CN106320327A - Uplift pipe pile and connection method for uplift pipe pile and foundation bottom plate - Google Patents

Uplift pipe pile and connection method for uplift pipe pile and foundation bottom plate Download PDF

Info

Publication number
CN106320327A
CN106320327A CN201610826404.5A CN201610826404A CN106320327A CN 106320327 A CN106320327 A CN 106320327A CN 201610826404 A CN201610826404 A CN 201610826404A CN 106320327 A CN106320327 A CN 106320327A
Authority
CN
China
Prior art keywords
pile
pipe pile
uplift
sleeve
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610826404.5A
Other languages
Chinese (zh)
Inventor
刘艳龙
潘君
吴向军
武成满
丁兴国
徐咏春
盛健
姚根洪
马丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shipbuilding NDRI Engineering Co Ltd
Original Assignee
China Shipbuilding NDRI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shipbuilding NDRI Engineering Co Ltd filed Critical China Shipbuilding NDRI Engineering Co Ltd
Priority to CN201610826404.5A priority Critical patent/CN106320327A/en
Publication of CN106320327A publication Critical patent/CN106320327A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/30Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0046Production methods using prestressing techniques
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Abstract

The invention discloses an uplift pipe pile and a connection method for the uplift pipe pile and a foundation bottom plate. The uplift pipe pile is characterized in that a pile head of a concrete pipe pile is provided with multiple sleeves in screwed connection with anchor steel bars, and the anchor steel bars are pre-buried in the concrete pipe pile after being in screwed connection with internal threads of the sleeves; and the concrete pipe pile and uplift steel bars of the foundation bottom plate are in screwed connection through the sleeves to form a pile foundation of the uplift pipe pile. Compared with the prior art, the working procedure of pile cutting construction is omitted, the construction that uplift treatment is carried out after the pile head is broken after pile sinking is completed is effectively replaced, the practical pile usage length is reduced, the construction difficulty is lowered, the on-site construction period is shortened, and therefore the material purchasing cost and the construction cost are saved; and the uplift pipe pile is particularly suitable for being applied and popularized in a pile foundation project with uplift requirements.

Description

A kind of anti-pulling pipe piles and the method for attachment with sole plate thereof
Technical field
The present invention relates to pre-cast pipe pile technical field, a kind of anti-pulling pipe piles and with sole plate Method of attachment.
Background technology
Along with the development of China's building trade, underground space building application is more and more extensive, and large-area applications has resistance to plucking The pile foundation engineering required also gets more and more.At present, anti-pulling pipe piles the most all uses the method cutting stake to be connected with sole plate, cuts Pile driving construction is on the basis of ensureing design effective length, and the pile tube that reserved stake top is divided, when being connected with sole plate by this portion It is in charge of the concrete amputation of stake, retains deformed bar and pile crown end plate, then carry out pile tube and be connected with sole plate.
Cutting pile three unfavorable factors of existence of prior art: first, add the pile tube consumption of actual consumption, increase The cost of processed materials purchased;Second, work progress increases pile driving engineering amount, increases cutting pile quantities after pile sinking, increase Construction cost, extends construction period;3rd, the pile body integrity in below stake face of cutting should be ensured during cutting stake, again Retaining pile crown end plate and cut stake partial prestressing reinforcing bar, difficulty of construction is the biggest.
Summary of the invention
It is an object of the invention to provide a kind of anti-pulling pipe piles and the company with sole plate thereof for the deficiencies in the prior art Connecing method, use tube pile structure and the sole plate method of screwed connection anti-punching shear bar of pile crown embedded sleeve barrel, sleeve is by anchor Gu steel bar preassembling is embedded in pile tube, the anti-punching shear bar of anchor bar and sole plate is all with screw thread with the sleeve being embedded in pile tube even Connect, not only reduce the difficulty of construction that resistance to plucking processes, shorten the duration, but also reduce making and the construction cost of pile tube, Overall structure is good, can be widely applied to the pile foundation engineering of anti-pulling pipe piles, has that stock utilization is high, processing technology simple, executes The advantage that work speed is fast and construction costs is low.
The object of the present invention is achieved like this: a kind of anti-pulling pipe piles, including by pile crown end plate, deformed bar and fill out The concrete tubular pile that in-core joint bar is prefabricated, is characterized in that the pile crown of concrete tubular pile is provided with several and anchor bar screwed connection Sleeve, described anchor bar is embedded in concrete tubular pile by after the female thread screwed connection of sleeve;Described sleeve vertically sets Put under pile crown end plate, and the port of sleeve is concordant with pile crown end plate.
A kind of method of attachment of anti-pulling pipe piles and sole plate, including using the pile foundation of anti-pulling pipe piles under sole plate, its Feature is the pile foundation that concrete tubular pile is anti-pulling pipe piles that sole plate uses embedded sleeve barrel, and described concrete tubular pile is by sleeve Female thread becomes the pile foundation of anti-pulling pipe piles with the anti-punching shear bar screwed connection of sole plate.
The present invention compared with prior art decreases cutting piles operation, effectively instead of after crushing pile crown after pile sinking completes Make the construction that resistance to plucking processes, decrease actual pile length, reduce difficulty of construction, shorten the cycle of site operation, thus Save the cost of processed materials purchased, construction cost, be particluarly suitable for there are popularization and application in the pile foundation engineering of resistance to plucking requirement.
Accompanying drawing explanation
Fig. 1 is present configuration schematic diagram;
Fig. 2 is Fig. 1 top view;
Fig. 3 is that the present invention specifically uses schematic diagram;
Fig. 4 is sleeve and anti-punching shear bar and anchor bar connection diagram.
Detailed description of the invention
Refering to accompanying drawing 1~accompanying drawing 2, the present invention is by pile crown end plate 1, sleeve 2, deformed bar 9 and to fill out in-core joint bar 4 prefabricated Concrete tubular pile 5, pre-buried five sleeves 2 being provided with female thread 6 on the pile crown of described concrete tubular pile 5, sleeve 2 is a length of 100mm and be screwed connection by female thread 6 and anchor bar 3;After described anchor bar 3 is by female thread 6 screwed connection of sleeve 2 It is embedded in the pile body of concrete tubular pile 5;Described sleeve 2 is vertically set on pile crown end plate 1 time, and the port of sleeve 2 and pile crown End plate 1 is concordant, and carries out labelling on the pile crown end plate 1 of embedded sleeve barrel 2.
Refering to accompanying drawing 3~accompanying drawing 4, the present invention is performed such anti-pulling pipe piles construction: marked by above-mentioned embedded sleeve barrel 2 of carrying out The concrete tubular pile 5 of note sit up straight as the direct pile sinking in stake top, when concrete tubular pile 5 is with basis floor 7 connection construction, by 25mm Anti-punching shear bar 8 tapping hot-rolled ribbed for HRB500 become the silk tooth of 20mm, silk dental length is 50mm, directly be embedded in pile body Female thread 6 screwed connection of sleeve 2.The present invention is embedded with the sleeve 2 of female thread 6, pipe of concrete during prefabricated tubular pile in advance Stake 5 uses the pull-out resistant pile foundation on floor 7 based on sleeves 2 and the mode of anti-punching shear bar 8 screwed connection, instead of after pile sinking completes The form of construction work that resistance to plucking processes made by broken pile crown, decreases cutting piles operation, thus is effectively shortened the cycle of site operation, Greatly reduce difficulty of construction, decrease actual pile length, saved the cost of processed materials purchased and construction cost, be particluarly suitable for Have in the pile foundation engineering of resistance to plucking requirement and apply.
More than simply the present invention is further illustrated, and is not used to limit this patent, all implements for equivalence of the present invention, Within being intended to be limited solely by the right of this patent.

Claims (2)

1. an anti-pulling pipe piles, including by pile crown end plate, deformed bar and fill out the precast concrete pipe that in-core joint bar forms Stake, it is characterised in that the pile crown of concrete tubular pile is provided with several and anchor bar screwed connection sleeve, described anchor bar It is embedded in concrete tubular pile by after the female thread screwed connection of sleeve;Described sleeve is vertically set under pile crown end plate, and set The port of cylinder is concordant with pile crown end plate.
2. anti-pulling pipe piles described in claim 1 and a method of attachment for sole plate, including using resistance to plucking pipe under sole plate Stake pile foundation, it is characterised in that sole plate uses the pile foundation that concrete tubular pile is anti-pulling pipe piles of embedded sleeve barrel, described concrete Pile tube is become the pile foundation of anti-pulling pipe piles by the female thread of sleeve and the anti-punching shear bar screwed connection of sole plate.
CN201610826404.5A 2016-09-18 2016-09-18 Uplift pipe pile and connection method for uplift pipe pile and foundation bottom plate Pending CN106320327A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610826404.5A CN106320327A (en) 2016-09-18 2016-09-18 Uplift pipe pile and connection method for uplift pipe pile and foundation bottom plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610826404.5A CN106320327A (en) 2016-09-18 2016-09-18 Uplift pipe pile and connection method for uplift pipe pile and foundation bottom plate

Publications (1)

Publication Number Publication Date
CN106320327A true CN106320327A (en) 2017-01-11

Family

ID=57788024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610826404.5A Pending CN106320327A (en) 2016-09-18 2016-09-18 Uplift pipe pile and connection method for uplift pipe pile and foundation bottom plate

Country Status (1)

Country Link
CN (1) CN106320327A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265744A (en) * 2018-03-13 2018-07-10 国家电网公司 A kind of connection structure of overhead transmission line PHC pipe pile foundations foundation pile and cushion cap
CN114718059A (en) * 2022-05-05 2022-07-08 广州建筑股份有限公司 Tubular pile connecting structure and pile splicing method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202073110U (en) * 2011-05-04 2011-12-14 江苏建华管桩有限公司 Concrete pile and bearing platform connecting structure
CN202202326U (en) * 2011-08-31 2012-04-25 中国建筑第二工程局有限公司 High-strength concrete precast pipe pile splicing structure
CN204112354U (en) * 2013-12-10 2015-01-21 江苏建华管桩有限公司 The syndeton of concrete precast pile and pile foundation support table
CN104695459A (en) * 2013-12-10 2015-06-10 江苏建华管桩有限公司 Connection method of concrete precast pile and pile foundation cap
JP2015194059A (en) * 2014-03-31 2015-11-05 前田製管株式会社 Steel pipe concrete composite pile and integrated construction method with footing part concrete
CN206204931U (en) * 2016-09-18 2017-05-31 中船第九设计研究院工程有限公司 A kind of precast concrete anti-pulling pipe piles

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202073110U (en) * 2011-05-04 2011-12-14 江苏建华管桩有限公司 Concrete pile and bearing platform connecting structure
CN202202326U (en) * 2011-08-31 2012-04-25 中国建筑第二工程局有限公司 High-strength concrete precast pipe pile splicing structure
CN204112354U (en) * 2013-12-10 2015-01-21 江苏建华管桩有限公司 The syndeton of concrete precast pile and pile foundation support table
CN104695459A (en) * 2013-12-10 2015-06-10 江苏建华管桩有限公司 Connection method of concrete precast pile and pile foundation cap
JP2015194059A (en) * 2014-03-31 2015-11-05 前田製管株式会社 Steel pipe concrete composite pile and integrated construction method with footing part concrete
CN206204931U (en) * 2016-09-18 2017-05-31 中船第九设计研究院工程有限公司 A kind of precast concrete anti-pulling pipe piles

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265744A (en) * 2018-03-13 2018-07-10 国家电网公司 A kind of connection structure of overhead transmission line PHC pipe pile foundations foundation pile and cushion cap
CN114718059A (en) * 2022-05-05 2022-07-08 广州建筑股份有限公司 Tubular pile connecting structure and pile splicing method thereof
CN114718059B (en) * 2022-05-05 2023-03-21 广州建筑股份有限公司 Tubular pile connecting structure and pile splicing method thereof

Similar Documents

Publication Publication Date Title
CN103410161B (en) Oblique control slip casting steel anchor tube framework and construction method thereof
CN202544883U (en) Self-boring full thread hollow grouting anchor rod
CN205422773U (en) Novel hollow grouting anchor bolt
CN106320327A (en) Uplift pipe pile and connection method for uplift pipe pile and foundation bottom plate
CN201512810U (en) Retaining wall
CN206204931U (en) A kind of precast concrete anti-pulling pipe piles
CN201050062Y (en) Sand bed soil reinforcing piece
CN2780833Y (en) Self-drill gruniting roofbolt
CN204919546U (en) But recovery type soil nail
CN102677685B (en) Surface fracture racheling and reinforcing method of dangerous rock
CN207348879U (en) Tailwater tunnel structure
CN204511480U (en) A kind of Novel hollow grouted anchor bar with multistage branch
CN102912928B (en) Structural member for restraining grouting anchoring connection by using two ends of steel bar and connection method
CN202882164U (en) Member for restraining grouting anchor connection by using two ends of reinforcing steel bar
CN1546842A (en) Construction method of leakage waterstop for shield tunnel concrete structure segments
CN201474703U (en) Bearing structure of consolidated ring of hydraulic tunnel
CN206941588U (en) A kind of simple positioning tool of steel-pipe pile spreading
CN204827500U (en) Pinniform wedge body stock
CN204418200U (en) One freezes cement mixing method
CN104480947A (en) Construction method of prestress cast-in-place pile and soil cement pile engagement support
CN205184009U (en) Straight screwed joint sleeve hoop melting welding reinforcing joint of reinforcing bar
CN205348145U (en) Rammer
CN102505668B (en) Construction method for reinforcing horizontal crack of gravity dam head by using steel bar
CN207454006U (en) A kind of integral type anchor pole
CN206769213U (en) A kind of reinforcing steel bar connecting device being used in precast concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170111