CN106371053A - Single-phase electric energy meter debugging device - Google Patents

Single-phase electric energy meter debugging device Download PDF

Info

Publication number
CN106371053A
CN106371053A CN201610956007.XA CN201610956007A CN106371053A CN 106371053 A CN106371053 A CN 106371053A CN 201610956007 A CN201610956007 A CN 201610956007A CN 106371053 A CN106371053 A CN 106371053A
Authority
CN
China
Prior art keywords
relay
standard scale
debugging
voltage
electric energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610956007.XA
Other languages
Chinese (zh)
Inventor
张欢
李维晴
刘其君
陈平
方明勇
俞银辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Sanxing Medical and Electric Co Ltd
Original Assignee
Ningbo Sanxing Medical and Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Sanxing Medical and Electric Co Ltd filed Critical Ningbo Sanxing Medical and Electric Co Ltd
Priority to CN201610956007.XA priority Critical patent/CN106371053A/en
Publication of CN106371053A publication Critical patent/CN106371053A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Abstract

The invention provides a single-phase electric energy meter debugging device which comprises a frame, a programmable power source and a host computer. The frame is provided with one or more calibration stations. Each calibration station is provided with one or more meter positions. The device is characterized in that the voltage passage of each meter position is provided with a first relay used for controlling voltage on and off; and the current channels of the respective epitopes are provided with a second relay for controlling the current on and off And a monitoring board is arranged on the frame, the monitoring board is provided with a relay monitoring module which is electrically connected with the first relay and the second relay of each epitope for monitoring the first relay and The second relay is switched on. The single-phase energy meter of the adjustment device for each of the current channel and the voltage channel on the relay switch status real-time monitoring.

Description

A kind of tune checking device of single-phase electric energy meter
Technical field
The present invention relates to single-phase electric energy meter detection means technical field is and in particular to a kind of tune inspection of single-phase electric energy meter fills Put.
Background technology
During the debugging and total inspection of existing single-phase electric energy meter, due to needing to carry out the detection of multiple test points, therefore After a test point detection finishes, it usually needs the relay on off voltage passage and current channel, treat program controled power source Voltage and current be adjusted to new test voltage and test electric current after just re-close relay.But in actual detection Cheng Zhong, some relays of possibility break down and reliably close, and the voltage and current of such program controled power source cannot be reliable It is switched in corresponding epi-position, thus have impact on debugging and the testing result of total inspection.
Content of the invention
The technical problem to be solved in the present invention is: offer is a kind of can be to continuing on the current channel and voltage channel of each epi-position The on off state of electrical equipment carries out the tune checking device of the single-phase electric energy meter of monitor in real time.
The technical solution of the present invention is: a kind of tune checking device of single-phase electric energy meter, including frame, program controled power source and Host computer, described program controled power source is communicated to connect with host computer, and described frame is provided with one or more calibration stations, described each Calibration station has one or more epi-positions, and described program controled power source is electrically connected with the calibrated meter being arranged on each calibration station, uses In for calibrated meter provide test voltage and test electric current it is characterised in that: the voltage channel of described each epi-position is provided with for controlling First relay of voltage break-make processed, the current channel of described each epi-position is provided with the second relay for control electric current break-make Device, described frame is additionally provided with monitor board, and described monitor board is provided with relay monitoring module, described relay monitoring module with First relay of each epi-position and the electrical connection of the second relay, for monitoring the switch shape of the first relay and the second relay State.
After said structure, the invention has the advantages that
Single-phase electric energy meter of the present invention adjust checking device by the first relay of control voltage current switching and the second relay Electrically connect with the relay monitoring module of monitor board, can monitor in real time first relay and the second relay on off state, from And can ensure that the voltage and current of program controled power source can reliably be switched in corresponding epi-position, it is to avoid epi-position deviation is to testing result Impact.
Preferably, described first relay is arranged on hot voltage passage.Because live wire is powered, by the first relay It is arranged on detection in hot voltage more convenient accurately.
Preferably, the 3rd relay for controlling neutral voltage break-make, institute are additionally provided with described neutral voltage passage State the 3rd relay also to electrically connect with the relay monitoring module on monitor board.This setting makes neutral voltage and hot voltage all Can reliably switch on and off, and the on off state of relay can be monitored, using safer.
Preferably, described each calibration station includes having the pallet of one or more epi-positions, is arranged on top at each epi-position Needle block component and for driving the calibrated meter connection of each thimble block assembly and each epi-position or detached tandem driving machine Structure, described program controled power source is electrically connected by the voltage x current binding post of the voltage x current thimble of thimble block assembly and calibrated meter Connect.This setting can facilitate and for the voltage x current of program controled power source to be linked into calibrated meter.
Preferably, impedance detection module is additionally provided with described monitor board, the electric current thimble of described each thimble block assembly with Impedance detection module electrically connects, for monitoring whether each thimble block assembly is contacted with calibrated meter.This setting can ensure thimble block Assembly is reliably connected with calibrated meter, thus epi-position deviation can be avoided to debugging and total impact examining result.
Preferably, also including debugging standard scale and total inspection standard scale, described program controled power source is existed by a handover module Switch to during debugging and debug standard scale and electrically connect, switch in total inspection and electrically connect with always inspection standard scale, for marking for debugging Quasi- table or total inspection standard scale provide test voltage and test electric current, and described debugging standard scale, total inspection standard scale are all taken by serial ports Business device is communicated to connect for real-time uploading detection data with host computer and preserves and compare.Debugging and total inspection are arranged on by this setting Together, and be respectively debugging and total inspection one standard scale of each setting, so in debugging, by debugging standard scale uploading detection data And preserved by host computer, in total inspection, by always examining standard scale uploading detection data, because total inspection and debugging have some tests Point is identical, therefore at identical test point, compares the detection data that always inspection standard scale uploads in real time therewith by host computer Before the detection data that uploads of the debugging standard scale that is saved in host computer, if both differences are too big, point out one of mark Deviation in quasi- table, so just can investigate out standard scale devious before entering next round detection, thus the standard of can achieve The monitor in real time of table deviation.
Preferably, also including the debugging for monitoring debugging standard scale and total inspection standard scale respectively being arranged in frame Base table and total inspection base table, described program controled power source switches in debugging also by handover module and debugs base table and electrically connect, Switch to during total inspection and electrically connect with always inspection base table, for being debugging base table or total inspection base table offer test voltage and test electric current, Described debugging base table, total inspection base table are communicated to connect for real-time Transmission detection data with debugging standard scale and total inspection standard scale respectively To debugging standard scale and total inspection standard scale.This setting makes to be utilized respectively debugging base table and total inspection base table in debugging and total inspection Two standard scales are monitored so that just having begun to the deviation of standard scale is monitored in debugging process, and total During inspection, can not only with debugging identical test point at, using total inspection base table with the debugging standard that is saved in before in computer The detection data of table is monitored to the deviation of standard scale simultaneously, but also at the test points different from debugging, also can utilize Total inspection base table is monitored to the deviation of standard scale, and standard scale deviation at total inspection and debugging identical test point When, appearance can quickly be investigated out according to the data debugging standard scale, always inspection standard scale, debugging base table and total inspection base table detect The standard scale of deviation, therefore monitors more comprehensively, in real time, accurately, and reduces investigation difficulty, improves detection efficiency.
Preferably, the pallet transfer passage for transport pallet is additionally provided with described frame.This setting can make electric energy meter Debugging and total inspection using streamline operating type, in hgher efficiency.
Preferably, being additionally provided with position detecting device on described pallet transfer passage, described pallet transfer passage and pallet It is provided with the positioner for location tray.This setting will be able to be held in the palm using positioner when pallet reaches corresponding position Disk positions, to facilitate subsequent job.
Preferably, described positioner includes being arranged at least two location holes of tray bottom and is arranged on pallet Floating junction in transfer passage, described floating junction include jacking apparatus and be connected with jacking apparatus for location hole The jacking block offseting.This positioning device structure is simple and convenient to operate, positions reliability.
Brief description:
Fig. 1 has the structural representation of the tune checking device of the single-phase electric energy meter of many bin levels for the present invention;
Fig. 2 is the structural representation of the tune checking device of the single-phase electric energy meter of the every bin level of the present invention;
Fig. 3 is another structural representation of the tune checking device of the single-phase electric energy meter of the every bin level of the present invention;
Fig. 4 is the structure of the present invention first relay, the second relay and the 3rd relay and voltage channel, current channel Schematic diagram;
Fig. 5 is the structural representation of pallet of the present invention and thimble block assembly;
Fig. 6 is the electrical schematic diagram of single-phase electric energy meter of the present invention;
In figure: 1- frame, 2- program controled power source, 3- host computer, 4- first relay, 5- second relay, 6- monitor board, 7- relay monitoring module, 8- pallet, 9- thimble block assembly, 10- tandem drive mechanism, 11- the 3rd relay, 12- hinders Anti- detection module, 13- voltage thimble, 14- electric current thimble, 15- debugs standard scale, and 16- always examines standard scale, 17- serial server, 18- debugs base table, and 19- always examines base table, 20- pallet transfer passage, 21- position detecting device, 22- positioner, and 23- positions Hole, 24- floating junction, 25- jacking apparatus, 26- jacking block, 27- voltage wiring terminal, 28- current wiring terminal, 29- live wire electricity Pressure passageway, 30- neutral voltage passage, 31- current channel, 32- calibrated meter, 33- handover module.
Specific embodiment
Below in conjunction with the accompanying drawings, and in conjunction with the embodiments the present invention is described further.
Embodiment:
As shown in Figures 1 to 6, the tune checking device of a kind of single-phase electric energy meter, including frame 1, program controled power source 2 and host computer 3, described program controled power source 2 and host computer 3 communicate to connect, and described frame 1 is provided with one or more calibration stations, described each school Table station has one or more epi-positions, and described program controled power source 2 is electrically connected with the calibrated meter 32 being arranged on each calibration station, For for calibrated meter 32 provide test voltage and test electric current it is characterised in that: the voltage channel of described each epi-position is provided with use In the first relay 4 of control voltage break-make, the current channel 31 of described each epi-position is provided with for control electric current break-make Two relays 5, described frame 1 is additionally provided with monitor board 6, and described monitor board 6 is provided with relay monitoring module 7, described relay Device monitoring module 7 is electrically connected with the first relay 4 of each epi-position and the second relay 5, for monitoring the first relay 4 and second The on off state of relay 5, described relay monitoring module 7 adopts prior art.
Electric energy meter of the present invention adjust checking device by the first relay 4 of control voltage current switching and the second relay 5 with The relay monitoring module 7 of monitor board 6 electrically connects, can monitor in real time the first relay 4 and the second relay 5 on off state, Thus can ensure that the voltage and current of program controled power source 2 can reliably be switched in corresponding epi-position, it is to avoid epi-position deviation is to detection The impact of result.
Preferably, described first relay 4 is arranged on hot voltage passage 29.Because live wire is powered, first is continued It is more convenient accurately that electrical equipment 4 is arranged on detection in hot voltage.
Preferably, the 3rd relay for controlling neutral voltage break-make is additionally provided with described neutral voltage passage 30 11, described 3rd relay 11 is also electrically connected with the relay monitoring module 7 on monitor board 6.This setting make neutral voltage and Hot voltage can reliably switch on and off, and the on off state of both relays can be detected, using safer.As Shown in Fig. 4, the electric current ih of described single-phase calibrated meter 32 is entered by 1# terminal, and il goes out from 2# terminal, and hot voltage vh is simultaneously connected to each quilt The 1# terminal of calibration 32, neutral voltage vl is simultaneously connected to the 3# terminal of each calibrated meter 32, and described second relay 5 is arranged on 1# terminal It is used for the break-make of control electric current passage 31, described first relay 4 is arranged on and is used for controlling fire on hot voltage passage 29 before The break-make of line voltage, described 3rd relay 11 is arranged on neutral voltage passage 30 and is used for controlling the break-make of neutral voltage, institute Stating relay monitoring module 7 is prior art, can adopt pressure decline method, for example, lead to 10a electric current to 1# the and 2# terminal of calibrated meter 32, To detect the pressure drop at the second relay 5 two ends, thus can determine whether that the second relay 5 is to turn on or disconnects, described first relay Device 4 and the 3rd relay 11 may also be employed pressure decline method to judge relay and be to turn on or to disconnect.
Preferably, described each calibration station includes having the pallet 8 of one or more epi-positions, is arranged at each epi-position Thimble block assembly 9 and for drive each thimble block assembly 9 to connect with the calibrated meter 32 of each epi-position or detached tandem drive Motivation structure 10, described program controled power source 2 passes through the voltage x current thimble 13,14 of thimble block assembly 9 and the voltage electricity of calibrated meter 32 Stream binding post 27,28 electrical connection.This setting can facilitate and for the voltage x current of program controled power source 2 to be linked into calibrated meter 32.
Preferably, impedance detection module 12 is additionally provided with described monitor board 6, the electric current top of described each thimble block assembly 9 Pin 14 is electrically connected with impedance detection module 12, for monitoring whether each thimble block assembly 9 is contacted with calibrated meter 32, described impedance Detection module 12 adopts prior art, can adopt pressure decline method, and pressure decline method, with relay monitoring module 7, may also be employed special Impedance detection chip, such as ad5933.This setting can ensure that thimble block assembly 9 is reliably connected with calibrated meter 32, thus can avoid Epi-position deviation is to debugging and total impact examining result.
Preferably, also including debugging standard scale 15 and total inspection standard scale 16, described program controled power source 2 passes through all die changes Block 33 switches in debugging and debugs standard scale 15 and electrically connect, and switches in total inspection and electrically connects with always inspection standard scale 16, use In being debugging standard scale 15 or total inspection standard scale 16 offer test voltage and test electric current, described debugging standard scale 15, total inspection are marked Quasi- table 16 is all communicated to connect for real-time uploading detection data by serial server and host computer 3 and preserves and compare, described Handover module 33 may also be arranged on monitor board 6, and described handover module 33 adopts prior art.This setting will be debugged and total Inspection is set together, and is respectively debugging and total inspection one standard scale of each setting, so in debugging, by debugging standard scale 15 Pass detection data simultaneously to be preserved by host computer 3, in total inspection, by always examining standard scale 16 uploading detection data, due to total inspection with Debugging has some test points to be identical, therefore at identical test point, is compared in real time on total inspection standard scale 16 by host computer 3 The detection data that the detection data passing is uploaded with the debugging standard scale 15 being saved in before in host computer 3, if both differences are too Greatly, then point out one of standard scale that deviation occurs, so just can investigate out mark devious before entering next round detection Quasi- table, thus can achieve the monitor in real time of standard scale deviation.
Preferably, also include being arranged in frame 1 for monitoring debugging standard scale 15 and total inspection standard scale 16 respectively Debugging base table 18 and total inspection base table 19, described program controled power source 2 switches in debugging also by handover module 33 and debugs Base table 18 electrically connects, and switches in total inspection and electrically connects with always inspection base table 19, for being debugging base table 18 or always examining base table 19 and carry For test voltage and test electric current, described debugging base table 18, total inspection base table 19 respectively with debugging standard scale 15 and always examine standard scale 16 communicate to connect for real-time Transmission detection data to debugging standard scale 15 and total inspection standard scale 16.This setting make debugging and Total examine in can be utilized respectively debugging base table 18 and total inspection base table 19 is monitored so that in debugging process just to two standard scales Have begun to the deviation of standard scale is monitored, and in total inspection, can not only with debugging identical test point at, using total The detection data of inspection base table 19 and the debugging standard scale 15 being saved in before in computer is supervised to the deviation of standard scale simultaneously Control, but also at the test points different from debugging, also using total inspection base table 19, the deviation of standard scale can be monitored, and When standard scale deviation occurring at total inspection and debugging identical test point, can be according to debugging standard scale 15, total inspection standard scale 16, tune The data that examination base table 18 and total inspection base table 19 detect, quickly investigates out standard scale deviation, therefore monitor more comprehensively, In real time, accurately, and reduce investigation difficulty, improve detection efficiency.
Preferably, the pallet transfer passage 20 for transport pallet 8 is additionally provided with described frame 1.This setting can make electricity The debugging of energy table and always inspection adopt the operating type of streamline, in hgher efficiency.
Preferably, position detecting device 21, described pallet transfer passage 20 are additionally provided with described pallet transfer passage 20 It is provided with the positioner 22 for location tray 8 with pallet 8.This setting can be when pallet 8 reaches corresponding position, using fixed Pallet 8 is positioned, to facilitate subsequent job by position device 22.
Preferably, described positioner 22 includes at least two location holes 23 and the setting being arranged on pallet 8 bottom Floating junction 24 in pallet transfer passage 20, described floating junction 24 include jacking apparatus 25 and with jacking apparatus 25 phase Even for the jacking block 26 offseting with location hole 23.This positioner 22 structure is simple and convenient to operate, positions reliability.
Preferably, described pallet 8 is two rows, three row six epi-position pallet 8.Six epi-position pallet 8 high working efficiency.
Preferably, described thimble block assembly 9 is separately positioned at each epi-position of pallet 8 both sides.Each setting can conveniently be held in the palm Disk 8 and the docking of thimble block assembly 9.

Claims (10)

1. the tune checking device of a kind of single-phase electric energy meter, including frame (1), program controled power source (2) and host computer (3), described program control Power source (2) is communicated to connect with host computer (3), and described frame (1) is provided with one or more calibration stations, described each calibration work Position has one or more epi-positions, and described program controled power source (2) is electrically connected with the calibrated meter (32) being arranged on each calibration station, For for calibrated meter (32) provide test voltage and test electric current it is characterised in that: the voltage channel of described each epi-position is provided with For first relay (4) of control voltage break-make, the current channel (31) of described each epi-position is provided with and leads to for control electric current Disconnected the second relay (5), described frame (1) is additionally provided with monitor board (6), and described monitor board (6) is provided with relay monitoring Module (7), described relay monitoring module (7) is electrically connected with first relay (4) of each epi-position and the second relay (5), uses In the on off state monitoring the first relay (4) and the second relay (5).
2. a kind of single-phase electric energy meter according to claim 1 tune checking device it is characterised in that: described first relay (4) it is arranged on hot voltage passage (29).
3. a kind of single-phase electric energy meter according to claim 2 tune checking device it is characterised in that: described neutral voltage passage (30) be additionally provided with the 3rd relay (11) for controlling neutral voltage break-make on, described 3rd relay (11) also with monitor board (6) relay monitoring module (7) electrical connection on.
4. a kind of single-phase electric energy meter according to claim 1 tune checking device it is characterised in that: described each calibration station bag Include and there is the pallet (8) of one or more epi-positions, be arranged on the thimble block assembly (9) at each epi-position and be used for driving each thimble Block assembly (9) is connected or detached tandem drive mechanism (10) with the calibrated meter (32) of each epi-position, described program controled power source (2) by the voltage x current binding post of the voltage x current thimble (13,14) of thimble block assembly (9) and calibrated meter (32) (27, 28) electrically connect.
5. a kind of single-phase electric energy meter according to claim 4 tune checking device it is characterised in that: on described monitor board (6) It is additionally provided with impedance detection module (12), the electric current thimble (14) of described each thimble block assembly (9) and impedance detection module (12) electricity Connect, for monitoring whether each thimble block assembly (9) is contacted with calibrated meter (32).
6. a kind of single-phase electric energy meter according to claim 1 tune checking device it is characterised in that: also include debug standard scale (15) and always examine standard scale (16), described program controled power source (2) is switched in debugging by a handover module (33) and debugs Standard scale (15) electrically connects, and switches in total inspection and electrically connects with always inspection standard scale (16), for for debug standard scale (15) or Total inspection standard scale (16) provides test voltage and test electric current, and described debugging standard scale (15), always inspection standard scale (16) are all passed through Serial server is communicated to connect for real-time uploading detection data with host computer (3) and preserves and compare.
7. a kind of single-phase electric energy meter according to claim 6 tune checking device it is characterised in that: also include being arranged on frame (1) the debugging base table (18) for monitoring debugging standard scale (15) and total inspection standard scale (16) respectively on and total inspection base table (19), described program controled power source (2) switches in debugging also by handover module (33) and debugs base table (18) and electrically connect, Switch to during total inspection and electrically connect with always inspection base table (19), for providing test voltage for debugging base table (18) or always inspection base table (19) With test electric current, described debugging base table (18), always inspection base table (19) respectively with debugging standard scale (15) and always examine standard scale (16) Communicate to connect for real-time Transmission detection data to debugging standard scale (15) and total inspection standard scale (16).
8. a kind of single-phase electric energy meter according to claim 4 tune checking device it is characterised in that: described frame (1) is upper also It is provided with the pallet transfer passage (20) for transport pallet (8).
9. a kind of single-phase electric energy meter according to claim 8 tune checking device it is characterised in that: the conveying of described pallet (8) Position detecting device (21) is additionally provided with passage, described pallet transfer passage (20) and pallet (8) are provided with for location tray (8) positioner (22).
10. a kind of single-phase electric energy meter according to claim 9 tune checking device it is characterised in that: described positioner (22) include being arranged at least two location holes (23) of pallet (8) bottom and be arranged on floating in pallet transfer passage (20) Dynamic joint (24), described floating junction (24) include jacking apparatus (25) and be connected with jacking apparatus (25) for positioning The jacking block (26) that hole (23) offsets.
CN201610956007.XA 2016-10-27 2016-10-27 Single-phase electric energy meter debugging device Pending CN106371053A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610956007.XA CN106371053A (en) 2016-10-27 2016-10-27 Single-phase electric energy meter debugging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610956007.XA CN106371053A (en) 2016-10-27 2016-10-27 Single-phase electric energy meter debugging device

Publications (1)

Publication Number Publication Date
CN106371053A true CN106371053A (en) 2017-02-01

Family

ID=57892896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610956007.XA Pending CN106371053A (en) 2016-10-27 2016-10-27 Single-phase electric energy meter debugging device

Country Status (1)

Country Link
CN (1) CN106371053A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114167340A (en) * 2021-11-17 2022-03-11 国网北京市电力公司 Electric energy meter calibration device and system thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202177694U (en) * 2011-07-22 2012-03-28 浙江省电力公司 Electric energy meter verification unit
CN104076318A (en) * 2014-04-18 2014-10-01 国家电网公司 Debugging inspection bench of smart electric meter and debugging inspection method
CN104090258A (en) * 2014-03-19 2014-10-08 天津市计量监督检测科学研究院 Micro electric-energy controlling device
CN204405831U (en) * 2015-02-11 2015-06-17 厦门明翰电气股份有限公司 The calibration of a kind of multifunctional measurement and control ammeter auto-update and test macro
CN105116364A (en) * 2015-07-06 2015-12-02 浙江涵普电力科技有限公司 Standard measurement unit and method used for electric energy metering remote on-line monitoring system
CN105487041A (en) * 2015-12-28 2016-04-13 云南电网有限责任公司电力科学研究院 Electric energy metering device performance detection system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202177694U (en) * 2011-07-22 2012-03-28 浙江省电力公司 Electric energy meter verification unit
CN104090258A (en) * 2014-03-19 2014-10-08 天津市计量监督检测科学研究院 Micro electric-energy controlling device
CN104076318A (en) * 2014-04-18 2014-10-01 国家电网公司 Debugging inspection bench of smart electric meter and debugging inspection method
CN204405831U (en) * 2015-02-11 2015-06-17 厦门明翰电气股份有限公司 The calibration of a kind of multifunctional measurement and control ammeter auto-update and test macro
CN105116364A (en) * 2015-07-06 2015-12-02 浙江涵普电力科技有限公司 Standard measurement unit and method used for electric energy metering remote on-line monitoring system
CN105487041A (en) * 2015-12-28 2016-04-13 云南电网有限责任公司电力科学研究院 Electric energy metering device performance detection system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114167340A (en) * 2021-11-17 2022-03-11 国网北京市电力公司 Electric energy meter calibration device and system thereof

Similar Documents

Publication Publication Date Title
CN103713221B (en) The low-frequency transformer automatic Synthesis test machine of GROOVY data acquisition and analysis system is controlled based on PLC
WO2014108048A1 (en) Apparatus for testing touchscreen module and touchscreen module
CN106653097A (en) Test system for FLASH chips
CN106383331A (en) Single-phase watt-hour meter debugging and inspecting integrated device and method thereof
WO2018201763A1 (en) Test method for connector, device and storage medium
CN103823149A (en) Chip detection system and detection method
CN205506865U (en) Test fixture needle bed and test equipment
CN105445604B (en) A kind of USB3.1 TYPE c-types cable automatic test approach
CN106371053A (en) Single-phase electric energy meter debugging device
CN202649371U (en) Cable automatic detection device
CN109490587A (en) Relay protection single board testing system and its veneer connection and ripping device
CN107271854B (en) Dual-redundancy equipotential cable network mixed wire testing device and testing method
CN106405480A (en) Integrated device and method for adjusting and checking of single-phase electric energy meter
CN104502831A (en) Circuit board debugging and detecting system and application method thereof
CN106093667B (en) Automatic pairing test system of combiner box and test fixture thereof
CN204964660U (en) Circuit board online test platform that walks abreast
CN105093051A (en) Circuit board parallel on-line test platform
CN102265229B (en) Method for an improved checking of repeatability and reproducibility of a measuring chain in a measuring system
WO2021088735A1 (en) Link detection method and apparatus, electronic device, and computer-readable medium
CN104425306A (en) Semiconductor package component testing system and method with open circuit testing
JP2008039452A (en) Inspection apparatus
US20020145434A1 (en) Interconnect package cluster probe short removal apparatus and method
KR101807532B1 (en) Wireless harness conveyor display system
CN209247969U (en) Plugboard and wafer test equipment
JP5319907B2 (en) Test apparatus having a switch element on a socket substrate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170201

RJ01 Rejection of invention patent application after publication