CN106295984A - A kind of demand response system and method towards industrial undertaking - Google Patents
A kind of demand response system and method towards industrial undertaking Download PDFInfo
- Publication number
- CN106295984A CN106295984A CN201610640980.0A CN201610640980A CN106295984A CN 106295984 A CN106295984 A CN 106295984A CN 201610640980 A CN201610640980 A CN 201610640980A CN 106295984 A CN106295984 A CN 106295984A
- Authority
- CN
- China
- Prior art keywords
- industrial undertaking
- electricity
- time
- module
- consumption
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000004044 response Effects 0.000 title claims abstract description 81
- 238000000034 method Methods 0.000 title claims abstract description 15
- 230000005611 electricity Effects 0.000 claims abstract description 112
- 238000007405 data analysis Methods 0.000 claims abstract description 22
- 238000011161 development Methods 0.000 claims abstract description 18
- 238000012545 processing Methods 0.000 claims abstract description 18
- 238000005265 energy consumption Methods 0.000 claims description 30
- 230000008439 repair process Effects 0.000 claims description 29
- 230000009467 reduction Effects 0.000 claims description 27
- 238000012423 maintenance Methods 0.000 claims description 24
- 238000007726 management method Methods 0.000 claims description 18
- 239000000284 extract Substances 0.000 claims description 15
- 238000012546 transfer Methods 0.000 claims description 12
- 230000003203 everyday effect Effects 0.000 claims description 10
- 230000006399 behavior Effects 0.000 claims description 8
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 claims description 5
- 230000010354 integration Effects 0.000 claims description 5
- 230000001737 promoting effect Effects 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 7
- 230000008859 change Effects 0.000 description 6
- 230000008901 benefit Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 241000196324 Embryophyta Species 0.000 description 2
- 238000007599 discharging Methods 0.000 description 2
- 230000009975 flexible effect Effects 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 230000007246 mechanism Effects 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002401 inhibitory effect Effects 0.000 description 1
- 230000004899 motility Effects 0.000 description 1
- 210000003516 pericardium Anatomy 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000012887 quadratic function Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/16—Energy services, e.g. dispersed generation or demand or load or energy savings aggregation
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of demand response system and method towards industrial undertaking, it is characterized in that including: Grid Central, electric energy service provider, industrial undertaking, the first wireless transport module and the second wireless transport module.Grid Central includes simultaneously: receive memory module, data analysis module and policy development module.Industrial undertaking includes: data acquisition module, project processing module and equipment respond module.The present invention can formulate the comprehensive electricity consumption planning demand response strategy meeting industrial undertaking's production requirement, thus alleviate operation of power networks pressure, balancing power network load in conjunction with industrial undertaking's own characteristic and electric power data, promote resource distribution and the energy-saving and emission-reduction of industrial undertaking.
Description
Technical field
The present invention relates to intelligent grid field, a kind of demand response system towards industrial undertaking and side
Method.
Background technology
Electric power is the pillar of modern industrial society, supports national economy and develops constantly at a high speed.In recent years, China is a lot
There is short of electricity phenomenon in area, and this " severe power shortage " phenomenon, it is not merely that supply of electric power deficiency is caused, but power supply and demand
Imbalance problem.Power supply and demand imbalance influences whether the sustainable development of China's electric power energy and stablizing of economic society.For
Alleviate this problem, the most domestic generally carry out Demand Side Response this effective regulating measure, by price signal with swash
The mechanism of encouraging guides power consumer to take rational electricity consumption behavior and power mode, such as, improve terminal power consumption efficiency and peak load transfer
Deng.The finished form of Demand Side Response is Spot Price, and the replacement scheme of Spot Price can be classified as 2 big classes: one is from fixing
Electricity price is to the various price between Spot Price, including tou power price;Two " the negative load schemes " being known as, typically
It is all based on, at special time, consumer is reduced consumption and payment is provided, including interruptible load, optional contract and Demand-side
Submit a tender.Demand Side Response can promote power supply and demand balance, safeguards system safe and reliable operation, stablizes improving electricity market
Property and operational efficiency important in inhibiting.
In July, 2012, the Ministry of Finance and National Development and Reform Committee combine issue " the city integrated pilot work of demand Side Management refer to
Lead suggestion ", specify that the incentive measure reducing electric load, just indicate the city integrated pilot work of demand Side Management
Formula starts to be implemented.Domestic scholars, also to demanding party's response and system and application, has carried out the discussion in theoretical and measure and research.
Industrial user has the features such as electric power consumption is big, and load adjustment is very fast, round-the-clock electricity consumption, is the important master participating in demanding party's response
Body.But, at present in the research field of intelligent grid, the management of various demand responses is only limitted to single area or resident mostly
User, lacks the demand response to industrial user and studies, and the system and method for the electricity consumption planning towards industrial undertaking.Simultaneously
The demand response form of existing industrial undertaking is single, and mechanism is simple, and inadequate science, such as power cuts to limit consumption during peak of power consumption in summer.
On the other hand, the existing electricity needs towards industrial undertaking responds system and method and ignores industrial undertaking's energy consumption equipment maintenance
The industry characteristic taken off with workman, it is impossible to be properly arrived at expection electric power reduction plan, promotes power supply and demand balance and enterprise's joint
Can reduce discharging.
Summary of the invention
The present invention is the weak point in order to overcome prior art to exist, it is provided that a kind of demand response towards industrial undertaking
System and method, to formulating meet combining of industrial undertaking's production requirement in conjunction with industrial undertaking's own characteristic and electric power data
Share electricity planning demand response strategy, thus alleviate operation of power networks pressure, balancing power network load, promote that the resource of industrial undertaking is joined
Put and energy-saving and emission-reduction.
To achieve the above object of the invention, the present invention adopts the following technical scheme that
A kind of feature towards the demand response system of industrial undertaking of the present invention is to include: Grid Central, electric energy service provider,
Industrial undertaking, the first wireless transport module and the second wireless transport module;
Described Grid Central includes: receive memory module, data analysis module and policy development module;
Described industrial undertaking includes: data acquisition module, project processing module and equipment respond module;
Described data acquisition module gathers the initial data of described industrial undertaking and by described by data acquisition unit
First wireless transport module passes to described Grid Central;Described data acquisition unit includes: be arranged on highly energy-consuming equipment
Intelligent electric meter and industrial undertaking are controlled mobile terminal;Described initial data includes: the electricity consumption data of industrial undertaking every day,
Highly energy-consuming equipment power consumption information per hour, and the number of highly energy-consuming equipment, energy consumption parameter, repair time, industrial undertaking workman
Vacation time;The reception memory module of described Grid Central receives described initial data and stores, thus history of forming number
According to;
The data analysis module of described Grid Central extracts described historical data from described reception memory module and carries out
Analyzing and processing, obtain corresponding industrial undertaking uses electrical feature;Described electrical feature includes: business electrical load curve, each high consumption
Energy equipment load curve per hour, each highly energy-consuming equipment different capacity table duration of runs and repair time planning chart, industrial undertaking
Workman's vacation plans table;
Described data analysis module chooses upper load marginal value and lower negative according to power project reduction and basic electricity amount
Lotus marginal value, and according to peak times of power consumption, low power consumption phase, electricity price and favor information thereof, determine and implement demand response strategy
Period;The period of described enforcement demand response strategy includes: peak of power consumption period, low power consumption period, can interrupt the period;
Economize on electricity is constituted by the period of power project reduction, described electricity price and favor information, enforcement demand response strategy
Information is the most sent along with described electrical feature to described electric energy service provider;
Described electric energy service provider is connected with the data analysis module of described Grid Central, is used for receiving described data analysis mould
The business electrical feature that block provides and economize on electricity information;Described business electrical feature and economize on electricity information integration are formed demand to ring simultaneously
The project application is answered to notify;
Described electric energy service provider is also connected with the project processing module of described industrial undertaking, and by described demand response project
Declare notice and be sent to the project processing module of industrial undertaking, receive the feedback information that described project processing module sends simultaneously,
And described feedback information is sent to the policy development module of Grid Central;Described feedback information includes: whether industrial undertaking connects
Notified by the described demand response project application, and the electric power reduction that industrial undertaking has been agreed to;
The policy development module of described Grid Central is connected with data analysis module, is used for accepting described data analysis module
There is provided uses electrical feature and economize on electricity information;Described policy development module also receives the feedback information of described industrial undertaking, thus makes
Determine the demand response strategy of industrial undertaking;And the equipment sound of described industrial undertaking is passed to by described second wireless transport module
Answer module;Described demand response strategy includes: time-of-use price strategy, Interrupted load management strategy, energy consumption equipment maintenance time
Adjustable strategies, workman's vacation time adjustable strategies;Described time-of-use price strategy is to promote the electricity price of peak of power consumption period, fall
The electricity price of low electric power consumption low-valley interval;Described Interrupted load management strategy is for interrupting period interruption Power Consumption of Industrial Enterprises;Described consumption
Can maintenance of equipment time adjustable strategies it be the electricity consumption time by changing energy consumption equipment repair time transfer equipment;Described workman
Vacation time adjustable strategies is the electricity consumption time carrying out transfer equipment by changing workman's vacation time;
The equipment respond module of described industrial undertaking receives described demand response plan by described second wireless transport module
Slightly, and self electricity consumption behavior is adjusted in real time;Described real-time adjustment includes: open and close highly energy-consuming device power supply (DPS);Adjust
Whole highly energy-consuming equipment runs power;Start and stop maintenance highly energy-consuming equipment;Start and terminate workman's vacation time.
A kind of feature towards the demand response method of industrial undertaking of the present invention is to be applied to by Grid Central, electric energy service
In industrial undertaking's electricity needs response system that business, industrial undertaking form, and comprise the following steps:
Step 1, gather the initial data of described industrial undertaking and pass to described Grid Central;Described enterprise initial data
Including: the electricity consumption data of industrial undertaking every day, each highly energy-consuming equipment power consumption information per hour, and the number of highly energy-consuming equipment
Mesh, energy consumption parameter, repair time, industrial undertaking's workman's vacation time;
Step 2, described Grid Central receive described initial data and store, thus history of forming data;
Described historical data is analyzed processing by step 3, described Grid Central, and obtain industrial undertaking uses electrical feature;
Described electrical feature includes: business electrical load curve, each highly energy-consuming equipment load curve per hour, and each highly energy-consuming equipment is different
The power table duration of runs and repair time planning chart, industrial undertaking workman vacation plans table;
Described Grid Central chooses upper load marginal value according to power project reduction and basic electricity amount and lower load faces
Dividing value, and according to peak times of power consumption, low power consumption phase, electricity price and favor information thereof, determine the period implementing demand response strategy;
The period of described enforcement demand response strategy includes: peak of power consumption period, low power consumption period, can interrupt the period;
Step 4, by power project reduction, described electricity price and favor information, the period structure of enforcement demand response strategy
One-tenth economize on electricity information is the most sent along with described electrical feature to described electric energy service provider;
Step 5, described electric energy service provider receive business electrical feature and economize on electricity information, form the demand response project application and lead to
Know and be sent to industrial undertaking;Receive the feedback information that described industrial undertaking sends simultaneously, and described feedback information is sent to
The policy development module of Grid Central;Described feedback information includes: whether industrial undertaking accepts the described demand response project application
Notice, and the electric power reduction that industrial undertaking has been agreed to;
Step 6, described Grid Central according to electrical feature, economize on electricity information, feedback information formulate industrial undertaking demand ring
Should be tactful, and pass to described industrial undertaking;Described demand response strategy includes: time-of-use price strategy, Interrupted load management
Strategy, energy consumption equipment adjustable strategies maintenance time, workman's vacation time adjustable strategies;Described time-of-use price strategy is for promoting
The electricity price of peak of power consumption period, the electricity price of reduction low power consumption period;Described Interrupted load management strategy is for can interrupt in the period
Disconnected Power Consumption of Industrial Enterprises;Described energy consumption equipment adjustable strategies maintenance time is set for being shifted by the change energy consumption equipment repair time
The standby electricity consumption time;When described workman's vacation time adjustable strategies is the electricity consumption being carried out transfer equipment by change workman's vacation time
Between;
Step 7, described industrial undertaking receive electricity needs response policy, and self electricity consumption behavior is carried out real-time adjustment;
Described real-time adjustment includes: open and close highly energy-consuming device power supply (DPS);Adjust highly energy-consuming equipment and run power;Start and stop
Maintenance highly energy-consuming equipment;Start and terminate workman's vacation time.
A kind of feature towards the demand response method of industrial undertaking of the present invention lies also in, and described step 3 includes:
Step 3.1. extracts the electricity consumption historical data of industrial undertaking's every day, in units of year, season, the moon, day, draws enterprise
Industry power load curve;
Step 3.2. extracts each highly energy-consuming equipment power consumption historical data per hour of industrial undertaking, carries out highly energy-consuming equipment
Classification, draws each highly energy-consuming equipment load curve per hour;
Step 3.3. extracts the number of each highly energy-consuming equipment, energy consumption parameter, and the repair time, analytical integration obtains each highly energy-consuming
The equipment different capacity table duration of runs and repair time planning chart;
Step 3.4. extracts industrial undertaking's workman's vacation time, integrates and obtains industrial undertaking workman vacation plans table;
Step 3.5., according to business electrical load curve, calculates date minimax load value and average load value;
Step 3.6., according to date minimax load value and average load value, is formulated industrial undertaking's power project and is cut down
Amount, thus choose in load marginal value and lower load marginal value, and statistical history load each moon/day load above and below facing
The moment number of dividing value, respectively as peak times of power consumption and low power consumption phase;
Step 3.7., according to the peak times of power consumption counted, low power consumption phase, electricity price and favor information thereof, determines that enforcement needs
Ask the period of response policy.
Compared with the prior art, beneficial effect of the present invention has:
1, the present invention is centered by Industry enterprise customer demand, takes off by gathering electricity consumption, energy consumption equipment and workman
Data, formulated and met industrial undertaking's production requirement and requirement response policy, defined real-time, comprehensive electricity consumption rule
The system of drawing, thus promoted Demand Side Response in the application of industrial undertaking, promote power supply and demand balance and industry energy conservation reduce discharging,
Improve efficiency of energy utilization.
2, the historical data of the electrically-based consumption of the present invention, ties with time-of-use price strategy mutually by Interrupted load management strategy
Conjunction applies to industrial undertaking.Peak-valley TOU power price is fairly simple, feasible, but its very flexible, and the active of peak load shifting effect
Power rests in user's hands, has certain hysteresis quality;Interrupted load management is carried out more complicated than Peak-valley TOU power price, but it is flexible
Property preferable, the initiative of peak clipping effect rests in electric company's hands, it is simple to safe and reliable power supply.Use two the most simultaneously
Measure so that it is having complementary advantages, peak load shifting effect becomes apparent from.
3, the present invention considers that industrial undertaking's energy consumption equipment is main electricity consumption facility, and equipment needs routine inspection and dimension simultaneously
Repair, propose energy consumption equipment adjustable strategies maintenance time, the equipment that will originally overhaul at low power consumption and Pinggu period, it is adjusted to use
Electricity keeps in repair peak period, more embodies industrial undertaking and is different from the feature of other users, at the bar ensureing production requirement
Achieve using electricity wisely under part, improve the economize on electricity profit of industrial undertaking.
4, the present invention considers industrial undertaking's workman's own characteristic and situation of having a holiday, and proposes workman's vacation time adjustable strategies,
The workman that will originally have a holiday at low power consumption and Pinggu period, is adjusted to have a holiday in the peak of power consumption period, more conforms to industry enterprise
The production of industry and power consumption characteristics, improve the motility of demand response strategy, is not affecting the most raw of industrial undertaking and workman
Produce and live, it is ensured that on the premise of electricity consumption comfort level, carried out demand response control, preferably carry out peak load shifting, reduce the electricity charge
Expenditure.
Accompanying drawing explanation
Fig. 1 is present system module map;
Fig. 2 is the flow chart of the inventive method.
Detailed description of the invention
The present embodiment scheme can account in terms of Peak-valley TOU power price, Interrupted load management and equipment, personnel, passes through
Price and motivator promote industrial undertaking to change electricity consumption behavior, it is thus possible to cut down and transfer industrial enterprise power utilization load, reach
Alleviate the purpose of imbalance between supply and demand.Specifically, a kind of demand response system and method towards industrial undertaking, as it is shown in figure 1, bag
Include: Grid Central, electric energy service provider, industrial undertaking, the first wireless transport module and the second wireless transport module;Wherein in electrical network
Pericardium includes: receive memory module, data analysis module and policy development module;Industrial undertaking includes: data acquisition module, project
Processing module and equipment respond module;
Data acquisition module gathers the initial data of industrial undertaking by data acquisition unit and is wirelessly transferred by first
Module passes to Grid Central;Data acquisition unit includes: in the intelligent electric meter being arranged on energy consumption equipment and industrial undertaking
Control mobile terminal;Initial data includes: the electricity consumption data of industrial undertaking every day, each highly energy-consuming equipment power consumption per hour letter
Breath, and the number of highly energy-consuming equipment, energy consumption parameter, repair time, industrial undertaking's workman's vacation time;Obtained by intelligent electric meter
The electricity consumption data of industrial undertaking every day, each highly energy-consuming equipment power consumption information per hour;By industrial undertaking is controlled mobile terminal
Obtain the number of highly energy-consuming equipment, energy consumption parameter, repair time, industrial undertaking's workman's vacation time;
The reception memory module of Grid Central receives initial data and stores, thus history of forming data;
The data analysis module of Grid Central extracts historical data from reception memory module and analyzes and processes, and obtains
Corresponding industrial undertaking uses electrical feature;Including with electrical feature: business electrical load curve, each highly energy-consuming equipment load per hour is bent
Line, each highly energy-consuming equipment different capacity table duration of runs and repair time planning chart, industrial undertaking workman vacation plans table;
Data analysis module chooses upper load marginal value according to power project reduction and basic electricity amount and lower load faces
Dividing value, and according to peak times of power consumption, low power consumption phase, electricity price and favor information thereof, determine the period implementing demand response strategy;
The period implementing demand response strategy includes: peak of power consumption period, low power consumption period, can interrupt the period;
Economize on electricity information is constituted by the period of power project reduction, electricity price and favor information thereof, enforcement demand response strategy
And it is sent along to electric energy service provider with electrical feature;
Electric energy service provider is connected with the data analysis module of Grid Central, for receiving the enterprise that data analysis module provides
By electrical feature and economize on electricity information;Demand response project application notice is formed by business electrical feature and economize on electricity information;
Electric energy service provider is also connected with the project processing module of industrial undertaking, and demand response project application notice is sent
To the project processing module of industrial undertaking, receive the feedback information that described project processing module sends simultaneously, and by feedback information
It is sent to the policy development module of Grid Central;Feedback information includes: whether industrial undertaking accepts described demand response project Shen
Report notice, and the electric power reduction that industrial undertaking has been agreed to;
The policy development module of Grid Central is connected with data analysis module, and being used for accepting described data analysis module provides
With electrical feature and economize on electricity information;Policy development module also receives the feedback information of industrial undertaking, thus formulates industrial undertaking
Demand response strategy;And the equipment respond module of industrial undertaking is passed to by the second wireless transport module;Demand response strategy
Including: time-of-use price strategy, Interrupted load management strategy, energy consumption equipment adjustable strategies maintenance time, workman's vacation time is adjusted
Whole strategy;Time-of-use price strategy is by promoting the electricity price of peak of power consumption period, the electricity price of reduction low power consumption period, coming
Industrial undertaking is encouraged to adjust plant capacity in peak of power consumption or close device power supply (DPS) to reduce business electrical amount period;Power-off in can
Valency strategy is for interrupting period interruption Power Consumption of Industrial Enterprises;Energy consumption equipment adjustable strategies maintenance time is for setting by change power consumption
The electricity consumption time of standby repair time transfer equipment;Workman's vacation time adjustable strategies is for turning by change workman's vacation time
The electricity consumption time of moving device;
The equipment respond module of industrial undertaking receives described demand response strategy by the second wireless transport module, and to certainly
Body electricity consumption behavior adjusts in real time;Adjust in real time and include: open and close highly energy-consuming device power supply (DPS);Adjust highly energy-consuming equipment fortune
Row power;Start and stop maintenance highly energy-consuming equipment;Start and terminate workman's vacation time.
