CN106320391A CN201610670720.8A CN201610670720A CN106320391A CN 106320391 A CN106320391 A CN 106320391A CN 201610670720 A CN201610670720 A CN 201610670720A CN 106320391 A CN106320391 A CN 106320391A
Authority
CN
China
Prior art keywords
rolling
dam
earth
stone
rolling compaction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610670720.8A
Other languages
Chinese (zh)
Other versions
CN106320391B (en
Inventor
张琦
李建
朱先文
王晓东
陈思帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201610670720.8A priority Critical patent/CN106320391B/en
Publication of CN106320391A publication Critical patent/CN106320391A/en
Application granted granted Critical
Publication of CN106320391B publication Critical patent/CN106320391B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a rolling compaction type earth and rockfill dam rolling compaction number experimental determining method and belongs to the technical field of geological engineering construction. The brand-new experimental determining method for the rolling compaction type earth and rockfill dam rolling compaction number with the dam body sedimentation rate influences being indirectly considered is provided, and the optimal rolling compaction number meeting the earth and rockfill dam sedimentation requirement can be obtained. Through rolling compaction experiments, parameters such as the compaction degree lambda i and the redundancy sedimentation rate gamma i are obtained through computation according to corresponding formulas, and the optimal rolling compaction number according to the experiments under the corresponding conditions serves as the rolling compaction number during actual construction. Due to the redundancy sedimentation rate gamma i represents the sedimentation rate of a single layer spreading material, and the final sedimentation rate is actually in direct ratio correlation with the redundancy sedimentation rate gamma i of the single layer spreading material after the dam is completed, the rolling compaction number determined through the method can meet the code requirement that the ratio of the sedimentation amount of the dam top to the dam height after completion is no greater than one, and the optimal economical efficiency can also be considered.

