CN106300391B - 一种基于先调风机的风电场agc优化方法 - Google Patents
一种基于先调风机的风电场agc优化方法 Download PDFInfo
- Publication number
- CN106300391B CN106300391B CN201610882350.4A CN201610882350A CN106300391B CN 106300391 B CN106300391 B CN 106300391B CN 201610882350 A CN201610882350 A CN 201610882350A CN 106300391 B CN106300391 B CN 106300391B
- Authority
- CN
- China
- Prior art keywords
- agc
- active
- blower
- dead zone
- power plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/24—Arrangements for preventing or reducing oscillations of power in networks
Abstract
本发明涉及一种基于先调风机的风电场AGC优化方法,包括步骤有:(1)计算风电场总有功P;(2)读取电网下发的AGC有功指令PAGC;(3)计算风电场实时总有功与AGC指令的差值ΔP=|P‑PAGC|;(4)假设先调风机的有功变化速率绝对值为r先调,设定足够短的场内风机有功指令下发时间间隔T场内,使得风电场有功控制死区设定值P死区>r先调·T场内;(5)判断差值ΔP是否超过死区设定值P死区:如果|P‑PAGC|≤P死区,则返回步骤(2),如果P‑PAGC>P死区,则转入降功率控制步骤(6),如果PAGC‑P>P死区,则转入升功率控制步骤(7)。本发明缩短了风电AGC的响应时间,降低了有功调节过程中的静态偏差,有利于风电有功的精准调控。
Description
技术领域
本发明属于自动发电控制技术领域,特别是一种基于先调风机的风电场AGC优化方法。
背景技术
随着风电并网容量的不断增长,将风电纳入AGC系统已成为保证风电消纳和电网安全两方面的必须。风电场AGC功能的实现方式和调节性能都与传统AGC机组有较大区别。这为风电场AGC调控工作带来了新的问题。
风电场的AGC功能一般通过在风电场内建立AGC子站实现。风电场AGC子站一方面建立了风电场与调度AGC主站的通信通道,使风电场具备与主站信息交换的功能,另一方面根据AGC指令计算并下发场内实际有功指令,自动调节全场有功,使其按一定速率跟随主站AGC指令稳定变化,从而实现风电场的AGC功能。在AGC调解过程中,AGC指令需要通过风电场AGC子站的计算、再分配等步骤才能下发至单个风力发电机。子站数据处理的过程受限于计算速率、硬件配置以及各接口的数据刷新频率等因素,往往耗时较长。这使得风电场的AGC响应时间比传统火电机组更长,产生较大的滞后性,在AGC控制中表现为静态偏差较大,风电场的AGC性能不佳。
发明内容
本发明的目的是针对现有技术的不足,而提出一种基于先调风机的风电场AGC优化方法。
本发明解决其技术问题是采取以下技术方案实现的:
一种基于先调风机的风电场AGC优化方法,包括步骤如下:
(1)读取风电场所有在运风机的实时有功出力和运行状态,计算风电场总有功P;
(2)读取电网调度机构下发的AGC有功指令PAGC;
(3)计算风电场实时总有功与AGC指令的差值ΔP=|P-PAGC|;
(4)假设先调风机的有功变化速率绝对值为r先调,设定足够短的场内风机有功指令下发时间间隔T场内,使得风电场有功控制死区设定值P死区>r先调·T场内;
(5)判断差值ΔP是否超过死区设定值P死区:
如果|P-PAGC|≤P死区,则返回步骤(2),如果P-PAGC>P死区,则转入降功率控制步骤(6)的①步,如果PAGC-P>P死区,则转入升功率控制步骤(7)的①步;
(6)降功率控制,具体包括步骤如下:
①向先调风机下发降有功指令,使其处于降有功状态,先调风机的调节目标
②向除先调风机以外的其它风机下发修正后的AGC有功指令P修正=PAGC+r先调·T场内;
③按照上述其它风机的剩余可调有功占总可调有功的比例分配P修正:对某台实际有功为其它风机i(i=1,2,…,m),其实际有功指令
(7)升功率控制,具体包括步骤如下:
①向先调风机下发升有功指令,使其处于升有功状态,先调风机的调节目标
②向其余风机下发修正后的AGC有功指令P修正=PAGC-r先调·T场内;
③按照上述其它风机的剩余可调有功占总可调有功的比例分配P修正:对某台实际有功为最大出力为的其它风机i(i=1,2,…,m),其实际有功指令
而且,所述步骤(4)中的先调风机为按照年累计发电量由多到少将风电场内全部风机排序,选取该排序中装机容量占前10%至20%的风机为先调风机。
本发明的优点和积极效果是:
1、本发明提出了一种基于先调风机的风电场AGC优化方法,通过AGC指令的分解,在风电场AGC子站计算传输过程开始之前,向事先选定的先调风机下发AGC指令,实现了风电场AGC的快速响应。
2、本发明方法在保证达到AGC控制目的前提下,缩短了风电AGC的响应时间,降低了有功调节过程中的静态偏差,有利于风电有功的精准调控。
附图说明
