CN106341836B - A kind of mobile network association dimension method - Google Patents
A kind of mobile network association dimension method Download PDFInfo
- Publication number
- CN106341836B CN106341836B CN201610729600.0A CN201610729600A CN106341836B CN 106341836 B CN106341836 B CN 106341836B CN 201610729600 A CN201610729600 A CN 201610729600A CN 106341836 B CN106341836 B CN 106341836B
- Authority
- CN
- China
- Prior art keywords
- base station
- network management
- alarm
- mobile network
- fault point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/04—Arrangements for maintaining operational condition
Abstract
The present invention relates to a kind of mobile networks to assist dimension method.First, collect disconnected station base station information, judge the affiliated type of scene for comprising the base station 2G, the only base station 4G or be two layers of the base station 3G, 4G, the time alarm monitoring of the monitoring of SDH network management alarm, districts and cities' PTN network management is then carried out by Huawei U2000 network management, BITS network management system and mobile network's Security Login System, and then judges fault point.The present invention realizes association's dimension of mobile network, especially Huawei's transmission device mobile network.
Description
Technical field
The present invention relates to a kind of mobile networks to assist dimension method.
Background technique
The application background be with mobile network it is increasingly developed growth and the requirement of customer perception mobile network quality gradually
It improves, in the case where also stepping up for mobile network's maintenance requirement, needs to invent a kind of quick, simple and practical shifting
Dynamic network maintenance method, preferably to safeguard mobile network;The application purpose is to simplify the maintenance process of mobile network, lead to
The simple-to-maintain that Huawei's U2000 network management, BITS network management system and mobile network's Security Login System realize mobile network is crossed, to protect
Hinder the safe and stable operation of mobile network.
Summary of the invention
The purpose of the present invention is to provide a kind of mobile networks to assist dimension method.
To achieve the above object, the technical scheme is that a kind of mobile network assists dimension method, include the following steps,
S1: disconnected station base station information is collected;
S2: judging scene type, if the only base station 4G, turns the processing of 4G base station fault, and notify maintenance personnel in time;If
Comprising the base station 2G, then step S3 is gone to;If two layers of the base station 3G or 4G, then step S7 is gone to;
S3: the monitoring of SDH network management alarm is carried out, judges whether network management has alarm report, if it is not, then going to step S4;If so,
Then go to step S5;
S4: the service path of inquiry network element port finds out the common convergent point network element of interrupting service, and go to step S6;
S5: judging whether to be related to interruption at looped network two, power down, switch unsuccessfully, if so, judging may be disconnected as optical cable, electricity
Source, equipment fault, obtain fault point;If it is not, continuing query warning influences whether path has interruption at two, interrupted if having at two,
Then judging may be disconnected as optical cable, and power supply, equipment fault obtain fault point;If it is not, then finding out common convergent point network element;
S6: judging whether related port has big error code, if so, obtaining fault point;If it is not, notifying related maintenance personnel;
S7: enter districts and cities PTN network management, check currently whether have with fault time consistent alarm, if so, judgement may
Disconnected for optical cable, power supply, equipment fault obtain fault point;If it is not, going to step S8;
S8: whether the active/standby tunnel of the disconnected station access PTN device of judgement passes through same paths, matches if so, changing standby tunnel
It sets, bypasses fault point, preferentially restore business, obtain fault point;If it is not, going to step S9;
S9: checking whether active/standby tunnel has alarm, if so, going to step S10;If it is not, going to step S11;
S10: judge whether that all active/standby tunnels have alarm, if so, obtaining fault point;If it is not, judging that tunnel is switched is
It is no normal, if tunnel is switched abnormal, then follow the steps S11;
S11: judging whether continuity testing normal, if so, and the important equipment interface that judges that tunnel passes through altogether have largely
Error code is, it is concluded that fault point.
In an embodiment of the present invention, the monitoring of SDH network management alarm is carried out using Huawei U2000 network management in step S3.
In an embodiment of the present invention, the time alarm monitoring of BITS network management system districts and cities PTN network management is used in step S7.
In an embodiment of the present invention, Huawei U2000 network management, BITS network management system pass through mobile network and step on safely
Recording system is monitored.
In an embodiment of the present invention, the disconnected station base station information includes base station name, the affiliated producer in base station, LTE base station
IP address, affiliated RNC or EPC information.
Compared to the prior art, it the invention has the following advantages: realizing that maintenance personnel is more efficient, more safely positions
Failure, mean failure rate handle time shortening 20%;The present invention plays promotion to mobile network's daily maintenance specification process and supplement is made
With more effectively guarantee mobile network safety, steadily runs, further increase perception of the client to mobile network quality;It is right
Enhance mobile network's maintenance effects, there is definite meaning.
Detailed description of the invention
Fig. 1 is that mobile network of the present invention assists dimension method flow diagram.
Specific embodiment
With reference to the accompanying drawing, technical solution of the present invention is specifically described.
As shown in Figure 1, a kind of mobile network of the invention assists dimension method, include the following steps,
S1: disconnected station base station information is collected;The disconnected station base station information includes base station name, the affiliated producer in base station, LTE base station
IP address, affiliated RNC or EPC information;
S2: judging scene type, if the only base station 4G, turns the processing of 4G base station fault, and notify maintenance personnel in time;If
Comprising the base station 2G, then step S3 is gone to;If two layers of the base station 3G or 4G, then step S7 is gone to;
S3: the monitoring of SDH network management alarm is carried out, judges whether network management has alarm report, if it is not, then going to step S4;If so,
Then go to step S5;
S4: the service path of inquiry network element port finds out the common convergent point network element of interrupting service, and go to step S6;
S5: judging whether to be related to interruption at looped network two, power down, switch unsuccessfully, if so, judging may be disconnected as optical cable, electricity
Source, equipment fault, obtain fault point;If it is not, continuing query warning influences whether path has interruption at two, interrupted if having at two,
Then judging may be disconnected as optical cable, and power supply, equipment fault obtain fault point;If it is not, then finding out common convergent point network element;
S6: judging whether related port has big error code, if so, obtaining fault point;If it is not, notifying related maintenance personnel;
S7: enter districts and cities PTN network management, check currently whether have with fault time consistent alarm, if so, judgement may
Disconnected for optical cable, power supply, equipment fault obtain fault point;If it is not, going to step S8;
S8: whether the active/standby tunnel of the disconnected station access PTN device of judgement passes through same paths, matches if so, changing standby tunnel
It sets, bypasses fault point, preferentially restore business, obtain fault point;If it is not, going to step S9;
S9: checking whether active/standby tunnel has alarm, if so, going to step S10;If it is not, going to step S11;
S10: judge whether that all active/standby tunnels have alarm, if so, obtaining fault point;If it is not, judging that tunnel is switched is
It is no normal, if tunnel is switched abnormal, then follow the steps S11;
S11: judging whether continuity testing normal, if so, and the important equipment interface that judges that tunnel passes through altogether have largely
Error code is, it is concluded that fault point.
The monitoring of SDH network management alarm is carried out using Huawei U2000 network management in step S3.BITS network management system is used in step S7
The time alarm monitoring of districts and cities' PTN network management.Huawei U2000 network management, BITS network management system pass through mobile network and step on safely
Recording system is monitored.
The above are preferred embodiments of the present invention, all any changes made according to the technical solution of the present invention, and generated function is made
When with range without departing from technical solution of the present invention, all belong to the scope of protection of the present invention.
Claims (5)
1. a kind of mobile network assists dimension method, it is characterised in that: include the following steps,
S1: disconnected station base station information is collected;
S2: judging scene type, if the only base station 4G, turns the processing of 4G base station fault, and notify maintenance personnel in time;If comprising
The base station 2G then goes to step S3;If two layers of the base station 3G or 4G, then step S7 is gone to;
S3: the monitoring of SDH network management alarm is carried out, judges whether network management has alarm report, if it is not, then going to step S4;If so, turning
To step S5;
S4: the service path of inquiry network element port finds out the common convergent point network element of interrupting service, and go to step S6;
S5: judging whether to be related to interruption at looped network two, power down, switch unsuccessfully, if so, it is judged as that optical cable is disconnected, power supply, equipment event
Barrier, obtains fault point;If it is not, continuing query warning influences whether path has interruption at two, is interrupted if having at two, be judged as light
Cable is disconnected, and power supply, equipment fault obtain fault point;If it is not, then finding out common convergent point network element;
S6: judging whether related port has a large amount of error codes, if so, obtaining fault point;If it is not, notifying related maintenance personnel;
S7: enter districts and cities PTN network management, check currently whether have with fault time consistent alarm, if so, being judged as optical cable
Disconnected, power supply, equipment fault obtain fault point;If it is not, going to step S8;
S8: whether the active/standby tunnel of the disconnected station access PTN device of judgement passes through same paths, if so, standby tunnel configuration is changed, around
Fault point is crossed, business is preferentially restored, obtains fault point;If it is not, going to step S9;
S9: checking whether active/standby tunnel has alarm, if so, going to step S10;If it is not, going to step S11;
S10: judge whether that all active/standby tunnels have alarm, if so, obtaining fault point;If it is not, judging whether just tunnel is switched
Often, if tunnel is switched abnormal, S11 is thened follow the steps;
S11: judging whether continuity testing normal, if so, and the important equipment interface that judges that tunnel passes through altogether have a large amount of error codes,
Then obtain fault point.
2. a kind of mobile network according to claim 1 assists dimension method, it is characterised in that: use Huawei in step S3
U2000 network management carries out the monitoring of SDH network management alarm.
3. a kind of mobile network according to claim 2 assists dimension method, it is characterised in that: use BITS network management in step S7
The time alarm monitoring of system districts and cities PTN network management.
4. a kind of mobile network according to claim 3 assists dimension method, it is characterised in that: Huawei U2000 network management,
BITS network management system passes through mobile network's Security Login System and is monitored.
5. a kind of mobile network according to claim 1 assists dimension method, it is characterised in that: the disconnected station base station information includes
Base station name, the affiliated producer in base station, LTE base station IP address, affiliated RNC or EPC information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610729600.0A CN106341836B (en) | 2016-08-26 | 2016-08-26 | A kind of mobile network association dimension method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610729600.0A CN106341836B (en) | 2016-08-26 | 2016-08-26 | A kind of mobile network association dimension method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106341836A CN106341836A (en) | 2017-01-18 |
CN106341836B true CN106341836B (en) | 2019-05-21 |
Family
ID=57822173
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610729600.0A Active CN106341836B (en) | 2016-08-26 | 2016-08-26 | A kind of mobile network association dimension method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106341836B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101360001A (en) * | 2007-07-31 | 2009-02-04 | 中兴通讯股份有限公司 | Apparatus and method for processing alarm by network manager at upper layer |
CN102315973A (en) * | 2011-10-14 | 2012-01-11 | 北京直真科技股份有限公司 | Processing method for large-area station service break caused by transmission network fault and device |
CN102833109A (en) * | 2012-08-30 | 2012-12-19 | 华为技术有限公司 | Positional information processing method and equipment of fault point |
CN104038955A (en) * | 2013-03-08 | 2014-09-10 | 中国移动通信集团公司 | Fault detection and processing method in mobile communication system, and base station |
CN104734775A (en) * | 2015-04-10 | 2015-06-24 | 江苏通软科技有限公司 | Optical cable communication network fault processing method and system |
-
2016
- 2016-08-26 CN CN201610729600.0A patent/CN106341836B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101360001A (en) * | 2007-07-31 | 2009-02-04 | 中兴通讯股份有限公司 | Apparatus and method for processing alarm by network manager at upper layer |
CN102315973A (en) * | 2011-10-14 | 2012-01-11 | 北京直真科技股份有限公司 | Processing method for large-area station service break caused by transmission network fault and device |
CN102833109A (en) * | 2012-08-30 | 2012-12-19 | 华为技术有限公司 | Positional information processing method and equipment of fault point |
CN104038955A (en) * | 2013-03-08 | 2014-09-10 | 中国移动通信集团公司 | Fault detection and processing method in mobile communication system, and base station |
CN104734775A (en) * | 2015-04-10 | 2015-06-24 | 江苏通软科技有限公司 | Optical cable communication network fault processing method and system |
Also Published As
Publication number | Publication date |
---|---|
CN106341836A (en) | 2017-01-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102074956B (en) | Power grid risk management method and system | |
CN102437922B (en) | A kind of power telecom network business impact analysis method based on N-1 principle | |
US20170026292A1 (en) | Communication link failure detection in a software defined network | |
CN103973359B (en) | Automatization test system, method and device are switched in a kind of OTN protection | |
CN103036727B (en) | Electric power communication network regional security warning method and system thereof | |
CN103065419A (en) | Monitor system of electric fire | |
CN107085153A (en) | A kind of multiplexing electric abnormality fire alarm method and system | |
CN106300254A (en) | A kind of relay protecting method identifying the single-phase or biphase broken string of circuit | |
CN108650140A (en) | The automation aided analysis method and system of optical transmission device traffic failure | |
CN107888455A (en) | A kind of data detection method, device and system | |
CN106549707A (en) | A kind of method of pilot protection multiplex channel fault location | |
CN103366245B (en) | Electric network fault information issuing method based on OSB bus and system | |
CN103605047B (en) | A kind of telegram in reply monitoring system and method | |
CN102710027A (en) | Real-time evaluating and state monitoring system for automatic communication network of transformer substation | |
CN207440228U (en) | A kind of feeder line fault on-line monitoring system | |
CN105323002A (en) | Fiber operation state analysis method | |
KR101214427B1 (en) | Supervisory Control and Data Acquisition System and Security management method thereof | |
CN106341836B (en) | A kind of mobile network association dimension method | |
CN103532794B (en) | Method for automatically switching stable control strategies based on warning signals of synchronous digital hierarchy equipment | |
CN104914328A (en) | Substation online monitoring device fault automatic diagnosis method | |
CN107171817B (en) | Fault information acquisition method and device | |
CN108736451A (en) | Overcurrent protection method and device for large power inverter power source | |
CN103809069A (en) | Method and device for lightning arrester fault indication | |
US20130088976A1 (en) | Method for Detecting Mismatch Fault and Maintenance Endpoint | |
KR20210042598A (en) | System for monitoring power cable and method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |