CN106320274A - 一种堆石坝面板水平施工缝及其施工方法 - Google Patents
一种堆石坝面板水平施工缝及其施工方法 Download PDFInfo
- Publication number
- CN106320274A CN106320274A CN201610958724.6A CN201610958724A CN106320274A CN 106320274 A CN106320274 A CN 106320274A CN 201610958724 A CN201610958724 A CN 201610958724A CN 106320274 A CN106320274 A CN 106320274A
- Authority
- CN
- China
- Prior art keywords
- block
- water
- construction joint
- joint
- face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/16—Sealings or joints
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B7/00—Barrages or weirs; Layout, construction, methods of, or devices for, making same
- E02B7/02—Fixed barrages
- E02B7/04—Dams across valleys
- E02B7/06—Earth-fill dams; Rock-fill dams
Abstract
一种堆石坝面板水平施工缝及其施工方法,包括先浇块和后浇块,先浇块和后浇块之间设有过缝钢筋,过缝钢筋两端分别设置在先浇块和后浇块之中,且过缝钢筋垂直于先浇块和后浇块形成的施工缝。过缝钢筋可以是在板中间跨缝布置,也可以采用上下两层在板中跨缝布置。双层过缝钢筋包括上层过缝钢筋和下层过缝钢筋,上层过缝钢筋和下层过缝钢筋分别组合形成上层钢筋网和下层钢筋网,上下层钢筋网之间通过连接筋连接。采用上述结构,能够提高大坝运行安全及寿命,减少浇筑过程中,先浇块的变形影响,更加适合于长面板堆石坝盖重铺盖以下和由于施工原因不得不临时停仓浇筑的情况下。
Description
技术领域
本发明涉及土石坝施工领域,特别是一种堆石坝面板水平施工缝及其施工方法。
背景技术
目前,堆石坝面板尤其是长面板出于控制面板裂缝的需要,大多采取了分段分期浇筑面板的方法,尤其是长面板,在水平分缝处,混凝土表面仅仅做常规施工缝处理,及采取凿毛、结构钢筋过缝处理。对于由于特殊原因终止面板继续浇筑时的施工缝也是这样处理。水利部部门规范也明文规定分段浇筑的接缝,按施工缝处理。
这种传统施工缝处理方法在分缝处留下了薄弱面,在面板受力时,法向剪力传递、面板弯曲内力传递在先后浇筑的两节板间不协调,存在缝面处混凝土被剪切破坏、面板弯折时施工缝张开等风险。
发明内容
本发明所要解决的技术问题是提供一种堆石坝面板水平施工缝及其施工方法,能够在分段浇筑时人为设置水平收缩缝,减少或避免面板裂缝的产生;在意外终止面板浇筑时既起到施工缝作用,又起到收缩缝作用。
为解决上述技术问题,本发明所采用的技术方案是:一种堆石坝面板水平施工缝,包括先浇块和后浇块,先浇块和后浇块之间设有过缝钢筋,过缝钢筋两端分别设置在先浇块和后浇块之中,且过缝钢筋垂直于先浇块和后浇块形成的施工缝。
优选的方案中,所述过缝钢筋可以是在板中间跨缝布置,也可以采用上下两层在板中跨缝布置。所述的双层过缝钢筋包括上层过缝钢筋和下层过缝钢筋,上层过缝钢筋和下层过缝钢筋分别组合形成上层钢筋网和下层钢筋网,上下层钢筋网之间通过连接筋连接。
优选的方案中,堆石坝面板水平施工缝施工方法包括以下步骤:
1)计算确定先浇块与后浇块之间的施工缝尺寸、位置以及面板下垫层面上砂浆条尺寸;
2)进行砂浆铺设,并在铺设好的砂浆上设置PVC垫片,并架立先浇块水平施工缝处侧模;
3)在架立好的水平施工缝侧模板中预设过缝钢筋并利用滑模进行混凝土浇筑,完成先浇块的混凝土浇筑后,拆除水平施工缝侧模,并将施工缝面按规范凿毛处理,对先浇块不间断进行养护;
4)先浇块浇筑完成至少20天后,先浇块已完成大部分体积变形,再继续利用滑模浇筑后浇块,水平施工缝形成,此时水平施工缝不会张开,完成施工缝的吸收面板大部分体积变形功能。
优选的方案中,所述的步骤4)中,先浇块与后浇块之间所形成的施工缝为缝面,先浇块与后浇块之间不设置间隙。
优选的方案中,所述的施工缝缝面上还设有复合止水条。
本发明所提供的一种堆石坝面板水平施工缝及其施工方法,通过采用上述结构和施工方法,具有以下有益效果:
(1)先浇块与后浇块之间的施工缝为缝面,先浇块与后浇块之间接触面之间紧贴,消除了混凝土面板分段浇筑时设置施工缝带来的薄弱面,避免面板在受到弯剪作用时在施工缝处发生张开,或者发生面板弯折破坏,从而影响大坝运行安全和耐久性;
(2)减小面板一次浇筑长度,从而减少面板混凝土裂缝数量和宽度、长度;
(3)后浇块的浇筑施工作业在先浇块大部分体积变形已完成之后进行,在后浇块体积变形期间,来自先浇块体积变形量极少,因此先浇块传给后浇块的体积变形累计量也大大减少,后浇块裂缝或其危害也减少;
(4)本方法及结构尤其适用于长面板堆石坝盖重铺盖以下和由于施工原因不得不临时停仓浇筑的情况下。
附图说明
下面结合附图和实施例对本发明作进一步说明:
图1为本发明专利的采用单层过缝钢筋时分缝处剖面结构示意图;
