- Prior art keywords
- jack
- displacement
- pushing tow
- box culvert
- controller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 35
- 230000001360 synchronised effect Effects 0.000 title claims abstract description 23
- 238000006073 displacement reaction Methods 0.000 claims abstract description 128
- 230000008569 process Effects 0.000 claims abstract description 19
- 238000012937 correction Methods 0.000 claims description 6
- 230000003247 decreasing effect Effects 0.000 claims description 6
- 238000004891 communication Methods 0.000 claims description 4
- 230000005540 biological transmission Effects 0.000 claims description 3
- 125000004122 cyclic group Chemical group 0.000 claims description 3
- 230000010363 phase shift Effects 0.000 claims description 3
- 241001654412 Corchorus hirsutus Species 0.000 claims 2
- 235000007261 jackswitch Nutrition 0.000 claims 2
- 238000010276 construction Methods 0.000 description 6
- 239000002689 soil Substances 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 235000010676 Ocimum basilicum Nutrition 0.000 description 1
- 240000007926 Ocimum gratissimum Species 0.000 description 1
- 208000037656 Respiratory Sounds Diseases 0.000 description 1
- 230000001154 acute effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 230000009931 harmful effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000007935 neutral effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F5/00—Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Fluid-Pressure Circuits (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610952581.8A CN106351134B (en) | 2016-11-02 | 2016-11-02 | Existing line box culvert is worn under one kind and synchronizes jacking system and jacking method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610952581.8A CN106351134B (en) | 2016-11-02 | 2016-11-02 | Existing line box culvert is worn under one kind and synchronizes jacking system and jacking method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106351134A true CN106351134A (en) | 2017-01-25 |
CN106351134B CN106351134B (en) | 2018-06-15 |
Family
ID=57864531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610952581.8A Active CN106351134B (en) | 2016-11-02 | 2016-11-02 | Existing line box culvert is worn under one kind and synchronizes jacking system and jacking method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106351134B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107505910A (en) * | 2017-10-19 | 2017-12-22 | 中铁六局集团石家庄铁路建设有限公司 | Box culvert synchronization jacking system |
CN107574765A (en) * | 2017-10-19 | 2018-01-12 | 中铁六局集团石家庄铁路建设有限公司 | Division control type box culvert synchronization jacking system |
CN107905259A (en) * | 2017-11-29 | 2018-04-13 | 浙江跃龙园林建设有限公司 | Box culvert advancing monitoring device and its construction method |
CN108375361A (en) * | 2018-03-13 | 2018-08-07 | 中国矿业大学 | A method of the detection effective pass trip of hydraulic support |
CN110219256A (en) * | 2019-06-17 | 2019-09-10 | 中建六局土木工程有限公司 | A kind of channel complexity Construction of Supporting method for passing through box culvert |
CN114687303A (en) * | 2022-03-15 | 2022-07-01 | 东南大学 | Active deviation rectifying method and system for large-angle oblique crossing box culvert jacking construction |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10103307A (en) * | 1996-09-27 | 1998-04-21 | Tadano Ltd | Hydraulic circuit for working machine |
CN2851337Y (en) * | 2005-11-28 | 2006-12-27 | 陈京广 | Synchronous hydraulic jacking equipment for replacing bridge bearing pad |
KR100911452B1 (en) * | 2008-09-19 | 2009-08-11 | 주식회사 오케이컨설턴트 | An auto-lifting apparatus of bridge construction for allowance vehicle-passage |
CN201915650U (en) * | 2010-09-03 | 2011-08-03 | 上海天演建筑物移位工程有限公司 | Control system for synchronous push |
CN202789796U (en) * | 2012-06-29 | 2013-03-13 | 李志华 | Programmable logic controller (PLC) multi-point synchronization jacking up hydraulic system |
CN104100590A (en) * | 2014-07-22 | 2014-10-15 | 湖南联智桥隧技术有限公司 | Jacking hydraulic system and jacking and back-jacking methods thereof |
CN204385634U (en) * | 2014-12-19 | 2015-06-10 | 山西省第三建筑工程公司 | Railway is not stopped transport the overall jacking mechanism of cross-line box culvert |
CN104878701A (en) * | 2015-06-26 | 2015-09-02 | 东南大学 | Underneath pass existing railway bridge and culvert jacking horizontal guiding and deviation correcting system |
CN106012853A (en) * | 2016-06-17 | 2016-10-12 | 柳州黔桥工程材料有限公司 | Walking type jacking and pushing construction method |
-
2016
- 2016-11-02 CN CN201610952581.8A patent/CN106351134B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10103307A (en) * | 1996-09-27 | 1998-04-21 | Tadano Ltd | Hydraulic circuit for working machine |
CN2851337Y (en) * | 2005-11-28 | 2006-12-27 | 陈京广 | Synchronous hydraulic jacking equipment for replacing bridge bearing pad |
KR100911452B1 (en) * | 2008-09-19 | 2009-08-11 | 주식회사 오케이컨설턴트 | An auto-lifting apparatus of bridge construction for allowance vehicle-passage |
CN201915650U (en) * | 2010-09-03 | 2011-08-03 | 上海天演建筑物移位工程有限公司 | Control system for synchronous push |
CN202789796U (en) * | 2012-06-29 | 2013-03-13 | 李志华 | Programmable logic controller (PLC) multi-point synchronization jacking up hydraulic system |
CN104100590A (en) * | 2014-07-22 | 2014-10-15 | 湖南联智桥隧技术有限公司 | Jacking hydraulic system and jacking and back-jacking methods thereof |
CN204385634U (en) * | 2014-12-19 | 2015-06-10 | 山西省第三建筑工程公司 | Railway is not stopped transport the overall jacking mechanism of cross-line box culvert |
CN104878701A (en) * | 2015-06-26 | 2015-09-02 | 东南大学 | Underneath pass existing railway bridge and culvert jacking horizontal guiding and deviation correcting system |
CN106012853A (en) * | 2016-06-17 | 2016-10-12 | 柳州黔桥工程材料有限公司 | Walking type jacking and pushing construction method |
Non-Patent Citations (1)
Title |
---|
米智楠等: "大断面箱涵液压同步顶进控制系统", 《同济大学学报(自然科学版)》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107505910A (en) * | 2017-10-19 | 2017-12-22 | 中铁六局集团石家庄铁路建设有限公司 | Box culvert synchronization jacking system |
CN107574765A (en) * | 2017-10-19 | 2018-01-12 | 中铁六局集团石家庄铁路建设有限公司 | Division control type box culvert synchronization jacking system |
CN107905259A (en) * | 2017-11-29 | 2018-04-13 | 浙江跃龙园林建设有限公司 | Box culvert advancing monitoring device and its construction method |
CN108375361A (en) * | 2018-03-13 | 2018-08-07 | 中国矿业大学 | A method of the detection effective pass trip of hydraulic support |
CN110219256A (en) * | 2019-06-17 | 2019-09-10 | 中建六局土木工程有限公司 | A kind of channel complexity Construction of Supporting method for passing through box culvert |
CN114687303A (en) * | 2022-03-15 | 2022-07-01 | 东南大学 | Active deviation rectifying method and system for large-angle oblique crossing box culvert jacking construction |
Also Published As
Publication number | Publication date |
---|---|
CN106351134B (en) | 2018-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106351134A (en) | Synchronous jacking system and method for underneath passing existing line box culvert | |
CN206173822U (en) | Under wear existing circuit box and contain synchronous top and enter system | |
CN106638322A (en) | Steel box beam pushing and deviation correcting method for walking type multiple-point continuous pushing technique | |
CN111810174B (en) | Method for calculating jacking force distribution of shield propulsion system in push-splicing synchronization mode | |
CN106246186B (en) | A kind of shaft excavation machine is oriented to control and method of adjustment | |
CN206191060U (en) | Gas pipeline push pipe construction structures | |
CN106013149B (en) | Full-automatic static pile press positioning control system based on GPS technology | |
CN108562515A (en) | A kind of Grouting Seepage in Rockmass slurries diffusion multifactorial experiment system | |
CN103821527B (en) | The anti-back of the body soil series system of rectangular shield machine and control method thereof | |
CN108239994A (en) | A kind of temporary support system and its application method | |
CN110182307A (en) | The sectional construction method of ship topside | |
CN106288987A (en) | A kind of small interval top-bottom cross constructing tunnel engineering method | |
CN101230584A (en) | Laser-control flattening bulldozer | |
CN109056534B (en) | Movable cast-in-situ bored pile construction platform and method | |
CN104047328B (en) | Excavator positive flow control method | |
CN208380575U (en) | The attitude control system of large section earth pressure balance box culvert development machine | |
CN208328721U (en) | Cross spacing and deviation-rectifying system suitable for box girder incremental launching method construction | |
CN108627359A (en) | A kind of Excavation Process simulator | |
CN205046480U (en) | Steel purlin girder segment point self -adaptation pushes away system in top in succession | |
CN108222957B (en) | A kind of control method of shield machine form regulation system | |
CN114790702B (en) | BIM and FEM cooperation-based steel box girder integral synchronous pushing installation method | |
CN210240154U (en) | Drill jumbo and drill boom control hydraulic system thereof | |
CN106638508B (en) | Huge underground cavity axis selection method under large ground pressure | |
CN210504462U (en) | Remote control device system for mining self-moving tail controller | |
CN110296115B (en) | Drill jumbo and drill boom control hydraulic system thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Synchronous jacking system and method for underneath passing existing line box culvert Effective date of registration: 20190701 Granted publication date: 20180615 Pledgee: Bank of Communications Co.,Ltd. Hunan Branch Pledgor: Hunan Lianzhi Bridge and Tunnel Technology Co.,Ltd. Registration number: 2019430000061 |
|
CP03 | Change of name, title or address |
Address after: 410200 No. 168, Second Section of Yanhe Road, Wangcheng Economic and Technological Development Zone, Changsha City, Hunan Province Patentee after: Hunan Lianzhi Technology Co.,Ltd. Address before: 410019 Yanhe Road, Wangcheng Economic Development Zone, Hunan, Changsha Patentee before: HUNAN LIANZHI BRIDGE AND TUNNEL TECHNOLOGY Co.,Ltd. |
|
CP03 | Change of name, title or address | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20200928 Granted publication date: 20180615 Pledgee: Bank of Communications Co.,Ltd. Hunan Branch Pledgor: HUNAN LIANZHI BRIDGE AND TUNNEL TECHNOLOGY Co.,Ltd. Registration number: 2019430000061 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A synchronous jacking system and jacking method for box culvert passing through existing line Effective date of registration: 20220920 Granted publication date: 20180615 Pledgee: China Everbright Bank Co.,Ltd. Changsha Huafeng Sub branch Pledgor: Hunan Lianzhi Technology Co.,Ltd. Registration number: Y2022430000087 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20231017 Granted publication date: 20180615 Pledgee: China Everbright Bank Co.,Ltd. Changsha Huafeng Sub branch Pledgor: Hunan Lianzhi Technology Co.,Ltd. Registration number: Y2022430000087 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Synchronous Jacking System and Jacking Method for Undercrossing Existing Line Box Culverts Effective date of registration: 20231109 Granted publication date: 20180615 Pledgee: China Everbright Bank Co.,Ltd. Changsha Huafeng Sub branch Pledgor: Hunan Lianzhi Technology Co.,Ltd. Registration number: Y2023980064937 |