Description

The Experimental Determination Method of rolling earth-rock dam rolling layer
Technical field
The invention belongs to Geological Engineering technical field of construction, the experiment relating to a kind of rolling earth-rock dam rolling layer determines Method.
Background technology
According to " DLT5395-2007 rolling earth-rock dam design specification ", general earth and rockfill dam all should carry out vertical deformation, i.e. Analysis by sedimentation, estimates the sedimentation under soil body deadweight and other external load effects, when the total settlement of dam body and the dam foundation and completion Amount.The superelevation that when determining completion, dam crest should be reserved, and estimate differential settlement amount and the differential settlement at each position of dam body Gradient, it is judged that the probability in crack occurs and should take to prevent the engineering measure in crack.When dam crest settling amount after the completion calculated When being more than 1% with the ratio of height of dam, the dam material selected should be proved and fills the reasonability of standard on the basis of analytical calculation achievement With the necessity taking engineering measure.It is known that earth and rockfill dam deformation analysis is too many owing to relating to factor, it is difficult to accurately estimate, Therefore specification enrockment roll quality can with construction parameter and with light-duty hit reality or heavy compaction experiment maximum dry density take advantage of It is controlled with the design dry density of compactness.And construction parameter generally comprise the model of rolling apparatus, frequency of vibration and weight, Capable spout speed, placement thickness, amount of water, number of rolling etc., it is typically by rolling experiment acquirement.For rolling experiment, permissible Obtain the model of such as rolling apparatus, frequency of vibration and weight, row spouts the ginsengs such as speed, placement thickness, amount of water, number of rolling Number, the common practice is to fix other parameter, and the amount of research carried out experiment statistics, and draws curve and find out point of inflexion on a curve, And think that knee value is i.e. to take into account economy and compactibility optimum point.But this method does not embodies to be wanted dam body settlement rate Ask, especially high soil stone optimum bathmometry may can not be met the control to dam body settlement.
Summary of the invention
Present invention solves the technical problem that be to provide a kind of brand-new, indirectly consider the impact of dam body settlement rate, for stone roller The Experimental Determination Method of pressure type earth and rockfill dam rolling layer, can obtain the optimal rolling layer meeting Earth-rockfill Dam Settlements requirement.
The technical solution adopted for the present invention to solve the technical problems is: the experiment of rolling earth-rock dam rolling layer determines Method, comprises the steps:
A, the original depth Δ H of record earth and stone material monolayer stone;
B, monolayer stone is rolled experiment, record rolling layer NiAnd measure and record roll every time after this monolayer The total settlement Δ of stonei;Wherein, i takes the positive integer more than or equal to 1;
C, determine rolling layer N when monolayer stone reaches basicly stablemaxAnd the total settlement of now this monolayer stone Δmax;So-called monolayer stone reaches basicly stable and refers to: record the total of this monolayer stone after once rolling after occurring in for the first time Settling amount ΔnextWith front once roll after record the total settlement Δ of this monolayer stonepreDifference DELTAnextpre≤ 0.1cm, the most i.e. thinks that at a rear rolling layer be Nmax
D, calculate each rolling layer NiCorresponding compactness λiWith redundancy sedimentation rate γi;Wherein, λiimax× 100%;Redundancy sedimentation rate γi=(Δmaxi)/Δ H × 100%;
E, take and meet γiMinimum rolling layer corresponding under the conditions of≤1% is Nmin1;Take and meet λiUnder the conditions of >=93% Corresponding minimum rolling layer is Nmin2
F, take Nmin1And Nmin2In higher value as the rolling layer of practice of construction.
Further: in step F, for Nmin2Value by following situation divide:
1), when earth and rockfill dam is one-level dam or two grades of dams, takes and meet λiMinimum corresponding under the conditions of >=95% rolls Number of times is Nmin2
2), when earth and rockfill dam be three grades of dams and following time, value λiMinimum rolling layer corresponding under the conditions of >=93% is Nmin2
Further: the theoretic throat of earth and stone material monolayer stone can be 20mm, 25mm, 30mm, 35mm or 40mm.
The invention has the beneficial effects as follows: by using method of the present invention, can obtain the rolling layer of optimum, it leads to Cross and roll experiment, and obtain compactness λ after being calculated by formulaiWith redundancy sedimentation rate γiEtc. parameter, then meeting corresponding bar Under part, determine that optimal rolling layer is as rolling layer during practice of construction according to experiment.Due to redundancy sedimentation rate γiIt is Monolayer stone contingent sedimentation rate after setting rolling layer embodies, and sedimentation rate final after dam completion is actual and single Redundancy sedimentation rate γ of layer stoneiIn dependency, and in theory, when redundancy sedimentation rate γiThe least, then the sedimentation of final dam Rate is the least.So, the rolling layer determined by method of the present invention, it can meet dam crest after the completion of code requirement The ratio of settling amount and height of dam is not more than the requirement of 1%;The economy of optimum can be taken into account again.
Accompanying drawing explanation
Fig. 1 is under different layer thickness, compactness λiWith rolling layer graph of relation;
Fig. 2 is under different layer thickness, redundancy sedimentation rate γiWith rolling layer graph of relation;
Detailed description of the invention
Below by detailed description of the invention, the present invention is further described.It is pointed out that the stone roller of indication in the present invention Pressure type earth and rockfill dam, refers to the dam body by the method for earth and stone material layered rolling being built up.The present invention be directed to compaction type soil stone For the Experimental Determination Method of rolling layer needed for every layer of earth and stone material in dam construction;I.e. determine rock fill dam construction by rolling experiment During the rolling layer of every layer of stone.Certainly, by rolling the rolling layer that experiment determines in the present invention, it is secondary except rolling Remaining parameter beyond number it has been determined that in the case of the experiment that carries out choose, this remaining parameter include as earth and stone material composition, Rolling apparatus model, the frequency of vibration selected, the parameter such as speed, water content of spouting of going;Choose as for this remaining parameter Or determine, concrete scheme the most involved in the present invention.
The Experimental Determination Method of rolling earth-rock dam rolling layer of the present invention, except rolling layer NiIn addition In the case of other parameter is fixed, comprise the steps:
A, the original depth Δ H of record earth and stone material monolayer stone;
B, monolayer stone is rolled experiment, record rolling layer NiAnd measure and record roll every time after this monolayer The total settlement Δ of stonei;Wherein, i takes the positive integer more than or equal to 1;
C, determine rolling layer N when monolayer stone reaches basicly stablemaxAnd the total settlement of now this monolayer stone Δmax;So-called monolayer stone reaches basicly stable and refers to: record the total of this monolayer stone after once rolling after occurring in for the first time Settling amount ΔnextWith front once roll after record the total settlement Δ of this monolayer stonepreDifference DELTAnextpre≤ 0.1cm, the most i.e. thinks that at a rear rolling layer be Nmax
D, calculate each rolling layer NiCorresponding compactness λiWith redundancy sedimentation rate γi;Wherein, λiimax× 100%;Redundancy sedimentation rate γi=(Δmaxi)/Δ H × 100%;
E, take and meet γiMinimum rolling layer corresponding under the conditions of≤1% is Nmin1;Take and meet λiUnder the conditions of >=93% Corresponding minimum rolling layer is Nmin2
F, take Nmin1And Nmin2In higher value as the rolling layer of practice of construction.
It is pointed out that and above-mentioned roll experiment, be a kind of normal experiment method of this area, its concrete experimental procedure Can refer to the concrete steps described in " A.4 rolling experiment " of page 43 in " rolling earth-rock dam job specfication " DL/T529-2013 Carry out.Certainly, of the present invention rolling in experimentation carrying out, selected earth and stone material, the rolling apparatus of selection etc. are all Actual earth and stone material that should be corresponding with during actual rock fill dam construction and actual rolling apparatus etc. are consistent.So guarantee soil stone Rolling effect actual after dam build is consistent with the result of experiment.It addition, each subscript in the parameter in a step in the present invention, Show is parameter corresponding under a certain specific rolling layer, such as NiShow is a certain rolling layer, when subscript i value When being 10, i.e. N10Represent the tenth time and roll.
It addition, generally, in step, when recording the original depth Δ H of earth and stone material monolayer stone, earth and stone material list One in theoretical laying depth desirable 20mm, 25mm, 30mm, 35mm or 40mm of layer stone.It is, step A it Before, when carrying out the monolayer stone of earth and stone material, it should be determined that a theory layer thickness, the most again in the situation of theoretical laying depth Under, carry out the actual stone of single-layer soil building stones, then by the original depth Δ H of its reality of surveying record.Certainly, due to reality Stone and measurement exist certain error, therefore allows to there is certain thickness between actual layer thickness and theoretical layer thickness It is poor to spend.It addition, the present invention also can be in experimentation, by the theoretic throat of various different monolayer stones is carried out reality respectively Test, to obtain the contrast experiment in the case of different theories layer thickness, then choose corresponding optimum further according to practical situation Theory layer thickness.
It addition, it may also be noted that above-mentioned so-called monolayer stone reaches basicly stable indication: occur in rear one for the first time Secondary roll after record the total settlement Δ of this monolayer stonenextWith front once roll after record the total settlement of this monolayer stone ΔpreDifference DELTAnextpre≤ 0.1cm, the most i.e. thinks that at a rear rolling layer be Nmax.Due to Δ in the present inventionnext And ΔpreAll obtained by artificial measurement, during therefore measuring, certainly exist measurement error;Thus due to measurement error Existence, when for the first time, Δ occursnextpreDuring the situation of≤0.1cm, i.e. show that the rolling layer additionally increased cannot Make layer thickness that significantly change, the total settlement Δ corresponding to rolling layer being further added by i.e. afterwards occuriThe most no longer There is significant change, the substitute is total settlement ΔiMay fluctuate in less amplitude range.
For above-mentioned steps E, it is really by meeting compactness λ respectivelyiWith redundancy sedimentation rate γiCondition go to choose Corresponding minimum rolling layer (Nmin1And Nmin2), then for above-mentioned steps F, then it is two minimums selected in step E Rolling layer (Nmin1And Nmin2The higher value rolling layer as practice of construction is taken out in).After step E and step F, can make Obtain the rolling layer finally determined and can meet compactness λ simultaneouslyiWith redundancy sedimentation rate γiCondition requirement.And then guarantee final Earth and rockfill dam after building by laying bricks or stones can meet corresponding prescription.
In the present invention, by directly controlling redundancy sedimentation rate γ of single-layer soil building stonesi≤ 1%, therefore, corresponding to compaction type For earth and rockfill dam, due to redundancy sedimentation rate γ of its every layer earth and stone materiali≤ 1%, thus can basic guarantee dam overall after build Sedimentation rate less than 1%.Such that the ratio of dam crest settling amount and the height of dam requirement less than 1% after completion can be substantially met.
More specifically, it is contemplated that in corresponding authority file, as on " DLT5395-2007 rolling earth-rock dam design rule Model " in, the classification of with good grounds earth and rockfill dam is different, and the compactness after needing earth and rockfill dam to roll meets different requirement;Right in order to adapt to Different earth and rockfill dam classifications, in the present invention in step F, for Nmin2Value can divide by following situation: 1), work as earth and rockfill dam During for one-level dam or two grades of dams, take and meet λiMinimum rolling layer corresponding under the conditions of >=95% is Nmin2;2), when soil stone Dam be three grades of dams and following time, value λiMinimum rolling layer corresponding under the conditions of >=93% is Nmin2
Below in conjunction with the experimental data that rolls of certain one-level earth and rockfill dam, the present invention is further elaborated, and in table 1 below Three kinds of different theoretical layer thickness are carried out respectively the concrete data of experiment simultaneously with reference to table 1 below..It is pointed out that reality Due to error, therefore there is certain error with theoretical layer thickness in border layer thickness, this error is to allow;Separately Outward, in this experiment, often record a secondary data, really carried out rolling back and forth to monolayer stone, actual be equivalent to every Roll twice record one secondary data;Or can be understood as rolling monolayer stone as indication in the present invention the most back and forth A rolling layer Ni
The total settlement experimental data that under the different layer thickness of table 1, each rolling layer is corresponding
Theoretical data instance corresponding for layer thickness 25cm in above table 1, wherein, NiCorresponding column number evidence and a ΔiCorresponding A column number according to being the record data of experiment;And λiCorresponding column number evidence and a γiA corresponding column number is according to then needing by phase The formula answered obtains after calculating.Wherein, from ΔiA corresponding column number according in, it appeared that roll for the 14th time the data of correspondence with 12nd rolls the difference (4.61-4.56=0.05mm) between corresponding data less than 0.1cm;Therefore, can assert and roll 14 Time secondary, stone has reached basicly stable;The most desirable Nmax=N14, Δmax14=4.61cm;Afterwards, according to corresponding public Formula i.e. can get each λiCorresponding data and each γiCorresponding data, specifically can refer to shown in table 1.
By each λ obtained in upper table 1iCorresponding data and each γiCorresponding data;Meeting γiUnder the conditions of≤1% Corresponding minimum rolling layer Nmin1Take N10, i.e. need to roll 10 times;Meeting λiMinimum corresponding under the conditions of >=93% Rolling layer Nmin2Take N10, i.e. need to roll 10 times;So can determine that the rolling layer eventually serving as practice of construction is 10 Secondary.It addition, in the case of different earth and rockfill dam classifications, for Nmin2Choose and have different λiWhen condition requires, concrete rolls Number of times may be different;Certainly, above-mentioned in the case of, when earth and rockfill dam is one-level dam or two grades of dams, meeting λiArticle >=95%, Minimum rolling layer N corresponding under partmin2Reality is also N10
It addition, can be it has furthermore been found that by the experiment to different theories layer thickness, find from upper table 1, Fig. 1 and Fig. 2 Under the different theories layer thickness of above-mentioned 25cm, 30cm, 35cm, the rolling layer being actually needed is not had significant impact, Can show after being judged by comprehensive analysis that the optimum rolling layer value of reality is as 10 times.

