CN106320363A - Installation method for foundation bolt of rolling line steel structure - Google Patents

Installation method for foundation bolt of rolling line steel structure Download PDF

Info

Publication number
CN106320363A
CN106320363A CN201510331111.5A CN201510331111A CN106320363A CN 106320363 A CN106320363 A CN 106320363A CN 201510331111 A CN201510331111 A CN 201510331111A CN 106320363 A CN106320363 A CN 106320363A
Authority
CN
China
Prior art keywords
foundation bolt
bolt
foundation
template
line steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510331111.5A
Other languages
Chinese (zh)
Inventor
林福斌
殷晓宁
汪才民
王新
吴豪
王金信
刘毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201510331111.5A priority Critical patent/CN106320363A/en
Publication of CN106320363A publication Critical patent/CN106320363A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

An installation method for a foundation bolt of a rolling line steel structure is characterized by comprising the steps that (a) a positioning template is fabricated; the foundation bolt is installed; (c) the foundation bolt and basic reinforcement are connected; and (d) threads of the foundation bolt are protected, and concrete pouring is conducted. The installation method for the foundation bolt of the rolling line steel structure provided by the invention has the advantages that the positioning template has a simple structure, and is manufactured easily and used steadily; the foundation bolt can be positioned conveniently; installation accuracy can be increased greatly; a solid installation foundation is laid for subsequent technological steel structure installation; installation progress of the foundation bolt is accelerated; and the engineering cost is reduced.

Description

The foundation bolt installation method of roll line steel construction
Technical field
The present invention relates to a kind of equipment Foundations foundation bolt installation method, specifically, be the foundation bolt installation method of a kind of roll line steel construction.
Background technology
Owing to equipment Foundations foundation bolt is installed before concreting, it is easily subject to vibrations, extrudes and produce displacement, inclination, causes installation accuracy deviation bigger.Therefore, improve foundation bolt and positioning precision is installed, just seem of crucial importance.
Roll line steel structure base foundation bolt positioning precision, higher than general basis foundation bolt positioning accuracy request, because technique steel construction is used as what equipment Foundations existed, its installation accuracy, largely effect on the installation progress of equipment.Therefore, improve the location of steel construction foundation bolt, just seem particularly important.
The fixing general employing screw-thread steel of traditional roll line steel construction foundation bolt connects fixing, but crimp, displacement easily occur when pouring, and affects installation progress.
The most known roll line steel construction foundation bolt installation method also exists above-mentioned all inconvenience and problem.
Summary of the invention
The purpose of the present invention, is to propose the Template Location foundation bolt installation method of a kind of roll line steel construction using Template Location.
For achieving the above object, the technical solution of the present invention is:
The foundation bolt installation method of a kind of roll line steel construction, it is characterised in that comprise the following steps:
A, making locating template
According to roll line Steel Structural Design, make 10mm thickness rectangle locating template, template arranges some foundation bolt positions, and some Φ 38mm boring for foundation bolt is set;The length of template, width determine according to anchor bolt pitch, and anchor (bolt) hole distance template edge is 100mm;
B, mounting foot bolt
By the foundation bolt end of thread through locating template upper surface, nut is installed and makes foundation bolt rely on nut to hang on locating template, be transferred to the regular length of foundation bolt with nut;
C, connection foundation bolt and reinforcement foundation
After adjusting perpendicularity and the absolute altitude of foundation bolt, the level of locating template is checked with horizon rule, foundation bolt point is welded on reinforcement foundation fixing with Φ 12mm round steel after the levelness of locating template is qualified, and with Φ 12mm round steel, template is fixed, prevent from deforming and displacement during casting concrete;
D, protecting field foot bolt screw thread and casting concrete
Go bail for sheath with gummed paper, protect foundation bolt screw thread, check foundation bolt location dimension, qualified after-pouring concrete.
The foundation bolt installation method of the roll line steel construction of the present invention can also be further achieved by the following technical measures.
Aforesaid method, wherein said regular length is 80-100mm.
Aforesaid method, the certainty of measurement of wherein said horizon rule is 0.5mm/1000mm.
Aforesaid method, the aperture that the wherein said Φ 38mm for foundation bolt holes is depending on foundation bolt size.
After using technique scheme, the foundation bolt installation method of the roll line steel construction of the present invention has the advantage that
1, locating template simple in construction, easy to make, use firm;
2, foot bolt positions easily, is greatly improved installation accuracy, also lays preferable installation foundation for subsequent technique Steel Structure Installation;
3, accelerate foundation bolt installation progress, reduce engineering cost.
Accompanying drawing explanation
Fig. 1 is the locating template structural representation of the embodiment of the present invention;
Fig. 2 is that the foundation bolt of the embodiment of the present invention is installed, fixed schematic diagram;
Fig. 3 is the horizontal adjustment schematic diagram of the locating template of the embodiment of the present invention.
In figure: 1 template, 2 anchor (bolt) holes, 3 foundation bolts, 4 the 1st round steel, 5 reinforcement foundations, 6 the 2nd round steel, 7 concrete foundations, 8 horizon rules.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing thereof, the present invention is illustrated further.
Embodiment 1
The foundation bolt installation method of the roll line steel construction of the present invention, comprises the following steps:
A, making locating template
Referring now to the locating template structural representation that Fig. 1, Fig. 1 are the embodiment of the present invention.As it can be seen, described locating template 1 is according to roll line Steel Structural Design, make 10mm thickness rectangle locating template, template arranges four foundation bolt positions, and four Φ 38mm borings for foundation bolt are set;The length of template, width determine according to anchor bolt pitch, and anchor (bolt) hole 2 distance template edge is 100mm.The aperture that the described Φ 38mm for foundation bolt holes can change according to foundation bolt size.
B, mounting foot bolt
By the foundation bolt end of thread of M36 through locating template upper surface, nut is installed and makes foundation bolt 3 rely on nut to hang on locating template 1, be transferred to the 100mm regular length of foundation bolt with nut.
C, connection foundation bolt and reinforcement foundation
After adjusting perpendicularity and the absolute altitude of foundation bolt, the level of locating template 1 is checked with horizon rule 8, foundation bolt point is welded on reinforcement foundation fixing with Φ 12mm the 2nd round steel 6 after the levelness of locating template is qualified, and with Φ 12mm the 1st round steel 4, template is fixed, prevent from deforming and displacement during casting concrete.Fig. 3 is the horizontal adjustment schematic diagram of the locating template of the embodiment of the present invention.The form that the surrounding of rectangle template arranges two with every limit is fixed by Φ 12mm the 1st round steel 4.The certainty of measurement of described horizon rule is 0.5mm/1000mm.
D, protecting field foot bolt screw thread and casting concrete
Go bail for sheath with gummed paper, protecting field foot bolt screw thread, check foundation bolt location dimension, qualified after-pouring concrete.
The present invention has substantive distinguishing features and significant technological progress, the foundation bolt installation method of the roll line steel construction of the present invention, uses Template Location, play overall fixation, as long as template fixation, it is ensured that do not produce global displacement, foundation bolt relative deviation would not be produced.Use Template Location technology, the overall precision of foundation bolt can be improved.And template construct is simple, easily realizes.Using Template Location technology, foot bolt location, can be greatly improved again installation accuracy, to later technique Steel Structure Installation, lay preferable installation foundation, be greatly enhanced installation accuracy the most easily.
Above example is used for illustrative purposes only, rather than limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, it is also possible to make various conversion or change.Therefore, the technical scheme of all equivalents also should belong to scope of the invention, should be limited by each claim.

Claims (4)

1. the foundation bolt installation method of a roll line steel construction, it is characterised in that comprise the following steps:
A, making locating template
According to roll line Steel Structural Design, make 10mm thickness rectangle locating template, template arranges some foundation bolt positions, and some Φ 38mm boring for foundation bolt is set;The length of template, width determine according to anchor bolt pitch, and anchor (bolt) hole distance template edge is 100mm;
B, mounting foot bolt
By the foundation bolt end of thread through locating template upper surface, nut is installed and makes foundation bolt rely on nut to hang on locating template, be transferred to the regular length of foundation bolt with nut;
C, connection foundation bolt and reinforcement foundation
After adjusting perpendicularity and the absolute altitude of foundation bolt, the level of locating template is checked with horizon rule, foundation bolt point is welded on reinforcement foundation fixing with Φ 12mm round steel after the levelness of locating template is qualified, and with Φ 12mm round steel, template is fixed, prevent from deforming and displacement during casting concrete;
D, protecting field foot bolt screw thread and casting concrete
Go bail for sheath with gummed paper, protect foundation bolt screw thread, check foundation bolt location dimension, qualified after-pouring concrete.
2. the foundation bolt installation method of roll line steel construction as claimed in claim 1, it is characterised in that described regular length is 80-100mm.
3. the foundation bolt installation method of roll line steel construction as claimed in claim 1, it is characterised in that the certainty of measurement of described horizon rule is 0.5mm/1000mm.
4. the foundation bolt installation method of roll line steel construction as claimed in claim 1, it is characterised in that the aperture that the described Φ 38mm for foundation bolt holes is depending on foundation bolt size.
CN201510331111.5A 2015-06-16 2015-06-16 Installation method for foundation bolt of rolling line steel structure Pending CN106320363A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510331111.5A CN106320363A (en) 2015-06-16 2015-06-16 Installation method for foundation bolt of rolling line steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510331111.5A CN106320363A (en) 2015-06-16 2015-06-16 Installation method for foundation bolt of rolling line steel structure

Publications (1)

Publication Number Publication Date
CN106320363A true CN106320363A (en) 2017-01-11

Family

ID=57732304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510331111.5A Pending CN106320363A (en) 2015-06-16 2015-06-16 Installation method for foundation bolt of rolling line steel structure

Country Status (1)

Country Link
CN (1) CN106320363A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB694590A (en) * 1951-02-05 1953-07-22 Bevil Guy Mabey Improvements in and relating to adjustable clamping devices for temporary moulds or shuttering
JPH06307077A (en) * 1993-04-28 1994-11-01 Kumagai Gumi Co Ltd Method for assembling formwork for column, formwork and formwork panel support member
CN201059070Y (en) * 2007-06-18 2008-05-14 河北建设集团有限公司 Locating formwork for steelwork pole bottom embedded bolt group
CN203247603U (en) * 2013-05-29 2013-10-23 中国建筑第二工程局有限公司 High-position foundation bolt positioning device
CN103590416A (en) * 2013-11-01 2014-02-19 浙江水利水电学院 Pre-buried construction method for high-precision foundation bolts

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB694590A (en) * 1951-02-05 1953-07-22 Bevil Guy Mabey Improvements in and relating to adjustable clamping devices for temporary moulds or shuttering
JPH06307077A (en) * 1993-04-28 1994-11-01 Kumagai Gumi Co Ltd Method for assembling formwork for column, formwork and formwork panel support member
CN201059070Y (en) * 2007-06-18 2008-05-14 河北建设集团有限公司 Locating formwork for steelwork pole bottom embedded bolt group
CN203247603U (en) * 2013-05-29 2013-10-23 中国建筑第二工程局有限公司 High-position foundation bolt positioning device
CN103590416A (en) * 2013-11-01 2014-02-19 浙江水利水电学院 Pre-buried construction method for high-precision foundation bolts

Similar Documents

Publication Publication Date Title
CN201300156Y (en) Roundness corrector for steel casing
US10214872B2 (en) Foundation for a wind turbine
CN102493471B (en) Suspending installation construction process method of structural foot margin anchor bolt
CN103993597A (en) High-precision vertical column pile construction method
CN103276899B (en) Reinforced steel bar ring is around steel kind design construction method
CN204001428U (en) A kind of Large-diameter Steel tubing string suspension column is installed pre-buried location structure and suspension column structure thereof
CN101818461B (en) Method for installing auxiliary line outside machine
CN103469732B (en) Construction method of preformed holes for foundation bolts of bridge support
CN103899076B (en) Method and device for demarcating construction standard of brick wall or plaster layer
CN103669390B (en) Major diameter embedding anchor bolts technology
CN106320363A (en) Installation method for foundation bolt of rolling line steel structure
CN203034474U (en) Locating device used in steel structure embedded bolt group
CN204024087U (en) The accurate preburied positioning device of a kind of steel work lattice column pedestal anchor bolt
CN104179190A (en) Composite pile foundation for offshore wind power and construction method thereof
CN103883845A (en) Method and pad iron assembly for adjusting elevation of flat pad iron by aid of three bolt reinforcements
CN202381269U (en) Adjusting device of mounting levelness of basic ring of wind driven generator
CN105569351A (en) Mounting construction technology of steel structure steel column
CN105064681B (en) Installing method of steel structure foundation screw bolt
CN204112768U (en) The two-way steel tube support jacking structure of adjustable type
CN110629936B (en) Construction method based on dowel bar construction structure
CN208167781U (en) A kind of levelling mounting structure of backing plate
CN109680711B (en) Ring-arranged direct-buried bolt pre-embedding positioning device and construction method
CN205976407U (en) Smart flat installation work rack of hanging of concrete built -in fitting
CN203256744U (en) Device for correcting perpendicularity of concrete-filled steel tubular column through reverse construction method
CN202500335U (en) Horizontal internal formwork supporting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170111