In the present embodiment, a kind of demand response system and method towards industrial undertaking, it is applied to by Grid Central, electric energy
In industrial undertaking's electricity needs response system that service provider, industrial undertaking form, as in figure 2 it is shown, be to sequentially include the following steps:
Step 1, gather the initial data of industrial undertaking, including: the electricity consumption data of industrial undertaking every day, each highly energy-consuming
Equipment power consumption information per hour, and the number of highly energy-consuming equipment, energy consumption parameter, repair time, when industrial undertaking workman has a holiday
Between, and pass to Grid Central,
Step 2, Grid Central receive initial data and store, thus history of forming data;
Historical data is analyzed processing by step 3, Grid Central, and obtain industrial undertaking uses electrical feature, including: enterprise
Power load curve, each highly energy-consuming equipment load curve per hour, each highly energy-consuming equipment different capacity table duration of runs and maintenance
Period planning table, industrial undertaking workman vacation plans table;Grid Central chooses load marginal value according to power project reduction, and
According to peak times of power consumption, low power consumption phase, electricity price and favor information thereof, determine the period implementing demand response strategy, including: use
Electricity peak period, low power consumption period, can interrupt the period;
Step 3.1. extracts the electricity consumption historical data of industrial undertaking's every day, in units of year, month, day, draws enterprise
Power load curve;
Step 3.2. extracts each highly energy-consuming equipment power consumption historical data per hour of industrial undertaking, carries out highly energy-consuming equipment
Classification, draws each highly energy-consuming equipment load curve per hour;
Step 3.3. extracts the number of each highly energy-consuming equipment, energy consumption parameter, and the repair time, analytical integration obtains each highly energy-consuming
The equipment different capacity table duration of runs and repair time planning chart;
Step 3.4. extracts industrial undertaking's workman's vacation time, integrates and obtains industrial undertaking workman vacation plans table;
Step 3.5., according to business electrical load curve, calculates date minimax load value and average load value;
Step 3.6., according to date minimax load value and average load value, is formulated industrial undertaking's power project and is cut down
Amount, thus chooses load marginal value and lower load marginal value, and statistical history load each moon in day load above and below facing
The moment number of dividing value, respectively as peak times of power consumption and low power consumption phase;
Step 3.7., according to the peak times of power consumption counted, low power consumption phase, electricity price and favor information thereof, determines that enforcement needs
Ask the period of response policy.
Step 4, period by power project reduction, electricity price and favor information thereof, enforcement demand response strategy constitute joint
Electrical information is the most sent along to electric energy service provider with electrical feature;
Step 5, electric energy service provider receive business electrical feature and economize on electricity information, form the demand response project application and notify also
It is sent to industrial undertaking;Receive the feedback information that industrial undertaking sends simultaneously, including: whether industrial undertaking accepts described demand is rung
The project application is answered to notify, and the electric power reduction that industrial undertaking has been agreed to, and feedback information is sent to Grid Central
Policy development module.
Step 6, Grid Central according to electrical feature, economize on electricity information, feedback information formulate industrial undertaking demand response plan
Omit, and pass to industrial undertaking;Demand response strategy includes: time-of-use price strategy, Interrupted load management strategy, energy consumption equipment
Maintenance time adjustable strategies, workman's vacation time adjustable strategies.Wherein, time-of-use price strategy is by promoting peak of power consumption
The electricity price of period, reduce the electricity price of low power consumption period, encourage industrial undertaking peak of power consumption adjust period plant capacity or
Close device power supply (DPS) and reduce business electrical amount;Interrupted load management strategy is for interrupting period interruption Power Consumption of Industrial Enterprises;Consumption
Can maintenance of equipment time adjustable strategies it be the electricity consumption time by changing energy consumption equipment repair time transfer equipment;Workman has a holiday
Time adjustable strategies is the electricity consumption time carrying out transfer equipment by changing workman's vacation time;
Step 6.1, whether accept demand response project application notice according to industrial undertaking, and industrial undertaking agreed to
Electric power reduction, in conjunction with power project reduction, determine industrial undertaking's final electric power reduction.
Step 6.2, combine industrial enterprise power utilization load curve and highly energy-consuming equipment load curve per hour, peak of power consumption
Phase, low power consumption phase and electricity price are preferential, formulate and implement time-of-use price strategy.Reduce highly energy-consuming in the peak of power consumption period to set
Standby running power or make highly energy-consuming equipment keep constant power operation, thus reduce Power Consumption of Industrial Enterprises amount;
In the present embodiment, the beginning and ending time of peak of power consumption period, Peak-valley TOU power price and the maximum of peak of power consumption period permit
Being permitted natural law is all to be determined by electric company.Electrically-based demand tracing, it can be deduced that t period after Peak-valley TOU power price
Power consumption.Grid company carries out power supply according to estimated power consumption, and industrial undertaking makes full use of limited electricity consumption
Peak period, natural law, selected the suitable rush day based on principle of profit maximization, reduced electric load, with maximum overall
Benefit.
Step 6.3, combine business electrical load curve and peak times of power consumption, formulate Interrupted load management strategy.Can interrupt
Period interrupts Power Consumption of Industrial Enterprises, by interrupting the expenditure minimizing of period demand charge and the electricity price discount in other periods
And earn a profit;
The outage cod of industrial user and advance notification times, interruption duration, power failure time of origin are relevant, this enforcement
In example, advance notification times is defined as 1 hour;Interruption duration calculates by the hour, and power off time occurred in peak times of power consumption,
Determined by grid company.Outage cod load rejection electricity is quadratic function relation.Enterprise benefits equal to by interrupting the period
Demand charge is paid minimizing and the electricity price discount in other periods and is earned a profit and deduct the outage cod of industrial user.
Step 6.4, combine each highly energy-consuming equipment different capacity table duration of runs and repair time planning chart, formulate power consumption and set
For adjustable strategies maintenance time.Adjust the energy consumption equipment repair time, by originally at the equipment of low power consumption period maintenance, be adjusted to
The peak of power consumption period keeps in repair;
In the present embodiment, industrial undertaking's highly energy-consuming equipment includes: luminaire, air-conditioning equipment, transformator, motor, wind
Machine, pump class, compressor, electric welding machine.The operationally power consumption of these equipment is many, waste is very serious, simultaneously need to carry out customary inspection
Look into maintenance, therefore there is huge economize on electricity space.
Step 6.5, combine industrial undertaking workman vacation plans table, formulate workman's vacation time adjustable strategies.Change workman
Vacation time, the workman just originally having a holiday at low power consumption, it is adjusted to have a holiday in the peak of power consumption period;
In the present embodiment, the arrangement taken off must be premised on not affecting actual production progress, and taking off of any scope must
Within 1 day, will take off in writing personnel and the administrative Human Resources Department of arrangement of time circular must be shifted to an earlier date.Take off should be by Production Supervisor's root simultaneously
According to arranging workman's vacation time adjustable strategies, employee must not apply for taking off.In the peak of power consumption day that Grid Central determines or power failure
The normal working hours of day, is adjusted to the time of having a rest by this day, mends class in being then arranged in former day off nearby.
Step 7, industrial undertaking receive electricity needs response policy, and self electricity consumption behavior is carried out real-time adjustment, including:
Open and close highly energy-consuming device power supply (DPS);Adjust highly energy-consuming equipment and run power;Start and stop maintenance highly energy-consuming equipment;Start
With end workman's vacation time.
Claims (3)
1. towards a demand response system for industrial undertaking, it is characterized in that including: Grid Central, electric energy service provider, industry enterprise
Industry, the first wireless transport module and the second wireless transport module;
Described Grid Central includes: receive memory module, data analysis module and policy development module;
Described industrial undertaking includes: data acquisition module, project processing module and equipment respond module;
Described data acquisition module gathers the initial data of described industrial undertaking and by described first by data acquisition unit
Wireless transport module passes to described Grid Central;Described data acquisition unit includes: be arranged on the intelligence on highly energy-consuming equipment
Ammeter and industrial undertaking are controlled mobile terminal;Described initial data includes: the electricity consumption data of industrial undertaking every day, high consumption
Energy equipment power consumption information per hour, and the number of highly energy-consuming equipment, energy consumption parameter, repair time, industrial undertaking workman has a holiday
Time;The reception memory module of described Grid Central receives described initial data and stores, thus history of forming data;
The data analysis module of described Grid Central extracts described historical data from described reception memory module and is analyzed
Processing, obtain corresponding industrial undertaking uses electrical feature;Described electrical feature includes: business electrical load curve, and each highly energy-consuming sets
Standby load curve, each highly energy-consuming equipment different capacity table duration of runs and repair time planning chart, industrial undertaking workman per hour
Vacation plans table;
Described data analysis module chooses upper load marginal value according to power project reduction and basic electricity amount and lower load faces
Dividing value, and according to peak times of power consumption, low power consumption phase, electricity price and favor information thereof, determine the period implementing demand response strategy;
The period of described enforcement demand response strategy includes: peak of power consumption period, low power consumption period, can interrupt the period;
Economize on electricity information is constituted by the period of power project reduction, described electricity price and favor information, enforcement demand response strategy
And it is sent along with described electrical feature to described electric energy service provider;
Described electric energy service provider is connected with the data analysis module of described Grid Central, is used for receiving described data analysis module and carries
The business electrical feature of confession and economize on electricity information;Described business electrical feature and economize on electricity information integration are formed demand response item simultaneously
Mesh declares notice;
Described electric energy service provider is also connected with the project processing module of described industrial undertaking, and by the described demand response project application
Notice is sent to the project processing module of industrial undertaking, receives the feedback information that described project processing module sends simultaneously, and will
Described feedback information is sent to the policy development module of Grid Central;Described feedback information includes: whether industrial undertaking accepts institute
State demand response project application notice, and the electric power reduction that industrial undertaking has been agreed to;
The policy development module of described Grid Central is connected with data analysis module, and being used for accepting described data analysis module provides
With electrical feature and economize on electricity information;Described policy development module also receives the feedback information of described industrial undertaking, thus formulates work
The demand response strategy of industry enterprise;And the equipment response mould of described industrial undertaking is passed to by described second wireless transport module
Block;Described demand response strategy includes: time-of-use price strategy, Interrupted load management strategy, and energy consumption equipment adjusts maintenance time
Strategy, workman's vacation time adjustable strategies;Described time-of-use price strategy is to promote the electricity price of peak of power consumption period, reduction use
The electricity price of electricity low-valley interval;Described Interrupted load management strategy is for interrupting period interruption Power Consumption of Industrial Enterprises;Described power consumption sets
It it is the electricity consumption time by changing energy consumption equipment repair time transfer equipment for adjustable strategies maintenance time;Described workman has a holiday
Time adjustable strategies is the electricity consumption time carrying out transfer equipment by changing workman's vacation time;
The equipment respond module of described industrial undertaking receives described demand response strategy by described second wireless transport module, and
Self electricity consumption behavior is adjusted in real time;Described real-time adjustment includes: open and close highly energy-consuming device power supply (DPS);Adjust high consumption
Power can be run by equipment;Start and stop maintenance highly energy-consuming equipment;Start and terminate workman's vacation time.
2., towards a demand response method for industrial undertaking, it is characterized in that being applied to by Grid Central, electric energy service provider, industry
In industrial undertaking's electricity needs response system of enterprise's composition, and comprise the following steps:
Step 1, gather the initial data of described industrial undertaking and pass to described Grid Central;Described enterprise raw data packets
Include: the electricity consumption data of industrial undertaking every day, each highly energy-consuming equipment power consumption information per hour, and the number of highly energy-consuming equipment
Mesh, energy consumption parameter, repair time, industrial undertaking's workman's vacation time;
Step 2, described Grid Central receive described initial data and store, thus history of forming data;
Described historical data is analyzed processing by step 3, described Grid Central, and obtain industrial undertaking uses electrical feature;Described
Include with electrical feature: business electrical load curve, each highly energy-consuming equipment load curve per hour, each highly energy-consuming equipment different capacity
The duration of runs table and repair time planning chart, industrial undertaking workman vacation plans table;
Described Grid Central chooses upper load marginal value and lower load marginal value according to power project reduction and basic electricity amount,
And according to peak times of power consumption, low power consumption phase, electricity price and favor information thereof, determine the period implementing demand response strategy;Described
The period implementing demand response strategy includes: peak of power consumption period, low power consumption period, can interrupt the period;
Step 4, period by power project reduction, described electricity price and favor information, enforcement demand response strategy constitute joint
Electrical information is the most sent along with described electrical feature to described electric energy service provider;
Step 5, described electric energy service provider receive business electrical feature and economize on electricity information, form the demand response project application and notify also
It is sent to industrial undertaking;Receive the feedback information that described industrial undertaking sends simultaneously, and described feedback information is sent to electrical network
The policy development module at center;Described feedback information includes: whether industrial undertaking accepts described demand response project application notice,
And the electric power reduction that industrial undertaking has been agreed to;
Step 6, described Grid Central according to electrical feature, economize on electricity information, feedback information formulate industrial undertaking demand response plan
Omit, and pass to described industrial undertaking;Described demand response strategy includes: time-of-use price strategy, Interrupted load management strategy,
Energy consumption equipment adjustable strategies maintenance time, workman's vacation time adjustable strategies;Described time-of-use price strategy is for promoting electricity consumption
The electricity price of peak period, the electricity price of reduction low power consumption period;Described Interrupted load management strategy is for interrupting period interruption work
Industry business electrical;Described energy consumption equipment adjustable strategies maintenance time is by changing energy consumption equipment repair time transfer equipment
The electricity consumption time;Described workman's vacation time adjustable strategies is the electricity consumption time carrying out transfer equipment by changing workman's vacation time;
Step 7, described industrial undertaking receive electricity needs response policy, and self electricity consumption behavior is carried out real-time adjustment;Described
Real-time adjustment includes: open and close highly energy-consuming device power supply (DPS);Adjust highly energy-consuming equipment and run power;Start and stop maintenance
Highly energy-consuming equipment;Start and terminate workman's vacation time.
A kind of demand response method towards industrial undertaking the most according to claim 2, it is characterised in that described step 3
Including:
Step 3.1. extracts the electricity consumption historical data of industrial undertaking's every day, in units of year, season, the moon, day, show that enterprise uses
Electric load curve;
Step 3.2. extracts each highly energy-consuming equipment power consumption historical data per hour of industrial undertaking, carries out highly energy-consuming equipment point
Class, draws each highly energy-consuming equipment load curve per hour;
Step 3.3. extracts the number of each highly energy-consuming equipment, energy consumption parameter, and the repair time, analytical integration obtains each highly energy-consuming equipment
The different capacity table duration of runs and repair time planning chart;
Step 3.4. extracts industrial undertaking's workman's vacation time, integrates and obtains industrial undertaking workman vacation plans table;
Step 3.5., according to business electrical load curve, calculates date minimax load value and average load value;
Step 3.6., according to date minimax load value and average load value, formulates industrial undertaking's power project reduction,
Thus choose load in load marginal value and lower load marginal value, and statistical history load each moon/day and be above and below critical
The moment number of value, respectively as peak times of power consumption and low power consumption phase;
Step 3.7., according to the peak times of power consumption counted, low power consumption phase, electricity price and favor information thereof, determines that enforcement demand is rung
Answer the period of strategy.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610640980.0A CN106295984A (en) | 2016-08-05 | 2016-08-05 | A kind of demand response system and method towards industrial undertaking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610640980.0A CN106295984A (en) | 2016-08-05 | 2016-08-05 | A kind of demand response system and method towards industrial undertaking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106295984A true CN106295984A (en) | 2017-01-04 |
Family
ID=57666147
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610640980.0A Pending CN106295984A (en) | 2016-08-05 | 2016-08-05 | A kind of demand response system and method towards industrial undertaking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106295984A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107220770A (en) * | 2017-05-26 | 2017-09-29 | 国网山东省电力公司泰安供电公司 | The dsm methods, devices and systems of residential electricity consumption |
CN108460546A (en) * | 2018-04-26 | 2018-08-28 | 国网上海市电力公司 | Demand response system in a kind of regional extent |
CN110163578A (en) * | 2019-05-31 | 2019-08-23 | 国网上海市电力公司 | A kind of batch carries out the virtual plant system of peak load shifting business |
CN110428513A (en) * | 2019-06-18 | 2019-11-08 | 平安科技(深圳)有限公司 | Attendance processing method, device, electronic equipment and storage medium |
CN111049169A (en) * | 2019-12-06 | 2020-04-21 | 星络智能科技有限公司 | Power storage management method, computer equipment and readable storage medium |
CN111291958A (en) * | 2018-12-10 | 2020-06-16 | 中国科学院沈阳自动化研究所 | Power grid and industrial user power supply and demand interaction device and implementation method |
CN113554268A (en) * | 2021-06-10 | 2021-10-26 | 合肥工业大学 | Method and system for selecting power utilization strategy for balancing peak valley and light and vigorous seasons |
CN113850496A (en) * | 2021-09-22 | 2021-12-28 | 广东电网有限责任公司 | Power utilization planning method and device, electronic equipment and storage medium |
CN113964940A (en) * | 2021-10-19 | 2022-01-21 | 国网浙江省电力有限公司湖州供电公司 | Production regulation and control method based on demand response terminal and PLC system |
CN114885230A (en) * | 2022-04-28 | 2022-08-09 | 浙江正泰中自控制工程有限公司 | Frequency domain analysis method based on pulse type water, electricity and gas meter |
-
2016
- 2016-08-05 CN CN201610640980.0A patent/CN106295984A/en active Pending
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107220770A (en) * | 2017-05-26 | 2017-09-29 | 国网山东省电力公司泰安供电公司 | The dsm methods, devices and systems of residential electricity consumption |
CN108460546A (en) * | 2018-04-26 | 2018-08-28 | 国网上海市电力公司 | Demand response system in a kind of regional extent |
CN111291958B (en) * | 2018-12-10 | 2023-09-19 | 中国科学院沈阳自动化研究所 | Power grid and industrial user electricity supply and demand interaction device and implementation method |
CN111291958A (en) * | 2018-12-10 | 2020-06-16 | 中国科学院沈阳自动化研究所 | Power grid and industrial user power supply and demand interaction device and implementation method |
CN110163578A (en) * | 2019-05-31 | 2019-08-23 | 国网上海市电力公司 | A kind of batch carries out the virtual plant system of peak load shifting business |
CN110428513B (en) * | 2019-06-18 | 2022-12-09 | 平安科技(深圳)有限公司 | Attendance processing method and device, electronic equipment and storage medium |
CN110428513A (en) * | 2019-06-18 | 2019-11-08 | 平安科技(深圳)有限公司 | Attendance processing method, device, electronic equipment and storage medium |
CN111049169B (en) * | 2019-12-06 | 2021-04-16 | 星络智能科技有限公司 | Power storage management method, computer equipment and readable storage medium |
CN111049169A (en) * | 2019-12-06 | 2020-04-21 | 星络智能科技有限公司 | Power storage management method, computer equipment and readable storage medium |
CN113554268A (en) * | 2021-06-10 | 2021-10-26 | 合肥工业大学 | Method and system for selecting power utilization strategy for balancing peak valley and light and vigorous seasons |
CN113554268B (en) * | 2021-06-10 | 2024-03-15 | 合肥工业大学 | Method and system for selecting electricity utilization strategies in balanced peak-valley and light-heavy seasons |
CN113850496A (en) * | 2021-09-22 | 2021-12-28 | 广东电网有限责任公司 | Power utilization planning method and device, electronic equipment and storage medium |
CN113964940A (en) * | 2021-10-19 | 2022-01-21 | 国网浙江省电力有限公司湖州供电公司 | Production regulation and control method based on demand response terminal and PLC system |
CN113964940B (en) * | 2021-10-19 | 2023-09-01 | 国网浙江省电力有限公司湖州供电公司 | Production regulation and control method based on demand response terminal and PLC system |
CN114885230A (en) * | 2022-04-28 | 2022-08-09 | 浙江正泰中自控制工程有限公司 | Frequency domain analysis method based on pulse type water, electricity and gas meter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106295984A (en) | A kind of demand response system and method towards industrial undertaking | |
CN105389645B (en) | Supply and demand balance analysis method and system based on power, electric quantity and peak regulation balance | |
CN106485417A (en) | Photovoltaic plant based on dynamic self-adapting task scheduling strategy moves O&M method | |
CN104218683B (en) | A kind of closed loop self study demand response system and method | |
CN106570783A (en) | Customer electricity utilization behavior analysis model based on big data thinking | |
CN107194514A (en) | A kind of demand response Multiple Time Scales dispatching method for wind power prediction error | |
KR20160047990A (en) | System and method for saving electric charge | |
CN105320999A (en) | Combination method for demand response based time-of-use power price strategy suitable for smart grid development | |
CN104156893A (en) | Peak and valley time period calculation method based on virtual energy-storage technology | |
CN106485605B (en) | Clean energy electricity stepped electricity price pre-purchase platform and control method | |
CN110061489B (en) | Control system of direct current microgrid | |
CN103793855A (en) | Construction method for real-time electricity supply and demand equilibrium index of regional grid | |
CN104281778A (en) | Flexible load time identification method | |
CN201503468U (en) | Electric energy meter for voltage quality | |
CN105809252A (en) | Large-scale wind power balance assessment method | |
CN113746105A (en) | Optimal control method, device, equipment and storage medium for power demand response | |
CN103955773A (en) | Hydropower water release and additional issue transaction management method and system | |
CN111969598B (en) | User side energy storage optimization method and system considering excitation type demand side response | |
CN105978022A (en) | Control system and control method for realizing automatic demand response of power grid users | |
CN103475001B (en) | Ordered electric load index distribution method and system | |
CN105719087A (en) | Elastic load cluster dispatching method and system | |
CN104917298A (en) | Automatic demand response based load control device and method for high energy consumption type enterprise | |
CN104050516A (en) | Fair and orderly electricity utilization method based on user interaction ability | |
CN106530138A (en) | Electricity peak averting scheduling method and device | |
Noppakant et al. | The study of challenge and issue of building demand response |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170104 |