CN106300207A - Power transmission overhead ground wire important leap region security is standby protects method of attachment and device - Google Patents

Power transmission overhead ground wire important leap region security is standby protects method of attachment and device Download PDF

Info

Publication number
CN106300207A
CN106300207A CN201610928288.8A CN201610928288A CN106300207A CN 106300207 A CN106300207 A CN 106300207A CN 201610928288 A CN201610928288 A CN 201610928288A CN 106300207 A CN106300207 A CN 106300207A
Authority
CN
China
Prior art keywords
standby
wire
fixing clamper
hinged
power transmission
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610928288.8A
Other languages
Chinese (zh)
Other versions
CN106300207B (en
Inventor
高峰
张中青
李智敏
李忠魁
熊卿府
司学军
薛冰
王麒
白建新
张文冰
熊一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Huaxi Electric Power Technology Co Ltd
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Original Assignee
Anhui Huaxi Electric Power Technology Co Ltd
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Huaxi Electric Power Technology Co Ltd, State Grid Corp of China SGCC, Zhengzhou Power Supply Co of Henan Electric Power Co filed Critical Anhui Huaxi Electric Power Technology Co Ltd
Priority to CN201610928288.8A priority Critical patent/CN106300207B/en
Publication of CN106300207A publication Critical patent/CN106300207A/en
Application granted granted Critical
Publication of CN106300207B publication Critical patent/CN106300207B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/22Arrangements of earthing wires suspended between mastheads

Abstract

The invention discloses a kind of power transmission overhead ground wire important leap region security for protecting method of attachment and device, its technical scheme is: arrange primary load bearing fixing clamper in the end of aerial earth wire, this primary load bearing fixing clamper is hinged with transmission tower fixed plate by U-shaped link and connecting bolt, standby preventer is being set on the aerial earth wire of transmission tower simultaneously, this standby preventer includes standby fixing clamper and extension rod, wherein, standby fixing clamper tightens together with aerial earth wire, and, this standby fixing clamper is hinged with one end of connecting plate, the other end of this connecting plate is hinged with one end of extension rod, the other end of extension rod is connected with transmission tower fixed plate by connector, thus form double protection and connect.The present invention effectively reduces transmission line malfunction tripping operation number of times, decreases the grid power blackout time, improves grid supply quality and CSAT.