图1是本发明方法的流程框图,图中,条件1为|P-PAGC|≤P死区;条件2为P-PAGC>P死区;条件3为PAGC-P>P死区;公式中,P为风电场总有功,PAGC为电网调度机构下发的AGC有功指令,P死区为风电场有功控制死区设定值。
具体实施方式
以下对本发明实施例做进一步详述:需要强调的是,本发明所述的实施例是说明性的,而不是限定性的,因此本发明并不限于具体实施方式中所述的实施例,凡是由本领域技术人员根据本发明的技术方案得出的其它实施方式,同样属于本发明保护的范围。
一种基于先调风机的风电场AGC优化方法,如图1所示,包括步骤如下:
(1)读取风电场所有在运风机的实时有功出力和运行状态,计算风电场总有功P;
(2)读取电网调度机构下发的AGC有功指令PAGC;
(3)计算风电场实时总有功与AGC指令的差值ΔP=|P-PAGC|;
(4)假设先调风机的有功变化速率绝对值为r先调,设定足够短的场内风机有功指令下发时间间隔T场内,使得风电场有功控制死区设定值P死区>r先调·T场内;
(5)判断差值ΔP是否超过死区设定值P死区:
如果|P-PAGC|≤P死区,则返回步骤(2),如果P-PAGC>P死区,则转入降功率控制步骤(6)的①步,如果PAGC-P>P死区,则转入升功率控制步骤(7)的①步。
(6)降功率控制,具体包括步骤如下:
①向先调风机下发降有功指令,使其处于降有功状态,先调风机的调节目标
②向除先调风机以外的其它风机下发修正后的AGC有功指令P修正=PAGC+r先调·T场内;
③按照上述其它风机的剩余可调有功占总可调有功的比例分配P修正:对某台实际有功为其它风机i(i=1,2,…,m),其实际有功指令
(7)升功率控制,具体包括步骤如下:
①向先调风机下发升有功指令,使其处于升有功状态,先调风机的调节目标
②向其余风机下发修正后的AGC有功指令P修正=PAGC-r先调·T场内;
③按照上述其它风机的剩余可调有功占总可调有功的比例分配P修正:对某台实际有功为最大出力为的其它风机i(i=1,2,…,m),其实际有功指令
在本发明的具体实施中,所述步骤(4)中的先调风机为按照年累计发电量由多到少将风电场内全部风机排序,选取该排序中装机容量占前10%至20%的风机为先调风机。
Claims (1)
1.一种基于先调风机的风电场AGC优化方法,其特征在于包括步骤如下:
(1)读取风电场所有在运风机的实时有功出力和运行状态,计算风电场总有功P;
(2)读取电网调度机构下发的AGC有功指令PAGC;
(3)计算风电场实时总有功与AGC指令的差值ΔP=|P-PAGC|;
(4)假设先调风机的有功变化速率绝对值为r先调,设定足够短的场内风机有功指令下发时间间隔T场内,使得风电场有功控制死区设定值P死区>r先调·T场内;
(5)判断差值ΔP是否超过死区设定值P死区:
如果| P-PAGC|≤P死区则返回步骤(2),如果P-PAGC>P死区,则转入降功率控制步骤(6)的①步,如果PAGC-P>P死区则转入升功率控制步骤(7)的①步;
(6)降功率控制,具体包括步骤如下:
①向先调风机下发降有功指令,使其处于降有功状态,先调风机的调节目标
②向除先调风机以外的其它风机下发修正后的AGC有功指令P修正=PAGC+r先调·T场内;
③按照上述其它风机的剩余可调有功占总可调有功的比例分配P修正:对某台实际有功为的其它风机i(i=1,2,…,m),其实际有功指令
(7)升功率控制,具体包括步骤如下:
①向先调风机下发升有功指令,使其处于升有功状态,先调风机的调节目标
②向其余风机下发修正后的AGC有功指令P修正=PAGC-r先调·T场内;
③按照上述其它风机的剩余可调有功占总可调有功的比例分配P修正:对某台实际有功为最大出力为的其它风机i(i=1,2,…,m),其实际有功指令
所述步骤(4)中,按照年累计发电量由多到少将风电场内全部风机排序,选取该排序中装机容量占前10%至20%的风机为先调风机。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610882350.4A CN106300391B (zh) | 2016-10-10 | 2016-10-10 | 一种基于先调风机的风电场agc优化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610882350.4A CN106300391B (zh) | 2016-10-10 | 2016-10-10 | 一种基于先调风机的风电场agc优化方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106300391A CN106300391A (zh) | 2017-01-04 |
CN106300391B true CN106300391B (zh) | 2019-06-18 |
Family
ID=57717246
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610882350.4A Active CN106300391B (zh) | 2016-10-10 | 2016-10-10 | 一种基于先调风机的风电场agc优化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106300391B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108964083A (zh) * | 2018-06-29 | 2018-12-07 | 中国电力科学研究院有限公司 | 一种风电场控制方法和装置 |
CN111654059A (zh) * | 2020-05-27 | 2020-09-11 | 国网天津市电力公司电力科学研究院 | 一种基于逆变器分类控制的光伏发电站agc控制优化方法 |
CN111884264B (zh) * | 2020-07-22 | 2023-09-29 | 国网天津市电力公司电力科学研究院 | 一种火力发电机组自动发电控制智能变速率控制方法 |
CN111987741B (zh) * | 2020-07-24 | 2022-09-23 | 山西大学 | 基于运行数据挖掘和动态区间控制的风电场能量管理方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104143839A (zh) * | 2013-11-06 | 2014-11-12 | 国家电网公司 | 基于功率预测的风电场集群限出力有功功率分配方法 |
CN105978041A (zh) * | 2016-03-23 | 2016-09-28 | 三重型能源装备有限公司 | 一种配置标杆风机的风电场有功功率控制方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130321040A1 (en) * | 2012-05-31 | 2013-12-05 | General Electric Company | Method and system for using demand response to provide frequency regulation |
-
2016
- 2016-10-10 CN CN201610882350.4A patent/CN106300391B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104143839A (zh) * | 2013-11-06 | 2014-11-12 | 国家电网公司 | 基于功率预测的风电场集群限出力有功功率分配方法 |
CN105978041A (zh) * | 2016-03-23 | 2016-09-28 | 三重型能源装备有限公司 | 一种配置标杆风机的风电场有功功率控制方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106300391A (zh) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106300391B (zh) | 一种基于先调风机的风电场agc优化方法 | |
CN107171368B (zh) | 基于风电场功率控制的风力发电一次调频功能实现方法 | |
CN102518560B (zh) | 一种风电场有功功率调节方法 | |
CN110350592A (zh) | 一种快速频率响应功率控制系统及方法 | |
CN104467030B (zh) | 一种基于风电与火电联合发电的功率分配方法 | |
CN104682437B (zh) | 一种风电场的有功/无功实时闭环下垂控制方法 | |
CN105006846A (zh) | 一种风电场场站级有功功率优化方法 | |
CN107732941B (zh) | 一种电池储能电源参与电网一次调频的控制方法 | |
CN109066790A (zh) | 一种基于场站控制的风电场一次调频与agc协调控制方法 | |
CN106499452A (zh) | 提升调整抽汽式汽轮机组一次调频补偿能力的控制方法及系统 | |
CN106773644B (zh) | 一种基于供热抽汽量变化的agc控制系统及其方法 | |
CN104917204A (zh) | 一种风电场有功功率优化控制方法 | |
CN113452092B (zh) | 一种提升火电机组agc综合调频性能指标的控制方法 | |
CN109412210B (zh) | 一种风电机组有功功率精细化调节方法 | |
CN106602613A (zh) | 一种省地两级调度断面协调控制方法 | |
CN105470978B (zh) | 一种静止无功补偿装置成组协调控制方法 | |
CN103545848A (zh) | 光伏电站群有功功率协调控制方法 | |
CN107968443A (zh) | 一种风光火打捆直流外送的agc控制方法 | |
CN105226716A (zh) | 一种分布式双馈风力发电机组自动电压控制方法 | |
CN104184169A (zh) | 一种计及风电并网风火协调的暂态切机控制方法 | |
CN106340893A (zh) | 一种基于虚拟发电厂的分布式光伏发电功率控制方法 | |
CN110011331A (zh) | 一种利用变速水泵参与电网一次调频的方法 | |
CN104269871B (zh) | 提高火力发电机组一次调频正确动作合格率的方法 | |
CN110716425B (zh) | 一种热电联产机组电热协调控制方法 | |
CN111654059A (zh) | 一种基于逆变器分类控制的光伏发电站agc控制优化方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |