CN106370926A - Missing electric quantity recorder for electric energy meter changing work and using method thereof - Google Patents

Missing electric quantity recorder for electric energy meter changing work and using method thereof Download PDF

Info

Publication number
CN106370926A
CN106370926A CN201510426352.8A CN201510426352A CN106370926A CN 106370926 A CN106370926 A CN 106370926A CN 201510426352 A CN201510426352 A CN 201510426352A CN 106370926 A CN106370926 A CN 106370926A
Authority
CN
China
Prior art keywords
electric energy
meter
recorder
power
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510426352.8A
Other languages
Chinese (zh)
Inventor
周惠民
乔璇
段宏伟
袁涛
赵睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Original Assignee
Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd filed Critical Pingdingshan Power Supply Co of State Grid Henan Electric Power Co Ltd
Priority to CN201510426352.8A priority Critical patent/CN106370926A/en
Publication of CN106370926A publication Critical patent/CN106370926A/en
Pending legal-status Critical Current

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本发明公开了电能表换表作业漏计电量记录仪及使用方法,包括采样单元、控制单元、通信单元和电源模块,所述控制单元与所述通信单元连接,所述采样单元、所述控制单元分别与所述电源模块连接;所述控制单元包括控制芯片、计算模块和控制面板,所述通信单元包括无线通信模块和以太网通信接口。本发明在传统的智能型多功能电能表的基础上进行改良,在相位表和电能表元件的基础上,引入单片机的功能,进行数据存储和管理,然后加入一些快捷操作按键,做到设计元器件无冗余,这样就可进一步减小仪表的体积和重量,以方便携带,这样的记录仪体积小,重量轻,接线、拆线简单、快捷、方便。

The invention discloses an electric energy recorder for electric energy meter replacement operation and a use method thereof, including a sampling unit, a control unit, a communication unit and a power supply module, the control unit is connected with the communication unit, the sampling unit, the control unit The units are respectively connected to the power supply module; the control unit includes a control chip, a computing module and a control panel, and the communication unit includes a wireless communication module and an Ethernet communication interface. The present invention improves on the basis of the traditional intelligent multi-functional electric energy meter, introduces the function of the single chip microcomputer on the basis of the phase meter and electric energy meter components, carries out data storage and management, and then adds some shortcut keys to achieve the design element There is no redundancy in the device, so that the volume and weight of the instrument can be further reduced to facilitate portability. Such a recorder is small in size and light in weight, and the wiring and unwiring are simple, fast and convenient.

Description

电能表换表作业漏计电量记录仪及使用方法Leakage electricity recorder and usage method for electric energy meter replacement operation

技术领域 technical field

本发明涉及电能表辅助作业设备技术领域,尤其涉及电能表换表作业漏计电量记录仪及使用方法。 The invention relates to the technical field of electric energy meter auxiliary operation equipment, in particular to an electric energy recorder for electric energy meter replacement operation and a usage method thereof.

背景技术 Background technique

电能表检定规程规定,安装式电能表都有一定的运行周期,到期必须强制轮换。针对经互感器接入的带有接线端子的电能表,为保证其供电可靠性,一般都采用带电换表。这样就产生了一个问题,就是换表期间漏计的电量该怎么计算。对此,我们通常采用的是瓦秒法,即记下换表前相应线路的功率,换表结束后再记下换表所用的时间,根据公式W=P×t 计算出漏计电量。其中W为换表期间漏计电能,P为换表前线路功率,t为换表所用的时间。这种计算换表期间电量的方法表面上看起来理论上可行,其实存在很大的缺陷,其原因如下;首先,路功率P由于现场条件局限很难准确获得;其次,这个公式只有在功率恒定不变的情况下才能使用,但实际上用户负荷是在一定范围内变化的,所以用线路某时刻的瞬时功率代替其平均功率不太科学,如果想得到精确电量,其正确的漏计电量表达式应为: ,即漏计电量线路瞬时功率和时间的积分;同时,换表时间t也不太容易确定,这主要是由于现场工作习惯以及具体条件限制,工作人员往往不太注意记录换表所用的时间,最后到处理换表工作票时换表期间追加的电量只能凭经验估计一个数,与真实漏计电量必定存在一定差别。 The energy meter verification regulation stipulates that the installed energy meter has a certain operating cycle, and must be forced to rotate when it expires. In order to ensure the reliability of the power supply for the electric energy meter connected with the terminal through the transformer, it is generally adopted to replace the meter with electricity. In this way, a problem arises, that is, how to calculate the amount of electricity missed during the meter change. In this regard, we usually use the watt-second method, that is, write down the power of the corresponding line before changing the meter, and record the time used for changing the meter after the meter is changed, and calculate the leakage power according to the formula W=P×t. Among them, W is the leakage electric energy during the meter change, P is the line power before the meter change, and t is the time used for the meter change. This method of calculating the power during the meter change appears to be theoretically feasible, but in fact has a lot of defects. The reasons are as follows: firstly, it is difficult to obtain the power P of the road accurately due to the limitation of the site conditions; secondly, this formula can only be used when the power is constant It can only be used under the same condition, but in fact, the user load changes within a certain range, so it is not scientific to replace the average power with the instantaneous power at a certain moment of the line. If you want to get accurate power, the correct expression of leakage power Should be: , that is, the integral of the instantaneous power and time of the leakage meter line; at the same time, it is not easy to determine the meter replacement time t, mainly due to the on-site work habits and specific conditions, the staff often pay little attention to recording the time used for meter replacement, Finally, when dealing with the work ticket for changing the meter, the additional power during the meter changing period can only be estimated based on experience, and there must be a certain difference from the real missing power.

申请号为201410125460.7的专利提供了电量记录分析仪,包括:前置采集器和上位控制分析机的主机设置在全铝镁合金机箱内,上位控制分析机的液晶显示器与机箱呈外翻式结构设置在机箱外,该液晶显示器通过转轴与机箱的顶盖的侧棱连接,该液晶显示器通过转轴内的数据线与主机相连;机箱的顶盖的外表面设置有与主机相连接的键盘和鼠标触摸板,液晶显示器的显示屏内凹的深度大于键盘的高度;上述机箱的后侧壁设置有前置采集器对应的信号采集接口,机箱的侧壁上设置有前置采集器与主机的供电接口,以及对应主机的外联接口。本发明解决了分离式结构的电量(波形)记录分析仪存在的通讯稳定性较差,使用不方便的问题,提升了设备的性能。 The patent application number is 201410125460.7 provides a power record analyzer, including: the front collector and the host of the upper control analysis machine are set in an all-aluminum-magnesium alloy chassis, and the liquid crystal display of the upper control analysis machine and the chassis are arranged in an outward structure. Outside the case, the liquid crystal display is connected to the side edge of the top cover of the case through the rotating shaft, and the liquid crystal display is connected to the host through the data line in the rotating shaft; the outer surface of the top cover of the case is provided with a keyboard and mouse touch screen connected to the main frame board, the depth of the concave of the display screen of the liquid crystal display is greater than the height of the keyboard; the rear side wall of the above-mentioned case is provided with a signal collection interface corresponding to the front collector, and the side wall of the case is provided with a power supply interface between the front collector and the host , and the external interface of the corresponding host. The invention solves the problems of poor communication stability and inconvenient use of the electric quantity (waveform) record analyzer with a separate structure, and improves the performance of the equipment.

申请号为201320293295.7的专利涉及一种电量记录分析仪,包括机壳和安装于机壳内的电量记录分析电路;所述电量记录分析电路包括相互电连接的数据测量电路和数据处理电路;所述数据测量电路具有多个数据测量接口,每个数据测量接口分别依次连接软信号线和开口式微型电流互感器。本发明实施例提供的一种电量记录分析仪,将数据测量电路与数据处理电路结合起来,方便一般家庭的使用;其数据量取过程不需要改动原接线,安全可靠。 The patent with application number 201320293295.7 relates to a power record analyzer, including a casing and a power record analysis circuit installed in the case; the power record analysis circuit includes a data measurement circuit and a data processing circuit electrically connected to each other; the The data measurement circuit has a plurality of data measurement interfaces, and each data measurement interface is respectively connected with a soft signal line and an open-type miniature current transformer in sequence. The electric quantity record analyzer provided by the embodiment of the present invention combines the data measurement circuit and the data processing circuit, which is convenient for general household use; the data measurement process does not need to change the original wiring, which is safe and reliable.

然而,以上方案均是对常规电量进行计算、记录与分析,并没有一种专用仪器或方法用来对换表作业过程中的漏电量进行准确记录,所以,我们提出一种电能表带电换表漏计电量记录仪的设计构想。 However, the above schemes all calculate, record and analyze the conventional electricity, and there is no special instrument or method for accurately recording the leakage electricity during the meter replacement operation. Therefore, we propose a live meter replacement The design idea of the leakage meter electricity recorder.

发明内容 Contents of the invention

本发明目的在于提供电能表换表作业漏计电量记录仪及使用方法,体积小,重量轻,便于携带,可以通过控制按键界面进行直观操作,并具有数据存储与查询功能。 The object of the present invention is to provide an electric energy meter replacement operation leak meter electricity recorder and its use method, which are small in size, light in weight, easy to carry, can be intuitively operated through the control button interface, and have data storage and query functions.

为实现上述目的,本发明采用的技术方案是:电能表换表作业漏计电量记录仪,包括采样单元、控制单元、通信单元和电源模块,所述控制单元与所述通信单元连接,所述采样单元、所述控制单元分别与所述电源模块连接;所述控制单元包括控制芯片、计算模块和控制面板,所述通信单元包括无线通信模块和以太网通信接口。 In order to achieve the above object, the technical solution adopted by the present invention is: a meter replacement operation leakage meter electricity recorder, including a sampling unit, a control unit, a communication unit and a power module, the control unit is connected to the communication unit, the The sampling unit and the control unit are respectively connected to the power module; the control unit includes a control chip, a computing module and a control panel, and the communication unit includes a wireless communication module and an Ethernet communication interface.

所述电源模块包括CT取电模块与PT取电模块,所述CT取电模块与所述采样单元连接,所述PT取电模块与所述控制单元连接。 The power supply module includes a CT power-taking module and a PT power-taking module, the CT power-taking module is connected to the sampling unit, and the PT power-taking module is connected to the control unit.

所述采样单元包括电压采集器和电流采集器。 The sampling unit includes a voltage collector and a current collector.

所述控制芯片包括单片机芯片或DSP芯片。 The control chip includes a single-chip microcomputer chip or a DSP chip.

所述计算模块包括顺次连接的功率乘法器、电压频率变换器、分频器、计数器和电度显示存储器,所述功率乘法器与所述采样单元连接,所述电压频率变换器、所述分频器、所述计数器和所述电度显示存储器分别与所述控制芯片连接。 The calculation module includes a power multiplier, a voltage-frequency converter, a frequency divider, a counter and an electric degree display memory connected in sequence, the power multiplier is connected with the sampling unit, the voltage-frequency converter, the The frequency divider, the counter and the electricity display memory are respectively connected with the control chip.

所述控制面板包括液晶显示屏、功能按键板、档位调节板和输入输出接口,所述功能按键板包括电源按键、复位按键和保持按键,所述输入输出接口与所述采样单元连接。 The control panel includes a liquid crystal display, a function button board, a gear adjustment board and an input and output interface. The function button board includes a power button, a reset button and a hold button, and the input and output interface is connected to the sampling unit.

所述PT取电模块包括无源感应取能器件以及与其连接的整流降压电路。 The PT power-taking module includes a passive inductive energy-taking device and a rectification and step-down circuit connected thereto.

所述电源模块连接后备电池,所述后备电池包括充电锂电池。 The power module is connected to a backup battery, and the backup battery includes a rechargeable lithium battery.

电能表换表作业漏计电量记录仪的使用方法,包括如下步骤: The method of using the meter-replacing meter leakage electricity recorder includes the following steps:

1)在记录仪的输入输出接口接入带有插接头的专用仪表软导线; 1) Connect the special instrument soft wire with plug connector to the input and output interface of the recorder;

2)调节控制面板上的档位调节板,将记录仪转换到电能/kWh档位,同时复位仪器度数显示清零; 2) Adjust the gear adjustment plate on the control panel, switch the recorder to the electric energy/kWh gear, and reset the instrument’s degree display to zero at the same time;

3)按照次序,将被换电能表电压回路的电压并联接入记录仪,再将被换电能表电流回路的电流在端子排处并联接入记录仪; 3) In order, connect the voltage of the voltage circuit of the replaced electric energy meter to the recorder in parallel, and then connect the current of the current circuit of the electric energy meter to be replaced to the recorder in parallel at the terminal block;

4)启动记录仪,开始进行漏计电量记录,同时更换电能表,先拆除被换电能表的电流回路,后拆除被换电能表的电压回路; 4) Start the recorder, start recording the leakage meter, and replace the electric energy meter at the same time, first remove the current circuit of the replaced electric energy meter, and then remove the voltage circuit of the replaced electric energy meter;

5)将新更换的电能表接入用电线路中,按照先接入电压回路,后接入电流回路的顺序; 5) Connect the newly replaced watt-hour meter into the power line, in the order of connecting to the voltage circuit first, and then connecting to the current circuit;

6)完成新旧电能表的更换后,将记录仪拆除,按照先拆除电流回路、后拆除电压回路的顺序,并清理工作现场,例行相关工作手续,此时记录仪的表度示值即为换表期间漏计的电量。 6) After the replacement of the old and new electric energy meters is completed, remove the recorder, follow the sequence of removing the current loop first, and then remove the voltage loop, and clean up the work site, and perform routine related work procedures. At this time, the meter indication value of the recorder is The amount of electricity that was leaked during meter replacement.

本发明的主要目的在于解决长久以来更换电能表计过程中,漏计电量记录不规范或不被重视的问题。在电力单位中,根据客户用电负荷的大小,可以分为Ⅰ类负荷、Ⅱ类负荷、Ⅲ类负荷、Ⅳ类负荷,当客户负荷较小,电能计量装置类别较低时,换表漏计电量不大,当客户负荷很大计量装置类别较高时,换表漏计电量就比较大,应引起我们的重视。 The main purpose of the present invention is to solve the problem of non-standard or under-appreciated records of leakage electricity in the process of replacing electric energy meters for a long time. In the power unit, according to the size of the customer's electricity load, it can be divided into Class I load, Class II load, Class III load, and Class IV load. The electricity is not large, and when the customer load is heavy and the category of the metering device is high, the amount of meter leakage will be relatively large, which should arouse our attention.

本发明的电能表换表作业漏计电量记录仪,包括采样单元、控制单元、通信单元和电源模块,控制单元与通信单元连接,采样单元、控制单元分别与电源模块连接;控制单元包括控制芯片、计算模块和控制面板;电源模块包括CT取电模块与PT取电模块,CT取电模块与采样单元连接,采样单元包括电压采集器和电流采集器,CT取电模块通过与电量输入线路连接并取源为采样单元供源;PT取电模块与控制单元连接,包括无源感应取能器件以及与其连接的整流降压电路,可以为控制单元提供电源供应,其中,无源感应取能器件主要包括电压互感器,当模块安装于母线上时,便可以将电场信号转换为电气信号发送,并通过集成一个低损耗整流器和一个高效率降压型转换器,以收集环境中产生的线路耦合能量,然后将这种能量转换成良好调节的输出,为后续组件提供电源支持。整流器直接对电压波形整流,无源感应取能器件还连接一个外部存储电容器,便于采集电能的稳定输出与自保持,可以在宽迟滞性的超低静态电流欠压时,使电荷能够在存储电容器上积累,直至降压型转换器可以高效率地将一部分存储的电荷传送给输出为止,在无负载休眠状态时,可调节输出电压,同时连续给存储电容充电;为了保证使用的连续性和安全性,电源模块连接后备电池,后备电池包括充电锂电池,平时为浮充电状态,可以通过PT取电模块充电。 The electric energy recorder for electric energy meter replacement operation of the present invention includes a sampling unit, a control unit, a communication unit and a power supply module, the control unit is connected to the communication unit, and the sampling unit and the control unit are respectively connected to the power supply module; the control unit includes a control chip , calculation module and control panel; the power supply module includes CT power-taking module and PT power-taking module, CT power-taking module is connected with sampling unit, sampling unit includes voltage collector and current collector, CT power-taking module is connected with power input line And take the source as the source of the sampling unit; the PT power-taking module is connected to the control unit, including the passive induction energy-taking device and the rectification and step-down circuit connected to it, which can provide power supply for the control unit. Among them, the passive induction energy-taking device It mainly includes a voltage transformer. When the module is installed on the bus, it can convert the electric field signal into an electrical signal for transmission, and integrate a low-loss rectifier and a high-efficiency step-down converter to collect the line coupling generated in the environment. energy, which is then converted into a well-regulated output that provides power support for subsequent components. The rectifier directly rectifies the voltage waveform, and the passive induction energy harvesting device is also connected to an external storage capacitor, which facilitates the stable output and self-maintenance of electric energy collection, and enables the charge to be stored in the storage capacitor when the ultra-low quiescent current with wide hysteresis is undervoltage Accumulate on the top until the step-down converter can efficiently transfer a part of the stored charge to the output. In the no-load sleep state, the output voltage can be adjusted while continuously charging the storage capacitor; in order to ensure the continuity and safety of use The power module is connected to the backup battery. The backup battery includes a rechargeable lithium battery. It is usually in a floating state and can be charged through the PT power-taking module.

通信单元包括无线通信模块和以太网通信接口,无线通信模块包括GPRS长距离传输模块和zigbee无线通信模块,GPRS长距离传输模块采用GPRS DTU通信方式,采用灵旗DTU终端,是一种物联网无线数据终端,利用公用运营商网络GPRS网络(又称G网)为用户提供无线长距离数据传输功能. 采用高性能的工业级8/16/32位通信处理器和工业级无线模块,以嵌入式实时操作系统为软件支撑平台,同时提供RS232和RS485(或RS422)接口,可直接连接串口设备,实现数据透明传输功能,内部集成TCP/IP协议栈,具备GPRS拨号上网以及TCP/IP数据通信的功能;提供串口数据双向转换功能,可以和各种使用串口通信的用户设备进行连接,而且不需要对用户设备作改动;Zigbee是基于IEEE802.15.4标准的低功耗无线局域网协议,适用于短距离的无线局域传输,通信单元可以根据距离远近等需要选择不同的传输方式,将电量记录数据传输给远程接收端,如中央控制室或供电网络,可以实时监控电能表的更换及计量状态,避免数据丢失造成不便。 The communication unit includes a wireless communication module and an Ethernet communication interface. The wireless communication module includes a GPRS long-distance transmission module and a zigbee wireless communication module. The GPRS long-distance transmission module adopts GPRS DTU communication mode and Lingqi DTU terminal. The data terminal uses the public operator network GPRS network (also known as G network) to provide users with wireless long-distance data transmission functions. It adopts high-performance industrial-grade 8/16/32-bit communication processors and industrial-grade wireless modules, embedded The real-time operating system is a software support platform, and provides RS232 and RS485 (or RS422) interfaces at the same time, which can be directly connected to serial devices to realize transparent data transmission function, internally integrates TCP/IP protocol stack, and has GPRS dial-up Internet access and TCP/IP data communication. Function; provide serial data two-way conversion function, can be connected with various user equipment using serial communication, and does not need to make changes to user equipment; Zigbee is a low-power wireless LAN protocol based on IEEE802.15.4 standard, suitable for short distance The wireless local area transmission, the communication unit can choose different transmission methods according to the distance and other needs, and transmit the power record data to the remote receiving end, such as the central control room or power supply network, which can monitor the replacement and measurement status of the electric energy meter in real time to avoid Data loss is an inconvenience.

控制芯片包括单片机芯片或DSP芯片,用以对计算模块中的各个元件和控制面板的控制显示提供管理;计算模块包括顺次连接的功率乘法器、电压频率变换器、分频器、计数器和电度显示存储器,功率乘法器与采样单元连接,电压频率变换器、分频器、计数器和电度显示存储器分别与控制芯片连接;控制面板包括液晶显示屏、功能按键板、档位调节板和输入输出接口,功能按键板包括电源按键、复位按键和保持按键,输入输出接口与采样单元连接;功率乘法器接收电压采样器与电流采样器的信号,主要是为了对电压与电流信号进行初始存储与汇集;电压频率变换器与控制面板的档位调节板连接,用于根据不同的电压等级选定不同的运行状态,通过该模块可以根据单片机和电源按键的控制,来实现整个记录仪的投入使用;分频器与计数器共同构成了电量微积分计算的分频时序逻辑计算模块,用来实时计算电压与电流乘积的功率信息并进行累加;电度显示存储器分别与单片机、液晶显示屏连接,可以接收单片机的控制信号、复位按键的复位信号和保持按键的保持信号,还可以直接在液晶显示屏上进行实时显示输出。 The control chip includes a single-chip microcomputer chip or a DSP chip, which is used to provide management for each component in the calculation module and the control display of the control panel; the calculation module includes a sequentially connected power multiplier, voltage-frequency converter, frequency divider, counter and electric The power multiplier is connected to the sampling unit, and the voltage frequency converter, frequency divider, counter and power display memory are respectively connected to the control chip; the control panel includes a liquid crystal display, a function key board, a gear adjustment board and an input The output interface, the function button board includes the power button, the reset button and the hold button, and the input and output interfaces are connected to the sampling unit; the power multiplier receives the signals of the voltage sampler and the current sampler, mainly for the initial storage and processing of the voltage and current signals. Collection; the voltage frequency converter is connected with the gear adjustment board of the control panel, which is used to select different operating states according to different voltage levels. Through this module, the entire recorder can be put into use according to the control of the single-chip microcomputer and the power button. ; The frequency divider and the counter together constitute the frequency division sequential logic calculation module for calculus calculation of electricity, which is used to calculate and accumulate the power information of the product of voltage and current in real time; Receive the control signal of the single-chip microcomputer, the reset signal of the reset button and the hold signal of the hold button, and can also directly perform real-time display output on the liquid crystal display.

本发明的记录仪有益效果在于以下几个方面: The recorder of the present invention has beneficial effects in the following aspects:

1、本发明可以在传统的智能型多功能电能表的基础上进行改良,传统安装在客户端的多功能电能表有许多功能,如峰谷平分时计量功能、错接线分析功能、记录最大需量功能等等,这对于漏计电量记录仪来说都是没必要的,因此可以去除其相应的元件模块,做到设计元器件无冗余,这样就可进一步减小仪表的体积和重量,以方便携带,这样的记录仪体积小,重量轻,接线、拆线简单、快捷、方便。 1. The present invention can be improved on the basis of the traditional intelligent multifunctional electric energy meter. The traditional multifunctional electric energy meter installed on the client side has many functions, such as peak and valley equivalence measurement function, wrong wiring analysis function, and maximum demand recording Functions, etc., which are unnecessary for the leakage meter electricity recorder, so the corresponding component modules can be removed, so that there is no redundancy in the design components, so that the volume and weight of the meter can be further reduced, and the Easy to carry, such a recorder is small in size, light in weight, simple, fast and convenient in wiring and disconnecting.

2、本发明在相位表和电能表元件的基础上,引入单片机的功能,进行数据存储和管理,然后加入一些快捷操作按键,具有开始、结束按钮方便操作,有电能度示快速回零功能,有数据存储、参数输入查询功能。 2. On the basis of the phase meter and electric energy meter components, the present invention introduces the function of a single-chip microcomputer for data storage and management, and then adds some quick operation buttons, with start and end buttons for easy operation, and the function of quickly returning to zero for the electric energy display. It has data storage and parameter input query functions.

3、本发明设计出的该仪表可以是作电能表用的相位表,其体积及重量与现场用的相位伏安表或万用表相类似,配合相位表的专用连接线、钳形电流表、测试电能量的专用二次连接软导线,就可以兼有这两种仪表的主要功能,达到一表多用的目的。 3. The instrument designed by the present invention can be a phase meter used as an electric energy meter. Its volume and weight are similar to phase voltammeters or multimeters used on the spot. Cooperate with the special connecting wire of the phase meter, clamp ammeter, and test electric meter. The special secondary connection soft wire for energy can have the main functions of these two instruments concurrently, so as to achieve the multi-purpose purpose of one meter.

4、本发明的记录仪在设计成型之后,如果能够作为带电换表的标配仪表,这对于有效保障供用电双方的合法权益,进一步规范我们的日常工作都大有益处,这在国网公司要求我们注重细节,向技术、向管理要效益的今天,其现实意义也不言而喻的。 4. After the recorder of the present invention is designed and formed, if it can be used as a standard meter for live meter replacement, it will be of great benefit to effectively protecting the legitimate rights and interests of both power supply and consumption parties and further standardizing our daily work. The company requires us to pay attention to details and seek benefits from technology and management, and its practical significance is self-evident.

附图说明 Description of drawings

图1是本发明记录仪的组成结构图。 Fig. 1 is a composition structure diagram of the recorder of the present invention.

图2是本发明记录仪控制面板的组成结构图。 Fig. 2 is a structural diagram of the control panel of the recorder of the present invention.

具体实施方式 detailed description

由于现场工作习惯以及具体条件限制,工作人员往往不太注意记录换表所用的时间,而且漏计电量占用户总电量的比重不大,容易被我们忽视,在电力单位中,根据客户用电负荷的大小,可以分为Ⅰ类负荷、Ⅱ类负荷、Ⅲ类负荷、Ⅳ类负荷,现假设客户表计更换所需时间为0.5小时,安装不同类别电能计量装置客户换表漏计电量制作成表1如下: Due to on-site work habits and specific conditions, the staff often do not pay much attention to recording the time used for meter replacement, and the proportion of the missing metered electricity to the total electricity of the user is not large, which is easily overlooked by us. In the power unit, according to the customer's electricity load The size of the load can be divided into class I load, class II load, class III load, and class IV load. Now assume that the time required for customer meter replacement is 0.5 hours, and the customer who installs different types of electric energy metering devices will make a table 1 as follows:

表1 Table 1

由表1可知,当客户负荷较小,电能计量装置类别较低时,换表漏计电量不大,当客户负荷很大计量装置类别较高时,换表漏计电量就比较大,应引起我们的重视。当客户为Ⅰ类负荷是,其换表期间漏计的电量大于5000kWh,应该引起我们足够的重视。 It can be seen from Table 1 that when the customer load is small and the category of the electric energy metering device is low, the leakage of meter replacement is not large. Our attention. When the customer is a Class I load, the electricity missed during meter replacement is greater than 5000kWh, which should arouse our sufficient attention.

针对这个问题,我们提出带电换表作业漏计电量记录仪的设计构想。这种仪表必须满足如下条件:体积小,重量轻,便于携带,接线、拆线简单、快捷、方便;应具有开始、结束按钮方便操作,有电能度示快速回零功能;应有数据存储、参数输入查询功能。 Aiming at this problem, we propose the design idea of the meter leakage electricity recorder for the live meter replacement operation. This kind of instrument must meet the following conditions: small size, light weight, easy to carry, simple, fast and convenient to connect and unplug; it should have start and end buttons for easy operation, and it should have the function of quick return to zero for electric energy display; it should have data storage, Parameter input query function.

所以,设计出的带电换表漏计电量记录仪应该具有便携式电能表和数字式相位伏安表、秒表以及单片机的主要功能,在相位表和电能表元件的基础上,引入单片机的功能,进行数据存储和管理,同时具备快捷操作按键,实现便捷操作。 Therefore, the designed electricity recorder should have the main functions of portable electric energy meter, digital phase voltammeter, stopwatch and single-chip microcomputer. Data storage and management, as well as shortcut buttons for convenient operation.

实施例一Embodiment one

如图1所示,电能表换表作业漏计电量记录仪,包括采样单元、控制单元、通信单元和电源模块,控制单元与通信单元连接,采样单元、控制单元分别与电源模块连接;控制单元包括控制芯片、计算模块和控制面板,通信单元包括无线通信模块和以太网通信接口;电源模块包括CT取电模块与PT取电模块,CT取电模块与采样单元连接,PT取电模块与控制单元连接;采样单元包括电压采集器和电流采集器;控制芯片包括单片机芯片或DSP芯片;计算模块包括顺次连接的功率乘法器、电压频率变换器、分频器、计数器和电度显示存储器,功率乘法器与采样单元连接,电压频率变换器、分频器、计数器和电度显示存储器分别与控制芯片连接;PT取电模块包括无源感应取能器件以及与其连接的整流降压电路。 As shown in Figure 1, the electric energy recorder for meter replacement operation includes a sampling unit, a control unit, a communication unit, and a power module. The control unit is connected to the communication unit, and the sampling unit and the control unit are respectively connected to the power module; the control unit Including control chip, computing module and control panel, communication unit includes wireless communication module and Ethernet communication interface; power supply module includes CT power-taking module and PT power-taking module, CT power-taking module is connected with sampling unit, PT power-taking module Unit connection; the sampling unit includes a voltage collector and a current collector; the control chip includes a single-chip microcomputer chip or a DSP chip; the calculation module includes a power multiplier, a voltage-frequency converter, a frequency divider, a counter and an electric degree display memory connected in sequence, The power multiplier is connected to the sampling unit, and the voltage-frequency converter, frequency divider, counter and energy display memory are respectively connected to the control chip; the PT power-taking module includes a passive induction energy-taking device and a rectification and step-down circuit connected to it.

控制面板包括液晶显示屏、功能按键板、档位调节板和输入输出接口,功能按键板包括电源按键、复位按键和保持按键,输入输出接口与采样单元连接,如图2所示,由于单片机和计算模块功能的引入,可以进行数据存储和管理,面板上的快捷操作按键,具有开始、结束按钮方便操作,有电能度示快速回零功能,有数据存储、参数输入查询功能,控制面板下端的输入输出接口可以连接专用钳形电流表、专用相位表连接线、专用二次连接测电量软导线,最下方还可以设置各种电力参数值显示切换按键,用于更清楚准确找到所需电量参数。 The control panel includes a liquid crystal display, a function button board, a gear adjustment board and an input and output interface. The function button board includes a power button, a reset button and a hold button. The input and output interfaces are connected to the sampling unit, as shown in Figure 2. The introduction of the calculation module function can be used for data storage and management. The shortcut keys on the panel have start and end buttons for easy operation, and the function of quickly returning to zero for the electric energy display, data storage, and parameter input query functions. The bottom of the control panel The input and output interfaces can be connected to a dedicated clamp ammeter, a dedicated phase meter connection line, and a dedicated secondary connection measuring soft wire. At the bottom, various power parameter value display switching buttons can be set to find the required power parameters more clearly and accurately.

电能表换表作业漏计电量记录仪的使用方法,包括如下步骤: The method of using the meter-replacing meter leakage electricity recorder includes the following steps:

1)在记录仪的输入输出接口接入带有插接头的专用仪表软导线; 1) Connect the special instrument soft wire with plug connector to the input and output interface of the recorder;

2)调节控制面板上的档位调节板,将记录仪转换到电能/kWh档位,同时复位仪器度数显示清零; 2) Adjust the gear adjustment plate on the control panel, switch the recorder to the electric energy/kWh gear, and reset the instrument’s degree display to zero at the same time;

3)按照次序,将被换电能表电压回路的电压并联接入记录仪,再将被换电能表电流回路的电流在端子排处并联接入记录仪; 3) In order, connect the voltage of the voltage circuit of the replaced electric energy meter to the recorder in parallel, and then connect the current of the current circuit of the electric energy meter to be replaced to the recorder in parallel at the terminal block;

4)启动记录仪,开始进行漏计电量记录,同时更换电能表,先拆除被换电能表的电流回路,后拆除被换电能表的电压回路; 4) Start the recorder, start recording the leakage meter, and replace the electric energy meter at the same time, first remove the current circuit of the replaced electric energy meter, and then remove the voltage circuit of the replaced electric energy meter;

5)将新更换的电能表接入用电线路中,按照先接入电压回路,后接入电流回路的顺序; 5) Connect the newly replaced watt-hour meter into the power line, in the order of connecting to the voltage circuit first, and then connecting to the current circuit;

6)完成新旧电能表的更换后,将记录仪拆除,按照先拆除电流回路、后拆除电压回路的顺序,并清理工作现场,例行相关工作手续,此时记录仪的表度示值即为换表期间漏计的电量。 6) After the replacement of the old and new electric energy meters is completed, remove the recorder, follow the sequence of removing the current loop first, and then remove the voltage loop, and clean up the work site, and perform routine related work procedures. At this time, the meter indication value of the recorder is The amount of electricity that was leaked during meter replacement.

在投入使用之前,也需要做到认清工作位置,勿碰其他带电设备;工作过程中禁止TA二次开路,TV二次短路及接地;遵守其他安全工作规程中规定应遵守的规定;本发明的电能表换表作业漏计电量记录仪,包括采样单元、控制单元、通信单元和电源模块,控制单元与通信单元连接,采样单元、控制单元分别与电源模块连接;控制单元包括控制芯片、计算模块和控制面板;电源模块包括CT取电模块与PT取电模块,CT取电模块与采样单元连接,采样单元包括电压采集器和电流采集器,CT取电模块通过与电量输入线路连接并取源为采样单元供源;PT取电模块与控制单元连接,包括无源感应取能器件以及与其连接的整流降压电路,可以为控制单元提供电源供应,其中,无源感应取能器件主要包括电压互感器,当模块安装于母线上时,便可以将电场信号转换为电气信号发送,并通过集成一个低损耗整流器和一个高效率降压型转换器,以收集环境中产生的线路耦合能量,然后将这种能量转换成良好调节的输出,为后续组件提供电源支持。整流器直接对电压波形整流,无源感应取能器件还连接一个外部存储电容器,便于采集电能的稳定输出与自保持,可以在宽迟滞性的超低静态电流欠压时,使电荷能够在存储电容器上积累,直至降压型转换器可以高效率地将一部分存储的电荷传送给输出为止,在无负载休眠状态时,可调节输出电压,同时连续给存储电容充电;为了保证使用的连续性和安全性,电源模块连接后备电池,后备电池包括充电锂电池,平时为浮充电状态,可以通过PT取电模块充电。 Before putting it into use, it is also necessary to recognize the working position and not touch other live equipment; TA secondary open circuit, TV secondary short circuit and grounding are prohibited during the working process; comply with the regulations that should be observed in other safety work regulations; the present invention The power meter replacement operation leakage meter electricity recorder includes a sampling unit, a control unit, a communication unit and a power module. The control unit is connected to the communication unit, and the sampling unit and the control unit are respectively connected to the power module. module and control panel; the power supply module includes a CT power-taking module and a PT power-taking module, and the CT power-taking module is connected with a sampling unit, and the sampling unit includes a voltage collector and a current collector. The source is the source for the sampling unit; the PT power-taking module is connected to the control unit, including a passive induction energy-taking device and a rectification and step-down circuit connected to it, which can provide power supply for the control unit. Among them, the passive induction energy-taking device mainly includes The voltage transformer, when the module is installed on the bus, can convert the electric field signal into an electrical signal for transmission, and integrate a low-loss rectifier and a high-efficiency step-down converter to collect the line coupling energy generated in the environment, This energy is then converted into a well-regulated output that provides power to subsequent components. The rectifier directly rectifies the voltage waveform, and the passive induction energy harvesting device is also connected to an external storage capacitor, which facilitates the stable output and self-maintenance of electric energy collection, and enables the charge to be stored in the storage capacitor when the ultra-low quiescent current with wide hysteresis is undervoltage Accumulate on the top until the step-down converter can efficiently transfer a part of the stored charge to the output. In the no-load sleep state, the output voltage can be adjusted while continuously charging the storage capacitor; in order to ensure the continuity and safety of use The power module is connected to the backup battery. The backup battery includes a rechargeable lithium battery. It is usually in a floating state and can be charged through the PT power-taking module.

通信单元包括无线通信模块和以太网通信接口,无线通信模块包括GPRS长距离传输模块和zigbee无线通信模块,GPRS长距离传输模块采用GPRS DTU通信方式,采用灵旗DTU终端,是一种物联网无线数据终端,利用公用运营商网络GPRS网络(又称G网)为用户提供无线长距离数据传输功能. 采用高性能的工业级8/16/32位通信处理器和工业级无线模块,以嵌入式实时操作系统为软件支撑平台,同时提供RS232和RS485(或RS422)接口,可直接连接串口设备,实现数据透明传输功能,内部集成TCP/IP协议栈,具备GPRS拨号上网以及TCP/IP数据通信的功能;提供串口数据双向转换功能,可以和各种使用串口通信的用户设备进行连接,而且不需要对用户设备作改动;Zigbee是基于IEEE802.15.4标准的低功耗无线局域网协议,适用于短距离的无线局域传输,通信单元可以根据距离远近等需要选择不同的传输方式,将电量记录数据传输给远程接收端,如中央控制室或供电网络,可以实时监控电能表的更换及计量状态,避免数据丢失造成不便。 The communication unit includes a wireless communication module and an Ethernet communication interface. The wireless communication module includes a GPRS long-distance transmission module and a zigbee wireless communication module. The GPRS long-distance transmission module adopts GPRS DTU communication mode and Lingqi DTU terminal. The data terminal uses the public operator network GPRS network (also known as G network) to provide users with wireless long-distance data transmission functions. It adopts high-performance industrial-grade 8/16/32-bit communication processors and industrial-grade wireless modules, embedded The real-time operating system is a software support platform, and provides RS232 and RS485 (or RS422) interfaces at the same time, which can be directly connected to serial devices to realize transparent data transmission function, internally integrates TCP/IP protocol stack, and has GPRS dial-up Internet access and TCP/IP data communication. Function; provide serial data two-way conversion function, can be connected with various user equipment using serial communication, and does not need to make changes to user equipment; Zigbee is a low-power wireless LAN protocol based on IEEE802.15.4 standard, suitable for short distance The wireless local area transmission, the communication unit can choose different transmission methods according to the distance and other needs, and transmit the power record data to the remote receiving end, such as the central control room or power supply network, which can monitor the replacement and measurement status of the electric energy meter in real time to avoid Data loss is an inconvenience.

控制芯片包括单片机芯片或DSP芯片,用以对计算模块中的各个元件和控制面板的控制显示提供管理;计算模块包括顺次连接的功率乘法器、电压频率变换器、分频器、计数器和电度显示存储器,功率乘法器与采样单元连接,电压频率变换器、分频器、计数器和电度显示存储器分别与控制芯片连接;控制面板包括液晶显示屏、功能按键板、档位调节板和输入输出接口,功能按键板包括电源按键、复位按键和保持按键,输入输出接口与采样单元连接;功率乘法器接收电压采样器与电流采样器的信号,主要是为了对电压与电流信号进行初始存储与汇集;电压频率变换器与控制面板的档位调节板连接,用于根据不同的电压等级选定不同的运行状态,档位调节板可以满足不同计量方式的需要要求,电压50V至380V均能正确计量,通过电压频率变换器可以根据单片机和电源按键的控制,来实现整个记录仪的投入使用;分频器与计数器共同构成了电量微积分计算的分频时序逻辑计算模块,用来实时计算电压与电流乘积的功率信息并进行累加;电度显示存储器分别与单片机、液晶显示屏连接,可以接收单片机的控制信号、复位按键的复位信号和保持按键的保持信号,还可以直接在液晶显示屏上进行实时显示输出。 The control chip includes a single-chip microcomputer chip or a DSP chip, which is used to provide management for each component in the calculation module and the control display of the control panel; the calculation module includes a sequentially connected power multiplier, voltage-frequency converter, frequency divider, counter and electric The power multiplier is connected to the sampling unit, and the voltage frequency converter, frequency divider, counter and power display memory are respectively connected to the control chip; the control panel includes a liquid crystal display, a function key board, a gear adjustment board and an input The output interface, the function button board includes the power button, the reset button and the hold button, and the input and output interfaces are connected to the sampling unit; the power multiplier receives the signals of the voltage sampler and the current sampler, mainly for the initial storage and processing of the voltage and current signals. Collection; the voltage frequency converter is connected with the gear adjustment board of the control panel, which is used to select different operating states according to different voltage levels. The gear adjustment board can meet the needs of different metering methods, and the voltage from 50V to 380V can be correct. Metering, through the voltage-frequency converter, the whole recorder can be put into use according to the control of the single-chip microcomputer and the power button; the frequency divider and the counter together constitute a frequency-division sequential logic calculation module for power calculus calculation, which is used to calculate the voltage in real time The power information multiplied by the current is accumulated; the energy display memory is connected to the single-chip microcomputer and the LCD screen respectively, and can receive the control signal of the single-chip microcomputer, the reset signal of the reset button and the hold signal of the hold button, and can also be directly displayed on the LCD screen. Perform real-time display output.

本发明可以在传统的智能型多功能电能表的基础上进行改良,传统安装在客户端的多功能电能表有许多功能,如峰谷平分时计量功能、错接线分析功能、记录最大需量功能等等,这对于漏计电量记录仪来说都是没必要的,因此可以去除其相应的元件模块,做到设计元器件无冗余,这样就可进一步减小仪表的体积和重量,以方便携带,这样的记录仪体积小,重量轻,接线、拆线简单、快捷、方便。 The present invention can be improved on the basis of the traditional intelligent multi-functional electric energy meter. The traditional multi-functional electric energy meter installed on the client side has many functions, such as peak-valley equivalence measurement function, wrong wiring analysis function, maximum demand recording function, etc. etc., this is not necessary for the leakage meter electricity recorder, so its corresponding component modules can be removed to make the design components without redundancy, so that the volume and weight of the meter can be further reduced for easy portability , Such a recorder is small in size, light in weight, simple, fast and convenient in wiring and disconnecting.

实施例二Embodiment two

电能表换表作业漏计电量记录仪,包括采样单元、控制单元、通信单元和电源模块,控制单元与通信单元连接,采样单元、控制单元分别与电源模块连接;控制单元包括控制芯片、计算模块和控制面板,通信单元包括无线通信模块和以太网通信接口;电源模块包括CT取电模块与PT取电模块,CT取电模块与采样单元连接,PT取电模块与控制单元连接;采样单元包括电压采集器和电流采集器;控制芯片包括单片机芯片或DSP芯片;计算模块包括顺次连接的功率乘法器、电压频率变换器、分频器、计数器和电度显示存储器,功率乘法器与采样单元连接,电压频率变换器、分频器、计数器和电度显示存储器分别与控制芯片连接;PT取电模块包括无源感应取能器件以及与其连接的整流降压电路;控制面板包括液晶显示屏、功能按键板、档位调节板和输入输出接口,功能按键板包括电源按键、复位按键和保持按键,输入输出接口与采样单元连接。 Electric energy recorder for meter replacement operation, including sampling unit, control unit, communication unit and power module, the control unit is connected to the communication unit, and the sampling unit and control unit are respectively connected to the power module; the control unit includes a control chip and a computing module and the control panel, the communication unit includes a wireless communication module and an Ethernet communication interface; the power module includes a CT power-taking module and a PT power-taking module, the CT power-taking module is connected to the sampling unit, and the PT power-taking module is connected to the control unit; the sampling unit includes Voltage collector and current collector; control chip includes single-chip microcomputer chip or DSP chip; calculation module includes sequentially connected power multiplier, voltage-frequency converter, frequency divider, counter and energy display memory, power multiplier and sampling unit Connection, the voltage frequency converter, frequency divider, counter and electric degree display memory are respectively connected to the control chip; the PT power-taking module includes passive induction energy-taking devices and a rectification and step-down circuit connected to it; the control panel includes a liquid crystal display, A function key board, a gear adjustment board and an input and output interface. The function key board includes a power button, a reset button and a hold button, and the input and output interfaces are connected to the sampling unit.

在实施例一的基础上,PT取电模块连接后备电池,后备电池连接外置充电锂电池,作为线路停电时短时后备电源使用,平时为浮充电状态,由PT取电模块供电,这样就具有了PT取电后备电源支持功能,保证了设备工作的可持续性,避免了设备欠电情况的发生。 On the basis of Embodiment 1, the PT power-taking module is connected to the backup battery, and the backup battery is connected to an external rechargeable lithium battery, which is used as a short-term backup power supply when the line is powered off. It is usually in a floating charging state and powered by the PT power-taking module. With the support function of PT power-taking backup power supply, it ensures the continuity of equipment work and avoids the occurrence of equipment power shortage.

Claims (9)

1.电能表换表作业漏计电量记录仪,其特征在于:包括采样单元、控制单元、通信单元和电源模块,所述控制单元与所述通信单元连接,所述采样单元、所述控制单元分别与所述电源模块连接;所述控制单元包括控制芯片、计算模块和控制面板,所述通信单元包括无线通信模块和以太网通信接口。 1. Electric energy meter replacement operation leakage meter electric quantity recorder, it is characterized in that: comprise sampling unit, control unit, communication unit and power supply module, described control unit is connected with described communication unit, described sampling unit, described control unit They are respectively connected to the power supply module; the control unit includes a control chip, a computing module and a control panel, and the communication unit includes a wireless communication module and an Ethernet communication interface. 2.如权利要求1所述的电能表换表作业漏计电量记录仪,其特征在于:所述电源模块包括CT取电模块与PT取电模块,所述CT取电模块与所述采样单元连接,所述PT取电模块与所述控制单元连接。 2. The electric energy recorder for electric energy meter replacement operation leakage metering as claimed in claim 1, characterized in that: the power supply module includes a CT power-taking module and a PT power-taking module, and the CT power-taking module and the sampling unit connected, the PT power-taking module is connected with the control unit. 3.如权利要求1所述的电能表换表作业漏计电量记录仪,其特征在于:所述采样单元包括电压采集器和电流采集器。 3. The electric energy recorder for electric energy meter replacement operation leakage meter according to claim 1, characterized in that: the sampling unit includes a voltage collector and a current collector. 4.如权利要求1所述的电能表换表作业漏计电量记录仪,其特征在于:所述控制芯片包括单片机芯片或DSP芯片。 4. The electric energy recorder for electricity meter replacement operation leakage meter according to claim 1, characterized in that: said control chip comprises a single-chip microcomputer chip or a DSP chip. 5.如权利要求1所述的电能表换表作业漏计电量记录仪,其特征在于:所述计算模块包括顺次连接的功率乘法器、电压频率变换器、分频器、计数器和电度显示存储器,所述功率乘法器与所述采样单元连接,所述电压频率变换器、所述分频器、所述计数器和所述电度显示存储器分别与所述控制芯片连接。 5. The electric energy recorder for meter replacement operation leakage metering as claimed in claim 1, characterized in that: the calculation module includes a power multiplier, a voltage-frequency converter, a frequency divider, a counter and an electric degree connected in sequence display memory, the power multiplier is connected to the sampling unit, and the voltage frequency converter, the frequency divider, the counter and the electricity display memory are respectively connected to the control chip. 6.如权利要求1所述的电能表换表作业漏计电量记录仪,其特征在于:所述控制面板包括液晶显示屏、功能按键板、档位调节板和输入输出接口,所述功能按键板包括电源按键、复位按键和保持按键,所述输入输出接口与所述采样单元连接。 6. The electric energy recorder for electric energy meter replacement operation leakage metering as claimed in claim 1, characterized in that: the control panel includes a liquid crystal display, a function button board, a gear adjustment board and an input and output interface, and the function buttons The board includes a power button, a reset button and a hold button, and the input and output interfaces are connected with the sampling unit. 7.如权利要求2所述的电能表换表作业漏计电量记录仪,其特征在于:所述PT取电模块包括无源感应取能器件以及与其连接的整流降压电路。 7. The electric energy recorder for electric energy meter replacement operation leakage meter according to claim 2, characterized in that: said PT power acquisition module includes a passive inductive energy acquisition device and a rectification and voltage reduction circuit connected thereto. 8.如权利要求1或2所述的电能表换表作业漏计电量记录仪,其特征在于:所述电源模块连接后备电池,所述后备电池包括充电锂电池。 8. The electric energy recorder for electric energy meter replacement operation leakage meter according to claim 1 or 2, characterized in that: the power module is connected to a backup battery, and the backup battery includes a rechargeable lithium battery. 9.电能表换表作业漏计电量记录仪的使用方法,其特征在于,包括如下步骤: 9. The method of using the meter-replacing operation of the electric energy meter leakage meter electricity recorder is characterized in that it includes the following steps: 1)在记录仪的输入输出接口接入带有插接头的专用仪表软导线; 1) Connect the special instrument soft wire with plug connector to the input and output interface of the recorder; 2)调节控制面板上的档位调节板,将记录仪转换到电能/kWh档位,同时复位仪器度数显示清零; 2) Adjust the gear adjustment plate on the control panel, switch the recorder to the electric energy/kWh gear, and reset the instrument’s degree display to zero at the same time; 3)按照次序,将被换电能表电压回路的电压并联接入记录仪,再将被换电能表电流回路的电流在端子排处并联接入记录仪; 3) In order, connect the voltage of the voltage circuit of the replaced electric energy meter to the recorder in parallel, and then connect the current of the current circuit of the electric energy meter to be replaced to the recorder in parallel at the terminal block; 4)启动记录仪,开始进行漏计电量记录,同时更换电能表,先拆除被换电能表的电流回路,后拆除被换电能表的电压回路; 4) Start the recorder, start recording the leakage meter, and replace the electric energy meter at the same time, first remove the current circuit of the replaced electric energy meter, and then remove the voltage circuit of the replaced electric energy meter; 5)将新更换的电能表接入用电线路中,按照先接入电压回路,后接入电流回路的顺序; 5) Connect the newly replaced watt-hour meter into the power line, in the order of connecting to the voltage circuit first, and then connecting to the current circuit; 6)完成新旧电能表的更换后,将记录仪拆除,按照先拆除电流回路、后拆除电压回路的顺序,并清理工作现场,例行相关工作手续,此时记录仪的表度示值即为换表期间漏计的电量。 6) After the replacement of the old and new electric energy meters is completed, remove the recorder, follow the sequence of removing the current loop first, and then remove the voltage loop, and clean up the work site, and perform routine related work procedures. At this time, the meter indication value of the recorder is The amount of electricity that was leaked during meter replacement.
CN201510426352.8A 2015-07-20 2015-07-20 Missing electric quantity recorder for electric energy meter changing work and using method thereof Pending CN106370926A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510426352.8A CN106370926A (en) 2015-07-20 2015-07-20 Missing electric quantity recorder for electric energy meter changing work and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510426352.8A CN106370926A (en) 2015-07-20 2015-07-20 Missing electric quantity recorder for electric energy meter changing work and using method thereof

Publications (1)

Publication Number Publication Date
CN106370926A true CN106370926A (en) 2017-02-01

Family

ID=57879820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510426352.8A Pending CN106370926A (en) 2015-07-20 2015-07-20 Missing electric quantity recorder for electric energy meter changing work and using method thereof

Country Status (1)

Country Link
CN (1) CN106370926A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104574915A (en) * 2015-01-23 2015-04-29 国家电网公司 Carrier type power acquisition equipment and carrier test equipment thereof
CN107703356A (en) * 2017-09-30 2018-02-16 国网河南省电力公司濮阳供电公司 A kind of intelligent electric energy meter with voice broadcast function
CN109001511A (en) * 2018-08-29 2018-12-14 南京觅丹电子信息有限公司 A kind of micro- ammeter
CN109541300A (en) * 2019-01-10 2019-03-29 国网青海省电力公司电力科学研究院 A kind of the Analysis of energy metering instrument and its application method of count by time sharing
CN110768378A (en) * 2019-10-29 2020-02-07 广州供电局有限公司 Measurement load control terminal
CN111474396A (en) * 2020-04-23 2020-07-31 国网天津市电力公司 Electric energy meter with electric meter changing function
CN113075449A (en) * 2021-03-26 2021-07-06 国网江苏省电力有限公司镇江供电分公司 Portable electric quantity measuring instrument
CN114113723A (en) * 2021-11-19 2022-03-01 云南电网有限责任公司电力科学研究院 Electric energy meter live-line replacement method and device without electric quantity loss
CN114325012A (en) * 2021-12-21 2022-04-12 安徽南瑞中天电力电子有限公司 A device for changing a meter without power failure on a low-voltage side and an operation method for changing the meter
CN115769595A (en) * 2020-06-26 2023-03-07 三菱电机株式会社 Communication terminal, communication system, power saving control method, and power saving control program

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102062814A (en) * 2009-11-16 2011-05-18 上海安科瑞电气股份有限公司 ZIGBEE technology-based three-phase guide rail-type installed electric energy meter
CN102393480A (en) * 2011-11-11 2012-03-28 天津市电力公司 Electric quantity compensation method during live replacement of electric energy meter
CN202372549U (en) * 2011-11-11 2012-08-08 天津市电力公司 Electric quantity compensation device for hot-line electric energy meter replacement
CN103245809A (en) * 2013-06-03 2013-08-14 国家电网公司 Portable electric quantity remedying device and electric energy meter replacing method for accurate metering
CN204044202U (en) * 2014-07-25 2014-12-24 国家电网公司 A kind of power failure changes the Apparatus and system of electric energy meter

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102062814A (en) * 2009-11-16 2011-05-18 上海安科瑞电气股份有限公司 ZIGBEE technology-based three-phase guide rail-type installed electric energy meter
CN102393480A (en) * 2011-11-11 2012-03-28 天津市电力公司 Electric quantity compensation method during live replacement of electric energy meter
CN202372549U (en) * 2011-11-11 2012-08-08 天津市电力公司 Electric quantity compensation device for hot-line electric energy meter replacement
CN103245809A (en) * 2013-06-03 2013-08-14 国家电网公司 Portable electric quantity remedying device and electric energy meter replacing method for accurate metering
CN204044202U (en) * 2014-07-25 2014-12-24 国家电网公司 A kind of power failure changes the Apparatus and system of electric energy meter

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104574915B (en) * 2015-01-23 2018-03-23 国家电网公司 A kind of carrier system electric power acquisition equipment and its carrier test equipment
CN104574915A (en) * 2015-01-23 2015-04-29 国家电网公司 Carrier type power acquisition equipment and carrier test equipment thereof
CN107703356A (en) * 2017-09-30 2018-02-16 国网河南省电力公司濮阳供电公司 A kind of intelligent electric energy meter with voice broadcast function
CN109001511B (en) * 2018-08-29 2024-05-31 南京觅丹电子信息有限公司 Micro-ammeter
CN109001511A (en) * 2018-08-29 2018-12-14 南京觅丹电子信息有限公司 A kind of micro- ammeter
CN109541300A (en) * 2019-01-10 2019-03-29 国网青海省电力公司电力科学研究院 A kind of the Analysis of energy metering instrument and its application method of count by time sharing
CN110768378A (en) * 2019-10-29 2020-02-07 广州供电局有限公司 Measurement load control terminal
CN111474396A (en) * 2020-04-23 2020-07-31 国网天津市电力公司 Electric energy meter with electric meter changing function
CN115769595A (en) * 2020-06-26 2023-03-07 三菱电机株式会社 Communication terminal, communication system, power saving control method, and power saving control program
CN113075449A (en) * 2021-03-26 2021-07-06 国网江苏省电力有限公司镇江供电分公司 Portable electric quantity measuring instrument
CN114113723A (en) * 2021-11-19 2022-03-01 云南电网有限责任公司电力科学研究院 Electric energy meter live-line replacement method and device without electric quantity loss
CN114325012A (en) * 2021-12-21 2022-04-12 安徽南瑞中天电力电子有限公司 A device for changing a meter without power failure on a low-voltage side and an operation method for changing the meter
CN114325012B (en) * 2021-12-21 2024-09-13 安徽南瑞中天电力电子有限公司 A low-voltage side non-stop power meter replacement device and a meter replacement operation method thereof

Similar Documents

Publication Publication Date Title
CN102262200B (en) Portable power quality and fault recording integrated device
CN201352234Y (en) Three-phase multifunctional electric energy meter
CN201035054Y (en) Portable power quality monitoring analyzer based on dual CPU mode
CN201352233Y (en) Three-phase multifunctional electric energy meter with power carrier communication
CN202486224U (en) Line loss measuring and calculating device of power distribution network
CN101776702B (en) Optical fiber electric energy meter
CN100568310C (en) A meter reading method, system and user terminal device for an electric energy meter
CN202189099U (en) Portable monitor
CN203786168U (en) Three-phase high-precision multifunctional electric energy meter
CN211478477U (en) A remote online monitoring device for power quality of distribution network
CN107024615B (en) Direct access type three-dimensional metering electric energy meter
CN210775648U (en) Three-phase electric energy meter system
CN207518272U (en) A kind of low-voltage intelligent idle compensating control
CN102148535A (en) Intelligent instrument for managing household power utilization
CN207894996U (en) A kind of solar photovoltaic power plant electric energy metered system
CN203553956U (en) Rural 10kV electric power circuit reactive power compensation controller
CN202474492U (en) Multifunctional socket capable of sensing peak-valley electrical measurement and controlling electric devices based on PLC communication
CN205608103U (en) Portable electric energy quality monitoring appearance of full touch screen
CN206773040U (en) A kind of intelligent electric energy meter
CN103869115A (en) Three-phase high-precision multifunctional watt-hour meter
CN204330894U (en) A kind of transformer loss proving installation
CN203929939U (en) Platform district identifier
CN201583593U (en) An optical fiber electric energy meter
CN211478638U (en) A handheld smart meter carrier module detection device
CN201821113U (en) A comprehensive display controller for low-voltage reactive power automatic compensation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170201