A kind of dust removal integrated removing means of coal fired power plant flue gas desulfurization
Technical field
Patent of the present invention is related to removing means, the dust removal integrated removing dress of more particularly, to a kind of coal fired power plant flue gas desulfurization
Put.
Background technology
What the minimum discharge of national coal-burning power plant was transformed at present just carries out on a large scale in order, and it is existing that improvement project is faced with unit
Condition difference is big, the problems such as arrangement condition is complicated, for various Coal ranks, boiler type, existing environmental protection facility and place
The conditions such as arrangement, under the premise of the safety and stability ensureing minimum discharge unit, should reduce the investment of minimum discharge transformation
And operating cost.
Content of the invention
For the deficiencies in the prior art, the present invention provides a kind of rational in infrastructure, reduces the cost of investment of improvement project and full
The dust removal integrated removing means of the coal fired power plant flue gas desulfurization of compact place arrangement requirement enough.
For achieving the above object, present invention employs technical scheme below:
The dust removal integrated removing means of coal fired power plant flue gas desulfurization, is provided with all stream synergic boards in absorption tower entrance top,
All above stream synergic board, between 1.5m~3m, 2~5 layers of spraying layer are set, the spacing of every layer of spraying layer, between 1.8~2.5m, is sprayed
Drench 1~2 layer of CPR dust of layer middle setting, pipe precipitator is set above the superiors' spraying layer.
As preferred: at described pipe precipitator 2m above the superiors' spraying layer.
As preferred: described all stream synergic board be the perforated plate construction being provided with rinforcement bar, percent opening be 28%~35% it
Between.
As preferred: the parallel absorption tower that is stratified and set on of described spraying layer is originally internal, and every layer includes many showers and spray
Mouth;Successively to parallel arrangement, diameter dimension is reduced section by section to far-end stairstepping spray piping by near-end, flow velocity in spray piping
Uniformly it is ensured that each nozzle flow is identical;Spray coverage rate is between 200%~400%.
As preferred: described CPR dust passes through rubber blanket and contacts with absorbing tower wall.
As preferred: described pipe precipitator is by restraining cylinder and multi-stage acceleration device, separator, collector ring and water conservancy diversion ring group
Become.
The invention has the beneficial effects as follows:
1st, all stream synergic board increases the time of contact of gas-liquid, can more effectively contact serosity than the simple liquid-gas ratio that increases,
There is provided more dissolving machine meetings in uptake zone, thus increasing desulfuration efficiency;
2nd, pass through all to be flowed the parameters such as spacing, percent opening and the perforate density of synergic board, the module cloth with pipe precipitator
Put and mated with specification etc. and adjust, the effect of CPR dust in addition, gas-liquid distribution can be made more uniform, it is to avoid different liquid gas
The ratio difference of region desulfurization and efficiency of dust collection, thus improve the integral desulfurization, dust removal efficiency of this device.
3rd, all flow the combination of synergic board and pipe precipitator, reduce the liquid-gas ratio of desulfurizer, saved sprayed slurry
Amount, decreases spray layer number, need not additionally increase the large-scale dust arrester such as wet electrical dust precipitator, greatly reduce improvement project
Amount and operating cost, shorten the transformation duration.
Brief description
Fig. 1 is overall structure diagram of the present invention;
Fig. 2 is all to flow potentiation plate structure schematic diagram;
Fig. 3 is spraying layer plane graph;
Fig. 4 is CPR dust detail drawing;
Description of reference numerals: absorption tower entrance 1, all stream synergic board 2, spraying layer 3, CPR dust 4, pipe precipitator 5, all flow
Synergic board body 6, rinforcement bar 7, spray piping 8, nozzle 9, rubber blanket 10, absorption tower wall 11.
Specific embodiment
With reference to embodiment, the present invention is described further.The explanation of following embodiments is only intended to help understand this
Invention.It should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, also
The present invention can be carried out with some improvement and modify, these improve and modify the protection domain also falling into the claims in the present invention
Interior.
As shown in Figures 1 to 4, the dust removal integrated removing means of coal fired power plant flue gas desulfurization, above absorption tower entrance 1
It is provided with all stream synergic boards 2, between all stream synergic board 2 top 1.5m~3m, 3 layers of spraying layer 3 are set, the spacing of every layer of spraying layer 3 exists
Between 1.8~2.5m, spraying layer 1 layer of CPR dust 4 of 3 middle setting, pipe precipitator is set at 2m above the superiors' spraying layer 3
5, substitute ridge type demister+wet electrical dust precipitator, the integration removing in tower by sulfur and dirt, reach minimum discharge requirement.Cigarette
Gas, after the entrance of absorption tower, first passes through all stream synergic board in tower, and the homogenizing carrying out gas, liquid with liquid film thereon is adjusted
Whole, whole in absorption region highly goes up the effective contact that can realize flue gas and serosity.Permissible in the CPR dust of tower wall periphery
Effectively flue gas is converged toward tower centre, and also can be conducive to carrying with flue gas effective contact along the serosity that tower wall flows down
High desulfurization efficiency.By experimental study, can all be flowed the percent opening of synergic board and the module of opening area and pipe precipitator
Arrangement is adjusted and mates so that gas phase is uniformly more preferable, and desulfurization and dedusting potentiation becomes apparent from.
Described all stream synergic board 2 is the perforated plate construction being provided with rinforcement bar 7, and percent opening is between 28%~35%, runs
When on the liquid film that can keep certain height, increased time of contact with serosity in absorption tower for the flue gas.When gas passes through,
Gas-to-liquid contact, can play and fully absorb so in gas2With the effect of dust, thus effectively reducing liquid-gas ratio, improve absorption
The utilization rate of agent.
The parallel absorption tower that is stratified and set on of described spraying layer 3 is originally internal, and every layer includes many showers and nozzle;Shower
Successively to parallel arrangement, diameter dimension is reduced to far-end stairstepping section by section by near-end in road 8, and in spray piping 8, flow velocity is uniform,
Guarantee that each nozzle flow is identical;Spray coverage rate between 200%~400%, the polymerization of CPR dust 4 in addition, can
To greatest extent washing absorption is carried out to flue gas, effectively so in removing flue gas2And dust.By the atomized drop of drive nozzle
Mean diameter be about 1500~2200 microns, be conducive to top bundled tube cleaner unit capture, work in coordination with improve dust removing effects.Institute
State CPR dust 4 to contact with absorbing tower wall 11 by rubber blanket 10.
Bundled tube cleaner unit 5 is to be collided at high speeds by fine drop and granule, condense and become bulky grain, by inertia
The separation from gas phase for the granule is realized in effect.Described pipe precipitator 5 is by tube bank cylinder and multi-stage acceleration device, separator, collector ring
And guide ring composition.Being arranged in absorption tower can be it is not necessary to other place, the strong adaptability to improvement project, initial cost and
Operation energy consumption is all relatively low.
All stream synergic board 2 of this programme and pipe precipitator 5 can adopt unlike material material, alloy or nonmetallic all
Can, stiffened panel can suitably be increased according to intensity requirement, be arranged on support steel beam by measures such as bolt, clips.
The present invention demonstrates in Zhejiang Zhe Neng Wenzhou Power factory 2 × 300mw coal unit flue gas minimum discharge, after transformation
One layer of setting all stream synergic board, one layer of CPR dust, three layers of spraying layer and one layer of pipe precipitator, the cigarette of final unit in absorption tower
Gas pollutant emission meets minimum discharge standard and requires.