Claims (3)

1. the Experimental Determination Method of rolling earth-rock dam rolling layer, it is characterised in that: comprise the steps:
A, the original depth Δ H of record earth and stone material monolayer stone;
B, monolayer stone is rolled experiment, record rolling layer NiAnd measure and record roll every time after this monolayer stone Total settlement Δi;Wherein, i takes the positive integer more than or equal to 1;
C, determine rolling layer N when monolayer stone reaches basicly stablemaxAnd the total settlement of now this monolayer stone Δmax;So-called monolayer stone reaches basicly stable and refers to: record the total settlement Δ of this monolayer stone after once rolling afternext With front once roll after record the total settlement Δ of this monolayer stonepreDifference DELTAnextpre≤ 0.1cm, the most i.e. recognizes For being N at a rear rolling layermax
D, calculate each rolling layer NiCorresponding compactness λiWith redundancy sedimentation rate γi;Wherein, λiimax× 100%;Superfluous Remaining sedimentation rate γi=(Δmaxi)/Δ H × 100%;
E, take and meet γiMinimum rolling layer corresponding under the conditions of≤1% is Nmin1;Take and meet λiUnder the conditions of >=93%, institute is right The minimum rolling layer answered is Nmin2
F, take Nmin1And Nmin2In higher value as the rolling layer of practice of construction.
2. the Experimental Determination Method of rolling earth-rock dam rolling layer as claimed in claim 1, it is characterised in that: in step F In, for Nmin2Value by following situation divide:
1), when earth and rockfill dam is one-level dam or two grades of dams, takes and meet λiMinimum rolling layer corresponding under the conditions of >=95% is Nmin2
2), when earth and rockfill dam be three grades of dams and following time, value λiMinimum rolling layer corresponding under the conditions of >=93% is Nmin2
3. the Experimental Determination Method of rolling earth-rock dam rolling layer as claimed in claim 1 or 2, it is characterised in that: monolayer The theoretic throat of stone can be 20mm, 25mm, 30mm, 35mm or 40mm.
CN201610670720.8A 2016-08-16 2016-08-16 The Experimental Determination Method of rolling earth-rock dam rolling layer Active CN106320391B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610670720.8A CN106320391B (en) 2016-08-16 2016-08-16 The Experimental Determination Method of rolling earth-rock dam rolling layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610670720.8A CN106320391B (en) 2016-08-16 2016-08-16 The Experimental Determination Method of rolling earth-rock dam rolling layer

Publications (2)

Publication Number Publication Date
CN106320391A true CN106320391A (en) 2017-01-11
CN106320391B CN106320391B (en) 2018-08-21

Family

ID=57740919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610670720.8A Active CN106320391B (en) 2016-08-16 2016-08-16 The Experimental Determination Method of rolling earth-rock dam rolling layer

Country Status (1)

Country Link
CN (1) CN106320391B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106908349A (en) * 2017-01-23 2017-06-30 中国水利水电科学研究院 It is determined that the simple method with sandy gravel maximum dry density of building a dam
CN106990229A (en) * 2017-04-18 2017-07-28 哈尔滨工业大学 A kind of determination method of Varying-thickness road surface structare layer compacting parameter
CN112376635A (en) * 2020-12-10 2021-02-19 中国电建集团华东勘测设计研究院有限公司 Quality control measure and detection method for soil-stone mixture
CN112800531A (en) * 2021-04-14 2021-05-14 西南交通大学 Dynamic adjustment method, device and equipment for compaction process and readable storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005030073A (en) * 2003-07-04 2005-02-03 Fudo Constr Co Ltd Compaction quality control method
JP4358036B2 (en) * 2004-06-03 2009-11-04 鹿島建設株式会社 Method for estimating rolling characteristics of construction materials
CN105178150A (en) * 2015-11-03 2015-12-23 哈尔滨工业大学 Fiber grating sensing-based asphalt pavement compaction monitoring method
CN105239551A (en) * 2015-09-30 2016-01-13 贵州正业工程技术投资有限公司 Vibration rolling quality control method
CN105718728A (en) * 2016-01-20 2016-06-29 湖南致同工程科技有限公司 Method for automatically calculating rolling pass of road roller

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005030073A (en) * 2003-07-04 2005-02-03 Fudo Constr Co Ltd Compaction quality control method
JP4358036B2 (en) * 2004-06-03 2009-11-04 鹿島建設株式会社 Method for estimating rolling characteristics of construction materials
CN105239551A (en) * 2015-09-30 2016-01-13 贵州正业工程技术投资有限公司 Vibration rolling quality control method
CN105178150A (en) * 2015-11-03 2015-12-23 哈尔滨工业大学 Fiber grating sensing-based asphalt pavement compaction monitoring method
CN105718728A (en) * 2016-01-20 2016-06-29 湖南致同工程科技有限公司 Method for automatically calculating rolling pass of road roller

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106908349A (en) * 2017-01-23 2017-06-30 中国水利水电科学研究院 It is determined that the simple method with sandy gravel maximum dry density of building a dam
CN106990229A (en) * 2017-04-18 2017-07-28 哈尔滨工业大学 A kind of determination method of Varying-thickness road surface structare layer compacting parameter
CN106990229B (en) * 2017-04-18 2019-03-08 哈尔滨工业大学 A kind of determination method of Varying-thickness road surface structare layer compacting parameter
CN112376635A (en) * 2020-12-10 2021-02-19 中国电建集团华东勘测设计研究院有限公司 Quality control measure and detection method for soil-stone mixture
CN112376635B (en) * 2020-12-10 2022-04-12 中国电建集团华东勘测设计研究院有限公司 Quality control measure and detection method for soil-stone mixture
CN112800531A (en) * 2021-04-14 2021-05-14 西南交通大学 Dynamic adjustment method, device and equipment for compaction process and readable storage medium

Also Published As

Publication number Publication date
CN106320391B (en) 2018-08-21

Similar Documents

Publication Publication Date Title
CN106320391A (en) Rolling compaction type earth and rockfill dam rolling compaction number experimental determining method
CN1952921B (en) A determination method of anticipated settlement in ground base
CN108287945B (en) Deformation calculation method and application technology of foundation soil under large foundation
CN104965987B (en) A kind of expansive soil foundation soil expansion causes the measuring method of a displacement and internal force
CN107153770A (en) A kind of Forecasting Methodology of Unevenly-pressured shallow tunnel ground settlement deformation
CN106529150A (en) Compound stratum shield tunnel vault load calculation method
Hamada et al. Lateral loading tests on piled rafts and simplified method to evaluate sectional forces of piles
CN106908349A (en) It is determined that the simple method with sandy gravel maximum dry density of building a dam
Tarawneh et al. Load testing and settlement of shallow foundation on desert sands
CN105160057A (en) Method for determining optimal moisture content of filling soil in same energy level according to compaction-settlement ratio
CN108763797A (en) A kind of lake based on groundwater model acts on analogy method with underground water stationary flow
Weber et al. Numerical modelling of stone columns in soft clay under an embankment
CN105887791B (en) A kind of road rigid pile composite foundation settlement calculation method for considering side load effect
CN107700460A (en) A kind of non-destructive measurement and calculation method of high-speed railway subgrade Compaction
Boiko et al. Effect of vertical cross-sectional shape of foundation on settlement and bearing capacity of soils
CN113832944B (en) Roadbed consolidation degree evaluation method by using single-bridge static sounding test
CN106702999A (en) Method for pre-estimating post-construction settlement of composite road foundation by static load test
CN103215914A (en) Method for controlling settlement of dyke body
CN108931422A (en) Middle compression often consolidates the measuring method of soil base lateral extrusion deformation under embankment load
Shin et al. Developments in elastic settlement estimation procedures for shallow foundations on granular soil
CN107386261B (en) High embankment heavy tamping treatment design method
CN111827032A (en) Processing method for determining structural thickness of pavement paved on hardened layer of beam field
CN101793037B (en) Surface sedimentation rate method of rockfill roadbed high-fill structure
Alhassan et al. Experimental study of the effect of foundation shape on settlement and bearing capacity of soils
CN107038291A (en) High roadbed culvert contains the straight Calculating method of earth pressure of roof pendant

Legal Events

Date Code Title Description