图2为本发明专利的采用双层过缝钢筋时分缝处剖面结构示意图;
图3为本发明专利的过缝钢筋等间距整齐排列时的俯视结构示意图。
图4为本发明专利的过缝钢筋等间距交错排列时的俯视结构示意图。
图中:施工缝1,过缝钢筋2,上层过缝钢筋2’,下层过缝钢筋2’’,先浇块3,后浇块4,连接筋5,复合止水条6。
具体实施方式
实施例1:
一种堆石坝面板水平施工缝,包括先浇块3和后浇块4,先浇块3和后浇块4之间设有过缝钢筋2,过缝钢筋2两端分别设置在先浇块3和后浇块4之中,且过缝钢筋2垂直于先浇块3和后浇块4形成的施工缝1。
优选的方案中,所述的双层过缝钢筋2包括上层过缝钢筋2’和下层过缝钢筋2’’,上层过缝钢筋2’和下层过缝钢筋2’’分别组合形成上层钢筋网和下层钢筋网,上下层钢筋网之间通过连接筋5连接。
优选的方案中,所述的单层过缝钢筋2位于面板中部,跨中垂直施工缝布置,可以像图3所示整体平齐布置,也可以像图4所示交错布置。
实施例2:
在实施例1的基础上,采用下列方法进行堆石坝面板水平施工缝施工:
1)1)计算确定先浇块3与后浇块4之间的施工缝尺寸、位置以及面板下垫层面上砂浆条尺寸;
2)进行砂浆铺设,并在铺设好的砂浆上设置PVC垫片,并架立先浇块3水平施工缝处的侧模;
3)在架立好的水平施工缝侧模板中预设过缝钢筋2并利用滑模进行混凝土浇筑,完成先浇块3的混凝土浇筑后,拆除水平施工缝侧模,并将施工缝面按规范凿毛处理,对先浇块3不间断进行养护;
4)先浇块3浇筑完成至少20天后,先浇块已完成大部分体积变形,再继续利用滑模浇筑后浇块4,水平施工缝形成,此时水平施工缝不会张开,完成施工缝1的吸收面板大部分体积变形功能。
优选的方案中,所述的步骤4)中,先浇块3与后浇块4之间所形成的施工缝1为缝面,先浇块3与后浇块4之间不设置间隙。
优选的方案中,所述的施工缝1缝面上还可以设置复合止水条6。
Claims (6)
1.一种堆石坝面板水平施工缝,包括先浇块(3)和后浇块(4),其特征是:先浇块(3)和后浇块(4)之间设有过缝钢筋(2),过缝钢筋(2)两端分别设置在先浇块(3)和后浇块(4)之中,且过缝钢筋(2)垂直于先浇块(3)和后浇块(4)形成的施工缝(1)。
2.根据权利要求1所述的一种堆石坝面板水平施工缝,其特征在于:所述的过缝钢筋(2)包括上层过缝钢筋(2’)和下层过缝钢筋(2’’),上层过缝钢筋(2’)和下层过缝钢筋(2’’)分别组合形成上层钢筋网和下层钢筋网,上下层钢筋网之间通过连接筋(5)连接。
3.根据权利要求1所述的一种堆石坝面板水平施工缝,其特征在于:所述的过缝钢筋(2)为单层钢筋,沿着施工缝在板中间布置。
4.根据权利要求1或2所述的一种堆石坝面板水平施工缝施工方法,其特征在于包括以下步骤:
1)计算确定先浇块(3)与后浇块(4)之间的施工缝尺寸、位置以及面板下垫层面上砂浆条尺寸;
2)进行砂浆铺设,并在铺设好的砂浆上设置PVC垫片,并架立先浇块(3)水平施工缝处的侧模;
3)在架立好的水平施工缝侧模板中预设过缝钢筋(2)并利用滑模进行混凝土浇筑,完成先浇块(3)的混凝土浇筑后,拆除水平施工缝侧模,并将施工缝面按规范凿毛处理,对先浇块(3)不间断进行养护;
4)先浇块(3)浇筑完成至少20天后,先浇块已完成大部分体积变形,再继续利用滑模浇筑后浇块(4),水平施工缝形成,此时水平施工缝不会张开,完成施工缝(1)的吸收面板大部分体积变形功能。
5.根据权利要求4所述的一种堆石坝面板水平施工缝施工方法,其特征在于:所述的步骤4)中,先浇块(3)与后浇块(4)之间所形成的施工缝(1)为缝面,先浇块(3)与后浇块(4)之间不设置间隙。
6.根据权利要求4所述的一种堆石坝面板水平施工缝施工方法,其特征在于:所述的施工缝(1)缝面上还设有复合止水条(6)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610958724.6A CN106320274A (zh) | 2016-10-27 | 2016-10-27 | 一种堆石坝面板水平施工缝及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610958724.6A CN106320274A (zh) | 2016-10-27 | 2016-10-27 | 一种堆石坝面板水平施工缝及其施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106320274A true CN106320274A (zh) | 2017-01-11 |
Family
ID=57819167
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610958724.6A Pending CN106320274A (zh) | 2016-10-27 | 2016-10-27 | 一种堆石坝面板水平施工缝及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106320274A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114032849A (zh) * | 2021-11-03 | 2022-02-11 | 中国电建集团西北勘测设计研究院有限公司 | 一种混凝土堆石坝面板水平永久缝的结构及施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1663093A1 (ru) * | 1989-04-14 | 1991-07-15 | Сибирский филиал Всесоюзного научно-исследовательского института гидротехники им.Б.Е.Веденеева | Противофильтрационна диафрагма грунтовой плотины |
CN103205979A (zh) * | 2013-03-15 | 2013-07-17 | 中国十七冶集团有限公司 | 高温环境下大型筏基施工方法 |
CN205399353U (zh) * | 2016-02-15 | 2016-07-27 | 中国葛洲坝集团第一工程有限公司 | 堆石坝面板垫层 |
CN206110091U (zh) * | 2016-10-27 | 2017-04-19 | 中国葛洲坝集团第一工程有限公司 | 一种堆石坝面板水平施工缝 |
-
2016
- 2016-10-27 CN CN201610958724.6A patent/CN106320274A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1663093A1 (ru) * | 1989-04-14 | 1991-07-15 | Сибирский филиал Всесоюзного научно-исследовательского института гидротехники им.Б.Е.Веденеева | Противофильтрационна диафрагма грунтовой плотины |
CN103205979A (zh) * | 2013-03-15 | 2013-07-17 | 中国十七冶集团有限公司 | 高温环境下大型筏基施工方法 |
CN205399353U (zh) * | 2016-02-15 | 2016-07-27 | 中国葛洲坝集团第一工程有限公司 | 堆石坝面板垫层 |
CN206110091U (zh) * | 2016-10-27 | 2017-04-19 | 中国葛洲坝集团第一工程有限公司 | 一种堆石坝面板水平施工缝 |
Non-Patent Citations (1)
Title |
---|
王勇等: "蒲石河抽水蓄能电站上水库面板混凝土施工控制", 《西北水电》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114032849A (zh) * | 2021-11-03 | 2022-02-11 | 中国电建集团西北勘测设计研究院有限公司 | 一种混凝土堆石坝面板水平永久缝的结构及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106677049B (zh) | 装配式钢-混凝土组合结构桥梁及施工方法 | |
CN105839510B (zh) | 一种钢‑超高性能混凝土组合连续梁桥结构及其施工方法 | |
CN105088937B (zh) | 铰缝有相对凹槽的空心板桥及其建造方法 | |
CN103981798A (zh) | 一种新型铰接预制空心板梁桥铰缝接头及其施工方法 | |
CN204676609U (zh) | 一种地下室底板后浇带加强型防水结构 | |
CN206428853U (zh) | 一种适用预制装配的耗能减震斜向预应力剪力墙结构体系 | |
CN109518858A (zh) | 装配式梁板连接结构及其施工方法 | |
CN205576955U (zh) | 一种条形基础置换成筏板基础的加固结构 | |
CN104674660A (zh) | 一种新型空心板铰缝结构及其施工方法 | |
CN106760050A (zh) | 剪力墙与后浇筑混凝土框架梁的连接结构及贯通式处理方法 | |
CN207660136U (zh) | 一种装配式混凝土框架剪力墙键槽连接结构 | |
CN105275096A (zh) | 一种预制拼合双向楼板施工方法 | |
CN105735099B (zh) | 施工期采用体外预应力的先简支后连续梁桥及其施工方法 | |
CN110644662A (zh) | 一种基于受力的预制无梁楼盖叠合板及其拆分方法 | |
CN203890868U (zh) | 铰缝有相对凹槽的空心板桥 | |
CN207919848U (zh) | 地下车库顶板用塑料模盒组合装置 | |
CN106320274A (zh) | 一种堆石坝面板水平施工缝及其施工方法 | |
CN107905426A (zh) | 一种双向空心叠合楼板的构造方法 | |
CN206110091U (zh) | 一种堆石坝面板水平施工缝 | |
CN207525906U (zh) | 一种装配式框剪结构墙错层式连接结构 | |
CN207739390U (zh) | 叠合墙与水平构件连接节点 | |
CN207032605U (zh) | 一种宽幅空心叠合板 | |
CN205691309U (zh) | 一种大比尺装配整体式剪力墙模型结构 | |
CN206503063U (zh) | 预制组合型波形钢腹板t梁桥 | |
CN109555252A (zh) | 外伸矩形筋的楼板和剪力墙结构及连接方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170111 |
|
RJ01 | Rejection of invention patent application after publication |