CN106351134A - Synchronous jacking system and method for underneath passing existing line box culvert - Google Patents

Synchronous jacking system and method for underneath passing existing line box culvert Download PDF

Info

Publication number
CN106351134A
CN106351134A CN201610952581.8A CN201610952581A CN106351134A CN 106351134 A CN106351134 A CN 106351134A CN 201610952581 A CN201610952581 A CN 201610952581A CN 106351134 A CN106351134 A CN 106351134A
Authority
CN
China
Prior art keywords
jack
displacement
pushing tow
box culvert
controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610952581.8A
Other languages
Chinese (zh)
Other versions
CN106351134B (en
Inventor
梁晓东
周怡孝
左雁
熊用
任协平
刘妙群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Lianzhi Technology Co Ltd
Original Assignee
Hunan Lianzhi Bridge and Tunnel Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Lianzhi Bridge and Tunnel Technology Co Ltd filed Critical Hunan Lianzhi Bridge and Tunnel Technology Co Ltd
Priority to CN201610952581.8A priority Critical patent/CN106351134B/en
Publication of CN106351134A publication Critical patent/CN106351134A/en
Application granted granted Critical
Publication of CN106351134B publication Critical patent/CN106351134B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F5/00Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Fluid-Pressure Circuits (AREA)

Abstract

The invention provides a synchronous jacking system for underneath passing an existing line box culvert. A plurality of jack groups, which are arrayed to form one row along a jacking direction, are arranged, so that the frequency of increasing cushion blocks between a rear wall and the jack groups is reduced and the jacking errors are reduced; the requirements on piston rod routes of the jacks are reduced and an applicable range of equipment is enlarged. According to a synchronous jacking method provided by the invention, reversing time of a reversing valve connected with each jack is controlled through a controller to be gradually increased along a direction from small displacement to large displacement of the box culvert, so that the jacking force of each jack is gradually increased along a direction from the large displacement to the small displacement of the box culvert in a synchronous jacking adjusting process; each jack has a stopping action, so that each jack can be independently and accurately controlled and the synchronous adjusting process can also be divided into a plurality of small routes according to requirements; the adjusting process is more accurate and controllable and aims of reasonably adjusting and correcting in real time are realized.

Description

Existing line box culvert synchronization jacking system and jacking method is worn under one kind
Technical field
The present invention relates to genuine jacking construction equipment, particularly, it is related under one kind wear existing line box culvert synchronization jacking system System and jacking method.
Background technology
Under wear more than the box culvert of existing line using the construction of jacking method, jacking construction flow process is: 1. excavates working pit, pours After the prefabricated box culvert body → 3. build on slide plate of slide plate → 2. parados, existing route reinforce → 4. jacking equipment, jacking are installed After box culvert → 5. complete a jacking stroke, place the circulation of fore-set → 6. at neutral and carry out, until jacking is in place.Jacking method Construction can reduce the disturbance to existing line, does not interrupt existing line operation, has the advantages that method is easy, safe and reliable.
" cities and towns Subway Bridge jacking construction and control of acceptance cjj74-99 " specifies, the jacking of box culvert allows that medium line error is: It is ± 200mm during the jacking of one end, be ± 100mm during the jacking of two ends.Therefore, for preventing excessive medium line error, need to strengthen seeing Survey, conscientiously prevent, rectify a deviation in time.
But during practice of construction, by the factor such as soil layer property, jacking technique under box culvert angle of bevel, existing line Influence each other, often occur off-design center line horizontal off normal the problems such as, if untreated, following harmful effect can be caused:
(1) the horizontal off normal of box culvert excessive lead to side cut soil amount backbreak, side owes to dig.Even if righting of rectifying a deviation can be passed through, Side of backbreaking can form large area cavity and causes existing line additionally to settle, and cause route top surface to ftracture when serious.
(2), after laterally off normal is excessive, correction can lead to box culvert front end to cut indigenous equipment (shield machine, the basil) side local pressure Excessive, produce improper deformation and cause box culvert main body concrete destruction.
(3) once off normal transfinites, correction difficulty is big, forces correction to cause box culvert pontic and front end to cut indigenous equipment and produce non-ballistic Property deformation and crackle, harm huge, if not taking any measure, box culvert is with the increase of jacking length, off-design axis Line increasingly severe it is impossible to intercommunication circuit connect suitable.
(4) existing jacking device is made up of hydraulic system and top force system system two large divisions, and this jacking device passes through oil gauge Reading is scaled top force data, reads jack displacement data by artificial survey, and error is larger.Laterally off normal relies on manual monitoring to survey Amount, once box culvert merogenesis quantity is many, panel length big, the responsibility to survey crew and professional standards are individual huge tests, and Efficiency of manual measurement is low, the frequency is low it is impossible to control the medium line error situation of box culvert in time.
(5), after oblique angle box culvert cuts native jacking, form couple because length difference in soil is cut in the left and right sides, force box culvert Along the horizontal off normal in acute angle side, and have to left and right sides Ding Gao position is adjusted with soil depth increase, but Existing jacking device cannot the data such as Real-time Collection each jack top power, displacement, under the conditions of prior art, top pick substantially with box culvert Centrage is arranged symmetrically or unsymmetrical arrangement, and top pick position adjustment is compared blindly, and adjustment does not often reach reasonable request.
Chinese patent 200510111406.8 discloses a kind of computer synchronous propelling method and device, and it adopts computer Hydraulic system control jack group is controlled to complete the synchronous jacking of box culvert, the program is only referred to by box culvert left and right sides peace Dress displacement transducer is used for obtaining the displacement of the box culvert left and right sides, and displacement is big, reduces the oil cylinder speed of the big side of displacement, position Move little, then increase the oil cylinder speed of the little side of displacement, not open specifically detailed oil cylinder adjusted in concert in the program Mode and process.
In sum, under wear in existing line box culvert, control horizontal off normal extremely important, though under the conditions of prior art Enable displacement synchronous, but during displacement adjusted in concert can not " Reasonable adjustment " and " real-time deviation correcting ", box culvert is also easy to produce relatively Horizontal off normal greatly, accordingly, it would be desirable to a kind of scheme is solving this problem.
Content of the invention
Present invention aim at provide wearing existing line box culvert synchronization jacking system and jacking method under one kind, to solve to carry on the back The problem proposing in scape technology.
Existing line box culvert synchronization jacking system is worn, including arranging along box culvert advancing direction for pushing tow box culvert under one kind Jack group, the quantity of described jack group is one or more groups of, and described in every group, jack group includes setting respectively Be placed in the left jack of box culvert the right and left and right jack, jack group described in every group also include being arranged on left jack with 1 between right jack or the middle jack of multiple stage, left jack, right jack and each middle jack are along box culvert laterally side To be arranged in a row and adjacent two jack between box culvert horizontal direction is provided with spacing;Left jack and difference on right jack It is provided with for the left dislocation sensor detecting displacement that box culvert the right and left is occurred in jack-in process and right displacement sensing Device;
Left jack included by Mei Zu jack group, right jack and each middle jack by same oil pump or Between same group of oil pump feed, and the pushing tow oil pocket of described left jack, right jack and each middle jack and retraction oil pocket It is respectively connected with for making jack in pushing tow stroke, retract stroke and the reversal valve stopping switching between stroke three, wherein push up Carry out journey, retract stroke and stop the stroke pushing tow position of corresponding reversal valve, retraction position and middle stop bit respectively;
Left jack, right jack and each middle jack are provided with the pressure for detecting this jack pushing tow pressure Sensor;
Described jack group is additionally provided with controller, described left dislocation sensor, right displacement transducer, reversal valve and pressure Force transducer is electrically connected by controller and controls;Described left dislocation sensor and right displacement transducer are used for anti-to controller respectively Displacement on the right of the displacement on the feedback box culvert left side and box culvert, switching between pushing tow position, retraction position and middle stop bit for the described reversal valve By controller control;
Described pressure transducer is used for the pushing tow force value of Real-time Collection jack and feeds back to controller so that controller can Pushing tow force value based on jack sends the instruction of switching position so that the jacking force of each jack is permissible to each reversal valve in real time Controlled by controlling the commutating period of reversal valve, and then the displacement difference in the jacking direction left and right sides for the real time correction box culvert is (i.e. The horizontal off normal of box culvert);
Described controller is used for, when the displacement difference of left dislocation sensor and right displacement transducer feedback is not equal to 0, first leading to Cross each reversal valve and whole jack switched to termination stroke, then by except displacement big left jack or right jack it Other outer each jack gain to pushing tow stroke, then by successively pushing tow will be in successively to the little direction of displacement greatly along displacement Each jack in stroke switches to termination stroke, that is, make displacement big left jack or right jack suspend top Push away, other each jack continue pushing tows and along displacement greatly to the little direction of displacement successively switch to termination stroke successively and successively first Suspend pushing tow afterwards;Described controller controls other each jack to experience one or more cyclic processes successively suspending pushing tow successively Afterwards, the displacement of the box culvert left side and right bit phase shift etc. is finally made to reach the purpose making box culvert the right and left synchronous.
Further, being respectively connected between each jack is connected reversal valve and its pushing tow oil pocket prevents pushing tow oil pocket from returning The too fast hydraulic control one-way valve of oil, the retraction oil pocket of the control port of each hydraulic control one-way valve jack corresponding with each hydraulic control one-way valve Connection.
Further, it is connected with for increasing pushing tow oil pocket between each jack is connected reversal valve and its pushing tow oil pocket Oil-feed flow and the flow control valve reducing pushing tow oil pocket return flow, flow control valve is by its corresponding controller electrical connection control System.
Further, described synchronous jacking system is provided with multigroup jack group, and each group jack group is along pushing tow direction Form a line, between two adjacent groups jack group, be folded with cushion block.
Further, the controller set by each group jack group be separately provided for each group jack group it Between carry out the wireless communication module of information transmission.
Further, described controller is connected with the touch screen for showing each jack information parameter, the information of display Parameter includes the pressure value of each pressure transducer feedback and the shift value of displacement transducer feedback.
Further, described pressure transducer is the oil pressure sensor and/or setting connecting with each jack pushing tow oil pocket Force transducer in each jack base one end end or pushing end end.
According to wearing existing line box culvert synchronization jacking system under described, present invention also offers wearing existing line case under one kind Contain synchronous jacking method, comprise the following steps:
1) controller receives the displacement of the box culvert left side and the box culvert right bit that left dislocation sensor is fed back with right displacement transducer Move;
2) when on the right of the displacement of the box culvert left side and box culvert, the difference between displacement is not equal to 0, controller passes through each reversal valve Whole jack are switched to termination stroke;
3) controller pass through reversal valve by addition to the left jack or right jack on the big one side of displacement other each thousand Jin is taken one's place and is back to pushing tow stroke;
4) value fed back in step 1 when the displacement that left dislocation sensor or the right displacement transducer on the little one side of displacement feed back On the basis of when increased, controller by pressure transducer gather displacement little left jack or right jack Pushing tow force value is simultaneously stored as thrust trial value fi, controller also gather displacement big right jack or left jack top Thrust magnitude is simultaneously stored as thrust reference value gi;
5) controller is that each middle jack distributes target pushing tow force value according to thrust trial value fi, each middle jack Target pushing tow force value tn is respectively less than fi, and along little direction (the target pushing tow force value of n intermediate jack big to displacement of displacement It is designated as tn), target pushing tow force value tn of each middle jack is successively decreased based on fi successively, amplitude δ of successively decreasing t=(fi-gi)/ (n+1), wherein n is total number of units of middle jack;
6) along displacement greatly to the direction that displacement is little, the real-time jacking force of each middle jack being fed back by pressure transducer After value successively reaches target pushing tow force value tn successively, during each middle jack is successively switched to by controller successively by reversal valve Little for displacement left jack or right jack are finally switched to termination stroke by only stroke;
7) process of repeat step 2~step 6, on the right of the displacement of the box culvert left side and box culvert, the difference between displacement is equal to 0 When, complete adjusted in concert process, whole jack are switched to pushing tow stroke pushing tow is synchronized with identical jacking force.
Heretofore described box culvert horizontal direction refers to the direction vertical with box culvert advancing direction;Heretofore described is very heavy Top includes left jack, right jack and each middle jack;Heretofore described displacement transducer includes left dislocation sensing Device and right displacement transducer, several oil pumps that heretofore described one group of oil pump is pointed out hydraulic fluid port and connected.
The method have the advantages that
The pushing tow system of the present invention is provided with the multigroup jack group forming a line along pushing tow direction, on the one hand can subtract The few frequency increasing cushion block between rear parados and jack group, it is to avoid make jack piston rod return because of cushion block to be increased Contract and cause pushing tow error;On the other hand the requirement of the piston rod stroke to jack can be reduced, when needing Long travel, can lead to Cross the jack group priority pushing tow that end to end multigroup short stroke is set to meet requirement, expand the scope of application of equipment, Beneficial to cost control.
The pushing method that the pushing tow system of the present invention is adopted controls, by controller, the reversal valve that each jack connected Commutating period along the little direction big to displacement of box culvert displacement increase successively thus reach synchronous push adjust during, edge Box culvert displacement to be incremented by the jacking force of each jack in the little direction of displacement greatly, finally make box culvert the right and left displacement identical and real Now synchronous, control process is simple, and the thrust profiles of each jack are reasonable.
The pushing method of the present invention during adjusted in concert, the big not jacking of box culvert displacement, remaining position is along position Move greatly to the little direction of displacement be in incrementally jacking, the adjustment of the on one side continuous way of deceleration with respect to speedup in prior art Mode, each jack of this patent has abort actions so that each of this patent jack can be independently accurate Control, also make adjusted in concert process can be subdivided into multiple little strokes as needed, adjust process more controllable precise, reach conjunction Reason adjustment and the purpose of real-time deviation correcting;
In addition to objects, features and advantages described above, the present invention also has other objects, features and advantages. Below with reference to figure, the present invention is further detailed explanation.
Brief description
The accompanying drawing constituting the part of the application is used for providing a further understanding of the present invention, the schematic reality of the present invention Apply example and its illustrate, for explaining the present invention, not constituting inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the overall top view of the synchronous jacking system of the preferred embodiment of the present invention;
Fig. 2 is the hydraulic schematic diagram of the synchronous jacking system of the preferred embodiment of the present invention;
Fig. 3 is the control principle block diagram of the synchronous jacking system of the preferred embodiment of the present invention.
In figure: 1- jack group, the left jack of 11-, the right jack of 12-, a- pushing tow oil pocket, b- retraction oil pocket, 13- is left Displacement transducer, the right displacement transducer of 14-, jack in the middle of 15-, 16- reversal valve one, 17- oil pressure sensor, 18- controller, 19- hydraulic control one-way valve, 10- reversal valve two, 2- oil pump, 3- cushion block.
Specific embodiment
Below in conjunction with accompanying drawing, embodiments of the invention are described in detail, but the present invention can limit according to claim Multitude of different ways that is fixed and covering is implemented.
Referring to wearing existing line box culvert synchronization jacking system under one kind of Fig. 1~Fig. 3, including along the setting of box culvert advancing direction The jack group 1 for pushing tow box culvert, jack group 1 includes the left jack 11 being respectively arranged at box culvert the right and left With right jack 12, jack 15 in the middle of jack group 1 also include being arranged between left jack and right jack ten, Left jack, right jack and each middle jack along box culvert horizontal direction be arranged in a row and adjacent two jack between along box culvert Horizontal direction is provided with spacing;It is separately provided for detecting box culvert the right and left in jacking on left jack and right jack Left dislocation sensor 13 and the right displacement transducer 14 of the displacement being occurred in journey;
Left jack, right jack and each middle jack by oil pump 2 fuel feeding, and left jack, right jack with each The pushing tow oil pocket a of middle jack and retraction oil pocket b between be respectively connected with for make jack pushing tow stroke, retract stroke with Stop the reversal valve 1 of switching between stroke three, wherein pushing tow stroke, retract stroke and termination stroke corresponding commutation respectively The pushing tow position of valve one, retraction position and middle stop bit, in the present embodiment, reversal valve one is three position four-way directional control valve, the top of reversal valve one Pushing, retraction position are respectively right position, left position and middle position with middle stop bit;
Left jack, right jack and each middle jack are provided with the pressure for detecting this jack pushing tow pressure Sensor, in the present embodiment, pressure transducer is the oil pressure sensor 17 connecting with each jack pushing tow oil pocket.
The jack group of the present embodiment is additionally provided with controller 18, left dislocation sensor 13, right displacement transducer 14, changes Electrically connected by controller to valve 1, oil pressure sensor 17 and Oil pump electrical machinery and control;Described left dislocation sensor and right displacement Sensor is used for feeding back the displacement on the right of displacement and the box culvert on the box culvert left side to controller respectively, described reversal valve pushing tow position, Switching between retraction position and middle stop bit is by controller control;
Oil pressure sensor 17 is used for the pushing tow force value of Real-time Collection jack and feeds back to controller 18 so that controller can Pushing tow force value based on jack sends the instruction of switching position so that the jacking force of each jack to each reversal valve 1 in real time Can be controlled by controlling the commutating period of reversal valve one, and then the horizontal off normal of real time correction box culvert;
(it is set to left side displacement when box culvert the right and left displacement occurs deviation in this facility example big, the right displacement is little), left Displacement transducer is not equal to 0 with the displacement difference of right displacement transducer feedback, and controller first passes through each reversal valve 1 by whole thousand Jin top switches to termination stroke, then jack in the middle of ten and right jack are gained to pushing tow stroke, then by from left to right Direction successively each jack being in pushing tow stroke is switched to termination stroke successively, that is, make left jack first suspend top Push away, other each jack continue pushing tow and successively switch to termination stroke successively along direction from left to right and make ten centres thousand Jin top and right jack successively suspend pushing tow successively;Controller controls ten middle jack one or more with right very heavy experience After successively suspending the cyclic process of pushing tow successively, the displacement of the box culvert left side and right bit phase shift etc. is finally made to reach and make about box culvert The synchronous purpose in both sides.
Referring to Fig. 2, it is respectively connected between the reversal valve 1 that each jack is connected and its pushing tow oil pocket a and prevents pushing tow oil The too fast hydraulic control one-way valve of chamber oil return 19, the control port of each hydraulic control one-way valve jack corresponding with each hydraulic control one-way valve return Contracting oil pocket b connects.
Referring to Fig. 2, it is connected with for increasing pushing tow between the reversal valve 1 that each jack is connected and its pushing tow oil pocket b Oil pocket oil-feed flow and the flow control valve reducing pushing tow oil pocket return flow, in the present embodiment, flow control valve adopts two The reversal valve 2 10 of two-way, reversal valve two also electrically connects control by controller 18.
Referring to Fig. 1, synchronous jacking system is provided with four groups of jack groups, and Mei Zu jack group is provided with and is laterally arranged in a row 12 jack, four groups of jack groups form a line along pushing tow direction, are folded between two adjacent groups jack group Cushion block 3.Multigroup jack group one side is set and can reduce the frequency increasing cushion block between rear parados and jack group, Avoid and so that jack piston rod is bounced back and cause pushing tow error;On the other hand can reduce to jack The requirement of piston rod stroke, when needing longer stroke, can be by arranging the jack group of end to end multigroup short stroke Priority pushing tow, to meet requirement, expands the scope of application of equipment, beneficial to cost control.
Referring to Fig. 3, the controller set by four groups of jack groups be connected to for each group jack group it Between carry out the wireless communication module of information transmission, each controller gathers other each group jack groups by wireless communication module Pushing tow pressure and pushing tow displacement data and realize information sharing.
Referring to Fig. 3, each controller is connected to the same touch screen for showing each jack information parameter, the letter of display Breath parameter includes the pressure value of each pressure transducer feedback and the shift value of displacement transducer feedback.
Wear existing line box culvert synchronization jacking method under one kind, comprise the following steps:
1) controller receives the displacement of the box culvert left side and the box culvert right bit that left dislocation sensor is fed back with right displacement transducer Move;
2) when the difference of the displacement of the box culvert left side and the right displacement is not equal to 0, it is assumed that the displacement of the box culvert left side in the present embodiment Bigger than displacement on the right of box culvert, whole jack are switched to termination stroke by each reversal valve by controller;
3) each for other in addition to the left jack on the big one side of displacement jack (is included ten by reversal valve by controller Individual middle jack and right jack) gain to pushing tow stroke;
4) when the little one side of displacement right displacement transducer feedback displacement on the right of the box culvert that step 1 is fed back shift value On the basis of when increased, controller by pressure transducer gather displacement little the pushing tow force value of right jack and deposit Store up as thrust trial value fi, controller also gather displacement big the pushing tow force value of left jack and be stored as thrust benchmark Value gi;
5) controller is that each middle jack distributes target pushing tow force value according to thrust trial value fi, each middle jack Target pushing tow force value tn is respectively less than fi, and along little direction (the target pushing tow force value of n intermediate jack big to displacement of displacement It is designated as tn), target pushing tow force value tn of each middle jack is successively decreased based on fi successively, amplitude δ of successively decreasing t=(fi-gi)/ (n+1), that is, along the little direction big to displacement of displacement, in the middle of first, the target pushing tow force value of jack is t1=fi- δ t, the In the middle of two, the target pushing tow force value of jack is t2=t1- δ t=fi-2 δ t, the target jacking force of n intermediate jack It is worth for tn=fi-n* δ t, wherein n are total number of units of middle jack;
6) along displacement greatly to the direction that displacement is little, the real-time jacking force of each middle jack being fed back by pressure transducer After value successively reaches target pushing tow force value tn successively, during each middle jack is successively switched to by controller successively by reversal valve Little for displacement left jack or right jack are finally switched to termination stroke by only stroke;
7) process of repeat step 2~step 6, on the right of the displacement of the box culvert left side and box culvert, the difference between displacement is equal to 0 When, complete adjusted in concert process, whole jack are switched to pushing tow stroke pushing tow is synchronized with identical jacking force.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (8)

1. wear existing line box culvert synchronization jacking system under a kind of it is characterised in that including the use along the setting of box culvert advancing direction In the jack group of pushing tow box culvert, the quantity of described jack group is one or more groups of, and jack group described in every group Including the left jack being respectively arranged at box culvert the right and left and right jack, jack group described in every group also includes being arranged on 1 between left jack and right jack or the middle jack of multiple stage, left jack, right jack and each middle jack edge Box culvert horizontal direction be arranged in a row and adjacent two jack between box culvert horizontal direction is provided with spacing;Left jack and right thousand Be separately provided on jin top detecting the left dislocation sensor of displacement that occurred in jack-in process of box culvert the right and left with Right displacement transducer;
Left jack included by Mei Zu jack group, right jack and each middle jack are by same oil pump or same All connect between group oil pump feed, and the pushing tow oil pocket of described left jack, right jack and each middle jack and retraction oil pocket It is connected to for making jack in pushing tow stroke, retract stroke and the reversal valve stopping switching between stroke three, wherein pushing tow row Journey, retract stroke and the termination stroke pushing tow position of corresponding reversal valve, retraction position and middle stop bit respectively;
Left jack, right jack and each middle jack are provided with the pressure sensing for detecting this jack pushing tow pressure Device;
Described jack group is additionally provided with controller, and described left dislocation sensor, right displacement transducer, reversal valve and pressure pass Sensor is electrically connected by controller and controls;Described left dislocation sensor is used for respectively to controller feedback box with right displacement transducer Contain the displacement on the right of displacement and the box culvert on the left side, switching between pushing tow position, retraction position and middle stop bit for the described reversal valve is by controlling Device processed controls;
Described pressure transducer is used for the pushing tow force value of Real-time Collection jack and feeds back to controller so that controller can be based on The pushing tow force value of jack sends the instruction of switching position so that the jacking force of each jack can be passed through to each reversal valve in real time The commutating period controlling reversal valve controls, and then real time correction box culvert is in the displacement difference of the jacking direction left and right sides;
Described controller is used for, when the displacement difference of left dislocation sensor and right displacement transducer feedback is not equal to 0, first passing through each Whole jack are switched to termination stroke by reversal valve, then by except displacement big left jack or right jack in addition to Other each jack gain to pushing tow stroke, then by successively pushing tow stroke will be in successively to the little direction of displacement greatly along displacement In each jack switch to termination stroke, that is, make displacement big left jack or right jack suspend pushing tow, its His each jack continue pushing tow and along displacement greatly to the little direction of displacement successively switch to termination stroke successively and successively temporarily successively Stop pushing tow;After described controller controls the one or more successively cyclic process of time-out pushing tow successively of other each jack experience, The displacement of the box culvert left side and right bit phase shift etc. is finally made to reach the purpose making box culvert the right and left synchronous.
2. wear existing line box culvert synchronization jacking system under one kind according to claim 1 it is characterised in that each jack It is respectively connected with the hydraulic control one-way valve preventing pushing tow oil pocket oil return too fast, each hydraulic control between the reversal valve being connected and its pushing tow oil pocket The retraction oil pocket connection of the control port of check valve jack corresponding with each hydraulic control one-way valve.
3. wear existing line box culvert synchronization jacking system under one kind according to claim 1 it is characterised in that each jack It is connected between the reversal valve being connected and its pushing tow oil pocket and return for increasing pushing tow oil pocket oil-feed flow and reduction pushing tow oil pocket The flow control valve of oily flow, flow control valve is controlled by its corresponding controller electrical connection.
4. wear existing line box culvert synchronization jacking system under one kind according to claim 1 it is characterised in that described pressure Sensor is the oil pressure sensor being connected with each jack pushing tow oil pocket and/or is arranged on each jack base one end end or top Push away the force transducer of end end.
5. under the one kind according to any one in Claims 1 to 4, wear existing line box culvert synchronization jacking system, its feature It is, described synchronous jacking system is provided with multigroup jack group, and the jack included by each group jack group is along pushing tow side To forming a line, between two adjacent groups jack group, it is folded with cushion block.
6. wear existing line box culvert synchronization jacking system under one kind according to claim 5 it is characterised in that each group is very heavy Controller set by the group of top is separately provided for carrying out the radio communication of information transmission between each group jack group Module.
7. wear existing line box culvert synchronization jacking system under one kind according to claim 5 it is characterised in that described control Device is connected with for inputting control parameter and showing the touch screen of each jack information parameter.
8. wear under according to any one in claim 1~7 under one kind of existing line box culvert synchronization jacking system setting Wear existing line box culvert synchronization jacking method it is characterised in that comprising the following steps:
1) controller receives displacement on the right of the box culvert left side displacement of left dislocation sensor and right displacement transducer feedback and box culvert;
2) when on the right of the displacement of the box culvert left side and box culvert, the difference between displacement is not equal to 0, controller passes through each reversal valve will be complete Portion's jack switches to termination stroke;
3) controller passes through reversal valve by other each jack in addition to the left jack or right jack on the big one side of displacement Gain to pushing tow stroke;
4) base of the value fed back in step 1 when the displacement that left dislocation sensor or the right displacement transducer on the little one side of displacement feed back When increased on plinth, controller by pressure transducer gather displacement little left jack or right jack pushing tow Force value is simultaneously stored as thrust trial value fi, controller also gather displacement big right jack or left jack jacking force It is worth and is stored as thrust reference value gi;
5) controller is that each middle jack distributes target pushing tow force value, the target of each middle jack according to thrust trial value fi Pushing tow force value tn is respectively less than fi, and along the little direction big to displacement of displacement, the target pushing tow force value of n intermediate jack is designated as Tn, target pushing tow force value tn of each middle jack is successively decreased based on fi successively, amplitude δ of successively decreasing t=(fi-gi)/(n+1), Wherein n is total number of units of middle jack;
6) along displacement greatly to the direction that displacement is little, the real-time pushing tow force value of each middle jack being fed back by pressure transducer according to After secondary priority reaches target pushing tow force value tn, each middle jack is successively switched to termination row by reversal valve by controller successively Little for displacement left jack or right jack are finally switched to termination stroke by journey;
7) process of repeat step 2~step 6, when on the right of the displacement of the box culvert left side and box culvert, the difference between displacement is equal to 0, complete Become adjusted in concert process, whole jack are switched to pushing tow stroke pushing tow is synchronized with identical jacking force.
CN201610952581.8A 2016-11-02 2016-11-02 Existing line box culvert is worn under one kind and synchronizes jacking system and jacking method Active CN106351134B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610952581.8A CN106351134B (en) 2016-11-02 2016-11-02 Existing line box culvert is worn under one kind and synchronizes jacking system and jacking method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610952581.8A CN106351134B (en) 2016-11-02 2016-11-02 Existing line box culvert is worn under one kind and synchronizes jacking system and jacking method

Publications (2)

Publication Number Publication Date
CN106351134A true CN106351134A (en) 2017-01-25
CN106351134B CN106351134B (en) 2018-06-15

Family

ID=57864531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610952581.8A Active CN106351134B (en) 2016-11-02 2016-11-02 Existing line box culvert is worn under one kind and synchronizes jacking system and jacking method

Country Status (1)

Country Link
CN (1) CN106351134B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107505910A (en) * 2017-10-19 2017-12-22 中铁六局集团石家庄铁路建设有限公司 Box culvert synchronization jacking system
CN107574765A (en) * 2017-10-19 2018-01-12 中铁六局集团石家庄铁路建设有限公司 Division control type box culvert synchronization jacking system
CN107905259A (en) * 2017-11-29 2018-04-13 浙江跃龙园林建设有限公司 Box culvert advancing monitoring device and its construction method
CN108375361A (en) * 2018-03-13 2018-08-07 中国矿业大学 A method of the detection effective pass trip of hydraulic support
CN110219256A (en) * 2019-06-17 2019-09-10 中建六局土木工程有限公司 A kind of channel complexity Construction of Supporting method for passing through box culvert
CN114687303A (en) * 2022-03-15 2022-07-01 东南大学 Active deviation rectifying method and system for large-angle oblique crossing box culvert jacking construction

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10103307A (en) * 1996-09-27 1998-04-21 Tadano Ltd Hydraulic circuit for working machine
CN2851337Y (en) * 2005-11-28 2006-12-27 陈京广 Synchronous hydraulic jacking equipment for replacing bridge bearing pad
KR100911452B1 (en) * 2008-09-19 2009-08-11 주식회사 오케이컨설턴트 An auto-lifting apparatus of bridge construction for allowance vehicle-passage
CN201915650U (en) * 2010-09-03 2011-08-03 上海天演建筑物移位工程有限公司 Control system for synchronous push
CN202789796U (en) * 2012-06-29 2013-03-13 李志华 Programmable logic controller (PLC) multi-point synchronization jacking up hydraulic system
CN104100590A (en) * 2014-07-22 2014-10-15 湖南联智桥隧技术有限公司 Jacking hydraulic system and jacking and back-jacking methods thereof
CN204385634U (en) * 2014-12-19 2015-06-10 山西省第三建筑工程公司 Railway is not stopped transport the overall jacking mechanism of cross-line box culvert
CN104878701A (en) * 2015-06-26 2015-09-02 东南大学 Underneath pass existing railway bridge and culvert jacking horizontal guiding and deviation correcting system
CN106012853A (en) * 2016-06-17 2016-10-12 柳州黔桥工程材料有限公司 Walking type jacking and pushing construction method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10103307A (en) * 1996-09-27 1998-04-21 Tadano Ltd Hydraulic circuit for working machine
CN2851337Y (en) * 2005-11-28 2006-12-27 陈京广 Synchronous hydraulic jacking equipment for replacing bridge bearing pad
KR100911452B1 (en) * 2008-09-19 2009-08-11 주식회사 오케이컨설턴트 An auto-lifting apparatus of bridge construction for allowance vehicle-passage
CN201915650U (en) * 2010-09-03 2011-08-03 上海天演建筑物移位工程有限公司 Control system for synchronous push
CN202789796U (en) * 2012-06-29 2013-03-13 李志华 Programmable logic controller (PLC) multi-point synchronization jacking up hydraulic system
CN104100590A (en) * 2014-07-22 2014-10-15 湖南联智桥隧技术有限公司 Jacking hydraulic system and jacking and back-jacking methods thereof
CN204385634U (en) * 2014-12-19 2015-06-10 山西省第三建筑工程公司 Railway is not stopped transport the overall jacking mechanism of cross-line box culvert
CN104878701A (en) * 2015-06-26 2015-09-02 东南大学 Underneath pass existing railway bridge and culvert jacking horizontal guiding and deviation correcting system
CN106012853A (en) * 2016-06-17 2016-10-12 柳州黔桥工程材料有限公司 Walking type jacking and pushing construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
米智楠等: "大断面箱涵液压同步顶进控制系统", 《同济大学学报(自然科学版)》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107505910A (en) * 2017-10-19 2017-12-22 中铁六局集团石家庄铁路建设有限公司 Box culvert synchronization jacking system
CN107574765A (en) * 2017-10-19 2018-01-12 中铁六局集团石家庄铁路建设有限公司 Division control type box culvert synchronization jacking system
CN107905259A (en) * 2017-11-29 2018-04-13 浙江跃龙园林建设有限公司 Box culvert advancing monitoring device and its construction method
CN108375361A (en) * 2018-03-13 2018-08-07 中国矿业大学 A method of the detection effective pass trip of hydraulic support
CN110219256A (en) * 2019-06-17 2019-09-10 中建六局土木工程有限公司 A kind of channel complexity Construction of Supporting method for passing through box culvert
CN114687303A (en) * 2022-03-15 2022-07-01 东南大学 Active deviation rectifying method and system for large-angle oblique crossing box culvert jacking construction

Also Published As

Publication number Publication date
CN106351134B (en) 2018-06-15

Similar Documents

Publication Publication Date Title
CN106351134A (en) Synchronous jacking system and method for underneath passing existing line box culvert
CN206173822U (en) Under wear existing circuit box and contain synchronous top and enter system
CN106638322A (en) Steel box beam pushing and deviation correcting method for walking type multiple-point continuous pushing technique
CN111810174B (en) Method for calculating jacking force distribution of shield propulsion system in push-splicing synchronization mode
CN106246186B (en) A kind of shaft excavation machine is oriented to control and method of adjustment
CN206191060U (en) Gas pipeline push pipe construction structures
CN106013149B (en) Full-automatic static pile press positioning control system based on GPS technology
CN108562515A (en) A kind of Grouting Seepage in Rockmass slurries diffusion multifactorial experiment system
CN103821527B (en) The anti-back of the body soil series system of rectangular shield machine and control method thereof
CN108239994A (en) A kind of temporary support system and its application method
CN110182307A (en) The sectional construction method of ship topside
CN106288987A (en) A kind of small interval top-bottom cross constructing tunnel engineering method
CN101230584A (en) Laser-control flattening bulldozer
CN109056534B (en) Movable cast-in-situ bored pile construction platform and method
CN104047328B (en) Excavator positive flow control method
CN208380575U (en) The attitude control system of large section earth pressure balance box culvert development machine
CN208328721U (en) Cross spacing and deviation-rectifying system suitable for box girder incremental launching method construction
CN108627359A (en) A kind of Excavation Process simulator
CN205046480U (en) Steel purlin girder segment point self -adaptation pushes away system in top in succession
CN108222957B (en) A kind of control method of shield machine form regulation system
CN114790702B (en) BIM and FEM cooperation-based steel box girder integral synchronous pushing installation method
CN210240154U (en) Drill jumbo and drill boom control hydraulic system thereof
CN106638508B (en) Huge underground cavity axis selection method under large ground pressure
CN210504462U (en) Remote control device system for mining self-moving tail controller
CN110296115B (en) Drill jumbo and drill boom control hydraulic system thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Synchronous jacking system and method for underneath passing existing line box culvert

Effective date of registration: 20190701

Granted publication date: 20180615

Pledgee: Bank of Communications Co.,Ltd. Hunan Branch

Pledgor: Hunan Lianzhi Bridge and Tunnel Technology Co.,Ltd.

Registration number: 2019430000061

CP03 Change of name, title or address

Address after: 410200 No. 168, Second Section of Yanhe Road, Wangcheng Economic and Technological Development Zone, Changsha City, Hunan Province

Patentee after: Hunan Lianzhi Technology Co.,Ltd.

Address before: 410019 Yanhe Road, Wangcheng Economic Development Zone, Hunan, Changsha

Patentee before: HUNAN LIANZHI BRIDGE AND TUNNEL TECHNOLOGY Co.,Ltd.

CP03 Change of name, title or address
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20200928

Granted publication date: 20180615

Pledgee: Bank of Communications Co.,Ltd. Hunan Branch

Pledgor: HUNAN LIANZHI BRIDGE AND TUNNEL TECHNOLOGY Co.,Ltd.

Registration number: 2019430000061

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A synchronous jacking system and jacking method for box culvert passing through existing line

Effective date of registration: 20220920

Granted publication date: 20180615

Pledgee: China Everbright Bank Co.,Ltd. Changsha Huafeng Sub branch

Pledgor: Hunan Lianzhi Technology Co.,Ltd.

Registration number: Y2022430000087

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20231017

Granted publication date: 20180615

Pledgee: China Everbright Bank Co.,Ltd. Changsha Huafeng Sub branch

Pledgor: Hunan Lianzhi Technology Co.,Ltd.

Registration number: Y2022430000087

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Synchronous Jacking System and Jacking Method for Undercrossing Existing Line Box Culverts

Effective date of registration: 20231109

Granted publication date: 20180615

Pledgee: China Everbright Bank Co.,Ltd. Changsha Huafeng Sub branch

Pledgor: Hunan Lianzhi Technology Co.,Ltd.

Registration number: Y2023980064937