Description

Power transmission overhead ground wire important leap region security is standby protects method of attachment and device
Technical field:
The present invention relates to a kind of safe crossing method of aerial line, particularly relate to a kind of power transmission overhead ground wire important leap region peace Complete for protecting method of attachment and device.
Background technology:
Along with electrical network scale is fast-developing, social environment acutely changes, the operation management of ultra-high-tension power transmission line present diversification, The feature complicated, owing to transmission line of electricity itself has the particularity that point more than long lines area is big, circuit in high voltage power transmission corridor The important areas such as Midspan sag, highway, house owed by a citizen, school, meanwhile, transmission line of electricity is wanted to meet lightning protection and carrier communication Ask, need to set up aerial earth wire above wire.Due to the material of aerial earth wire own and the restriction of construction gold utensil, it is impossible to as wire Equally taking the compression joint technique that reliability is higher, when taking other connected modes, during O&M, aerial earth wire connection can Occur to a certain degree reducing by property, once in important leap region, line-outage contingency occurs, it will produce huge personnel's property and damage Lose, cause the most severe social influence.
Summary of the invention:
The technical problem to be solved is: overcome the deficiencies in the prior art, it is provided that a kind of power transmission overhead ground wire important across More region security is standby protects method of attachment and device, and the aerial earth wire solving to cause owing to connecting gold utensil damage comes off and broken string is asked Topic, improves the reliability of circuit.
The technical scheme is that
The standby technical scheme protecting method of attachment and device of a kind of power transmission overhead ground wire important leap region security: at aerial earth wire End arranges primary load bearing fixing clamper, and this primary load bearing fixing clamper is by U-shaped link and connecting bolt and transmission tower fixed plate Hinged, standby preventer is being set on the aerial earth wire of transmission tower simultaneously, this standby preventer includes that standby is solid Alignment folder and extension rod, wherein, standby fixing clamper tightens together with aerial earth wire, and, this standby fixing clamper and company One end of fishplate bar is hinged, and the other end of this connecting plate is hinged with one end of extension rod, the other end of extension rod by connector with Transmission tower fixed plate connects, thus forms double protection and connect.
Connector bag right angle link plate and U-shaped link, wherein, one end of right angle link plate is hinged with the other end of extension rod, directly The other end of angle link plate is connected with the blind end of U-shaped link, and the opening of U-shaped link is cut with scissors with transmission tower fixed plate by bolt Connect.
Primary load bearing fixing clamper use high intensity moral formula wedge clamp, top-twisted wire-clip, screw bolt-type wire clamp, hydraulic pressure wire clamp or Wedge clamp, standby fixing clamper uses high intensity moral formula wedge clamp, top-twisted wire-clip or screw bolt-type wire clamp;Aerial earth wire is adopted With steel strand wires, aluminum Baogang or OPGW.
Described connecting plate is two flat boards, is provided with reinforcing plate in the middle part of it, and described reinforcing plate is U-shaped, is stuck in described in two On flat board and be bolted.
The invention has the beneficial effects as follows:
1, program reliability of the present invention is high, original aerial earth wire is carried out feasibility transformation, by fixing clamper and extension rod A newly-increased standby attachment means, can make the reliability of aerial earth wire be greatly enhanced.
2, the present invention is after primary load bearing fixing clamper damages, and the action immediately of standby fixing clamper is transferred to by slight stress Undertake all pulling force of aerial earth wire, through computational analysis and experimental test, specified the drawing of various feasibility standby fixing clampers Disconnected power, all can meet instantaneous impact produced by the aerial earth wire of various model.
3, the present invention utilizes conventional construction gold utensil, proposes optimum have back-up protection for different types of aerial earth wire Connected mode, can popularization and application and power transmission line important leap region, improve transmission line of electricity safe operation reliability index, effectively Reduce transmission line malfunction tripping operation number of times, decrease the grid power blackout time, improve grid supply quality and CSAT, keep away Exempt from occur owing to aerial earth wire breaks, comes off and cause Pyatyi and above grid event, it is ensured that people's life and wealth at important leap Produce safety, fulfil the social responsibility of power grid enterprises, meet enterprise and social development requirement.
4, the program suitability of the present invention is strong, for aerial earth wire and the wire of various models, and the line of various kind Folder all can use, and it is applied widely, it is easy to promotion and implementation, and economic benefit is obvious.
Accompanying drawing illustrates:
Fig. 1 is the standby structural representation protecting attachment means of power transmission overhead ground wire important leap region security.
Detailed description of the invention:
Embodiment: see Fig. 1, in figure, 1-aerial earth wire, 2-standby fixing clamper, 3-connecting plate, 4-reinforcing plate, 5-extension rod, 6-right angle link plate, 7-primary load bearing fixing clamper, the U-shaped link of 8-, 9-transmission tower fixed plate.
Power transmission overhead ground wire important leap region security for the technical scheme protecting method of attachment and device is: at aerial earth wire The end of 1 arranges primary load bearing fixing clamper 7, and this primary load bearing fixing clamper 7 is by U-shaped link 8 and connecting bolt and transmission tower Fixed plate 9 is hinged, is arranging standby preventer, this standby preventer bag on the aerial earth wire 1 of transmission tower simultaneously Including standby fixing clamper 2 and extension rod 5, wherein, standby fixing clamper 2 tightens together with aerial earth wire 1, and, this standby Fixing clamper 2 is hinged with one end of connecting plate 3, and the other end of this connecting plate 3 is hinged with one end of extension rod 5, extension rod 5 another One end is connected with transmission tower fixed plate 9 by connector, thus forms double protection and connect.
Connector bag right angle link plate 6 and U-shaped link 8, wherein, the other end hinge of one end of right angle link plate 6 and extension rod 5 Connecing, the other end of right angle link plate 6 is connected with the blind end of U-shaped link 8, and the opening of U-shaped link 8 passes through bolt and transmission tower Fixed plate 9 is hinged.
Primary load bearing fixing clamper 7 uses high intensity moral formula wedge clamp, top-twisted wire-clip, screw bolt-type wire clamp, hydraulic pressure wire clamp Or wedge clamp, standby fixing clamper 2 uses high intensity moral formula wedge clamp, top-twisted wire-clip or screw bolt-type wire clamp;Built on stilts ground Line 1 uses steel strand wires, aluminum Baogang or OPGW.
Connecting plate 3 is two flat boards, is provided with reinforcing plate 4 in the middle part of it, and reinforcing plate 4 is U-shaped, is stuck on two flat boards 3 also It is bolted.
Program reliability of the present invention is high, and original aerial earth wire is carried out feasibility transformation, and line is fixed in a newly-increased standby Folder, can make the reliability of aerial earth wire be greatly improved.After primary load bearing fixing clamper damages, standby fixing clamper moves immediately Making, slight stress transfer to and undertake all pulling force of aerial earth wire, through computational analysis and experimental test, various feasibility standby are solid The specified pull-off force of alignment folder, all can meet instantaneous impact produced by the aerial earth wire of various model, thus safety is high.
The above, be only presently preferred embodiments of the present invention, and the present invention not makees any pro forma restriction, all It is based on any simple modification, equivalent variations and modification that above example is made by the technical spirit of the present invention, all still falls within In the range of technical solution of the present invention.

Claims (7)

1. power transmission overhead ground wire important leap region security is standby protects a method of attachment, it is characterized in that: in the end of aerial earth wire Arranging primary load bearing fixing clamper, this primary load bearing fixing clamper is hinged with transmission tower fixed plate by U-shaped link and connecting bolt, Arranging standby preventer on the aerial earth wire of transmission tower, this standby preventer includes standby fixing clamper simultaneously And extension rod, wherein, standby fixing clamper tightens together with aerial earth wire, and, this standby fixing clamper and connecting plate One end is hinged, and the other end of this connecting plate is hinged with one end of extension rod, and the other end of extension rod passes through connector and power transmission rod Tower fixed plate connects, thus forms double protection and connect.
Power transmission overhead ground wire the most according to claim 1 important leap region security is standby protects method of attachment, it is characterized in that: even Fitting bag right angle link plate and U-shaped link, wherein, one end of right angle link plate is hinged with the other end of extension rod, right angle link plate another One end is connected with the blind end of U-shaped link, and the opening of U-shaped link is hinged with transmission tower fixed plate by bolt.
Power transmission overhead ground wire the most according to claim 1 important leap region security is standby protects method of attachment, it is characterized in that: main Load fixing clamper uses high intensity moral formula wedge clamp, top-twisted wire-clip, screw bolt-type wire clamp, hydraulic pressure wire clamp or wedge clamp, Standby fixing clamper uses high intensity moral formula wedge clamp, top-twisted wire-clip or screw bolt-type wire clamp;Aerial earth wire employing steel strand wires, Aluminum Baogang or OPGW.
4. power transmission overhead ground wire important leap region security is standby protects an attachment means, solid including primary load bearing fixing clamper and standby Alignment presss from both sides, and it is characterized in that: one end of described primary load bearing fixing clamper is fixing with the end of aerial earth wire to be connected, and described primary load bearing is solid The other end of alignment folder is hinged with transmission tower fixed plate by U-shaped link and connecting bolt, and described standby fixing clamper is fixed On the described aerial earth wire of end, described standby fixing clamper is hinged with one end of connecting plate, another of this connecting plate Holding hinged with one end of extension rod, the other end of described extension rod is connected with described transmission tower fixed plate by connector, from And form double protection and connect.
Power transmission overhead ground wire the most according to claim 4 important leap region security is standby protects attachment means, it is characterized in that: institute Stating connector bag right angle link plate and U-shaped link, wherein, one end of described right angle link plate is hinged with the other end of described extension rod, The other end of described right angle link plate is connected with the blind end of U-shaped link, and the opening of this U-shaped link is by bolt and described transmission of electricity Shaft tower fixed plate is hinged.
Power transmission overhead ground wire the most according to claim 4 important leap region security is standby protects method of attachment, it is characterized in that: institute State primary load bearing fixing clamper and use high intensity moral formula wedge clamp, top-twisted wire-clip, screw bolt-type wire clamp, hydraulic pressure wire clamp or wedge shape line Folder, described standby fixing clamper uses high intensity moral formula wedge clamp, top-twisted wire-clip or screw bolt-type wire clamp;Described aerial earth wire Use steel strand wires, aluminum Baogang or OPGW.
Power transmission overhead ground wire the most according to claim 4 important leap region security is standby protects method of attachment, it is characterized in that: institute Stating connecting plate is two flat boards, is provided with reinforcing plate in the middle part of it, and described reinforcing plate is U-shaped, is stuck on two described flat boards and leads to Cross bolt to connect.
CN201610928288.8A 2016-10-31 2016-10-31 Power transmission overhead ground wire is important across the standby shield connection method of region security and device Active CN106300207B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610928288.8A CN106300207B (en) 2016-10-31 2016-10-31 Power transmission overhead ground wire is important across the standby shield connection method of region security and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610928288.8A CN106300207B (en) 2016-10-31 2016-10-31 Power transmission overhead ground wire is important across the standby shield connection method of region security and device

Publications (2)

Publication Number Publication Date
CN106300207A true CN106300207A (en) 2017-01-04
CN106300207B CN106300207B (en) 2018-07-20

Family

ID=57720518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610928288.8A Active CN106300207B (en) 2016-10-31 2016-10-31 Power transmission overhead ground wire is important across the standby shield connection method of region security and device

Country Status (1)

Country Link
CN (1) CN106300207B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106856317A (en) * 2017-03-21 2017-06-16 国网新疆电力公司电力科学研究院 The inclined abrasion-proof apparatus of power transmission line wind
CN106877260A (en) * 2017-03-27 2017-06-20 国网河南省电力公司郑州供电公司 The method and device of the double protections of the important leap region duplex of aerial condutor
CN110611281A (en) * 2018-06-17 2019-12-24 江苏天南电力器材有限公司 Carbon fiber wire strain backup complete device
CN113904262A (en) * 2021-10-08 2022-01-07 攀钢集团工程技术有限公司 Construction method for transferring large-span overhead line

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109066553A (en) * 2018-09-16 2018-12-21 安徽华希电力科技有限公司 A kind of double protection attachment devices of band buffering aerial earth wire

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013141332A (en) * 2011-12-28 2013-07-18 Furukawa Electric Power Systems Co Ltd Jumper wire vibration suppressing device
CN204538614U (en) * 2015-01-30 2015-08-05 惠州捷畅精密线束有限公司 A kind of strain clamp for erecting cable
CN204832624U (en) * 2015-08-13 2015-12-02 上海艾能电力工程有限公司 ADSS optical cable gold utensil cluster for power transmission sequence is maked somebody a mere figurehead to high pressure and connection structure thereof
CN205070358U (en) * 2015-10-14 2016-03-02 北京帕尔普线路器材有限公司 Set up safe spare fastener that cable used
CN206135371U (en) * 2016-10-31 2017-04-26 国网河南省电力公司郑州供电公司 Important leap regional security of transmission of electricity overhead earth wire protects connecting device fully

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013141332A (en) * 2011-12-28 2013-07-18 Furukawa Electric Power Systems Co Ltd Jumper wire vibration suppressing device
CN204538614U (en) * 2015-01-30 2015-08-05 惠州捷畅精密线束有限公司 A kind of strain clamp for erecting cable
CN204832624U (en) * 2015-08-13 2015-12-02 上海艾能电力工程有限公司 ADSS optical cable gold utensil cluster for power transmission sequence is maked somebody a mere figurehead to high pressure and connection structure thereof
CN205070358U (en) * 2015-10-14 2016-03-02 北京帕尔普线路器材有限公司 Set up safe spare fastener that cable used
CN206135371U (en) * 2016-10-31 2017-04-26 国网河南省电力公司郑州供电公司 Important leap regional security of transmission of electricity overhead earth wire protects connecting device fully

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106856317A (en) * 2017-03-21 2017-06-16 国网新疆电力公司电力科学研究院 The inclined abrasion-proof apparatus of power transmission line wind
CN106856317B (en) * 2017-03-21 2019-06-14 国网新疆电力公司电力科学研究院 The inclined abrasion-proof apparatus of power transmission line wind
CN106877260A (en) * 2017-03-27 2017-06-20 国网河南省电力公司郑州供电公司 The method and device of the double protections of the important leap region duplex of aerial condutor
CN110611281A (en) * 2018-06-17 2019-12-24 江苏天南电力器材有限公司 Carbon fiber wire strain backup complete device
CN110611281B (en) * 2018-06-17 2024-03-08 江苏天南电力股份有限公司 Zhang Beifen-resistant complete device for carbon fiber wires
CN113904262A (en) * 2021-10-08 2022-01-07 攀钢集团工程技术有限公司 Construction method for transferring large-span overhead line
CN113904262B (en) * 2021-10-08 2023-08-04 攀钢集团工程技术有限公司 Construction method for transferring large-span overhead line

Also Published As

Publication number Publication date
CN106300207B (en) 2018-07-20

Similar Documents

Publication Publication Date Title
CN106300207A (en) Power transmission overhead ground wire important leap region security is standby protects method of attachment and device
CN203643532U (en) Novel lightning-protection detection system
CN103746314A (en) Quick hot-line by-pass jumper removing operation method for 10kV insulated power distribution line
CN202076736U (en) Novel cable protective pipe
CN207967875U (en) Safety backup for monitoring transmission line of electricity protects line clamping device
CN206135371U (en) Important leap regional security of transmission of electricity overhead earth wire protects connecting device fully
CN106877260B (en) The important method and device across the double protections of region duplex of aerial condutor
CN208423398U (en) A kind of data line preventing connector bending tension failure
CN206640265U (en) The important device across the double protections of region duplex of aerial condutor
CN204046104U (en) Ultra-high-tension power transmission line straight line suspended pattern shaft tower tower head wind leaning fault prevention and control device
CN203615971U (en) Online monitoring device suitable for large-spanning comprehensive monitoring
CN205846571U (en) Overhead transmission line telescopic earth lead hanger bar
CN203101546U (en) Online monitoring system of overhead contact system section insulator
CN205543976U (en) Novel it stridees across to have electrified of intelligent monitoring structure device
CN205265161U (en) T type cable joint extracts device
CN200965635Y (en) Nuclear power station computer monitor system double loop network
CN208636389U (en) Low-voltage leakage current monitoring prior-warning device
CN209134033U (en) A kind of mobile interim electricity getting device of 10KV overhead transmission line
CN209167607U (en) Cable disk storage device more than a kind of combined type suitable for ADSS optical cable
CN207039065U (en) A kind of transmission line of electricity block device with positioner
CN103105551A (en) Online detection system of contact net graded insulator
CN205304087U (en) Distribution lines abandons line and protects lever apparatus when being surpassed design condition's natural disasters
CN205623031U (en) Environment on -line monitoring and early warning device
CN203109897U (en) Tool for live installation of bird scaring device
CN203889955U (en) Tower crane attachment device of bridge tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Gao Feng

Inventor after: Yang Fulei

Inventor after: Li Zhongkui

Inventor after: Xiong Qingfu

Inventor after: Si Xuejun

Inventor after: Xue Bing

Inventor after: Wang Qi

Inventor after: Bai Jianxin

Inventor after: Zhang Wenbing

Inventor after: Xiong Yi

Inventor before: Gao Feng

Inventor before: Zhang Wenbing

Inventor before: Xiong Yi

Inventor before: Zhang Zhongqing

Inventor before: Li Zhimin

Inventor before: Li Zhongkui

Inventor before: Xiong Qingfu

Inventor before: Si Xuejun

Inventor before: Xue Bing

Inventor before: Wang Qi

Inventor before: Bai Jianxin

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant