CN106339827A - 一种配电网规划方案成本效益比计算方法 - Google Patents

一种配电网规划方案成本效益比计算方法 Download PDF

Info

Publication number
CN106339827A
CN106339827A CN201610903109.5A CN201610903109A CN106339827A CN 106339827 A CN106339827 A CN 106339827A CN 201610903109 A CN201610903109 A CN 201610903109A CN 106339827 A CN106339827 A CN 106339827A
Authority
CN
China
Prior art keywords
year
cost
benefit
worth
value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610903109.5A
Other languages
English (en)
Inventor
冷正龙
张林垚
王韦
吴宇忻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610903109.5A priority Critical patent/CN106339827A/zh
Publication of CN106339827A publication Critical patent/CN106339827A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明涉及一种配电网规划方案成本效益比计算方法,通过在配电网规划方案技术经济评价研究中,引入成本效益比分析方法,并结合全寿命周期成本理念,研究各类成本、效益的货币化量化表征方法,提出配电网规划方案的成本、效益实用化算法,本发明能够为配电网规划方案的制定提供指导依据。

Description

一种配电网规划方案成本效益比计算方法
技术领域
本发明涉及配电网规划领域,特别是一种配电网规划方案成本效益比计算方法。
背景技术
随着经济结构由工业化逐步向消费化转变,居民和商业用电负荷占比逐年提高,电网的投资重点将相应从主网转向配网。随着配网投资比重逐年加大,配网投资管理的短板日益凸显。配电网规划作为配电网发展建设的源头,引导着配电网的发展方向,其规划项目的合理选择、规划方案的合理确定直接关系到对当前配网薄弱环节的解决、对配网投入产出效益的提升。为进一步契合电网发展需求和经营绩效目标,科学优化资源配置,引导电网投资方向,提升配电网投入产出成效,基于LCC的配电网规划方案成本效益比计算方法的研究具有十分重要的意义。
发明内容
有鉴于此,本发明的目的是提出一种配电网规划方案成本效益比计算方法,在配电网规划方案分析中引入经济决策的成本效益分析法,分析配电网规划方案的成本、效益构成,研究各类成本、效益的货币化量化表征方法,提出配电网规划方案的成本、效益实用化算法。为配电网规划方案的制定提供指导依据。
本发明采用以下方案实现:一种配电网规划方案成本效益比计算方法,具体包括以下步骤:
步骤S1:将初始建设投资成本和运行维护成本折算成等年值:
将所述初始建设投资成本折算成等年值,计算公式如下:
C f ( A ) 1 = C f ( P ) 1 × ( A / P , a , n ) = C f ( P ) 1 × a ( 1 + a ) n ( 1 + a ) n - 1 ;
其中,Cf(A)1为初始建设投资成本的等年值,Cf(P)1为初始投资现值,n为经济使用寿命,a为折现率,A为等年值,P为现值,称为资金收回系数;
将所述运行维护成本折算成等年值,计算公式如下:
C f ( A ) 2 = C f ( P ) 2 × ( A / P , a , n ) = Σ i = 1 n [ C f ( i ) 2 × ( P / A , a , i ) × ( A / P , a , n ) ] = Σ i = 1 n [ C f ( i ) 2 × 1 ( 1 + a ) n ] × a ( 1 + a ) n ( 1 + a ) n - 1 ;
其中,Cf(A)2为运行维护成本的等年值,Cf(P)2为以初始年为基准年的总的运行成本现值;Cf(i)2为第i年的运行成本现值;
步骤S2:将增供电量效益和可靠性提升效益折算成等年值:
将所述增供电量效益折算成等年值,计算公式如下:
B Q ( A ) 1 = B Q ( P ) 1 × ( A / P , a , n ) = Σ i = 1 n [ B Q ( i ) 1 × ( P / A , a , i ) ] × ( A / P , a , n ) = Σ i = 1 n [ B Q ( i ) 1 × 1 ( 1 + a ) n ] × a ( 1 + a ) n ( 1 + a ) n - 1 ;
BQ(i)1=ΔPi×Tmax×a1
其中,BQ(A)1为增供电量效益的等年值,BQ(P)1为以初始年为基准年的总的增供电量效益现值,BQ(i)1为第i年的增供电量效益现值,ΔPi为第i年增供负荷,Tmax为最大负荷利用小时数,a1为经济使用寿命;
将所述可靠性提升效益折算成等年值,计算公式如下;
B Q ( A ) 2 = B Q ( P ) 2 × ( A / P , a , n ) = Σ i = 1 n [ B Q ( i ) 2 × ( P / A , a , i ) ] × ( A / P , a , n ) = Σ i = 1 n [ B Q ( i ) 2 × 1 ( 1 + a ) n ] × a ( 1 + a ) n ( 1 + a ) n - 1 ;
其中,BQ(A)2为可靠性提升效益的等年值,BQ(P)2为以初始年为基准年的总的可靠性提升效益现值,BQ(i)2为第i年的可靠性提升效益现值,t为规划方案实施后供电靠性提高而减少的停电时间,Pi为第i年负荷预测值;
步骤S3:计算规划方案效益成本比,所述效益成本比为效益的等年值除以成本的等年值,即:
RB/C=(BQ(A)1+BQ(A)2)/(Cf(A)1+Cf(a)2);
其中,RB/C为规划方案效益成本比。
进一步地,还包括步骤S4:判断所述规划方案效益成本比RB/C的大小是否大于1,若是,则将该规划方案作为备选方案;否则,不建议采用该规划方案。
与现有技术相比,本发明有以下有益效果:本发明在配电网规划方案成本效益比计算方法中引入全寿命周期成本(LCC)理念,依据效益成本比(B/C)来综合分析配电网规划方案的技术经济情况,提出配电网规划方案的成本、效益实用计算方法,实现各类成本、效益的货币化量化分析,本发明能够有效应用于配电网规划方案的制定工作中。
附图说明
图1为本发明实施例中的方法流程示意图。
具体实施方式
下面结合附图及实施例对本发明做进一步说明。
如图1所示,本实施例提供了一种配电网规划方案成本效益比计算方法,具体包括以下步骤:
步骤S1:将初始建设投资成本和运行维护成本折算成等年值:
将所述初始建设投资成本折算成等年值,计算公式如下:
C f ( A ) 1 = C f ( P ) 1 × ( A / P , a , n ) = C f ( P ) 1 × a ( 1 + a ) n ( 1 + a ) n - 1 ;
其中,Cf(A)1为初始建设投资成本的等年值,Cf(P)1为初始投资现值,n为经济使用寿命,a为折现率,A为等年值,P为现值,称为资金收回系数;
将所述运行维护成本折算成等年值,计算公式如下:
C f ( A ) 2 = C f ( P ) 2 × ( A / P , a , n ) = Σ i = 1 n [ C f ( i ) 2 × ( P / A , a , i ) × ( A / P , a , n ) ] = Σ i = 1 n [ C f ( i ) 2 × 1 ( 1 + a ) n ] × a ( 1 + a ) n ( 1 + a ) n - 1 ;
其中,Cf(A)2为运行维护成本的等年值,Cf(P)2为以初始年为基准年的总的运行成本现值;Cf(i)2为第i年的运行成本现值;
步骤S2:将增供电量效益和可靠性提升效益折算成等年值:
将所述增供电量效益折算成等年值,计算公式如下:
B Q ( A ) 1 = B Q ( P ) 1 × ( A / P , a , n ) = Σ i = 1 n [ B Q ( i ) 1 × ( P / A , a , i ) ] × ( A / P , a , n ) = Σ i = 1 n [ B Q ( i ) 1 × 1 ( 1 + a ) n ] × a ( 1 + a ) n ( 1 + a ) n - 1 ;
BQ(i)1=ΔPi×Tmax×a1
其中,BQ(A)1为增供电量效益的等年值,BQ(P)1为以初始年为基准年的总的增供电量效益现值,BQ(i)1为第i年的增供电量效益现值,ΔPi为第i年增供负荷,Tmax为最大负荷利用小时数,a1为经济使用寿命;
将所述可靠性提升效益折算成等年值,计算公式如下;
B Q ( A ) 2 = B Q ( P ) 2 × ( A / P , a , n ) = Σ i = 1 n [ B Q ( i ) 2 × ( P / A , a , i ) ] × ( A / P , a , n ) = Σ i = 1 n [ B Q ( i ) 2 × 1 ( 1 + a ) n ] × a ( 1 + a ) n ( 1 + a ) n - 1 ;
其中,BQ(A)2为可靠性提升效益的等年值,BQ(P)2为以初始年为基准年的总的可靠性提升效益现值,BQ(i)2为第i年的可靠性提升效益现值,t为规划方案实施后供电靠性提高而减少的停电时间,Pi为第i年负荷预测值;
步骤S3:计算规划方案效益成本比,所述效益成本比为效益的等年值除以成本的等年值,即:
RB/C=(BQ(A)1+BQ(A)2)/(Cf(A)1+Cf(a)2);
其中,RB/C为规划方案效益成本比。
在本实施例中,还包括步骤S4:判断所述规划方案效益成本比RB/C的大小是否大于1,若是,则将该规划方案作为备选方案;否则,不建议采用该规划方案。
本实施例以改造xx#12配变、xx#5配变、xx#6配变工程为例,说明配电网规划方案效益成本比计算方法。目前三台配变容量均为250kVA,总容量750kVA,现状最大负荷约为800kW。为满足负荷增长需要,现规划对三台箱式变压器进行改造,将每台配变增容为630kVA,共投资为75万元。首先确定全寿命周期成本的相关计算参数,如表1所示。
表1全寿命周期成本相关计算参数
1)成本等年值计算
初始投资成本等年值Cf(A)1
运行维护成本等年值:
因此该方案的总成本等年值Cf(A)=Cf(A)1+Cf(A)2=15.74万元;
2)效益等年值计算
首先逐年估算增供负荷量,如表2所示:
表2年供电负荷预测值
增供电量效益等年值:
BQ(i)1=ΔPi×Tmax×a1
对于单个配网变电类工程规划方案,通常忽略可靠性提升效益,因此该方案的总效益等年值,为20.6万元。
3)规划方案效益成本比计算
效益成本比=效益等年值/成本等年值:
由计算结果可知,该规划方案的效益成本比大于1,从经济效益角度来看是可以接受的,可作为备选规划方案。
以上所述仅为本发明的较佳实施例,凡依本发明申请专利范围所做的均等变化与修饰,皆应属本发明的涵盖范围。

Claims (2)

1.一种配电网规划方案成本效益比计算方法,其特征在于:包括以下步骤:
步骤S1:将初始建设投资成本和运行维护成本折算成等年值:
将所述初始建设投资成本折算成等年值,计算公式如下:
C f ( A ) 1 = C f ( P ) 1 × ( A / P , a , n ) = C f ( P ) 1 × a ( 1 + a ) n ( 1 + a ) n - 1 ;
其中,Cf(A)1为初始建设投资成本的等年值,Cf(P)1为初始投资现值,n为经济使用寿命,a为折现率,A为等年值,P为现值,称为资金收回系数;
将所述运行维护成本折算成等年值,计算公式如下:
C f ( A ) 2 = C f ( P ) 2 × ( A / P , a , n ) = Σ i = 1 n [ C f ( i ) 2 × ( P / A , a , i ) × ( A / P , a , n ) ] = Σ i = 1 n [ C f ( i ) 2 × 1 ( 1 + a ) n ] × a ( 1 + a ) n ( 1 + a ) n - 1 ;
其中,Cf(A)2为运行维护成本的等年值,Cf(P)2为以初始年为基准年的总的运行成本现值;Cf(i)2为第i年的运行成本现值;
步骤S2:将增供电量效益和可靠性提升效益折算成等年值:
将所述增供电量效益折算成等年值,计算公式如下:
B Q ( A ) 1 = B Q ( P ) 1 × ( A / P , a , n ) = Σ i = 1 n [ B Q ( i ) 1 × ( P / A , a , i ) ] × ( A / P , a , n ) = Σ i = 1 n [ B Q ( i ) 1 × 1 ( 1 + a ) n ] × a ( 1 + a ) n ( 1 + a ) n - 1 ;
BQ(i)1=ΔPi×Tmax×a1
其中,BQ(A)1为增供电量效益的等年值,BQ(P)1为以初始年为基准年的总的增供电量效益现值,BQ(i)1为第i年的增供电量效益现值,ΔPi为第i年增供负荷,Tmax为最大负荷利用小时数,a1为经济使用寿命;
将所述可靠性提升效益折算成等年值,计算公式如下;
B Q ( A ) 2 = B Q ( P ) 2 × ( A / P , a , n ) = Σ i = 1 n [ B Q ( i ) 2 × ( P / A , a , i ) ] × ( A / P , a , n ) = Σ i = 1 n [ B Q ( i ) 2 × 1 ( 1 + a ) n ] × a ( 1 + a ) n ( 1 + a ) n - 1 ;
其中,BQ(A)2为可靠性提升效益的等年值,BQ(P)2为以初始年为基准年的总的可靠性提升效益现值,BQ(i)2为第i年的可靠性提升效益现值,t为规划方案实施后供电靠性提高而减少的停电时间,Pi为第i年负荷预测值;
步骤S3:计算规划方案效益成本比,所述效益成本比为效益的等年值除以成本的等年值,即:
RB/C=(BQ(A)1+BQ(A)2)/(Cf(A)1+Cf(a)2);
其中,RB/C为规划方案效益成本比。
2.根据权利要求1所述的一种配电网规划方案成本效益比计算方法,其特征在于:还包括步骤S4:判断所述规划方案效益成本比RB/C的大小是否大于1,若是,则将该规划方案作为备选方案;否则,不建议采用该规划方案。
CN201610903109.5A 2016-10-17 2016-10-17 一种配电网规划方案成本效益比计算方法 Pending CN106339827A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610903109.5A CN106339827A (zh) 2016-10-17 2016-10-17 一种配电网规划方案成本效益比计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610903109.5A CN106339827A (zh) 2016-10-17 2016-10-17 一种配电网规划方案成本效益比计算方法

Publications (1)

Publication Number Publication Date
CN106339827A true CN106339827A (zh) 2017-01-18

Family

ID=57840009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610903109.5A Pending CN106339827A (zh) 2016-10-17 2016-10-17 一种配电网规划方案成本效益比计算方法

Country Status (1)

Country Link
CN (1) CN106339827A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108062624A (zh) * 2017-12-12 2018-05-22 国家电网公司 一种导体技术经济评估系统及其评估方法

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108062624A (zh) * 2017-12-12 2018-05-22 国家电网公司 一种导体技术经济评估系统及其评估方法
CN108062624B (zh) * 2017-12-12 2021-07-13 国家电网公司 一种导体技术经济评估系统及其评估方法

Similar Documents

Publication Publication Date Title
Ye et al. High step-up interleaved dc/dc converter with high efficiency
Zhai et al. The relationship between technological innovation and green transformation efficiency in China: An empirical analysis using spatial panel data
Zhao et al. Analytical energy dissipation in large and medium-sized hydraulic press
Khanna et al. Quantifying the potential impacts of China's power-sector policies on coal input and CO2 emissions through 2050: A bottom-up perspective
CN106485417A (zh) 基于动态自适应任务调度策略的光伏电站移动运维方法
CN109658005A (zh) 考虑电储能的园区综合能源系统设备选型与容量规划方法
CN101409447A (zh) 基于部分自动微分技术的电力系统潮流优化方法
CN105046369A (zh) 一种基于能源中心的电气混联系统建模和优化调度方法
Wang et al. Electric vehicle clusters scheduling strategy considering real-time electricity prices based on deep reinforcement learning
CN101764405B (zh) 多周期多维度一体化检修计划优化与安全分析的方法
CN103324848A (zh) 基于诱导目标函数的含电量约束月度机组组合优化方法
Lü et al. Energy management and optimization of PEMFC/battery mobile robot based on hybrid rule strategy and AMPSO
CN102279565B (zh) 一种火力发电机组冷端设备的优化指导系统
CN103500361A (zh) 基于博弈论的微网负荷控制方法
CN103116814B (zh) 一种地区电网主设备中期负荷预测系统
Rao et al. Forecasting the carbon emissions in Hubei Province under the background of carbon neutrality: A novel STIRPAT extended model with ridge regression and scenario analysis
CN100590571C (zh) 实时嵌入式系统edf低功耗调度的msr方法
CN106339827A (zh) 一种配电网规划方案成本效益比计算方法
CN112862157B (zh) 一种考虑耦合度的综合能源系统优化调度方法及系统
CN105226649A (zh) 一种基于母线负荷预测改进的省级电网发电调度优化方法
CN111463777B (zh) 光-储充电站容量配置与定价模型的构建方法、计算设备
CN203239484U (zh) 一种工业循环水发电系统
CN102314643A (zh) 电网调度操作票系统智能拟票方法
CN205356155U (zh) 一种单管Buck-Boost-flyback升降压型电路
CN102207769A (zh) 一种基于静态电压调度的dvs系统的能量优化方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170118

RJ01 Rejection of invention patent application after publication