CN205543976U - Novel it stridees across to have electrified of intelligent monitoring structure device - Google Patents

Novel it stridees across to have electrified of intelligent monitoring structure device Download PDF

Info

Publication number
CN205543976U
CN205543976U CN201620337083.8U CN201620337083U CN205543976U CN 205543976 U CN205543976 U CN 205543976U CN 201620337083 U CN201620337083 U CN 201620337083U CN 205543976 U CN205543976 U CN 205543976U
Authority
CN
China
Prior art keywords
cross arm
temporary cross
module
combination
intelligent monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620337083.8U
Other languages
Chinese (zh)
Inventor
葛沼洲
王万志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinghua City Yong Sheng Power Equipment Co Ltd
Original Assignee
Xinghua City Yong Sheng Power Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinghua City Yong Sheng Power Equipment Co Ltd filed Critical Xinghua City Yong Sheng Power Equipment Co Ltd
Priority to CN201620337083.8U priority Critical patent/CN205543976U/en
Application granted granted Critical
Publication of CN205543976U publication Critical patent/CN205543976U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to the technical field of power line overhauls the accessory, a novel it stridees across to have electrified of intelligent monitoring structure device is specifically disclosed, by a set of first interim cross arm, reach the interim cross arm of a set of second that cooperatees and use with a set of first interim cross arm, and respectively with first interim cross arm, the rope that bears that the interim cross arm of second cooperateed and uses, haulage rope and setting up respectively on first interim cross arm support, on the interim cross arm support of second, and be located the pressure sensor who bears the rope below, a spring, reach the control subassembly component that matches and use with pressure sensor. The utility model discloses a novel it stridees across to have electrified of intelligent monitoring structure device's beneficial effect lies in: its project organization is reasonable, and the single uses equipment or takedown time short, improves effectively that power line erects or maintenance efficiency, the electrified working condition of strideing across the device of ability real time monitoring, power line high -voltage transmission tower's operation requirement under improving high altitude construction's security and satisfying multiple environment.

Description

A kind of novel there is intelligent monitoring structure live across device
Technical field
This utility model belongs to Electric Power Line Overhaul accessory technical field, be specifically related to a kind of novel there is intelligent monitoring structure live across device, be applicable to the Electric Power Line Overhaul operation of high tension electric tower, and can the real-time working condition to crossover device supervise, improve the safety of work high above the ground.
Background technology
At present, in power circuit engineering construction or repair and maintenance, inevitably run into the power circuit having some to be spanned, one is first to have a power failure the power circuit being spanned before stringing, so will result in a lot of potential safety hazards, and the personnel used are more, not only inconvenience but also dangerous;Two is that the power circuit having some to be spanned can not have a power failure, it is necessary to live across.Additionally, development along with economic construction, newly-built superelevation electricity transmission line of electricity acrossing highway, railway, industrial crops and other barriers also get more and more, and in these cases, set up the construction method of crossing frame and can not reach efficient, safe and stable construction and to go.
Existing for this problem, the commonly used device that lives across carries out operation, but, traditional structure live across device, its function singleness and structure are complicated, it is intended for single use the assembly and disassembly time long, cause power circuit to set up or overhaul efficiency is low, the real time status living across device in operation cannot be monitored simultaneously, and work high above the ground inherently high-risk operations mode, if can not monitor in real time once goes wrong is exactly irreversible potential safety hazard, and this is current urgently to be resolved hurrily.
Therefore, based on the problems referred to above, this utility model provide a kind of novel there is intelligent monitoring structure live across device.
Utility model content
Utility model purpose: the purpose of this utility model be to provide a kind of novel there is intelligent monitoring structure live across device, its design is rational in infrastructure, it is intended for single use the assembly and disassembly time short, it is effectively improved power circuit to set up or overhaul efficiency, the working condition of charged crossover device can be monitored simultaneously in real time, improve the safety of work high above the ground.
nullTechnical scheme: this utility model provide a kind of novel there is intelligent monitoring structure live across device,By one group of first temporary cross arm,And one group of second temporary cross arm being used in combination with one group of first temporary cross arm,And respectively with the first temporary cross arm、The carrying rope that second temporary cross arm is used in combination、Pull rope,Wherein,Carrying rope is fixed by earth anchor,Pull rope is fixed by sheave,And it is separately positioned on the first temporary cross arm、Restrict on second temporary cross arm and with carrying、The double-deck coaster that pull rope is used in combination,And restrict with carrying respectively、Several pulley suspension hooks that pull rope is used in combination,And several glass reinforced plastic pipes that two ends are connected with several pulley suspension hooks respectively,And be separately positioned on the first temporary cross arm support、On second temporary cross arm support,And it is positioned at the pressure transducer below carrying rope、Spring,And be separately positioned on the first temporary cross arm support、It is used for pressure transducer is installed on second temporary cross arm support、The pressure transducer mounting groove of spring,And the monitor component composition being used in combination with pressure transducer;Described monitor component, including shell, and the handle being used in combination with shell, and warning module, LCD MODULE, one-chip computer module and power module in the enclosure is set, wherein, pressure transducer, warning module, LCD MODULE and power module are connected with one-chip computer module respectively, and warning module, LCD MODULE are connected with power module respectively.
The technical program, described in there is intelligent monitoring structure live across device, the position-limiting tube also including being separately positioned on the first temporary cross arm support, being used in combination on the second temporary cross arm support and with carrying rope.
The technical program, described one-chip computer module uses model to be the single-chip microcomputer of EM78P173N, and warning module is stroboscopic lamp, the LCM display module that LCD MODULE uses model to be HZY1602, and pressure transducer uses model to be the metal pressure sensor of K6D40.
Compared with prior art, of the present utility model a kind of novel there is intelligent monitoring structure live across having the beneficial effects that of device: 1, its design is rational in infrastructure, is intended for single use the assembly and disassembly time short, is effectively improved power circuit and sets up or overhaul efficiency;2, the working condition of charged crossover device can be monitored in real time, improve the safety of work high above the ground, and meet the use requirement of power circuit high voltage power transmission tower under multiple environment.
Accompanying drawing explanation
Fig. 1 is a kind of novel structural representation living across device with intelligent monitoring structure of the present utility model;
Fig. 2 is a kind of novel first temporary cross arm living across device with intelligent monitoring structure of the present utility model or the partial enlargement structural representation of the second temporary cross arm;
Fig. 3 is the structural representation of a kind of novel monitor component living across device with intelligent monitoring structure of the present utility model;
Wherein, in figure, sequence number mark is as follows: 1-the first temporary cross arm, 2-the second temporary cross arm, 3-bilayer coaster, 4-carry rope, 5-earth anchor, 6-pulley suspension hook, 7-glass reinforced plastic pipe, 8-pull rope, 9-sheave, 10-position-limiting tube, 11-pressure transducer mounting groove, 12-pressure transducer, 13-spring, 14-shell, 15-handle, 16-warning module, 17-LCD MODULE, 18-one-chip computer module, 19-power module.
Detailed description of the invention
Below in conjunction with the accompanying drawings and specific embodiment, it is further elucidated with this utility model.
Embodiment
nullSuch as Fig. 1 (Fig. 1 does not marks cross-arm support)、What a kind of novel shown in Fig. 2 and Fig. 3 had an intelligent monitoring structure lives across device,By one group of first temporary cross arm 1,And one group of second temporary cross arm 2 being used in combination with one group of first temporary cross arm 1,And respectively with the first temporary cross arm 1、The carrying rope 4 that second temporary cross arm 2 is used in combination、Pull rope 8,Wherein,Carrying rope 4 is fixed by earth anchor 5,Pull rope 8 is fixed by sheave 9,And it is separately positioned on the first temporary cross arm 1、On second temporary cross arm 2 and with carrying rope 4、The double-deck coaster 3 that pull rope 8 is used in combination,And respectively with carrying rope 4、Several pulley suspension hooks 6 that pull rope 8 is used in combination,And several glass reinforced plastic pipes 7 that two ends are connected with several pulley suspension hooks 6 respectively,And be separately positioned on the first temporary cross arm 1 support、On second temporary cross arm 2 support,And it is positioned at the pressure transducer 12 below carrying rope 4、Spring 13,And be separately positioned on the first temporary cross arm 1 support、It is used for pressure transducer 12 is installed on second temporary cross arm 2 support、The pressure transducer mounting groove 11 of spring 13,And the monitor component composition being used in combination with pressure transducer 12;Described monitor component, including shell 14, and the handle 15 being used in combination with shell 14, and warning module 16, LCD MODULE 17, one-chip computer module 18 and the power module 19 being arranged in shell 14, wherein, pressure transducer 12, warning module 16, LCD MODULE 17 and power module 19 are connected with one-chip computer module 18 respectively, and warning module 16, LCD MODULE 17 are connected with power module 19 respectively.
Further preferred, have intelligent monitoring structure lives across device, the position-limiting tubes 10 also including being separately positioned on the first temporary cross arm 1 support, being used in combination on the second temporary cross arm 2 support and with carrying rope 4, for carrying rope 4 is carried out spacing, it is ensured that monitoring of real-time stabilization can carry the pressure state information that rope 4 is carried;The single-chip microcomputer that one-chip computer module 18 uses model to be EM78P173N, its low cost and processing data information are stable, accurate, efficient;Warning module 16 is stroboscopic lamp, is easy to timely discovery and processes when its low cost and early warning;The LCM display module that LCD MODULE 17 uses model to be HZY1602, its resolution is 16.2, and pixel is 0.55*0.65, puts away from for 0.6*0.7mm, and response time is 180ms, meets outdoor display and uses demand and length in service life, low cost;The metal pressure sensor that pressure transducer 12 uses model to be K6D40, it can measure three orthogonal directions Fx, the tension force of Fy, Fz and compression stress, can measure three face Mx simultaneously, My, the moment of torsion of Mz, output signal 1mV/V, use anti-bias load design, effectively reduce crosstalk from each other, meet real-time high-efficiency, stable, pressure measxurement demand accurately.
The intelligent monitoring structure of this structure live across device, it is adaptable to high voltage power transmission tower under the conditions of multiple is installed and is supported the use requirement, be effectively improved power circuit set up, overhaul efficiency, and ensure the safety of work high above the ground.
The above is only preferred implementation of the present utility model; it should be pointed out that, for those skilled in the art, on the premise of without departing from this utility model principle; can also make some improvement, these improvement also should be regarded as protection domain of the present utility model.

Claims (3)

  1. null1. one kind novel there is intelligent monitoring structure live across device,It is characterized in that: by one group of first temporary cross arm (1),And one group of second temporary cross arm (2) being used in combination with one group of first temporary cross arm (1),And respectively with the first temporary cross arm (1)、The carrying rope (4) that second temporary cross arm (2) is used in combination、Pull rope (8),Wherein,Carrying rope (4) is fixed by earth anchor (5),Pull rope (8) is fixed by sheave (9),And it is separately positioned on the first temporary cross arm (1)、Second temporary cross arm (2) is upper and restricts (4) with carrying、The double-deck coaster (3) that pull rope (8) is used in combination,And restrict (4) with carrying respectively、Several pulley suspension hooks (6) that pull rope (8) is used in combination,And several glass reinforced plastic pipes (7) that two ends are connected with several pulley suspension hooks (6) respectively,And be separately positioned on the first temporary cross arm (1) support、On second temporary cross arm (2) support,And it is positioned at the pressure transducer (12) of carrying rope (4) lower section、Spring (13),And be separately positioned on the first temporary cross arm (1) support、It is used on second temporary cross arm (2) support pressure transducer (12) is installed、The pressure transducer mounting groove (11) of spring (13),And the monitor component composition being used in combination with pressure transducer (12);Described monitor component, including shell (14), and the handle (15) being used in combination with shell (14), and warning module (16), LCD MODULE (17), one-chip computer module (18) and the power module (19) being arranged in shell (14), wherein, pressure transducer (12), warning module (16), LCD MODULE (17) and power module (19) are connected with one-chip computer module (18) respectively, and warning module (16), LCD MODULE (17) are connected with power module (19) respectively.
  2. The most according to claim 1 a kind of novel there is intelligent monitoring structure live across device, it is characterized in that: described in there is intelligent monitoring structure live across device, the position-limiting tube (10) also including being separately positioned on the first temporary cross arm (1) support, being used in combination on the second temporary cross arm (2) support and with carrying rope (4).
  3. The most according to claim 1 a kind of novel there is intelligent monitoring structure live across device, it is characterized in that: described one-chip computer module (18) uses model to be the single-chip microcomputer of EM78P173N, warning module (16) is stroboscopic lamp, the LCM display module that LCD MODULE (17) uses model to be HZY1602, pressure transducer (12) uses model to be the metal pressure sensor of K6D40.
CN201620337083.8U 2016-04-21 2016-04-21 Novel it stridees across to have electrified of intelligent monitoring structure device Expired - Fee Related CN205543976U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620337083.8U CN205543976U (en) 2016-04-21 2016-04-21 Novel it stridees across to have electrified of intelligent monitoring structure device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620337083.8U CN205543976U (en) 2016-04-21 2016-04-21 Novel it stridees across to have electrified of intelligent monitoring structure device

Publications (1)

Publication Number Publication Date
CN205543976U true CN205543976U (en) 2016-08-31

Family

ID=56796760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620337083.8U Expired - Fee Related CN205543976U (en) 2016-04-21 2016-04-21 Novel it stridees across to have electrified of intelligent monitoring structure device

Country Status (1)

Country Link
CN (1) CN205543976U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035314A (en) * 2017-06-15 2017-08-11 兴化市永盛电力器材有限公司 A kind of damp proof insulation boxlike lift
CN108963855A (en) * 2018-06-26 2018-12-07 国网山东省电力公司滨州市沾化区供电公司 A kind of power grid construction highway crossing equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035314A (en) * 2017-06-15 2017-08-11 兴化市永盛电力器材有限公司 A kind of damp proof insulation boxlike lift
CN108963855A (en) * 2018-06-26 2018-12-07 国网山东省电力公司滨州市沾化区供电公司 A kind of power grid construction highway crossing equipment

Similar Documents

Publication Publication Date Title
CN205843862U (en) A kind of pole external cable stress monitoring early-warning device
CN205543976U (en) Novel it stridees across to have electrified of intelligent monitoring structure device
CN2890345Y (en) Pre-warning device capable of real-time monitoring
CN102842155A (en) Safety monitoring system for large-size hoisting machinery
CN205158562U (en) Ultrasonic wave monitoring external damage system
CN202976502U (en) Remote monitoring system of traffic light signal working state
CN205211172U (en) Intelligent transportation lamp control system based on GPRS control
CN202974426U (en) Intelligent power transmission line tower vibration monitoring system
CN203977984U (en) A kind of photo-electric high-potting warning fence
CN203640371U (en) Online monitoring system installation device used for power transmission tower
CN204695709U (en) Screen display warning limit device
CN203520570U (en) Tramcar maintenance work platform intelligent integrated attention device based on local area network
CN110653741A (en) Tool for electrically fastening clamp bolt in overhead electrified remote control of power transmission line
CN205428222U (en) Traffic signal light control device based on power line carrier
CN206135371U (en) Important leap regional security of transmission of electricity overhead earth wire protects connecting device fully
CN201567833U (en) Three-column unequal-height stretching insulator emergency repair tower
CN205983077U (en) Power supply monitors communication device
CN204679598U (en) A kind of vacuum circuit breaker vehicle intelligent diagnosis system
CN205985890U (en) Insulating baffle of electric power
CN204897065U (en) Construction elevator with trouble display device
CN204782180U (en) Transmission line tower pole with laser warning line
CN204179566U (en) A kind of two insulator string insulation tractor
CN204010254U (en) A kind of transformer station allots direct-buried cable safety monitoring warning system
CN203715131U (en) Tower crane safety monitoring device
CN203497970U (en) Moment limiter of derrick crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20190421

CF01 Termination of patent right due to non-payment of annual fee