CN106328314B - A kind of accompanying-heat cable cross-linked polyolefin insulating barrier extrudes technique - Google Patents
A kind of accompanying-heat cable cross-linked polyolefin insulating barrier extrudes technique Download PDFInfo
- Publication number
- CN106328314B CN106328314B CN201610820070.0A CN201610820070A CN106328314B CN 106328314 B CN106328314 B CN 106328314B CN 201610820070 A CN201610820070 A CN 201610820070A CN 106328314 B CN106328314 B CN 106328314B
- Authority
- CN
- China
- Prior art keywords
- guide pin
- pin bushing
- upstream
- downstream
- cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01B—CABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
- H01B13/00—Apparatus or processes specially adapted for manufacturing conductors or cables
- H01B13/06—Insulating conductors or cables
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01B—CABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
- H01B13/00—Apparatus or processes specially adapted for manufacturing conductors or cables
- H01B13/06—Insulating conductors or cables
- H01B13/14—Insulating conductors or cables by extrusion
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Extrusion Moulding Of Plastics Or The Like (AREA)
Abstract
Technique is extruded the invention discloses a kind of accompanying-heat cable cross-linked polyolefin insulating barrier, including insulating barrier plsitive mold, the insulating barrier plsitive mold includes inner mould core, outer die casing, the concentric guide pin bushing of the concentric guide pin bushing in upstream and downstream, and the concentric guide pin bushing of the concentric guide pin bushing in upstream and the upstream includes hard guide pin bushing outer tube and the guide pin bushing rubber ring being arranged in the hard guide pin bushing outer tube;It is further comprising the steps of:S1, adjust wait the direction for extruding cable make wait extrude cable shuttle the inner mould core when will not rub the inwall of the inner mould core;S2, the position for adjusting the concentric guide pin bushing in upstream and the concentric guide pin bushing in the downstream, make the guide pin bushing rubber ring of the concentric guide pin bushing of the concentric guide pin bushing in the upstream and the downstream undeformed;S3, adjustment upstream straining pulley and downstream tension wheel position, make the guide pin bushing rubber ring of the concentric guide pin bushing of the concentric guide pin bushing in the upstream and the downstream undeformed.The present invention can ensure the degree of eccentricity quality of the product insulating barrier such as cable or heating tape.
Description
Technical field
The present invention relates to a kind of cable or heating tape Product processing equipment technical field, particularly a kind of accompanying-heat cable crosslinking
Polyolefin insulation layer extrudes technique.
Background technology
The processing technology of the product such as cable or heating tape mainly includes drawing, process and cladding:Drawing is mainly used in processing
The conductor wire core of cable or heating tape, makes metal bar by pulling force effect or thicker metal wire is forced through mould, metal bar
Or the sectional area of metal wire is compressed and obtains required section shape and size;Process is to improve cable or heating tape
The pliability of core, entirety degree, and the Kelvin effect for overcoming single cable or heating tape core to exist, and many single lines are pressed
According to predetermined direction weave in;Cladding be primarily referred to as the product such as cable or heating tape one layer of conductor thread core outer wrapping or
Multi-layer insulation and jacket material, thermoplastic superior performance, with good process industrial art performance, in particular for electricity
Technique is easy when cable or heating tape extrude insulating barrier and sheath production, cable or heating tape plastic insulating layer and the base of sheath production
The manner is using the continuously extruded progress of single screw extrusion machine, the characteristics of having continuous extrusion due to extruder, so plastics
The production process of insulation and sheath is also what is be carried out continuously.
The product such as cable or heating tape is when carrying out cladding procedures, it is usually required mainly for one of technical barrier overcome is
The degree of eccentricity of insulating barrier is kept, i.e. the deviation of basic thickness of insulating layer can not be excessive, and the insulating barrier of cable or heating tape is same
Radial thickness at one cross section and varying cross-section should be consistent.Influence the bias of the product insulating barrier such as cable or heating tape
The factor of degree is broadly divided into two pieces:One is the plasticizing situation of insulating materials in itself, specifically mainly plastic molten melt temperature, insulation
The technological parameter such as material shear strain rate and plastic molten melt heating and incorporation time;Two be insulating materials cable in extrusion
With the concentricity of mould, when cable tension force not enough or it is poor with the concentricity of mould, although in the position-limiting action of inner mould core
Under, concentricity of the cable at inner mould core extrusion can be guaranteed, but cable and the concentricity at outer die casing extrusion
Can occur relatively large deviation, so as to influence the degree of eccentricity of insulating barrier.
The content of the invention
In order to overcome the deficiencies in the prior art, work is extruded the invention provides a kind of accompanying-heat cable cross-linked polyolefin insulating barrier
Skill, ensure that cable has higher concentricity with mould, so as to ensure the product insulating barrier such as cable or heating tape
Degree of eccentricity quality.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of accompanying-heat cable cross-linked polyolefin insulating barrier extrudes technique, including insulating barrier plsitive mold, the insulating barrier
Plsitive mold includes being used to limit the inner mould core of cable location to be extruded and for extruding insulating materials and being wrapped in outside cable
Outer die casing, the outer die casing coaxial package is in the outside of the inner mould core, and the inner mould core is located at the upper of the outer die casing
Trip;It is also concentric including the concentric guide pin bushing in upstream for being arranged at the inner mould core upstream and the downstream for being arranged at the outer die casing downstream
Guide pin bushing, the concentric guide pin bushing of the concentric guide pin bushing in upstream and the downstream is coaxially disposed with the outer die casing, and the upstream is led with one heart
Set and the concentric guide pin bushing in the downstream include hard guide pin bushing outer tube and the guide pin bushing rubber ring being arranged in the hard guide pin bushing outer tube,
The internal diameter of the guide pin bushing rubber ring is identical with the external diameter of cable to be extruded;It is further comprising the steps of:
S1, will cable be extruded sequentially pass through the concentric guide pin bushing in the upstream, the inner mould core, the outer die casing and it is described under
Concentric guide pin bushing is swum, cable to be extruded is kept certain tension force, adjusting the direction of cable to be extruded wears cable to be extruded
Will not rub the inwall of the inner mould core described in shuttle during inner mould core;
S2, make cable to be extruded keep tension force and direction constant, adjust the concentric guide pin bushing in upstream and the downstream is concentric
The position of guide pin bushing, makes the guide pin bushing rubber ring of the concentric guide pin bushing of the concentric guide pin bushing in the upstream and the downstream undeformed, fixed
The position of the concentric guide pin bushing of the concentric guide pin bushing in upstream and the downstream;
S3, will cable be extruded it is concentric from the concentric guide pin bushing in the upstream, the inner mould core, the outer die casing and the downstream
In guide pin bushing extract out, first bypass upstream straining pulley sequentially pass through again the concentric guide pin bushing in the upstream, the inner mould core, the outer die casing and
The concentric guide pin bushing in downstream, then bypasses downstream tension wheel by cable to be extruded, and then adjusts upstream straining pulley and downstream tension
The position of wheel, makes the guide pin bushing rubber ring of the concentric guide pin bushing of the concentric guide pin bushing in the upstream and the downstream undeformed.
As the further improvement of above-mentioned technical proposal, the concentric guide pin bushing of the concentric guide pin bushing in upstream and the downstream is also wrapped
Include and adjust housing for installing the hard guide pin bushing outer tube and adjusting the installation of the hard guide pin bushing outer tube position, the hard is led
The outer shape for covering outer tube radial section is rectangle, and the installation regulation housing is also rectangle, the four of the installation regulation housing
The position adjustments bolt for fixing the hard guide pin bushing outer tube is provided with bar side;And adjust the concentric guide pin bushing in upstream and
The position of the concentric guide pin bushing in downstream comprises the following steps:
S21, the position adjustments bolt unscrewed first on the four edges for installing regulation housing, adjust the hard
The height of guide pin bushing outer tube, makes the bottom and top of the guide pin bushing rubber ring without deformation, then tentatively tightens described install outside regulation
The position adjustments bolt on the base of frame;
S22 and then the regulation hard guide pin bushing outer tube horizontal level, make the horizontal both sides of the guide pin bushing rubber ring without change
Shape, then tentatively tightens the position adjustments bolt on two vertical edges for installing regulation housing, leads the hard
Set outer tube can not be moved horizontally but can moved up and down;
S23, the position adjustments bolt tentatively tightened on the top margin for installing regulation housing, then alternately tighten institute
State the position adjustments bolt on the four edges for installing regulation housing, and keep the guide pin bushing rubber ring without local deformation, directly
Fastened completely to all position adjustments bolts.
As the further improvement of above-mentioned technical proposal, it is provided with the inside of the hard guide pin bushing outer tube for fixed described
The rubber for coordinating the rubber ring mounting groove is provided with the outside of the rubber ring mounting groove of guide pin bushing rubber ring, the guide pin bushing rubber ring
The rubber ring limiting section being provided with the outside of fixed part, the guide pin bushing rubber ring for limiting cable location to be extruded is enclosed, it is described
Rubber ring limiting section contacts the radial cross-sectional shape of the medial surface of cable to be extruded for arc, and the rubber ring limiting section is contacted
The medial surface of cable to be extruded is provided with polytetrafluorethylecoatings coatings.
Compared with prior art, the beneficial effects of the invention are as follows:
A kind of accompanying-heat cable cross-linked polyolefin insulating barrier provided by the present invention extrudes technique, is led with one heart by setting upstream
Set and the concentric guide pin bushing in downstream, ensure that cable has higher concentricity with mould, so as to ensure cable or heating tape
Deng the degree of eccentricity quality of product insulating barrier.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the structural representation of insulating barrier plsitive mold of the present invention;
Fig. 2 is the structural representation of the concentric guide pin bushing of the concentric guide pin bushing in upstream of the present invention and downstream.
Embodiment
Referring to figs. 1 to Fig. 2, Fig. 1 to Fig. 2 is the structural representation of a specific embodiment of the invention.
As shown in Figure 1 to Figure 2, a kind of accompanying-heat cable cross-linked polyolefin insulating barrier extrudes technique, including insulating barrier squash type
Mould, the insulating barrier plsitive mold includes the inner mould core 20 for limiting cable location to be extruded and insulated for extruding
Material and the outer die casing 10 being wrapped in outside cable, the coaxial package of outer die casing 10 are and described in the outside of the inner mould core 20
Inner mould core 20 is located at the upstream of the outer die casing 10;Also include be arranged at the upstream of inner mould core 20 the concentric guide pin bushing 40 in upstream,
With the concentric guide pin bushing 30 in downstream for being arranged at the downstream of outer die casing 10, the concentric guide pin bushing 40 in upstream and the concentric guide pin bushing in the downstream
30 are coaxially disposed with the outer die casing 10, and the concentric guide pin bushing 30 of the concentric guide pin bushing 40 in upstream and the downstream is led including hard
Set outer tube 41 and the guide pin bushing rubber ring 42 being arranged in the hard guide pin bushing outer tube 41, the internal diameter of the guide pin bushing rubber ring 42 is with treating
The external diameter for extruding cable is identical;The inner side of the hard guide pin bushing outer tube 41 is provided with the rubber for fixing the guide pin bushing rubber ring 42
Cushion rubber mounting groove, the outside of the guide pin bushing rubber ring 42 is provided with the rubber ring fixed part 421 for coordinating the rubber ring mounting groove,
The outside of the guide pin bushing rubber ring 42 is provided with the rubber ring limiting section 422 for limiting cable location to be extruded, the rubber
The radial cross-sectional shape that circle limiting section 422 contacts the medial surface of cable to be extruded is arc, and the rubber ring limiting section 422 connects
The medial surface for touching cable to be extruded is provided with polytetrafluorethylecoatings coatings.It is further comprising the steps of:
S1, cable to be extruded sequentially passed through into the concentric guide pin bushing 40 in the upstream, the inner mould core 20, the and of the outer die casing 10
The concentric guide pin bushing 30 in downstream, then makes cable to be extruded keep certain tension force, adjusting the direction of cable to be extruded makes to wait to squeeze
Envelope curve cable shuttle the inner mould core 20 when will not rub the inwall of the inner mould core 20;
S2, make cable to be extruded keep tension force and direction constant, adjust the concentric guide pin bushing 40 in upstream and the downstream is same
The position of heart guide pin bushing 30, makes the equal nothing of the guide pin bushing rubber ring 42 of the concentric guide pin bushing 30 of the concentric guide pin bushing 40 in the upstream and the downstream
Deformation, the position of the fixed concentric guide pin bushing 40 in upstream and the concentric guide pin bushing 30 in the downstream;
S3, will cable be extruded from the concentric guide pin bushing 40 in the upstream, the inner mould core 20, the outer die casing 10 and it is described under
Swim in concentric guide pin bushing 30 extract out, first bypass upstream straining pulley sequentially pass through again the concentric guide pin bushing 40 in the upstream, the inner mould core 20,
The concentric guide pin bushing 30 of the outer die casing 10 and the downstream, then bypasses downstream tension wheel by cable to be extruded, then adjusts upstream
The position of straining pulley and downstream tension wheel, makes the guide pin bushing rubber of the concentric guide pin bushing 30 of the concentric guide pin bushing 40 in the upstream and the downstream
Cushion rubber 42 is undeformed.
Specifically, the concentric guide pin bushing 30 of the concentric guide pin bushing 40 in the upstream and the downstream is also included for installing the hard
Guide pin bushing outer tube 41 and the installation regulation housing 43 for adjusting the position of hard guide pin bushing outer tube 41, the hard guide pin bushing outer tube 41 is radially
The outer shape in section is rectangle, and the installation regulation housing 43 is also rectangle, on the four edges of the installation regulation housing 43
It is provided with the position adjustments bolt 44 for fixing the hard guide pin bushing outer tube 41;And adjust the concentric He of guide pin bushing 40 in upstream
The position of the concentric guide pin bushing 30 in downstream comprises the following steps:
S21, the position adjustments bolt 44 unscrewed first on the four edges for installing regulation housing 43, regulation are described
The height of hard guide pin bushing outer tube 41, makes the bottom and top of the guide pin bushing rubber ring 42 without deformation, then tentatively tightens the peace
Debug the position adjustments bolt 44 on the base of section housing 43;
S22 and then the regulation hard guide pin bushing outer tube 41 horizontal level, make the horizontal both sides of the guide pin bushing rubber ring 42
Without deformation, the position adjustments bolt 44 on two vertical edges for installing regulation housing 43 is then tentatively tightened, makes institute
Stating hard guide pin bushing outer tube 41 can not move horizontally but can move up and down;
S23, the position adjustments bolt 44 tentatively tightened on the top margin for installing regulation housing 43, are then alternately twisted
The position adjustments bolt 44 on the tight four edges for installing regulation housing 43, and the guide pin bushing rubber ring 42 is kept without office
Portion is deformed, until all the position adjustments bolt 44 is fastened completely.
The preferable implementation to the present invention is illustrated above, certainly, and the present invention can also be used and above-mentioned implementation
The different form of mode, the equivalent conversion that those of ordinary skill in the art are made on the premise of without prejudice to spirit of the invention
Or corresponding change, it should all belong in protection scope of the present invention.
Claims (3)
1. a kind of accompanying-heat cable cross-linked polyolefin insulating barrier extrudes technique, it is characterised in that:Including insulating barrier plsitive mold, institute
Stating insulating barrier plsitive mold includes being used to limit the inner mould core of cable location to be extruded and for extruding insulating materials and wrapping up
Outer die casing outside cable, the outer die casing coaxial package is located at outside described in the outside of the inner mould core, and the inner mould core
The upstream of die sleeve;It is characterized in that:Also include being arranged at the concentric guide pin bushing in upstream of the inner mould core upstream and be arranged at described outer
The concentric guide pin bushing in downstream in die sleeve downstream, the concentric guide pin bushing of the concentric guide pin bushing in upstream and the downstream is coaxially set with the outer die casing
Put, the concentric guide pin bushing of the concentric guide pin bushing in upstream and the downstream includes hard guide pin bushing outer tube and is arranged at outside the hard guide pin bushing
Guide pin bushing rubber ring in pipe, the internal diameter of the guide pin bushing rubber ring is identical with the external diameter of cable to be extruded;It is further comprising the steps of:
S1, will cable be extruded to sequentially pass through the concentric guide pin bushing in the upstream, the inner mould core, the outer die casing and the downstream same
Heart guide pin bushing, then makes cable to be extruded keep certain tension force, adjusting the direction of cable to be extruded makes cable shuttle institute to be extruded
Will not rub the inwall of the inner mould core when stating inner mould core;
S2, make cable to be extruded keep tension force and direction constant, adjust the concentric guide pin bushing in upstream and the concentric guide pin bushing in the downstream
Position, make the guide pin bushing rubber ring of the concentric guide pin bushing of the concentric guide pin bushing in the upstream and the downstream undeformed, it is fixed described
The position of the concentric guide pin bushing of the concentric guide pin bushing in upstream and the downstream;
S3, will cable be extruded from the concentric guide pin bushing in the upstream, the inner mould core, the concentric guide pin bushing of the outer die casing and the downstream
It is middle to extract out, first bypass upstream straining pulley and sequentially pass through the concentric guide pin bushing in the upstream, the inner mould core, the outer die casing and described again
The concentric guide pin bushing in downstream, then bypasses downstream tension wheel by cable to be extruded, and then adjusts upstream straining pulley and downstream tension wheel
Position, makes the guide pin bushing rubber ring of the concentric guide pin bushing of the concentric guide pin bushing in the upstream and the downstream undeformed.
2. a kind of accompanying-heat cable cross-linked polyolefin insulating barrier according to claim 1 extrudes technique, it is characterised in that:It is described
The concentric guide pin bushing of the concentric guide pin bushing in upstream and the downstream is also included for installing the hard guide pin bushing outer tube and adjusting the hard
The installation regulation housing of guide pin bushing outer tube position, the outer shape of the hard guide pin bushing outer tube radial section is rectangle, the installation
It is also rectangle to adjust housing, is provided with the four edges of the installation regulation housing for fixing the hard guide pin bushing outer tube
Position adjustments bolt;And the position of the adjustment concentric guide pin bushing in upstream and the concentric guide pin bushing in the downstream comprises the following steps:
S21, the position adjustments bolt unscrewed first on the four edges for installing regulation housing, adjust the hard guide pin bushing
The height of outer tube, makes the bottom and top of the guide pin bushing rubber ring without deformation, then tentatively tightens described install and adjust housing
The position adjustments bolt on base;
S22 and then the regulation hard guide pin bushing outer tube horizontal level, make the horizontal both sides of the guide pin bushing rubber ring without deformation,
Then the position adjustments bolt on two vertical edges for installing regulation housing is tentatively tightened, is made outside the hard guide pin bushing
Pipe can not be moved horizontally but can moved up and down;
S23, the position adjustments bolt tentatively tightened on the top margin for installing regulation housing, then alternately tighten the peace
The position adjustments bolt on the four edges of section housing is debug, and keeps the guide pin bushing rubber ring without local deformation, until complete
Position adjustments bolt is fastened completely described in portion.
3. a kind of accompanying-heat cable cross-linked polyolefin insulating barrier according to claim 1 extrudes technique, it is characterised in that:It is described
The rubber ring mounting groove for fixing the guide pin bushing rubber ring is provided with the inside of hard guide pin bushing outer tube, the guide pin bushing rubber ring
Outside, which is provided with the outside of the rubber ring fixed part for coordinating the rubber ring mounting groove, the guide pin bushing rubber ring, to be provided with for limiting
Surely the rubber ring limiting section of cable location to be extruded, the radial direction that the rubber ring limiting section contacts the medial surface of cable to be extruded is cut
Face is shaped as arc, and the medial surface that the rubber ring limiting section contacts cable to be extruded is provided with polytetrafluorethylecoatings coatings.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610820070.0A CN106328314B (en) | 2016-09-13 | 2016-09-13 | A kind of accompanying-heat cable cross-linked polyolefin insulating barrier extrudes technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610820070.0A CN106328314B (en) | 2016-09-13 | 2016-09-13 | A kind of accompanying-heat cable cross-linked polyolefin insulating barrier extrudes technique |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106328314A CN106328314A (en) | 2017-01-11 |
CN106328314B true CN106328314B (en) | 2017-07-14 |
Family
ID=57787517
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610820070.0A Active CN106328314B (en) | 2016-09-13 | 2016-09-13 | A kind of accompanying-heat cable cross-linked polyolefin insulating barrier extrudes technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106328314B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107967970B (en) * | 2017-11-28 | 2019-04-12 | 安徽环瑞电热器材有限公司 | A kind of accompanying-heat cable manufacturing device and its application method |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202352419U (en) * | 2011-11-24 | 2012-07-25 | 湖北洪乐电缆股份有限公司 | Eccentric adjuster of for fixing eccentric plastic extruder head |
CN103137273A (en) * | 2011-11-30 | 2013-06-05 | 大连永太精密工业有限公司 | Extrusion die |
CN102514171A (en) * | 2012-01-05 | 2012-06-27 | 河北华通线缆集团有限公司 | Extruder head |
EP2752256B1 (en) * | 2013-01-07 | 2016-06-15 | Nexans | Device for corrugating a pipe |
-
2016
- 2016-09-13 CN CN201610820070.0A patent/CN106328314B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN106328314A (en) | 2017-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106346733B (en) | A kind of cable insulation extrusion process of automatic concentricity adjusting | |
US10851493B2 (en) | Running wire rope and method of manufacturing same | |
CN106328314B (en) | A kind of accompanying-heat cable cross-linked polyolefin insulating barrier extrudes technique | |
CN112053804A (en) | Automatic operation and integrated forming method for waterproof core wire | |
CN106373668B (en) | A kind of cable insulation extrusion equipment of automatic concentricity adjusting | |
CN113427737A (en) | Soluble teflon processing device and processing technology thereof | |
CN116682621A (en) | Suspension chain type crosslinking production process for split conductor | |
CN106273308A (en) | A kind of accompanying-heat cable cross-linked polyolefin insulating barrier plsitive mold | |
CN111009355A (en) | Control method for eccentricity of split conductor of crosslinked wire core of ultrahigh-voltage cable | |
CN103341960A (en) | Plastic extruding mould for producing electric cables | |
CN204546987U (en) | A kind of machine strap devices for taking-up of polymer material extrusion forming machine | |
CN109411120A (en) | A kind of wire structure that high temperature resistant protective is strong | |
CN115674629A (en) | High uniformity cable sheath extruding machine for manufacturing | |
CN115384021A (en) | Multi-degree-of-freedom pressure adjustment longitudinal wrapping pinch roller device | |
CN104409141B (en) | Elastic molding flexible wire cable and production method thereof | |
CN203673890U (en) | Mold core for insulation common-mold extruding of medium voltage crosslinked cable | |
CN109203410B (en) | Extrusion processing die capable of improving stripping force of automobile wire | |
CN201402679Y (en) | Device for connecting finished stranded wire and substitute wire in crosslinking machine | |
CN210126267U (en) | Fire hose lining extruder with steering adjusting head | |
CN213704440U (en) | Wire and cable extrusion molding die | |
CN204076766U (en) | A kind of head of extruding machine adjustable mold device | |
CN105355335A (en) | Four-head longitudinal wrapping die | |
CN111622001A (en) | PVC coating device and method for steel wire rope | |
CN211518420U (en) | Cable material extrusion device | |
KR102057683B1 (en) | Carbon-based wire manufacturing method and manufacturing apparatus using the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |