Mounting method of double-layer paper surface gypsum board ceiling Download PDFInfo
- Publication number
- CN106337524A CN106337524A CN201610748507.4A CN201610748507A CN106337524A CN 106337524 A CN106337524 A CN 106337524A CN 201610748507 A CN201610748507 A CN 201610748507A CN 106337524 A CN106337524 A CN 106337524A
- Authority
- CN
- China
- Prior art keywords
- plate
- keel
- installation
- thistle board
- line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/006—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/02—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation having means for ventilation or vapour discharge
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/04—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/22—Connection of slabs, panels, sheets or the like to the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/22—Connection of slabs, panels, sheets or the like to the supporting construction
- E04B9/24—Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like positioned on the upperside of, or held against the underside of the horizontal flanges of the supporting construction or accessory means connected thereto
- E04B9/245—Connection of slabs, panels, sheets or the like to the supporting construction with the slabs, panels, sheets or the like positioned on the upperside of, or held against the underside of the horizontal flanges of the supporting construction or accessory means connected thereto by means of screws, bolts or clamping strips held against the underside of the supporting construction
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses a mounting method of a double-layer paper surface gypsum board ceiling. The mounting method mainly comprises the following steps: firstly, surveying and setting out; secondly, composing and dividing meshes; thirdly, mounting side keels; fourthly, mounting hanging bars; fifthly, mounting main keels; sixthly, mounting minor keels; seventhly, mounting a base-layer paper surface gypsum board; eighthly, mounting a surface-layer paper surface gypsum board; ninthly, dotting antirust paint, and repairing and sticking a special paper tape. According to the mounting method disclosed by the invention, by means of the mode, the firmness and the flatness of the double-layer paper surface gypsum board can be improved, and cracks are reduced.
Description
Technical field
The present invention relates to building field, more particularly to a kind of installation method of bilayer Thistle board furred ceiling.
Background technology
Traditional double-deck Thistle board hoisting be exactly hidden after the completion of successively by tapping screw self-tapping screw rifle
Basic unit's Thistle board and surface layer plasterboard are fixed with keel.Traditional double-deck Thistle board hoisting exists several as follows
Point is not enough: 1, double-deck Thistle board is not integrally formed collective effect it is impossible to play its high intensity and protection against the tide, cracking resistance excellent
Feature;2nd, during surface construction, workmen estimates, mainly by experience, the position that keel are located, and has what panel was not connected with keel
Risk, easily causes double-deck Thistle board firmness and poor flatness, under generation around and crackle.
Content of the invention
The invention mainly solves the technical problem of providing a kind of installation method of bilayer Thistle board furred ceiling, energy
Enough firmness improving double-deck Thistle board and flatness, reduce crackle.
For solving above-mentioned technical problem, one aspect of the present invention is: provides a kind of bilayer Thistle board
The installation method of furred ceiling is it is characterised in that mainly comprise the steps:
First, surveying setting-out: according to construction drawing, job site is measured with unwrapping wire, determine+1.000 elevation line and hang
Push up minimum elevation line;
2nd, typesetting, lattice: according to the actual furred ceiling room-sized measuring, by the sheet material situation of market purchasing, carry out each room
Between Thistle board row plate, on computers with cad draw row plate plan, row plate when need to consider ceiling decoration moulding, sky
Tune to open hole site, large-scale lamp installation, reduce the cutting of sheet material, be easy to keel installation, the particularly installation of main joist, Ran Houyi
Factually border row plate situation, ejects the main joist position line at floor bottom;
3rd, keelson is installed: require according to the absolute altitude control line being ferreted out and drawing absolute altitude, on surrounding body of wall, cylinder
Paving nail keelson, to control ceiling keel installation, keelson installation requirement is firm, straight, elevation location accurate, installs
After whether check elevation location correct;
4th, hangs muscle is installed: installs hangs muscle, its spacing controls within 1200mm;
5th, main joist is installed: after fire-fighting, air-conditioning, forceful electric power, light current, Pipe installing are substantially ready in furred ceiling, carry out main dragon
Bone is installed, and wherein, adjacent two main joist joint location should stagger, and stagger and be advisable with 1200mm;Adjacent main joist is dorsad installed,
Adjacent main Skeleton hanging part adopts a positive and a negative to install, and prevents keel from toppling;Keel are connected by special connecting piece, and blending bolt is locked
Tightly;Main joist middle-range 1000 1200mm;
6th, secondary joist, stull keel are installed: according to spine arrangement material cutting plan, secondary joist is installed, after secondary joist installs
Stull keel are installed, secondary joist requires adjacent secondary joist joint to stagger when installing, and joint location can not point-blank prevent
After plasterboard is installed, furred ceiling stays;Stull keel installation requires to be located at the long side seam crossing of Thistle board, stull keel blanking
Size will guarantee that stull keel and secondary joist are completely embedded, firmly;Answer live unwrapping wire in large-scale lamp panel, hole periphery, determine position
Postpone, large-scale lamp panel adds special hangs muscle, and add stull keel according to keel material cutting plan in its periphery;
7th, basic unit's Thistle board is installed: after testing in primary and secondary keel are according to actual material cutting plan installation simultaneously, arrange
Furred ceiling work sets about installing plasterboard, before plasterboard is installed, first by corresponding for frame position projective rendering to basic unit's plasterboard
Visible face and surface layer plate visible face, and carry out line numbering;By material cutting plan, basal plate is installed, by the line at plate two ends and reality dragon
Bone corresponds to respectively, and operating personnel's be aligned line is fixed installation;Thistle board is installed seam and should be staggered, and seaming position is necessary
Fall on secondary joist or stull keel, from the centre of plate to the Four built in boundaries of plate during installation, must not multiple spot operation simultaneously, install should
Carry out under plate face unstress state;Thistle board is installed and is stayed seam 3~5mm between plate face, and gap width is consistent, Paper-faced gyp
Plate and wall column leave 5~6mm gap;
8th, surface layer Thistle board is installed: the stitching position fissure of displacement construction of panel and basal plate, rule in two ends on panel
Rule corresponding with base plate two ends, carry out following steps installation:
One), by surface layer plate and basal plate contact surface full coat white glue with vinyl: white glue with vinyl is added in the bucket of cleaning 5%
Clear water modulation is uniformly, stand-by;On mounted basal plate, surface layer plate is spelled in examination, determines the piece position of overlap joint, then takes off
It is placed on operating desk, the side full coat white glue with vinyl that it is contacted with basal plate, coated face is affixed to basal plate, then finely tunes,
So that the line at its two ends is squeezed after overlapping with basal plate line viscous closely knit, hold out against plate face with pernetti;
Two), panel screw is fixed with keel shoe: operating personnel are aligned with the self-tapping screw of 3.5*35 rapidly and draw
Line schedules surface layer tabulare on keel shoe;
9th, put antirust paint, squeegee, paste Special paper belt: after Thistle board installs, self-tapping screw carries out antirust place
Reason, and levelling with putty, and the seam between Thistle board is filled up it is desirable to be filled up close in three times using special cream of squeegeeing
Real, smooth, after cream of squeegeeing is dried, paste special affixing kerfs belt.
Preferably, the concrete installation method of wherein step 7 installation basic unit Thistle board is as follows: uses self-tapping screw
It is fixed with keel, ailhead should embed plate face 0.5~1.00mm, the specification of self-tapping screw adopts m3.5*25, self-tapping screw with
Plate face should be vertical, and separately pacify screw at the position being separated by 50mm, and self-tapping screw pitch of nails scope is 150~170mm, self-tapping screw with
The distance of basic unit's Thistle board edges of boards: the edges of boards distance of facial tissue encapsulating is 10~15mm, the edges of boards distance of cutting for 15~
20mm.
Preferably, in step 9, the color of antirust paint selects silver gray.
The invention has the beneficial effects as follows: the present invention 1, first pasted with white glue with vinyl between panel and base plate, then used self tapping
Screw is fixed, and so that panel and base plate is fitted like a glove integral, overall stress, makes the flatness of furred ceiling, intensity, cracking resistance
Strengthen;2nd, adopt by keel position line projective rendering in the visible face of Thistle board, then be fixed installation, can guarantee that bottom
Plate and panel are all firmly fixed on keel.
Specific embodiment
Below presently preferred embodiments of the present invention is described in detail so that advantages and features of the invention can be easier to by
It will be appreciated by those skilled in the art that apparent clearly defining thus making to protection scope of the present invention.
The embodiment of the present invention includes:
A kind of installation method of bilayer Thistle board furred ceiling, mainly comprises the steps:
First, surveying setting-out: according to construction drawing, job site is measured with unwrapping wire, determine+1.000 elevation line and hang
Push up minimum elevation line;
2nd, typesetting, lattice: according to the actual furred ceiling room-sized measuring, by the sheet material situation of market purchasing, carry out each room
Between Thistle board row plate, on computers with cad draw row plate plan, row plate when need to consider ceiling decoration moulding, sky
Tune to open hole site, large-scale lamp installation, reduce the cutting of sheet material, be easy to keel installation, the particularly installation of main joist, Ran Houyi
Factually border row plate situation, ejects the main joist position line at floor bottom;
3rd, keelson is installed: require according to the absolute altitude control line being ferreted out and drawing absolute altitude, on surrounding body of wall, cylinder
Paving nail keelson, to control ceiling keel installation, keelson installation requirement is firm, straight, elevation location accurate, installs
After whether check elevation location correct;
4th, hangs muscle is installed: installs hangs muscle, its spacing controls within 1200mm;
5th, main joist is installed: after fire-fighting, air-conditioning, forceful electric power, light current, Pipe installing are substantially ready in furred ceiling, carry out main dragon
Bone is installed, and wherein, adjacent two main joist joint location should stagger, and stagger and be advisable with 1200mm;Adjacent main joist is dorsad installed,
Adjacent main Skeleton hanging part adopts a positive and a negative to install, and prevents keel from toppling;Keel are connected by special connecting piece, and blending bolt is locked
Tightly;Main joist middle-range 1000 1200mm;
6th, secondary joist, stull keel are installed: according to spine arrangement material cutting plan, secondary joist is installed, after secondary joist installs
Stull keel are installed, secondary joist requires adjacent secondary joist joint to stagger when installing, and joint location can not point-blank prevent
After plasterboard is installed, furred ceiling stays;Stull keel installation requires to be located at the long side seam crossing of Thistle board, stull keel blanking
Size will guarantee that stull keel and secondary joist are completely embedded, firmly;Answer live unwrapping wire in large-scale lamp panel, hole periphery, determine position
Postpone, large-scale lamp panel adds special hangs muscle, and add stull keel according to keel material cutting plan in its periphery;
7th, basic unit's Thistle board is installed: after testing in primary and secondary keel are according to actual material cutting plan installation simultaneously, arrange
Furred ceiling work sets about installing plasterboard, before plasterboard is installed, first by corresponding for frame position projective rendering to basic unit's plasterboard
Visible face and surface layer plate visible face, and carry out line numbering;By material cutting plan, basal plate is installed, by the line at plate two ends and reality dragon
Bone corresponds to respectively, and operating personnel's be aligned line is fixed installation;Thistle board is installed seam and should be staggered, and seaming position is necessary
Fall on secondary joist or stull keel, from the centre of plate to the Four built in boundaries of plate during installation, must not multiple spot operation simultaneously, install should
Carry out under plate face unstress state;Thistle board is installed and is stayed seam 3~5mm between plate face, and gap width is consistent, Paper-faced gyp
Plate and wall column leave 5~6mm gap;
8th, surface layer Thistle board is installed: the stitching position fissure of displacement construction of panel and basal plate, rule in two ends on panel
Rule corresponding with base plate two ends, carry out following steps installation:
One), by surface layer plate and basal plate contact surface full coat white glue with vinyl: white glue with vinyl is added in the bucket of cleaning 5%
Clear water modulation is uniformly, stand-by;On mounted basal plate, surface layer plate is spelled in examination, determines the piece position of overlap joint, then takes off
It is placed on operating desk, the side full coat white glue with vinyl that it is contacted with basal plate, coated face is affixed to basal plate, then finely tunes,
So that the line at its two ends is squeezed after overlapping with basal plate line viscous closely knit, hold out against plate face with pernetti;
Two), panel screw is fixed with keel shoe: operating personnel are aligned with the self-tapping screw of 3.5*35 rapidly and draw
Line schedules surface layer tabulare on keel shoe;
9th, put antirust paint, squeegee, paste Special paper belt: after Thistle board installs, self-tapping screw carries out antirust place
Reason, and levelling with putty, and the seam between Thistle board is filled up it is desirable to be filled up close in three times using special cream of squeegeeing
Real, smooth, after cream of squeegeeing is dried, paste special affixing kerfs belt.
Further, the concrete installation method of wherein step 7 installation basic unit Thistle board is as follows: uses self tapping spiral shell
It is fixed by silk with keel, and ailhead should embed plate face 1.00mm, and the specification of self-tapping screw adopts m3.5*25, self-tapping screw and plate
Face should be vertical, and separately pacifies screw at the position being separated by 50mm, and self-tapping screw pitch of nails scope is 150mm, self-tapping screw and basic unit's paper
The distance of surface gypsum board edges of boards: the edges of boards distance of facial tissue encapsulating is 15mm, and the edges of boards distance of cutting is 20mm.
Further, in step 9, the color of antirust paint selects silver gray.
The foregoing is only embodiments of the invention, not thereby limit the present invention the scope of the claims, every using this
Equivalent structure or equivalent flow conversion that bright specification is made, or directly or indirectly it is used in other related technical fields, all
It is included within the scope of the present invention in the same manner.
Claims (3)
1. a kind of installation method of bilayer Thistle board furred ceiling is it is characterised in that mainly comprise the steps:
First, surveying setting-out: according to construction drawing, job site is measured with unwrapping wire, determine+1.000 elevation line and furred ceiling
Low elevation line;
2nd, typesetting, lattice: according to the actual furred ceiling room-sized measuring, by the sheet material situation of market purchasing, carry out each room
Plate arranged by Thistle board, draws row's plate plan with cad on computers, need to consider ceiling decoration moulding, air-conditioning is opened during row's plate
Hole site, large-scale lamp installation, reduce the cutting of sheet material, are easy to keel installation, and the particularly installation of main joist, then according to real
Plate situation is arranged on border, ejects the main joist position line at floor bottom;
3rd, keelson is installed: require according to the absolute altitude control line being ferreted out and drawing absolute altitude, in surrounding body of wall, cylinder upper berth nail
Keelson, to control ceiling keel installation, keelson installation requirement is firm, straight, elevation location accurate, multiple after installing
Whether core elevation location is correct;
4th, hangs muscle is installed: installs hangs muscle, its spacing controls within 1200mm;
5th, main joist is installed: after fire-fighting, air-conditioning, forceful electric power, light current, Pipe installing are substantially ready in furred ceiling, carry out main joist peace
Dress, wherein, adjacent two main joist joint location should stagger, and stagger and be advisable with 1200mm;Adjacent main joist is dorsad installed, adjacent
Main joist suspension member adopts a positive and a negative to install, and prevents keel from toppling;Keel are connected by special connecting piece, and blending bolt is locked;
Main joist middle-range 1000-1200mm;
6th, secondary joist, stull keel are installed: according to spine arrangement material cutting plan, secondary joist is installed, secondary joist is installed after installing
Stull keel, secondary joist requires adjacent secondary joist joint to stagger when installing, and joint location point-blank can not prevent gypsum
After plate is installed, furred ceiling stays;Stull keel installation requires to be located at the long side seam crossing of Thistle board, stull keel blank size
Guarantee that stull keel and secondary joist are completely embedded, firmly;Answer live unwrapping wire in large-scale lamp panel, hole periphery, after determining position,
Large-scale lamp panel adds special hangs muscle, and adds stull keel according to keel material cutting plan in its periphery;
7th, basic unit's Thistle board is installed: after testing in primary and secondary keel are according to actual material cutting plan installation simultaneously, arrange furred ceiling
Work sets about installing plasterboard, before plasterboard is installed, first will be visible to basic unit's plasterboard for corresponding for frame position projective rendering
Face and surface layer plate visible face, and carry out line numbering;By material cutting plan, basal plate is installed, the line at plate two ends is divided with actual keel
Not corresponding, operating personnel's be aligned line is fixed installation;Thistle board is installed seam and should be staggered, and seaming position must fall
On secondary joist or stull keel, from the centre of plate to the Four built in boundaries of plate during installation, must not multiple spot operation simultaneously, installation should be in plate
Carry out under the unstress state of face;Thistle board is installed and is stayed seam 3 ~ 5 mm between plate face, and gap width is consistent, Thistle board with
Wall column leaves 5 ~ 6mm gap;
8th, surface layer Thistle board is installed: the stitching position fissure of displacement construction of panel and basal plate, by two ends line and bottom on panel
The line of plate two ends corresponds to, and carries out following steps installation:
One), by surface layer plate and basal plate contact surface full coat white glue with vinyl: white glue with vinyl is added in the bucket of cleaning 5% clear water adjust
System is uniformly, stand-by;On mounted basal plate, surface layer plate is spelled in examination, determines the piece position of overlap joint, then takes off and be placed on behaviour
In station, side full coat white glue with vinyl that it is contacted with basal plate, coated face is affixed to basal plate, then fine setting is so as to two
The line at end is crowded viscous closely knit after overlapping with basal plate line, holds out against plate face with pernetti;
Two), panel screw is fixed with keel shoe: operating personnel are directed at line with the self-tapping screw of 3.5*35 rapidly will
Surface layer tabulare schedules on keel shoe;
9th, put antirust paint, squeegee, paste Special paper belt: after Thistle board installs, self-tapping screw carries out antirust treatment,
And levelling with putty, the seam between Thistle board is filled up it is desirable to be filled up closely knit in three times using special cream of squeegeeing, and puts down
Whole, after cream of squeegeeing is dried, paste special affixing kerfs belt.
2. a kind of installation method of bilayer Thistle board furred ceiling according to claim 1 is it is characterised in that wherein step
The concrete installation method of seven installation basic unit Thistle boards is as follows: is fixed it with keel with self-tapping screw, ailhead should be embedding
Enter plate face 0.5 ~ 1.00mm, the specification of self-tapping screw adopts m3.5*25, and self-tapping screw should be vertical with plate face, and is being separated by 50mm
Position separately pacify screw, self-tapping screw pitch of nails scope is 150 ~ 170mm, self-tapping screw and basic unit's Thistle board edges of boards away from
From: for 10 ~ 15mm with a distance from the edges of boards of facial tissue encapsulating, the edges of boards distance of cutting is 15 ~ 20mm.
3. a kind of installation method of bilayer Thistle board furred ceiling according to claim 1 is it is characterised in that in step 9
The color of antirust paint selects silver gray.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610748507.4A CN106337524A (en) | 2016-08-30 | 2016-08-30 | Mounting method of double-layer paper surface gypsum board ceiling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610748507.4A CN106337524A (en) | 2016-08-30 | 2016-08-30 | Mounting method of double-layer paper surface gypsum board ceiling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106337524A true CN106337524A (en) | 2017-01-18 |
Family
ID=57822796
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610748507.4A Pending CN106337524A (en) | 2016-08-30 | 2016-08-30 | Mounting method of double-layer paper surface gypsum board ceiling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106337524A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108009331A (en) * | 2017-11-24 | 2018-05-08 | 巧夺天宫(深圳)科技有限公司 | Furred ceiling design system, its method, electronic equipment and computer program |
CN108021745A (en) * | 2017-11-24 | 2018-05-11 | 巧夺天宫(深圳)科技有限公司 | Furred ceiling design system, its method, electronic equipment and computer program |
CN108086561A (en) * | 2017-12-21 | 2018-05-29 | 合肥市艾美莱装饰有限公司 | The method of construction and decoration furred ceiling |
CN108868139A (en) * | 2018-08-11 | 2018-11-23 | 天津市盛世基建岩土工程有限公司 | A kind of method of furred ceiling |
CN108930350A (en) * | 2017-05-23 | 2018-12-04 | 太仓顺如成建筑材料有限公司 | A kind of technique of gypsum stud L-type Substrate sheet crack resistence |
CN112012392A (en) * | 2020-08-31 | 2020-12-01 | 浙江世润建创科技发展有限公司 | Light steel keel gypsum plaster slab suspended ceiling and construction method |
CN112593654A (en) * | 2020-11-19 | 2021-04-02 | 北京港源建筑装饰工程有限公司 | Sound insulation roof manufacturing method and sound insulation roof |
CN112726931A (en) * | 2021-01-26 | 2021-04-30 | 武汉市华天仑建筑装饰工程有限公司 | Green construction method of light steel keel gypsum plasterboard |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2005106156A1 (en) * | 2004-04-28 | 2005-11-10 | Yoshino Gypsum Co., Ltd. | Board building material, board building material producing method, board building material installation method |
CN103835423A (en) * | 2014-02-12 | 2014-06-04 | 苏州金螳螂建筑装饰股份有限公司 | Processing structure of top surface movable expansion joint |
CN204571055U (en) * | 2015-03-11 | 2015-08-19 | 上海申远建筑装饰工程有限公司 | Insulation ceiling structure |
CN204738432U (en) * | 2015-02-04 | 2015-11-04 | 长春昆仑装饰有限公司 | Prevent double layer plaster tablet furred ceiling of fracture in winter |
-
2016
- 2016-08-30 CN CN201610748507.4A patent/CN106337524A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2005106156A1 (en) * | 2004-04-28 | 2005-11-10 | Yoshino Gypsum Co., Ltd. | Board building material, board building material producing method, board building material installation method |
CN103835423A (en) * | 2014-02-12 | 2014-06-04 | 苏州金螳螂建筑装饰股份有限公司 | Processing structure of top surface movable expansion joint |
CN204738432U (en) * | 2015-02-04 | 2015-11-04 | 长春昆仑装饰有限公司 | Prevent double layer plaster tablet furred ceiling of fracture in winter |
CN204571055U (en) * | 2015-03-11 | 2015-08-19 | 上海申远建筑装饰工程有限公司 | Insulation ceiling structure |
Non-Patent Citations (1)
Title |
---|
SYH73010833: ""轻钢龙骨、双层纸面石膏板吊顶施工方案"", 《HTTPS://WENKU.BAIDU.COM/BROWSE/DOWNLOADREC?DOC_ID=05A262539B6648D7C1C746AC&》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108930350A (en) * | 2017-05-23 | 2018-12-04 | 太仓顺如成建筑材料有限公司 | A kind of technique of gypsum stud L-type Substrate sheet crack resistence |
CN108009331A (en) * | 2017-11-24 | 2018-05-08 | 巧夺天宫(深圳)科技有限公司 | Furred ceiling design system, its method, electronic equipment and computer program |
CN108021745A (en) * | 2017-11-24 | 2018-05-11 | 巧夺天宫(深圳)科技有限公司 | Furred ceiling design system, its method, electronic equipment and computer program |
CN108086561A (en) * | 2017-12-21 | 2018-05-29 | 合肥市艾美莱装饰有限公司 | The method of construction and decoration furred ceiling |
CN108868139A (en) * | 2018-08-11 | 2018-11-23 | 天津市盛世基建岩土工程有限公司 | A kind of method of furred ceiling |
CN112012392A (en) * | 2020-08-31 | 2020-12-01 | 浙江世润建创科技发展有限公司 | Light steel keel gypsum plaster slab suspended ceiling and construction method |
CN112593654A (en) * | 2020-11-19 | 2021-04-02 | 北京港源建筑装饰工程有限公司 | Sound insulation roof manufacturing method and sound insulation roof |
CN112726931A (en) * | 2021-01-26 | 2021-04-30 | 武汉市华天仑建筑装饰工程有限公司 | Green construction method of light steel keel gypsum plasterboard |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106337524A (en) | Mounting method of double-layer paper surface gypsum board ceiling | |
CN104612306B (en) | Construction method of large-space multi-layer multi-curved-surface special-shaped aluminum magnesium alloy profile suspended ceiling | |
CN109930734B (en) | Gypsum board suspended ceiling construction method | |
CN206070889U (en) | A kind of expansion joint both sides roof boarding Collapsible structure | |
CN105804305B (en) | Corrugated metal plate ceiling system and its installation method | |
CN202324295U (en) | Drop ceiling closing-in structure | |
CN204199617U (en) | Anti-static all-steel raised flooring system | |
CN204738432U (en) | Prevent double layer plaster tablet furred ceiling of fracture in winter | |
CN206916972U (en) | A kind of external heat insulating wall | |
CN205382610U (en) | Abnormal shape suspended ceiling structure | |
CN108505662B (en) | Construction method for self-lifting hyperboloid dense-hole GRC solid wood-skin-attached ceiling lamp | |
CN109518900B (en) | Bare top decoration structure of steel structure building and elastic coating construction method | |
CN103615065B (en) | A kind of fabricated luminous mantle ceiling structure and construction method thereof | |
CN202227559U (en) | Edging device for plasterboard furred ceiling | |
CN217924247U (en) | Unit type clear water-imitating concrete skeleton partition wall structure | |
CN107762032A (en) | A kind of ceiling system and installation method | |
CN104389396B (en) | Pseudo-classic architecture eaves lower decoration and heat-insulation system | |
CN203684562U (en) | Anti-crack suspended ceiling structure | |
CN210976267U (en) | Suspended ceiling deformation joint structure | |
CN211850290U (en) | Integrally-detachable large-scale roof access opening structure | |
CN210399112U (en) | Electric heating system containing carbon fiber electrothermal film | |
CN104018591B (en) | Mechanized construction method for wall thermal insulation | |
CN205777216U (en) | A kind of press strip anchoring type integration is combined veneer construction assembling structure | |
CN203160503U (en) | Invertedly concave connecting structure of indoor ceiling and wall body | |
CN207846818U (en) | A kind of slope light section steel structure roof aluminum plate facing ceiling structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170118 |
|
RJ01 | Rejection of invention patent application after publication |