CN106356849A - Power distribution network reconstruction multi-objective optimization method containing section switch configuration - Google Patents

Power distribution network reconstruction multi-objective optimization method containing section switch configuration Download PDF

Info

Publication number
CN106356849A
CN106356849A CN201610932525.8A CN201610932525A CN106356849A CN 106356849 A CN106356849 A CN 106356849A CN 201610932525 A CN201610932525 A CN 201610932525A CN 106356849 A CN106356849 A CN 106356849A
Authority
CN
China
Prior art keywords
distribution network
power distribution
centerdot
block switch
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610932525.8A
Other languages
Chinese (zh)
Other versions
CN106356849B (en
Inventor
张博颐
张波
张长行
张利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG SHANDONG UNIVERSITY ELECTRIC POWER TECHNOLOGY Co Ltd
Original Assignee
SHANDONG SHANDONG UNIVERSITY ELECTRIC POWER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG SHANDONG UNIVERSITY ELECTRIC POWER TECHNOLOGY Co Ltd filed Critical SHANDONG SHANDONG UNIVERSITY ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN201610932525.8A priority Critical patent/CN106356849B/en
Publication of CN106356849A publication Critical patent/CN106356849A/en
Application granted granted Critical
Publication of CN106356849B publication Critical patent/CN106356849B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/004Artificial life, i.e. computing arrangements simulating life
    • G06N3/006Artificial life, i.e. computing arrangements simulating life based on simulated virtual individual or collective life forms, e.g. social simulations or particle swarm optimisation [PSO]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • Biomedical Technology (AREA)
  • Biophysics (AREA)
  • Computational Linguistics (AREA)
  • Data Mining & Analysis (AREA)
  • Evolutionary Computation (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Molecular Biology (AREA)
  • Artificial Intelligence (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Mathematical Physics (AREA)
  • Software Systems (AREA)
  • Health & Medical Sciences (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a power distribution network reconstruction multi-objective optimization method containing section switch configuration. The method comprises the following steps: constructing a global optimal multi-objective power distribution network reconstruction model for system reliability, electric energy loss as well as section switch installation and operating cost; using an ant colony algorithm to solve the reconstruction model; obtaining an optimal solution of the multi-objective power distribution network reconstruction model; and optimizing the quantity and positions of power distribution network switches according to the optimal solution so as to realize the global optimal multi-objective power distribution network reconstruction. The method has the beneficial effects that the system reliability can be greatly improved through optimal configuration of section switches according to the method provided by the invention, and the overall system cost can be greatly reduced.

Description

A kind of power distribution network reconfiguration Multipurpose Optimal Method containing block switch configuration
Technical field
The invention belongs to Automatization in Power Distribution Network technical field, more particularly, to a kind of joining containing block switch configuration Reconfiguration of electric networks Multipurpose Optimal Method.
Background technology
With the rapidly growth to electricity needs for the society, for Utilities Electric Co., transmission reliability and power transmission efficiency become Obtain more and more important.Power outage is generally primarily focused in distribution rank.Improve customer electricity satisfaction, electric power in order to overall Company needs to improve power supply reliability, and this also becomes Utilities Electric Co. and is planning one of focus with operation stage.Another Aspect, electric energy loss also occurs mostly in distribution, and therefore, the planning of power distribution network must pay close attention to subtracting of loss with running simultaneously Few, to improve systematic economy benefit.For effectively reducing the recovery time after the system failure, the installation of block switch is just in power distribution network Middle popularization.The selection of quantity, position and block switch type that block switch is installed has to distribution network reliability and economy Prominent impact.Power distribution network reconfiguration changes network topology structure by changing the open and-shut mode of interconnection switch and block switch, It is to reduce system recovery time, the important measures of raising power supply reliability.Therefore it is directed to above-mentioned factor foundation and can take into account two sides The reconstruction method of power distribution network of face demand is significantly.
It has been proposed that Fault traversal algorithm, Failure Mode Effective Analysis method, interval in terms of evaluating reliability of distribution network The methods such as algorithm, but the feature how to plan with reference to distribution switch in evaluating reliability of distribution network not yet has research.Intelligence is calculated Method has more application in terms of power distribution network reconfiguration, on the premise of meeting certain optimization aim, can realize the optimization of power distribution network Reconstruct.Wherein, have research using simulated annealing solve staging device location problem, object function by system reliability, set Standby input and maintenance cost three part composition;Triple population optimal algorithms (tpso), improvement ant group algorithm (acs), mixing are whole Number linear programming method is also used for solving block switch location problem in power distribution network;Based on " modern heuristic " random search optimizing The artificial fish-swarm algorithm (afsa) of technology has application in the switch location problem considering client's power failure cost.
Reduce electric energy loss, be also a key factor of impact power distribution network reconfiguration.In view of system reliability and loss Between influence each other, have research using binary particle swarm algorithm (bpso) solve containing Reliability Index and transmission of electricity damage The power distribution network reconfiguration problem of consumption compound target function.Algorithm aspect, micro-oxidation test (μ ga) is solving medium voltage distribution network reconstruct There is application in multi-objective optimization question;Ant group algorithm (aco) have positive feedback, Distributed Calculation, initial value is relied on little and can The features such as with global search optimal solution, also there is application in power distribution network optimum reconstruction, and have research according to power distribution network open loop The feature run, ant group algorithm is improved it is ensured that after search each time power distribution network tree, improve computing Speed.
But, in the research of above-mentioned power distribution network reconfiguration, there is following deficiency:
One be object function consideration comprehensive not enough, block switch to system reliability, Transmission Loss and costliness Install and not yet inquire into the overall balance of operating cost;
Two is in power distribution network reconfiguration, only using the open and close having switched state as decision content, not yet considers block switch The impact to system reliability for the position.
Content of the invention
The purpose of the present invention is exactly to solve the above problems it is proposed that a kind of power distribution network reconfiguration containing block switch configuration Multipurpose Optimal Method, the method constructing system reliability, electric energy loss and block switch are installed with operating cost totally Excellent multi-objective Reconfiguration of Distribution Network model, and quantity and the position of power distribution network switch are optimized it is achieved that many mesh using ant group algorithm The power distribution network reconfiguration of mark total optimization.
For achieving the above object, the concrete scheme of the present invention is as follows:
A kind of power distribution network reconfiguration Multipurpose Optimal Method containing block switch configuration, comprises the following steps:
(1) input system topological relation, load data and dependability parameter;
(2) multiple target with operating cost global optimum installed by constructing system reliability, electric energy loss and block switch Power distribution network reconfiguration model;
(3) initialize ant group algorithm parameter in search space, initialize iterationses n=1;
(4) according to the pheromone level on path, ant colony is allowed to select path to reach " at food ";Obtain the position of system switching Put list, and then change system topological relation;
(5) all paths passed by according to ant colony, draw the optimal solution of object function in current iteration, and according to local and Overall criterion fresh information prime number value;The optimal solution of object function empty position of the switch list in storage current iteration;
(6) installed and operating cost according to systems reliability analysis, electric energy loss amount and block switch, to current iteration The optimal solution that the optimal solution of the object function obtaining is obtained with front an iteration is compared, and updates optimal solution;
(7) loop iteration, until iterationses reach maximum iteration time set in advance or target is not further excellent Change;Obtain the optimal solution of multi-objective Reconfiguration of Distribution Network model;
(8) quantity and the position of power distribution network switch are optimized it is achieved that the power distribution network of multiple target total optimization according to optimal solution Reconstruct.
Further, in described step (2), the multi-objective Reconfiguration of Distribution Network model of structure particularly as follows:
Minj=ω1·(ecost+sc)+ω2·el;
Constraints is:
δvn≤δvmax
ib≤imax
σ i = 1 n i p i ≤ δp m a x ;
π b = 1 n b k n b = 1 ;
Wherein, ω1For the weight of Reliability Index, ω2For the weight of transmission losses, ecost refers to for system reliability Scalar functions, sc is switch cost function, and el is system transmission losses function;δvnFor the voltage drop-out value of node, δ vmaxFor section The maximum voltage drop-out value that point allows, ibThe absolute value of electric current, i is flow through in circuitmaxFor maximum transmitted electric current, p in circuitiIt is negative The active power of user, n under lotus pointiPower lower user's intersection for feeder line, δ pmaxFor transformer capacity,For ensureing power distribution network It is the state of open loop operation.
Further, described Reliability Index function particularly as follows:
e c o s t = σ t = 1 t ( σ b = 1 n b λ b · l b · ( σ k = 1 ct b σ j = 1 nr b p ( k . j ) · c k ( d , b ) + σ k = 1 ct b σ j = 1 ns b p ( k . j ) · c k ( d , b ) ) ) · ( 1 + i r ) t - 1 · ( 1 + d r ) - 1 ( t - 1 ) ;
Wherein, t is the time cycle, nbFor circuit sum, λbFor circuit failure rate, lbFor line length, ctbIt is to work as When breaking down on circuit, the type sum of affected load, nrbIt is when breaking down on circuit, persistently have a power failure is negative Lotus point sum, p (k, j) is the average load of different user types under different load point, ck(d, b) is to occur on circuit b to continue d During the power failure of individual hour, the function that different load type suffers a loss because of power failure, nsbDuring for line failure, temporarily stop The load point number of electricity, ir is load annual average rate of increase, and dr is load annual rate of descent.
Further, described switch cost function particularly as follows:
s c = c i s + σ t = 1 t m c · n s · ( 1 + d r ) - 1 ( t - 1 ) ;
Wherein, cis is the expense installing a new block switch, nsFor the number of the new block switch installed, mc is every Individual block switch is safeguarded and every annual operating cost, and dr is load annual rate of descent.
Further, described system transmission losses function particularly as follows:
e l = σ t = 1 t ( σ b = 1 n b 8760 · i b t 2 · r b · e p · ( 1 + d r ) - 1 ( t - 1 ) ) ;
Wherein, ibtFor flowing through the absolute value of line current, rbFor the resistance of circuit, epFor electric energy average price, dr is negative Lotus annual rate of descent.
Further, in described step (5) local criterion particularly as follows: in the range of whole search space distribution information Element, with the increase of iterationses, its numerical value will be gradually reduced, to ensure that path gradually weakens to the captivation of ant colony;
The computing formula of described local criterion is as follows:
τ i , j x , y ( n ) = ( 1 - ρ ) · τ i , j x , y ( n - 1 ) + τ c ;
Wherein, ρ is pheromones evaporation rate;For the pheromones numerical value of i, j on path in (n-1)th iteration, τcFor positive constant.
Further, in described step (5), overall criterion refers to the Pheromone update that optimal path is carried out, particularly as follows: On path bulk information element being distributed to optimal solution in iteration each time;
The computing formula of described overall situation criterion is as follows:
τ x , y ( n ) = τ x , y ( n - 1 ) + ρ · j b e s t ( n ) j b e s t ;
Wherein,For the pheromones numerical value of i, j on path in (n-1)th iteration, ρ is pheromones evaporation rate, jbestN () is the optimal solution solving after current iteration, jbestIt is by the optimal result in front n iteration.
Further, in described step (6), method that system reliability is analyzed particularly as follows:
1) define the binary vector of block switch installation site and interconnection switch opening and closing state;List whole events that have a power failure Barrier;
2) for power-off fault each time, power failure position is determined by the chopper of searching of line upstream and downstream;
3) by power supply interrupted district is isolated to the chopper in line upstream downstream and the action of block switch;
4) classified according to user's requirement different to power supply reliability, by user type be divided into resident, commercial and Small amount straight power purchase user;
5) impact causing according to having a power failure is analyzed to the overall reliability of system.
Further, described step 1) in,
For the position of block switch can be installed, block switch is not installed in 0 this position of expression, 1 this position of expression Put and be mounted with block switch;
For the interconnection switch installed, with binary vector be 1, the 0 opening and closing shape representing interconnection switch respectively State.
Beneficial effects of the present invention:
The present invention passes through constructing system reliability, electric energy loss and block switch and installs and operating cost global optimum Multi-objective Reconfiguration of Distribution Network model, and using ant group algorithm optimize power distribution network switch quantity with position it is achieved that multiple target is whole The optimum power distribution network reconfiguration of body.
When carrying out systems reliability analysis, take into full account the impact to system reliability of the position of the switch of segmentation so that Analysis result is more accurately and reliably.
Practice result proves, method proposed by the present invention can greatly improve system by distributing block switch rationally Reliability, and system whole cost can be significantly reduced.
Brief description
Fig. 1 is assessment system reliability (fmea) flow chart in the present invention;
Fig. 2 is ant group algorithm of the present invention (aco) flow chart;
Fig. 3 distribution network system structure chart used by present invention test;
Fig. 4 is distribution network system structure chart after system reconfiguration.
Specific embodiment:
The present invention is described in detail below in conjunction with the accompanying drawings:
A kind of the invention discloses power distribution network reconfiguration Multipurpose Optimal Method containing block switch configuration, as shown in Fig. 2 bag Include following steps:
(1) input system topological relation, load data and dependability parameter;
(2) multiple target with operating cost global optimum installed by constructing system reliability, electric energy loss and block switch Power distribution network reconfiguration model;
The construction method of target power distribution network reconfiguration model is as follows:
First, each several part of objective function:
1) reliability index:
e c o s t = σ t = 1 t ( σ b = 1 n b λ b · l b · ( σ k = 1 ct b σ j = 1 nr b p ( k . j ) · c k ( d , b ) + σ k = 1 ct b σ j = 1 ns b p ( k . j ) · c k ( d , b ) ) ) · ( 1 + i r ) t - 1 · ( 1 + d r ) - 1 ( t - 1 )
In formula: t is the time cycle (year), nbFor circuit sum, λbFor circuit failure rate (fault rate/kilometer-year), lbFor line length, ctbIt is when breaking down on circuit, the type sum of affected load, nrbIt is when generation on circuit During fault, the load point persistently having a power failure is total, and p (k, j) is the average load of different user types under different load point, ck(d, When b) being the power failure that lasting d hour is occurred on circuit b, the function that different load type suffers a loss because of power failure, nsbFor line When breaking down in road, the load point number of brief power outage, ir is load annual average rate of increase, and dr is load annual rate of descent.
In above-mentioned reliability index, nrbnsbRelevant with the number and location of block switch in system;(1+ir)t-1With (1+dr)-1(t-1)React the change of load level.
2) system transmission losses function:
e l = σ t = 1 t ( σ b = 1 n b 8760 · i b t 2 · r b · e p · ( 1 + d r ) - 1 ( t - 1 ) ) ;
In formula: ibtFor flowing through the absolute value of line current, rbFor the resistance of circuit, epFor electric energy average price.
3) switch expense, comprise switch purchase and mounting cost and follow-up maintenance operation expense:
s c = c i s + σ t = 1 t m c · n s · ( 1 + d r ) - 1 ( t - 1 ) ;
In formula: cis is the expense (unit $) installing a new block switch, nsThe number of the block switch for newly installing, Mc safeguards and every annual operating cost (unit) for each block switch.
Then, the mathematical model of this method is:
Minj=ω1·(ecost+sc)+ω2·el (1)
Constraints: δ vn≤δvmax(2)
ib≤imax(3)
σ i = 1 n i p i ≤ δp m a x - - - ( 4 )
π b = 1 n b k n b = 1 - - - ( 5 )
In formula, ω1For the weight of Reliability Index, it is a constant more than 0;ω2For the weight of transmission losses, It is a constant more than 0, δ vnFor the voltage drop-out value of node, δ vmaxThe maximum voltage drop-out value allowing for node, ibFor The absolute value of electric current, i is flow through in circuitmaxFor maximum transmitted electric current, p in circuitiFor the active power of user under load point, niFor Feeder line is powered lower user's intersection, δ pmaxFor transformer capacity,For ensureing that power distribution network is the state of open loop operation.
Above-mentioned optimization problem is the Solve problems of nonlinear combining functions, and available ant group algorithm (aco) solves.
(3) using ant group algorithm (aco), multi-objective Reconfiguration of Distribution Network model is solved.
First, in each iteration, system reliability adopts failure modes and effects analysis (fmea) Algorithm Analysis, that is, Determine power-off fault possible each time and analyze its impact to user.Particularly, block switch peace defined in analysis Holding position and the binary vector of interconnection switch opening and closing state, for can installing the position of block switch, 0 expression should On position, block switch is not installed, 1 this position of expression is mounted with block switch;For the interconnection switch installed, With binary vector be 1, the 0 opening and closing state representing interconnection switch respectively.
The block diagram of fema algorithm is as shown in figure 1, specifically comprise the following steps that
1) whole power-off faults are listed;
2) for power-off fault each time, power failure position is determined by the chopper of searching of line upstream and downstream;
3) by power supply interrupted district is isolated to the chopper in line upstream downstream and the action of block switch;
4) classified according to user's requirement different to power supply reliability, user type can be divided into resident, commercialization And small amount straight power purchase user;
5) pass through the reliability of the power supply reliability of the dissimilar user of impact analysis causing and system entirety that has a power failure.
The block diagram of the ant group algorithm (aco) of model solution is as shown in Fig. 2 step is as follows:
1) initialize: the initial position of ant colony is all provided in " in family ", and on path, pheromone numerical value is a series of positive Constant;
2) ant colony scheduling: all of Formica fusca is from " " in family, according to status transition criterion, select the next stage is No by a certain path reach " at food ", wherein, status transition criterion is the function of pheromone on path.For example, in the x stage In the case of state i, Formica fusca selects the probability of next stage y state j as follows:
p i , j x , y ( n ) = τ i , j x , y ( n ) σ h &element; δ x , t τ i , j x , y ( n ) - - - ( 6 )
In formula,For pheromones level on path in nth iteration, δx,iFor the selectable total number of paths of ant colony.
3) assess object function: after all Formica fuscas all reach " at food ", the position of switch has determined out, and Object function (1) can also be calculated.In current iteration, if being unsatisfactory for the constraints of (2) (5) it is necessary to give up this Reconfiguration scheme;If constraints is all satisfied, just record the value of the object function after current iteration: jbest(n).And will Optimal result j in result of calculation after this iteration and above all of iterative calculationbestCompare, if nth iteration Result of calculation is better than jbest, then update optimal result, make jbest=jbest(n);If jbest(n)>jbest, then still keep original Optimum reconfiguration scheme;
4) fresh information prime number value: the purpose of this step is to find optimal solution by higher pheromone level.Update letter Breath prime number value will follow two criterions:
1. local criterion: the pheromone of distribution in the range of whole search space, with the increase of iterationses, its numerical value It is gradually reduced, to ensure that path gradually weakens to the captivation of ant colony.The computing formula of local criterion is as follows:
τ i , j x , y ( n ) = ( 1 - ρ ) · τ i , j x , y ( n - 1 ) + τ c - - - ( 7 )
In formula, ρ is pheromone evaporation rate, is one between the number between 1 and 0;For (n-1)th iteration Pheromone numerical value on middle path;τcFor positive constant.
2. overall criterion: global information element replacement criteria is, in iteration each time, bulk information element has been distributed to optimum On the path of solution.Formula is as follows:
τ x , y ( n ) = τ x , y ( n - 1 ) + ρ · j b e s t ( n ) j b e s t - - - ( 8 )
Behind application local and global information element replacement criteria, maximum-minimum ant group algorithm is just integrated into following In equation:
In formula, τmaxFor the pheromone greatest measure allowing on path;
τminFor the pheromone minimum value allowing on path.
Boundary to pheromones setting value minima is it is ensured that the pheromone numerical value on each paths is all greater than 0, algorithm so can be avoided only to find optimal solution in local.
5) move in circles calculating, until reaching maximum iteration time set in advance.
Obtain the optimal solution of multi-objective Reconfiguration of Distribution Network model;Optimize quantity and the position of power distribution network switch according to optimal solution Put it is achieved that the power distribution network reconfiguration of multiple target total optimization.
As a example distribution network system used by test shown in below by Fig. 3, effect of the present invention is verified.Table 1 is to correspond to User data.
The corresponding user data of table 1 distribution network system
Using the inventive method, distribution network system is reconstructed, the distribution network system structure after reconstruct is as shown in Figure 4.
The Comparative result obtaining before and after system reconfiguration is as shown in table 2.
Comparative result before and after the reconstruct of table 2 distribution network system
Table 2 shows, the scheme of system optimization reconstruct needs to increase block switch 18, and this can improve system reliability, makes Index ecost drops to $ 226610 by $ 3363900, and system loss drops to $ 867400 by $ 1000800, and system integrally spends $ 1193100 is dropped to by $ 4364700, have dropped 72.66%.As can be seen here, method proposed by the present invention can be by optimizing Configuration block switch, greatly improves system reliability, and can be significantly reduced system whole cost.
Although the above-mentioned accompanying drawing that combines is described to the specific embodiment of the present invention, not model is protected to the present invention The restriction enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme, and those skilled in the art are not Need to pay the various modifications that creative work can make or deformation still within protection scope of the present invention.

Claims (9)

1. a kind of power distribution network reconfiguration Multipurpose Optimal Method containing block switch configuration, is characterized in that, comprise the following steps:
(1) input system topological relation, load data and dependability parameter;
(2) the multiple target distribution with operating cost global optimum installed by constructing system reliability, electric energy loss and block switch Net reconstruction model;
(3) initialize ant group algorithm parameter in search space, initialize iterationses n=1;
(4) according to the pheromone level on path, ant colony is allowed to select path to reach " at food ";Obtain the location column of system switching Table, and then change system topological relation;
(5) all paths passed by according to ant colony, draw the optimal solution of object function in current iteration, and according to local and the overall situation Criterion fresh information prime number value;The optimal solution of object function empty position of the switch list in storage current iteration;
(6) installed and operating cost according to systems reliability analysis, electric energy loss amount and block switch, current iteration is obtained The optimal solution that obtains with front an iteration of the optimal solution of object function be compared, update optimal solution;
(7) loop iteration, until iterationses reach maximum iteration time set in advance or target does not further optimize;? Optimal solution to multi-objective Reconfiguration of Distribution Network model;
(8) quantity and the position of power distribution network switch are optimized it is achieved that the power distribution network reconfiguration of multiple target total optimization according to optimal solution.
2. a kind of power distribution network reconfiguration Multipurpose Optimal Method containing block switch configuration as claimed in claim 1, is characterized in that, In described step (2), the multi-objective Reconfiguration of Distribution Network model of structure particularly as follows:
Minj=ω1·(ecost+sc)+ω2·el;
Constraints is:
δvn≤δvmax
ib≤imax
σ i = 1 n i p i ≤ δp m a x ;
π b = 1 n b k n b = 1 ;
Wherein, ω1For the weight of Reliability Index, ω2For the weight of transmission losses, ecost is Reliability Index letter Number, sc is switch cost function, and el is system transmission losses function;δvnFor the voltage drop-out value of node, δ vmaxPermit for node The maximum voltage drop-out value permitted, ibThe absolute value of electric current, i is flow through in circuitmaxFor maximum transmitted electric current, p in circuitiFor load point The active power of lower user, niPower lower user's intersection for feeder line, δ pmaxFor transformer capacity,For ensureing that power distribution network is out The state of inscription of loop.
3. a kind of power distribution network reconfiguration Multipurpose Optimal Method containing block switch configuration as claimed in claim 2, is characterized in that, Described Reliability Index function particularly as follows:
e c o s t = σ t = 1 t ( σ b = 1 n b λ b · l b · ( σ k = 1 ct b σ j = 1 nr b p ( k . j ) · c k ( d , b ) + σ k = 1 ct b σ j = 1 ns b p ( k . j ) · c k ( d , b ) ) ) · ( 1 + i r ) t - 1 · ( 1 + d r ) - 1 ( t - 1 ) ;
Wherein, t is the time cycle, nbFor circuit sum, λbFor circuit failure rate, lbFor line length, ctbIt is when on circuit When breaking down, the type sum of affected load, nrbIt is when breaking down on circuit, the load point persistently having a power failure is total Number, p (k, j) is the average load of different user types under different load point, ck(d, b) is to occur on circuit b to continue d hour Power failure when, the function that different load type suffers a loss because of power failure, nsbDuring for line failure, brief power outage negative Lotus point number, ir is load annual average rate of increase, and dr is load annual rate of descent.
4. a kind of power distribution network reconfiguration Multipurpose Optimal Method containing block switch configuration as claimed in claim 2, is characterized in that, Described switch cost function particularly as follows:
s c = c i s + σ t = 1 t m c · n s · ( 1 + d r ) - 1 ( t - 1 ) ;
Wherein, cis is the expense installing a new block switch, nsFor the number of the new block switch installed, mc is each segmentation Switch is safeguarded and every annual operating cost, and dr is load annual rate of descent.
5. a kind of power distribution network reconfiguration Multipurpose Optimal Method containing block switch configuration as claimed in claim 2, is characterized in that, Described system transmission losses function particularly as follows:
e l = σ t = 1 t ( σ b = 1 n b 8760 · i b t 2 · r b · e p · ( 1 + d r ) - 1 ( t - 1 ) ) ;
Wherein, ibtFor flowing through the absolute value of line current, rbFor the resistance of circuit, epFor electric energy average price, dr put down for load year All rates of descent.
6. a kind of power distribution network reconfiguration Multipurpose Optimal Method containing block switch configuration as claimed in claim 1, is characterized in that, Local criterion in described step (5) particularly as follows: in the range of whole search space distribution pheromones, with the increasing of iterationses Plus, its numerical value will be gradually reduced, to ensure that path gradually weakens to the captivation of ant colony;
The computing formula of described local criterion is as follows:
τ i , j x , y ( n ) = ( 1 - ρ ) · τ i , j x , y ( n - 1 ) + τ c ;
Wherein, ρ is pheromones evaporation rate;For the pheromones numerical value on path in (n-1)th iteration, τcFor positive Constant.
7. a kind of power distribution network reconfiguration Multipurpose Optimal Method containing block switch configuration as claimed in claim 1, is characterized in that, Overall criterion in described step (5) particularly as follows: in iteration each time, bulk information element is distributed to optimal solution path on;
The computing formula of described overall situation criterion is as follows:
τ x , y ( n ) = τ x , y ( n - 1 ) + ρ · j b e s t ( n ) j b e s t ;
Wherein,For the pheromones numerical value of i, j on path in (n-1)th iteration, ρ is pheromones evaporation rate, jbest N () is the optimal solution solving after current iteration, jbestIt is by the optimal result in front n iteration.
8. a kind of power distribution network reconfiguration Multipurpose Optimal Method containing block switch configuration as claimed in claim 1, is characterized in that, In described step (6), method that system reliability is analyzed particularly as follows:
1) define the binary vector of block switch installation site and interconnection switch opening and closing state;List whole power-off faults;
2) for power-off fault each time, power failure position is determined by the chopper of searching of line upstream and downstream;
3) by power supply interrupted district is isolated to the chopper in line upstream downstream and the action of block switch;
4) classified according to user's requirement different to power supply reliability, user type is divided into resident, commercial and small amount Straight power purchase user;
5) impact causing according to having a power failure is analyzed to the overall reliability of system.
9. a kind of power distribution network reconfiguration Multipurpose Optimal Method containing block switch configuration as claimed in claim 8, is characterized in that, Described step 1) in,
For the position of block switch can be installed, block switch is not installed in 0 this position of expression, 1 represents on this position It is mounted with block switch;
For the interconnection switch installed, with binary vector be 1, the 0 opening and closing state representing interconnection switch respectively.
CN201610932525.8A 2016-10-31 2016-10-31 A kind of power distribution network reconfiguration Multipurpose Optimal Method of the configuration containing block switch Active CN106356849B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610932525.8A CN106356849B (en) 2016-10-31 2016-10-31 A kind of power distribution network reconfiguration Multipurpose Optimal Method of the configuration containing block switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610932525.8A CN106356849B (en) 2016-10-31 2016-10-31 A kind of power distribution network reconfiguration Multipurpose Optimal Method of the configuration containing block switch

Publications (2)

Publication Number Publication Date
CN106356849A true CN106356849A (en) 2017-01-25
CN106356849B CN106356849B (en) 2018-12-11

Family

ID=57863667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610932525.8A Active CN106356849B (en) 2016-10-31 2016-10-31 A kind of power distribution network reconfiguration Multipurpose Optimal Method of the configuration containing block switch

Country Status (1)

Country Link
CN (1) CN106356849B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107017618A (en) * 2017-03-15 2017-08-04 中国电力科学研究院 A kind of active power distribution network division of the power supply area method and device
CN107392350A (en) * 2017-06-08 2017-11-24 国网宁夏电力公司电力科学研究院 Power distribution network Expansion Planning comprehensive optimization method containing distributed energy and charging station
CN107704959A (en) * 2017-09-30 2018-02-16 深圳供电局有限公司 A kind of power system rack reconstructing method that dimensionality reduction is realized based on ant group algorithm
CN108110766A (en) * 2018-01-23 2018-06-01 华翔翔能电气股份有限公司 A kind of transformer load management method and device towards wisdom garden
CN108182498A (en) * 2018-01-15 2018-06-19 国网黑龙江省电力有限公司电力科学研究院 The restorative reconstructing method of distribution network failure
CN109902964A (en) * 2019-03-04 2019-06-18 广东电网有限责任公司 A kind of design of feeder automation terminal configuration method and device
CN111355237A (en) * 2020-04-14 2020-06-30 贵州电网有限责任公司 Test system and method based on power distribution network model
CN112531655A (en) * 2020-11-19 2021-03-19 广西电网有限责任公司电力科学研究院 Rapid optimization configuration method and system for distribution network feeder line section switch
CN112926187A (en) * 2021-01-28 2021-06-08 国网浙江省电力有限公司金华供电公司 Method for analyzing and optimizing economic operation of power distribution network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102412574A (en) * 2011-11-28 2012-04-11 上海市电力公司 Restructuring algorithm for distribution network
CN102820648A (en) * 2012-08-03 2012-12-12 冶金自动化研究设计院 Method for reconstructing power distribution networks of iron and steel enterprises
CN102868161A (en) * 2012-10-23 2013-01-09 四川大学 Optimization method of network variable structure with distributed type power supply distribution system
CN103457263A (en) * 2013-09-17 2013-12-18 国家电网公司 Intelligent active power distribution network reestablishing method based on largest power supply capacity

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102412574A (en) * 2011-11-28 2012-04-11 上海市电力公司 Restructuring algorithm for distribution network
CN102820648A (en) * 2012-08-03 2012-12-12 冶金自动化研究设计院 Method for reconstructing power distribution networks of iron and steel enterprises
CN102868161A (en) * 2012-10-23 2013-01-09 四川大学 Optimization method of network variable structure with distributed type power supply distribution system
CN103457263A (en) * 2013-09-17 2013-12-18 国家电网公司 Intelligent active power distribution network reestablishing method based on largest power supply capacity

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107017618A (en) * 2017-03-15 2017-08-04 中国电力科学研究院 A kind of active power distribution network division of the power supply area method and device
CN107392350A (en) * 2017-06-08 2017-11-24 国网宁夏电力公司电力科学研究院 Power distribution network Expansion Planning comprehensive optimization method containing distributed energy and charging station
CN107392350B (en) * 2017-06-08 2021-08-13 国网宁夏电力公司电力科学研究院 Comprehensive optimization method for power distribution network extension planning containing distributed energy and charging stations
CN107704959B (en) * 2017-09-30 2021-06-15 深圳供电局有限公司 Electric power system grid reconstruction method for achieving dimensionality reduction based on ant colony algorithm
CN107704959A (en) * 2017-09-30 2018-02-16 深圳供电局有限公司 A kind of power system rack reconstructing method that dimensionality reduction is realized based on ant group algorithm
CN108182498A (en) * 2018-01-15 2018-06-19 国网黑龙江省电力有限公司电力科学研究院 The restorative reconstructing method of distribution network failure
CN108110766A (en) * 2018-01-23 2018-06-01 华翔翔能电气股份有限公司 A kind of transformer load management method and device towards wisdom garden
CN108110766B (en) * 2018-01-23 2019-01-11 华翔翔能电气股份有限公司 A kind of transformer load management method and device towards wisdom garden
CN109902964A (en) * 2019-03-04 2019-06-18 广东电网有限责任公司 A kind of design of feeder automation terminal configuration method and device
CN109902964B (en) * 2019-03-04 2023-01-31 广东电网有限责任公司 Power distribution network feeder automation terminal configuration method and device
CN111355237A (en) * 2020-04-14 2020-06-30 贵州电网有限责任公司 Test system and method based on power distribution network model
CN112531655A (en) * 2020-11-19 2021-03-19 广西电网有限责任公司电力科学研究院 Rapid optimization configuration method and system for distribution network feeder line section switch
CN112926187A (en) * 2021-01-28 2021-06-08 国网浙江省电力有限公司金华供电公司 Method for analyzing and optimizing economic operation of power distribution network
CN112926187B (en) * 2021-01-28 2022-12-30 国网浙江省电力有限公司金华供电公司 Method for analyzing and optimizing economic operation of power distribution network

Also Published As

Publication number Publication date
CN106356849B (en) 2018-12-11

Similar Documents

Publication Publication Date Title
CN106356849B (en) A kind of power distribution network reconfiguration Multipurpose Optimal Method of the configuration containing block switch
Mahmoud et al. The role of intelligent generation control algorithms in optimizing battery energy storage systems size in microgrids: A case study from Western Australia
Moser et al. A MILP-based modular energy management system for urban multi-energy systems: Performance and sensitivity analysis
Yin et al. Distribution feeder scheduling considering variable load profile and outage costs
Ahmadi et al. Information-gap decision theory for robust security-constrained unit commitment of joint renewable energy and gridable vehicles
Chazarra et al. Stochastic optimization model for the weekly scheduling of a hydropower system in day-ahead and secondary regulation reserve markets
CN104820864A (en) Full-view fault recovery game method of intelligent power distribution network comprising distributed power source
Novoselnik et al. Electrical power distribution system reconfiguration: Case study of a real-life grid in Croatia
Zhao et al. Multistage active distribution network planning with restricted operation scenario selection
Amosedinakaran et al. Generation expansion planning for a real-world power system: aiming towards cost and environmental emission minimization by penetrating huge renewable energy sources
Matijašević et al. A systematic review of machine learning applications in the operation of smart distribution systems
Abid et al. Multi-objective architecture for strategic integration of distributed energy resources and battery storage system in microgrids
Zambelli et al. Long-term hydropower scheduling based on deterministic nonlinear optimization and annual inflow forecasting models
Almassalkhi et al. Incorporating storage as a flexible transmission asset in power system operation procedure
Tică et al. Annual performance estimation of a multireservoir system including a pumped storage plant for the mean hydrological year
Muzi et al. Smart Energy Management of a Prosumer for a Better Environment Safeguard
Rezaeimozafar et al. A hybrid heuristic-reinforcement learning-based real-time control model for residential behind-the-meter PV-battery systems
Tisseur et al. Optimal scheduling of distributed energy storage systems by means of ACO algorithm
Yıldıran et al. MILP based short-term centralized and decentralized scheduling of a hydro-chain on Kelkit River
Chang et al. The use of the peak-clipping method for energy management in households with energy storage equipment
Lata et al. Optimal placement and sizing of energy storage systems to improve the reliability of hybrid power distribution network with renewable energy sources
Donde et al. Short-term load forecasting based capacity check for automated power restoration of electric distribution networks
Senthil Kumar et al. [Retracted] Optimization Technique for Renewable Energy Storage Systems for Power Quality Analysis with Connected Grid
Zambelli et al. Model predictive control applied to the long-term hydrothermal scheduling of the brazilian power system
Matute et al. Transmission expansion planning considering the impact of distributed generation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 250101 high tech Development Zone, Shandong, Zhejiang Province, Ji'nan Road, science and Technology Park

Applicant after: Shandong Mountain Power Technology Limited by Share Ltd

Address before: 250013 hi tech park, No. 2600, Sau Sau Road, Ji'nan hi tech Development Zone, Shandong, China

Applicant before: Shandong Shandong University Electric Power Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant