CN106320193A - Method for leveling bridge support during replacement and new installation - Google Patents

Method for leveling bridge support during replacement and new installation Download PDF

Info

Publication number
CN106320193A
CN106320193A CN201610983821.0A CN201610983821A CN106320193A CN 106320193 A CN106320193 A CN 106320193A CN 201610983821 A CN201610983821 A CN 201610983821A CN 106320193 A CN106320193 A CN 106320193A
Authority
CN
China
Prior art keywords
millet
fine strain
jacking
ultrathin
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610983821.0A
Other languages
Chinese (zh)
Inventor
魏锦辉
李锐
李广慧
邓苗毅
魏晓刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University of Aeronautics
Original Assignee
Zhengzhou University of Aeronautics
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University of Aeronautics filed Critical Zhengzhou University of Aeronautics
Priority to CN201610983821.0A priority Critical patent/CN106320193A/en
Publication of CN106320193A publication Critical patent/CN106320193A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a method for leveling a bridge support during replacement and new installation and belongs to the technical field of bridge reconstruction. The method comprises construction preparation, jack installation, integral jacking, graded jacking, replacement and leveling and bridge falling. The method for leveling the bridge support during replacement and new installation comprises a step S1 of construction preparation, a step S2 of jack installation, a step S3 of integral jacking, a step S4 of graded jacking, a step S5 of replacement and leveling and a step S6 of bridge falling. In the process of replacing or installing the bridge support, the contact surface between the support and the bridge bottom is leveled first and smeared with cement mortar, a horizontal steel plate is installed, and a level meter is utilize to accurately control the levelness of the support, the service life of the support is prolonged, and integral structure stability of a bridge is guaranteed. The leveling method is simple, reliable, quick, convenient and suitable for being popularized and used in the bridge support leveling process.

