本发明属于电力电网技术领域,尤其涉及一种基于虚拟储能技术的峰谷时段计算 的方法。
背景技术
[0002] 目前公知的用电负荷峰谷时段是电力系统根据总负荷曲线的变化规律总结设定 的,用电负荷峰谷时段无法做的精准,对各区域电网误差是难以避免的,造成区域削峰填谷 效果针对性较差。
[0003] 需求侧管理:在政府法规和政策的支持下,采取有效的激励和引导措施以及适宜 的运作方式,通过发电公司、电网公司、能源服务公司、社会中介组织、产品供应商、电力用 户等共同协力,提高终端用电效率和改变用电方式,在满足同样用电功能的同时减少电量 消耗和电力需求,达到节约资源和保护环境,实现社会效益最好、各方受益、最低成本能源 服务所进行的管理活动。
[0004] 削峰填谷:把一部分高峰负荷挪到低谷时段,从而减少电网运行的峰谷负荷差,实 现了节约能源的目的。
[0005] 虚拟储能技术:是一种基于电力需求侧管理和峰谷电价策略,通过智能电网实现 的提高用电设备谷段用电量,减少尖、峰段用电量的负荷能量管理技术。包括错峰关断、错 峰调压、错峰调参三种控制方式。
发明内容
[0006] 本发明实施例的目的在于提供一种基于虚拟储能技术的峰谷时段计算的方法,旨 在解决目前公知的用电负荷峰谷时段是电力系统根据总负荷曲线的变化规律总结设定的, 用电负荷峰谷时段无法做的精准,对各区域电网误差是难以避免的,造成区域削峰填谷效 果针对性较差的问题。
[0007] 本发明实施例是这样实现的,一种基于虚拟储能技术的峰谷时段计算方法,该基 于虚拟储能技术的峰谷时段计算方法包括:
[0008] 步骤一,由电力用户智能电表获取用户信息及历史负荷数据;
[0009] 步骤二,计算电力用户年用电负荷在24个时段分布权重,其计算公式为:
[0010]
Figure CN104156893AD00031
[0011] 步骤三,计算电力用户月用电负荷在24个时段分布权重,其计算公式为:
[0012]
Figure CN104156893AD00032
[0013] 步骤四,计算电力用户周用电负荷在24个时段分布权重,其计算公式为:
[0014]
Figure CN104156893AD00041
[0015] 步骤五,根据电力用户年、月、周用电负荷在24个时段分布权重,预测电力用户日 24个时段尖峰平谷用电负荷分布;
[0016] 步骤六,将电力用户日24个尖锋谷平用电负荷预测时段作为虚拟储能控制技术 的用电参数,对用电负荷进行错峰控制;
[0017] 进一步,由电力用户智能电表获取用户信息及历史负荷数据。
[0018] 进一步,用电负荷按照年、月、周统计计算。
[0019] 进一步,用电负荷按照24各时段计算负荷分布。
[0020] 进一步,根据电力用户年、月、周用电负荷在24个时段分布权重,预测电力用户日 24个时段尖峰平谷用电负荷分布。
[0021] 进一步,将电力用户日24个尖锋谷平用电负荷预测时段作为虚拟储能控制技术 的用电参数,对用电负荷进行错峰控制。
[0022] 本发明提供的基于虚拟储能技术的峰谷时段计算方法,通过电力用户智能电表获 取用户信息及历史负荷数据,并结合年、月、周用电负荷在24个时段分布权重,预测电力用 户日24个时段尖峰平谷用电负荷分布,实现了区域电网峰谷时段的精准预测,有利于通过 虚拟储能技术,定向降低电网峰段用电量,提高电网谷段用电量,从而实现节能降耗的目 的。
附图说明
[0023] 图1是本发明实施例提供的基于虚拟储能技术的峰谷时段计算方法流程图;
[0024] 图2是本发明实施例提供的基于虚拟储能技术的峰谷时段数据结构图;
具体实施方式
[0025] 为了使本发明的目的、技术方案及优点更加清楚明白,以下结合实施例,对本发明 进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于 限定本发明。
[0026] 下面结合附图及具体实施例对本发明的应用原理作进一步描述。
[0027] 如图1所示,本发明实施例的基于虚拟储能技术的峰谷时段计算方法包括以下步 骤:
[0028] S101 :由电力用户智能电表获取用户信息及历史负荷数据;
[0029] S102 :计算电力用户年用电负荷在24个时段分布权重,其计算公式为:
[00301
Figure CN104156893AD00042
[0031] S103:计算电力用户月用电负荷在24个时段分布权重,其计算公式为:
[0032]
Figure CN104156893AD00051
[0033] S104 :计算电力用户周用电负荷在24个时段分布权重,其计算公式为:
[00341
Figure CN104156893AD00052
[0035] S105 :根据电力用户年、月、周用电负荷在24个时段分布权重,预测电力用户日24 个时段尖峰平谷用电负荷分布;
[0036] S106 :将电力用户日24个尖锋谷平用电负荷预测时段作为虚拟储能控制技术的 用电参数,对用电负荷进行错峰控制;
[0037] 本发明的具体实施例:
[0038] 如图2所示,为居民用电类的智能电表按照24个时段预测的尖锋谷平用电负荷分 布。该电力用户根据年、月、周用电负荷在24个时段分布权重,分别以30 %、30 %、40 %权重 比例预测的电力用户日24个时段尖峰平谷用电负荷分布如下表。步骤S106将电力用户日 24个尖锋谷平用电负荷预测时段作为虚拟储能控制技术的用电参数,对用电负荷进行错峰 控制。
[0039]
Figure CN104156893AD00061
[0040] 以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精 神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。

Claims (6)

1. 一种基于虚拟储能技术的峰谷时段计算方法,其特征在于,该基于虚拟储能技术的 峰谷时段计算方法包括: 步骤一,由电力用户智能电表获取用户信息及历史负荷数据; 步骤二,计算电力用户年用电负荷在24个时段分布权重; 步骤三,计算电力用户月用电负荷在24个时段分布权重; 步骤四,计算电力用户周用电负荷在24个时段分布权重; 步骤五,根据电力用户年、月、周用电负荷在24个时段分布权重,预测电力用户日24个 时段尖峰平谷用电负荷分布; 步骤六,将电力用户日24个尖锋谷平用电负荷预测时段作为虚拟储能控制技术的用 电参数,对用电负荷进行错峰控制。
2. 如权利要求1所述的基于虚拟储能技术的峰谷时段计算方法,其特征在于,由电力 用户智能电表获取用户信息及历史负荷数据。
3. 如权利要求1所述的基于虚拟储能技术的峰谷时段计算方法,其特征在于,用电负 荷按照年、月、周统计计算。
4. 如权利要求1所述的基于虚拟储能技术的峰谷时段计算方法,其特征在于,用电负 荷按照24个时段计算用电负荷分布。
5. 如权利要求1所述的基于虚拟储能技术的峰谷时段计算的方法,其特征在于,步骤 五根据电力用户年、月、周用电负荷在24个时段分布权重,预测电力用户日24个时段尖峰 平谷用电负荷分布。
6. 如权利要求1所述的基于虚拟储能技术的峰谷时段计算方法,其特征在于,步骤六, 将电力用户日24个尖锋谷平用电负荷预测时段作为虚拟储能控制技术的用电参数,对用 电负荷进行错峰控制。
CN201410407964.8A 2014-08-19 2014-08-19 一种基于虚拟储能技术的峰谷时段计算方法 Pending CN104156893A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410407964.8A CN104156893A (zh) 2014-08-19 2014-08-19 一种基于虚拟储能技术的峰谷时段计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410407964.8A CN104156893A (zh) 2014-08-19 2014-08-19 一种基于虚拟储能技术的峰谷时段计算方法

Publications (1)

Publication Number Publication Date
CN104156893A true CN104156893A (zh) 2014-11-19

Family

ID=51882384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410407964.8A Pending CN104156893A (zh) 2014-08-19 2014-08-19 一种基于虚拟储能技术的峰谷时段计算方法

Country Status (1)

Country Link
CN (1) CN104156893A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105004061A (zh) * 2015-07-20 2015-10-28 国网天津市电力公司 一种电热水器错峰调参控制系统及其负荷管理的方法
CN105004136A (zh) * 2015-07-20 2015-10-28 国网天津市电力公司 一种电冰箱错峰调参控制系统及其用电负荷预测管理方法
CN105023062A (zh) * 2015-07-20 2015-11-04 国网天津市电力公司 一种基于峰谷时段的用电负荷权重管理系统及方法
CN105046360A (zh) * 2015-07-20 2015-11-11 国网天津市电力公司 基于峰谷时段用电负荷权重管理系统及峰谷时段管理方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102567412A (zh) * 2010-12-31 2012-07-11 上海久隆信息工程有限公司 一种计算机辅助电网负荷分析的信息处理方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102567412A (zh) * 2010-12-31 2012-07-11 上海久隆信息工程有限公司 一种计算机辅助电网负荷分析的信息处理方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
乔慧婷: ""基于密度聚类的峰谷时段划分方法研究"", 《中国优秀硕士学位论文全文数据库 经济与管理科学辑》 *
李虹 等: ""分时电价峰谷时段划分方法研究"", 《中国电业(技术版)》 *
霍成军: ""电力系统负荷特性分析研究"", 《中国优秀硕士学位论文全文数据库 信息科技II辑》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105004061A (zh) * 2015-07-20 2015-10-28 国网天津市电力公司 一种电热水器错峰调参控制系统及其负荷管理的方法
CN105004136A (zh) * 2015-07-20 2015-10-28 国网天津市电力公司 一种电冰箱错峰调参控制系统及其用电负荷预测管理方法
CN105023062A (zh) * 2015-07-20 2015-11-04 国网天津市电力公司 一种基于峰谷时段的用电负荷权重管理系统及方法
CN105046360A (zh) * 2015-07-20 2015-11-11 国网天津市电力公司 基于峰谷时段用电负荷权重管理系统及峰谷时段管理方法

Similar Documents

Publication Publication Date Title
Evangelopoulos et al. Optimal operation of smart distribution networks: A review of models, methods and future research
Bennett et al. Development of a three-phase battery energy storage scheduling and operation system for low voltage distribution networks
US20140005852A1 (en) Reduction of operational cost using energy storage management and demand response
Sui et al. A demand side management model based on advanced metering infrastructure
Zhong et al. Demand side management in China
CN104134169A (zh) 一种基于峰谷时段用电负荷权重的计算方法
CN104156893A (zh) 一种基于虚拟储能技术的峰谷时段计算方法
Yang et al. Investigation of the potential to improve DC fast charging station economics by integrating photovoltaic power generation and/or local battery energy storage system
CN105389645A (zh) 基于电力、电量和调峰平衡的供需平衡分析方法及系统
Anand et al. A real time pricing strategy for remote micro-grid with economic emission dispatch and stochastic renewable energy sources
Dabur et al. Electricity demand side management: Various concept and prospects
CN104680253A (zh) 基于可靠性与经济性相协调的配电网规划投资优化方法
CN104598999A (zh) 一种计及可靠性的配电网分时电价优化方法
Yang et al. Parallel autonomous optimization of demand response with renewable distributed generators
CN104716693A (zh) 一种分布式储能电池的能量管理方法及控制器、系统
Li et al. PV integration in Low-Voltage feeders with Demand Response
KR20130074045A (ko) 마이크로그리드 기반의 수용가 에너지 관리 방법 및 시스템
CN105740962A (zh) 一种配电网可靠性优化决策方法
Hau et al. Active control strategy of energy storage system for reducing maximum demand charges under limited storage capacity
CN105046360A (zh) 基于峰谷时段用电负荷权重管理系统及峰谷时段管理方法
Raoufat et al. Model predictive BESS control for demand charge management and PV-utilization improvement
Menniti et al. Nanogrids for home application in a power cloud framework
Li et al. A bottom-up assessment method of demand response potential
CN104484711A (zh) 考虑用户不满意度的家用设备调度方法
Chang et al. Demand response and ancillary service management using fractional-order integral indicator and dynamic game model for an aggregator program in smart grids

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
CB02 Change of applicant information

Address after: 300010 Tianjin city Hebei District Wujing Road No. 39

Applicant after: State Grid Corporation of China

Applicant after: State Grid Tianjin Electric Power Company

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: State Grid Tianjin Electric Power Company

C53 Correction of patent for invention or patent application
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141119

RJ01 Rejection of invention patent application after publication