Description

A kind of Bridge Support Replacement and newly installed time leveling method
Technical field
The present invention relates to Bridge Reconstruction technical field, a kind of Bridge Support Replacement and newly installed time leveling side Method.
Background technology
Flourish along with China's all our undertakings, volume of transport is increasing, much eighties of last century bridge with The passage of time, the problem of the Lack of support produced owing to bearing is aging is the most serious.Bridge pad is aging to be produced Bridge structure destroy, the Tough questions that at present bridge is faced especially.Bridge pad not only carry superstructure weight, The bearing reaction of car load, and be directly passed to pier, it is ensured that pier can uniform stressed, but also ensure that structure exists Free Transform under the factors such as mobile load, temperature and concrete shrinkage and creep effect, but when replacing or mounting bridge beam support, it is adjusted Quadratic method is unreliable, directly affects the service life of bridge pad and the overall structure that destroys a bridge, to this end, we have invented one Bridge Support Replacement and newly installed time leveling method.
Summary of the invention
It is an object of the invention to provide a kind of Bridge Support Replacement and newly installed time leveling method, to solve the above-mentioned back of the body The traditional leveling method proposed in scape technology is inaccurate thus affects the service life of bearing and integrally-built the asking that destroy a bridge Topic.
For achieving the above object, the present invention provides following technical scheme: a kind of Bridge Support Replacement and newly installed time tune Quadratic method, including preparation of construction, jack installation, integral jacking, classification jacking, changes and leveling and the fine strain of millet step that falls, described bridge Leveling method when beam support is changed and be newly installed, specifically comprises the following steps that
S1: preparation of construction: erection construction operating platform simple rack, clears up bridge pier, countertop foreign body, and carries out theoretical meter Calculate, determine the once safety jacking amount of each bearing reaction size and buttress;
S2: jack is installed: use ultrathin synchronous hydra-ulic jacks to be placed on centrage at the bottom of fine strain of millet, ultrathin synchronization liquid Pressure jack top is away from concrete edge 10--15cm, and installs oil gauge and displacement transducer;
S3: integral jacking: open pressure fuel pump and rise to 6--9MPa, and observe displacement transducer reading, jack-up 2--5mm Time, oil pump stops pressurization, and stirrup is enclosed within ultrathin synchronous hydra-ulic jacks outer wall, in case jack decompression causes jack Falling after rise, wherein oil pump is controlled by Hydraulic Station entirety;
S4: classification jacking: when the deadweight of fine strain of millet body is fully transferred on ultrathin synchronous hydra-ulic jacks, top lift no longer increases Add, use classification jacking, each jacking 2--5mm, each buttress jacking amount difference 0.2--0.5mm, stop after ejecting replacing gap Running;
S5: change and leveling: removed by the upper steel plate of bearing, requires contact surface chipping at the bottom of upper steel plate and fine strain of millet according to design Whole, and carry out levelling with cement mortar and steel plate, the thickness of its screed-coat with do not change before the relative altitude of bearing front and rear beam Unanimously;
S6: fall fine strain of millet: after grouting material is strengthened 2--5 days, carry out falling fine strain of millet, to ensure that during the fine strain of millet that falls each is ultrathin The once falling amount of synchronous hydra-ulic jacks, and jack falling holding synchronization, to guarantee fine strain of millet body whole machine balancing, the fine strain of millet that falls is to actual During position, check bearing support situation.
Preferably, in described step S1, measure at the bottom of fine strain of millet to buttress and the distance of countertop so that it is distance controlling is at 3-- 6cm, as less than 3cm, then cuts pier top part concrete, and floating by cement mortar.
Preferably, in described step S2, use between ultrathin synchronous hydra-ulic jacks and fine strain of millet bottom surface, pinner or bent cap Pading plate mode pads, and keeps each ultrathin synchronous hydra-ulic jacks pressure consistent, and its jacking face and installed surface keep flat Whole, ultrathin synchronous hydra-ulic jacks is near bearing, and in solid-section bottom at the bottom of fine strain of millet, displacement transducer is installed and kept vertical, its Range is 0--50mm.
Preferably, in described step S2, ultrathin synchronous hydra-ulic jacks selects external diameter 16--20cm, internal diameter 10-- 14cm, thickness 40--50mm, stroke 8--12mm, wherein, the piston seal of ultrathin synchronous hydra-ulic jacks is three road combination types Sealing ring.
Preferably, in described step S3, Hydraulic Station is by hydraulic manifold block, overflow valve, bidirectional electromagnetic valve, Pressure gauge and oil pipe Composition, wherein tubing length 6--20m, the Integral synchronous of Hydraulic Station control oil pump operate, utilize displacement transducer real-time monitored Jacking amount.
Preferably, in described step S5, grafter or long-handled hook is used to be removed by former bearing after head space at the bottom of fine strain of millet, on removal bearing During steel plate, superscribe the bottom of steel plate with oils and fats cloth, and by the level of level indicator adjustment upper steel plate, reserve simultaneously The decrement of 2--6mm.
Preferably, in described step S5, after bearing upper steel plate has adjusted, the gap between at the bottom of upper steel plate and fine strain of millet is entered Row grouting, fills closely knit by gap, and wherein grouting uses M60 contraction-free grouting concrete.
Compared with prior art, the invention has the beneficial effects as follows: the present invention will during replacing or mounting bridge beam support Bearing is whole with the first chipping of the contact surface at the bottom of fine strain of millet, and smears cement mortar and install horizontal steel plate, utilizes level indicator accurately to control Its levelness, extends the service life of bearing, and ensures that the overall structure of bridge is stable, and its leveling method is simple and reliable, quick Convenient, it is suitable for during bridge pad leveling promoting the use of.
Accompanying drawing explanation
Fig. 1 is workflow diagram of the present invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Describe, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments wholely.Based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under not making creative work premise Embodiment, broadly falls into the scope of protection of the invention.
Embodiment one
A kind of Bridge Support Replacement and newly installed time leveling method, install including preparation of construction, jack, overall top Liter, classification jacking, change with leveling and the fine strain of millet step that falls, described Bridge Support Replacement and newly installed time leveling method, specifically walk Rapid as follows:
S1: preparation of construction: erection construction operating platform simple rack, clears up bridge pier, countertop foreign body, and carries out theoretical meter Calculate, determine the once safety jacking amount of each bearing reaction size and buttress;
S2: jack is installed: use ultrathin synchronous hydra-ulic jacks to be placed on centrage at the bottom of fine strain of millet, ultrathin synchronization liquid Pressure jack top is away from concrete edge 10cm, and installs oil gauge and displacement transducer, ultrathin synchronous hydra-ulic jacks and fine strain of millet Use pading plate mode to pad between bottom surface, pinner or bent cap, and keep each ultrathin synchronous hydra-ulic jacks pressure consistent, Its jacking face and installed surface keep smooth, and ultrathin synchronous hydra-ulic jacks is near bearing, and in solid-section bottom at the bottom of fine strain of millet, displacement Sensor is installed and is kept vertical, and its range is 0--50mm, and ultrathin synchronous hydra-ulic jacks selects external diameter 16cm, internal diameter 10cm, Thickness 40mm, stroke 8mm, wherein, the piston seal of ultrathin synchronous hydra-ulic jacks is three road complex sealing rings;
S3: integral jacking: open pressure fuel pump and rise to 6MPa, and observe displacement transducer reading, during jack-up 2mm, oil pump Stop pressurization, and stirrup is enclosed within ultrathin synchronous hydra-ulic jacks outer wall, in case jack decompression causes jack to fall after rise, its Middle oil pump is controlled by Hydraulic Station entirety, and Hydraulic Station is made up of hydraulic manifold block, overflow valve, bidirectional electromagnetic valve, Pressure gauge and oil pipe, Wherein tubing length 6m, is operated by the Integral synchronous of Hydraulic Station control oil pump, utilizes displacement transducer real-time monitored jacking amount;
S4: classification jacking: when the deadweight of fine strain of millet body is fully transferred on ultrathin synchronous hydra-ulic jacks, top lift no longer increases Add, use classification jacking, each jacking 2mm, each buttress jacking amount difference 0.2mm, decommission after ejecting replacing gap;
S5: change and leveling: removed by the upper steel plate of bearing, requires contact surface chipping at the bottom of upper steel plate and fine strain of millet according to design Whole, and carry out levelling with cement mortar and steel plate, the thickness of its screed-coat with do not change before the relative altitude of bearing front and rear beam Unanimously, grafter or long-handled hook is used to be removed by former bearing after head space at the bottom of fine strain of millet, during removal bearing upper steel plate, with oils and fats cloth bag Wrap the bottom of steel plate, and by the level of level indicator adjustment upper steel plate, reserve the decrement of 2mm, at bearing upper steel plate simultaneously After adjustment completes, being in the milk the gap between at the bottom of upper steel plate and fine strain of millet, filled gap closely knit, wherein grouting uses M60 Contraction-free grouting concrete;
S6: fall fine strain of millet: after grouting material is strengthened 2 days, carry out falling fine strain of millet, to ensure each ultrathin synchronization during the fine strain of millet that falls The once falling amount of hydraulic jack, and jack falling holding synchronization, to guarantee fine strain of millet body whole machine balancing, the fine strain of millet that falls is to physical location Time, check bearing support situation.
Embodiment two
A kind of Bridge Support Replacement and newly installed time leveling method, install including preparation of construction, jack, overall top Liter, classification jacking, change with leveling and the fine strain of millet step that falls, described Bridge Support Replacement and newly installed time leveling method, specifically walk Rapid as follows:
S1: preparation of construction: erection construction operating platform simple rack, clears up bridge pier, countertop foreign body, and carries out theoretical meter Calculate, determine the once safety jacking amount of each bearing reaction size and buttress;
S2: jack is installed: use ultrathin synchronous hydra-ulic jacks to be placed on centrage at the bottom of fine strain of millet, ultrathin synchronization liquid Pressure jack top is away from concrete edge 12cm, and installs oil gauge and displacement transducer, ultrathin synchronous hydra-ulic jacks and fine strain of millet Use pading plate mode to pad between bottom surface, pinner or bent cap, and keep each ultrathin synchronous hydra-ulic jacks pressure consistent, Its jacking face and installed surface keep smooth, and ultrathin synchronous hydra-ulic jacks is near bearing, and in solid-section bottom at the bottom of fine strain of millet, displacement Sensor is installed and is kept vertical, and its range is 0--50mm, and ultrathin synchronous hydra-ulic jacks selects external diameter 17cm, internal diameter 11cm, Thickness 44mm, stroke 9mm, wherein, the piston seal of ultrathin synchronous hydra-ulic jacks is three road complex sealing rings;
S3: integral jacking: open pressure fuel pump and rise to 7MPa, and observe displacement transducer reading, during jack-up 3mm, oil pump Stop pressurization, and stirrup is enclosed within ultrathin synchronous hydra-ulic jacks outer wall, in case jack decompression causes jack to fall after rise, its Middle oil pump is controlled by Hydraulic Station entirety, and Hydraulic Station is made up of hydraulic manifold block, overflow valve, bidirectional electromagnetic valve, Pressure gauge and oil pipe, Wherein tubing length 12m, is operated by the Integral synchronous of Hydraulic Station control oil pump, utilizes displacement transducer real-time monitored jacking amount;
S4: classification jacking: when the deadweight of fine strain of millet body is fully transferred on ultrathin synchronous hydra-ulic jacks, top lift no longer increases Add, use classification jacking, each jacking 3mm, each buttress jacking amount difference 0.3mm, decommission after ejecting replacing gap;
S5: change and leveling: removed by the upper steel plate of bearing, requires contact surface chipping at the bottom of upper steel plate and fine strain of millet according to design Whole, and carry out levelling with cement mortar and steel plate, the thickness of its screed-coat with do not change before the relative altitude of bearing front and rear beam Unanimously, grafter or long-handled hook is used to be removed by former bearing after head space at the bottom of fine strain of millet, during removal bearing upper steel plate, with oils and fats cloth bag Wrap the bottom of steel plate, and by the level of level indicator adjustment upper steel plate, reserve the decrement of 4mm, at bearing upper steel plate simultaneously After adjustment completes, being in the milk the gap between at the bottom of upper steel plate and fine strain of millet, filled gap closely knit, wherein grouting uses M60 Contraction-free grouting concrete;
S6: fall fine strain of millet: after grouting material is strengthened 3 days, carry out falling fine strain of millet, to ensure each ultrathin synchronization during the fine strain of millet that falls The once falling amount of hydraulic jack, and jack falling holding synchronization, to guarantee fine strain of millet body whole machine balancing, the fine strain of millet that falls is to physical location Time, check bearing support situation.
Embodiment three
A kind of Bridge Support Replacement and newly installed time leveling method, install including preparation of construction, jack, overall top Liter, classification jacking, change with leveling and the fine strain of millet step that falls, described Bridge Support Replacement and newly installed time leveling method, specifically walk Rapid as follows:
S1: preparation of construction: erection construction operating platform simple rack, clears up bridge pier, countertop foreign body, and carries out theoretical meter Calculate, determine the once safety jacking amount of each bearing reaction size and buttress;
S2: jack is installed: use ultrathin synchronous hydra-ulic jacks to be placed on centrage at the bottom of fine strain of millet, ultrathin synchronization liquid Pressure jack top is away from concrete edge 15cm, and installs oil gauge and displacement transducer, ultrathin synchronous hydra-ulic jacks and fine strain of millet Use pading plate mode to pad between bottom surface, pinner or bent cap, and keep each ultrathin synchronous hydra-ulic jacks pressure consistent, Its jacking face and installed surface keep smooth, and ultrathin synchronous hydra-ulic jacks is near bearing, and in solid-section bottom at the bottom of fine strain of millet, displacement Sensor is installed and is kept vertical, and its range is 0--50mm, and ultrathin synchronous hydra-ulic jacks selects external diameter 20cm, internal diameter 14cm, Thickness 50mm, stroke 12mm, wherein, the piston seal of ultrathin synchronous hydra-ulic jacks is three road complex sealing rings;
S3: integral jacking: open pressure fuel pump and rise to 9MPa, and observe displacement transducer reading, during jack-up 5mm, oil pump Stop pressurization, and stirrup is enclosed within ultrathin synchronous hydra-ulic jacks outer wall, in case jack decompression causes jack to fall after rise, its Middle oil pump is controlled by Hydraulic Station entirety, and Hydraulic Station is made up of hydraulic manifold block, overflow valve, bidirectional electromagnetic valve, Pressure gauge and oil pipe, Wherein tubing length 20m, is operated by the Integral synchronous of Hydraulic Station control oil pump, utilizes displacement transducer real-time monitored jacking amount;
S4: classification jacking: when the deadweight of fine strain of millet body is fully transferred on ultrathin synchronous hydra-ulic jacks, top lift no longer increases Add, use classification jacking, each jacking 5mm, each buttress jacking amount difference 0.5mm, decommission after ejecting replacing gap;
S5: change and leveling: removed by the upper steel plate of bearing, requires contact surface chipping at the bottom of upper steel plate and fine strain of millet according to design Whole, and carry out levelling with cement mortar and steel plate, the thickness of its screed-coat with do not change before the relative altitude of bearing front and rear beam Unanimously, grafter or long-handled hook is used to be removed by former bearing after head space at the bottom of fine strain of millet, during removal bearing upper steel plate, with oils and fats cloth bag Wrap the bottom of steel plate, and by the level of level indicator adjustment upper steel plate, reserve the decrement of 6mm, at bearing upper steel plate simultaneously After adjustment completes, being in the milk the gap between at the bottom of upper steel plate and fine strain of millet, filled gap closely knit, wherein grouting uses M60 Contraction-free grouting concrete;
S6: fall fine strain of millet: after grouting material is strengthened 5 days, carry out falling fine strain of millet, to ensure each ultrathin synchronization during the fine strain of millet that falls The once falling amount of hydraulic jack, and jack falling holding synchronization, to guarantee fine strain of millet body whole machine balancing, the fine strain of millet that falls is to physical location Time, check bearing support situation.
Described in comprehensive above example, a kind of Bridge Support Replacement that the present invention provides and newly installed time leveling method Most preferred embodiment is: a kind of Bridge Support Replacement and newly installed time leveling method, including preparation of construction, jack install, whole Body jacking, classification jacking, change with leveling and the fine strain of millet step that falls, described Bridge Support Replacement and newly installed time leveling method, tool Body step is as follows:
S1: preparation of construction: erection construction operating platform simple rack, clears up bridge pier, countertop foreign body, and carries out theoretical meter Calculate, determine the once safety jacking amount of each bearing reaction size and buttress;
S2: jack is installed: use ultrathin synchronous hydra-ulic jacks to be placed on centrage at the bottom of fine strain of millet, ultrathin synchronization liquid Pressure jack top is away from concrete edge 13cm, and installs oil gauge and displacement transducer, ultrathin synchronous hydra-ulic jacks and fine strain of millet Use pading plate mode to pad between bottom surface, pinner or bent cap, and keep each ultrathin synchronous hydra-ulic jacks pressure consistent, Its jacking face and installed surface keep smooth, and ultrathin synchronous hydra-ulic jacks is near bearing, and in solid-section bottom at the bottom of fine strain of millet, displacement Sensor is installed and is kept vertical, and its range is 0--50mm, and ultrathin synchronous hydra-ulic jacks selects external diameter 18cm, internal diameter 13cm, Thickness 48mm, stroke 10mm, wherein, the piston seal of ultrathin synchronous hydra-ulic jacks is three road complex sealing rings;
S3: integral jacking: open pressure fuel pump and rise to 8MPa, and observe displacement transducer reading, during jack-up 4mm, oil pump Stop pressurization, and stirrup is enclosed within ultrathin synchronous hydra-ulic jacks outer wall, in case jack decompression causes jack to fall after rise, its Middle oil pump is controlled by Hydraulic Station entirety, and Hydraulic Station is made up of hydraulic manifold block, overflow valve, bidirectional electromagnetic valve, Pressure gauge and oil pipe, Wherein tubing length 16m, is operated by the Integral synchronous of Hydraulic Station control oil pump, utilizes displacement transducer real-time monitored jacking amount;
S4: classification jacking: when the deadweight of fine strain of millet body is fully transferred on ultrathin synchronous hydra-ulic jacks, top lift no longer increases Add, use classification jacking, each jacking 4mm, each buttress jacking amount difference 0.4mm, decommission after ejecting replacing gap;
S5: change and leveling: removed by the upper steel plate of bearing, requires contact surface chipping at the bottom of upper steel plate and fine strain of millet according to design Whole, and carry out levelling with cement mortar and steel plate, the thickness of its screed-coat with do not change before the relative altitude of bearing front and rear beam Unanimously, grafter or long-handled hook is used to be removed by former bearing after head space at the bottom of fine strain of millet, during removal bearing upper steel plate, with oils and fats cloth bag Wrap the bottom of steel plate, and by the level of level indicator adjustment upper steel plate, reserve the decrement of 5mm, at bearing upper steel plate simultaneously After adjustment completes, being in the milk the gap between at the bottom of upper steel plate and fine strain of millet, filled gap closely knit, wherein grouting uses M60 Contraction-free grouting concrete;
S6: fall fine strain of millet: after grouting material is strengthened 4 days, carry out falling fine strain of millet, to ensure each ultrathin synchronization during the fine strain of millet that falls The once falling amount of hydraulic jack, and jack falling holding synchronization, to guarantee fine strain of millet body whole machine balancing, the fine strain of millet that falls is to physical location Time, check bearing support situation.
Although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, permissible Understand and these embodiments can be carried out multiple change without departing from the principles and spirit of the present invention, revise, replace And modification, the scope of the present invention be defined by the appended.

Claims (7)

1. Bridge Support Replacement and newly installed time a leveling method, including preparation of construction, jack installation, integral jacking, Classification jacking, change with leveling and the fine strain of millet step that falls, it is characterised in that: described Bridge Support Replacement and newly installed time leveling side Method, specifically comprises the following steps that
S1: preparation of construction: erection construction operating platform simple rack, clears up bridge pier, countertop foreign body, and carries out Theoretical Calculation, Determine the once safety jacking amount of each bearing reaction size and buttress;
S2: jack is installed: use ultrathin synchronous hydra-ulic jacks to be placed on centrage at the bottom of fine strain of millet, ultrathin synchronous hydraulic thousand Top, jin top is away from concrete edge 10--15cm, and installs oil gauge and displacement transducer;
S3: integral jacking: open pressure fuel pump and rise to 6--9MPa, and observe displacement transducer reading, during jack-up 2--5mm, oil Pump stops pressurization, and stirrup is enclosed within ultrathin synchronous hydra-ulic jacks outer wall, in case jack decompression causes jack to fall after rise, Wherein oil pump is controlled by Hydraulic Station entirety;
S4: classification jacking: when the deadweight of fine strain of millet body is fully transferred on ultrathin synchronous hydra-ulic jacks, top lift is not further added by, Use classification jacking, each jacking 2--5mm, each buttress jacking amount difference 0.2--0.5mm, after ejecting replacing gap, stop fortune Make;
S5: change and leveling: removed the upper steel plate of bearing, requires whole for contact surface chipping at the bottom of upper steel plate and fine strain of millet according to design, And carry out levelling with cement mortar and steel plate, the thickness of its screed-coat with do not change before the relative altitude one of bearing front and rear beam Cause;
S6: fall fine strain of millet: after grouting material is strengthened 2--5 days, carry out falling fine strain of millet, to ensure each ultrathin synchronization during the fine strain of millet that falls The once falling amount of hydraulic jack, and jack falling holding synchronization, to guarantee fine strain of millet body whole machine balancing, the fine strain of millet that falls is to physical location Time, check bearing support situation.
A kind of Bridge Support Replacement the most according to claim 1 and newly installed time leveling method, it is characterised in that: described In step S1, measure at the bottom of fine strain of millet to buttress and the distance of countertop so that it is distance controlling, at 3--6cm, as less than 3cm, then cuts pier Concrete is divided at top, and floating by cement mortar.
A kind of Bridge Support Replacement the most according to claim 1 and newly installed time leveling method, it is characterised in that: described In step S2, use pading plate mode to pad between ultrathin synchronous hydra-ulic jacks and fine strain of millet bottom surface, pinner or bent cap, and protect Holding each ultrathin synchronous hydra-ulic jacks pressure consistent, its jacking face and installed surface keep smooth, ultrathin synchronous hydraulic thousand Jin leans nearly bearing, and in solid-section bottom at the bottom of fine strain of millet, displacement transducer is installed and kept vertical, and its range is 0--50mm.
A kind of Bridge Support Replacement the most according to claim 1 and newly installed time leveling method, it is characterised in that: described In step S2, ultrathin synchronous hydra-ulic jacks selects external diameter 16--20cm, internal diameter 10--14cm, thickness 40--50mm, stroke 8--12mm, wherein, the piston seal of ultrathin synchronous hydra-ulic jacks is three road complex sealing rings.
A kind of Bridge Support Replacement the most according to claim 1 and newly installed time leveling method, it is characterised in that: described In step S3, Hydraulic Station is made up of hydraulic manifold block, overflow valve, bidirectional electromagnetic valve, Pressure gauge and oil pipe, wherein tubing length 6--20m, is operated by the Integral synchronous of Hydraulic Station control oil pump, utilizes displacement transducer real-time monitored jacking amount.
A kind of Bridge Support Replacement the most according to claim 1 and newly installed time leveling method, it is characterised in that: described In step S5, use grafter or long-handled hook to be removed by former bearing after head space at the bottom of fine strain of millet, during removal bearing upper steel plate, use oils and fats Cloth superscribes the bottom of steel plate, and by the level of level indicator adjustment upper steel plate, reserves the decrement of 2--6mm simultaneously.
A kind of Bridge Support Replacement the most according to claim 1 and newly installed time leveling method, it is characterised in that: described In step S5, after bearing upper steel plate has adjusted, is in the milk in the gap between at the bottom of upper steel plate and fine strain of millet, gap is filled Closely knit, wherein grouting uses M60 contraction-free grouting concrete.
CN201610983821.0A 2016-11-09 2016-11-09 Method for leveling bridge support during replacement and new installation Pending CN106320193A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610983821.0A CN106320193A (en) 2016-11-09 2016-11-09 Method for leveling bridge support during replacement and new installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610983821.0A CN106320193A (en) 2016-11-09 2016-11-09 Method for leveling bridge support during replacement and new installation

Publications (1)

Publication Number Publication Date
CN106320193A true CN106320193A (en) 2017-01-11

Family

ID=57816296

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610983821.0A Pending CN106320193A (en) 2016-11-09 2016-11-09 Method for leveling bridge support during replacement and new installation

Country Status (1)

Country Link
CN (1) CN106320193A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158490A (en) * 2019-06-04 2019-08-23 中铁九局集团第七工程有限公司 Continuous beam synchronization of jacking up construction
CN110453594A (en) * 2019-09-06 2019-11-15 郑州航空工业管理学院 A kind of adjustable Bridge Support Replacement method of support force
CN110468725A (en) * 2019-08-30 2019-11-19 中铁六局集团太原铁路建设有限公司 Installation engineering method after swivel bridges abutment pier support
CN110983997A (en) * 2019-12-24 2020-04-10 中铁十八局集团第四工程有限公司 Replacing method for sticky steel glue fixing support in counter bore production
CN113026566A (en) * 2021-03-23 2021-06-25 中铁一局集团第二工程有限公司 Reverse hoisting system and method for dismantling Bailey beam support
CN113481882A (en) * 2021-06-30 2021-10-08 重庆建工第三建设有限责任公司 Bridge plate type rubber support and replacement construction method thereof
CN114197301A (en) * 2021-12-30 2022-03-18 成都济通路桥科技有限公司 Cluster adjusting method for height-adjusting force-measuring device based on force and displacement dual control
CN115030066A (en) * 2022-06-22 2022-09-09 广东长大道路养护有限公司 Reverse installation construction method for basin-type support of bridge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001254315A (en) * 2000-03-09 2001-09-21 Samikon Koji:Kk Repairing method of shoe seat
CN201447670U (en) * 2009-05-19 2010-05-05 汕头市达濠市政建设有限公司 Multi-jack synchronous linkage jacking device for bridges
CN201553992U (en) * 2009-12-17 2010-08-18 杭州市市政工程集团有限公司 Device for jacking whole body of box girder
CN104528582A (en) * 2014-12-26 2015-04-22 柳州欧维姆机械股份有限公司 Intelligent separate control type hydraulic synchronous jacking system and method for replacing bridge support through same
CN104988845A (en) * 2015-07-17 2015-10-21 重庆桥都桥梁技术有限公司 Bridge bearer exchanging and newly-installation leveling method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001254315A (en) * 2000-03-09 2001-09-21 Samikon Koji:Kk Repairing method of shoe seat
CN201447670U (en) * 2009-05-19 2010-05-05 汕头市达濠市政建设有限公司 Multi-jack synchronous linkage jacking device for bridges
CN201553992U (en) * 2009-12-17 2010-08-18 杭州市市政工程集团有限公司 Device for jacking whole body of box girder
CN104528582A (en) * 2014-12-26 2015-04-22 柳州欧维姆机械股份有限公司 Intelligent separate control type hydraulic synchronous jacking system and method for replacing bridge support through same
CN104988845A (en) * 2015-07-17 2015-10-21 重庆桥都桥梁技术有限公司 Bridge bearer exchanging and newly-installation leveling method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158490A (en) * 2019-06-04 2019-08-23 中铁九局集团第七工程有限公司 Continuous beam synchronization of jacking up construction
CN110468725A (en) * 2019-08-30 2019-11-19 中铁六局集团太原铁路建设有限公司 Installation engineering method after swivel bridges abutment pier support
CN110468725B (en) * 2019-08-30 2021-05-07 中铁六局集团太原铁路建设有限公司 Rear mounting construction method for side pier support of swivel bridge
CN110453594A (en) * 2019-09-06 2019-11-15 郑州航空工业管理学院 A kind of adjustable Bridge Support Replacement method of support force
CN110983997A (en) * 2019-12-24 2020-04-10 中铁十八局集团第四工程有限公司 Replacing method for sticky steel glue fixing support in counter bore production
CN110983997B (en) * 2019-12-24 2021-06-25 中铁十八局集团第四工程有限公司 Replacing method for sticky steel glue fixing support in counter bore production
CN113026566A (en) * 2021-03-23 2021-06-25 中铁一局集团第二工程有限公司 Reverse hoisting system and method for dismantling Bailey beam support
CN113481882A (en) * 2021-06-30 2021-10-08 重庆建工第三建设有限责任公司 Bridge plate type rubber support and replacement construction method thereof
CN114197301A (en) * 2021-12-30 2022-03-18 成都济通路桥科技有限公司 Cluster adjusting method for height-adjusting force-measuring device based on force and displacement dual control
CN115030066A (en) * 2022-06-22 2022-09-09 广东长大道路养护有限公司 Reverse installation construction method for basin-type support of bridge

Similar Documents

Publication Publication Date Title
CN106320193A (en) Method for leveling bridge support during replacement and new installation
CN102080356B (en) Box girder positioning temporary supporting seat and positioning construction method of box girder
CN104562924B (en) Bridge pad from jacking backing plate replacing options
CN101429820B (en) Integral shift method for buildings
CN104652291B (en) The slip casing by pressure replacing method of bridge pad
CN102477717B (en) A kind of bridge pushing construction method
TWI580842B (en) Integrated Control System for Bridge Roof
CN102817328B (en) Method for heightening support
CN101230563A (en) Method for replacing bridge bearing without traffic interruption and special device thereof
CN203530837U (en) Circular laminated rubber bearing mounting structure
CN102704412B (en) Construction process for lifting broken pillars of bridge
CN204608819U (en) A kind of levelling device for wind-driven generator
CN206985612U (en) A kind of automatic leveling shearing type lifter
CN204475154U (en) Bearing capacity is adjustable bridge vibration absorption and isolation support
CN204151670U (en) Pressure-adjusting type bridge bearing pad
CN109505404A (en) The intelligent recognition and restraint system of roof system deformation
CN205802804U (en) A kind of building airduct anti-deformation hanging apparatus
CN202139533U (en) Ball-shaped height-adjusting support
CN104787695A (en) Hydraulic supporting device for temporarily supporting and detaching steel structure and use method of hydraulic supporting device
CN206545165U (en) A kind of bridge elevation compensates bearing
CN204703059U (en) A kind of bridge pad with height-adjusting function
CN102704398B (en) Jacking construction method of capping beam
CN206784184U (en) Heavy template support system off-load stand apparatus
CN112030782B (en) Construction method for jacking old bridge by using replacement support
CN215104623U (en) Height-adjustable support for improving stress of main beam bridge deck structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170111

RJ01 Rejection of invention patent application after publication