CN106291849A - A kind of manufacturing process of great Yu long single beam tube - Google Patents

A kind of manufacturing process of great Yu long single beam tube Download PDF

Info

Publication number
CN106291849A
CN106291849A CN201610830964.8A CN201610830964A CN106291849A CN 106291849 A CN106291849 A CN 106291849A CN 201610830964 A CN201610830964 A CN 201610830964A CN 106291849 A CN106291849 A CN 106291849A
Authority
CN
China
Prior art keywords
semi
finished product
great
beam tube
manufacturing process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610830964.8A
Other languages
Chinese (zh)
Other versions
CN106291849B (en
Inventor
钱镇国
吴华良
严惠良
蒋莹
何侃云
沈正建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dongtong Optical Network Iot Technology Co Ltd
Original Assignee
Zhejiang Hengtong Optical Network IOT Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hengtong Optical Network IOT Technology Co Ltd filed Critical Zhejiang Hengtong Optical Network IOT Technology Co Ltd
Priority to CN201610830964.8A priority Critical patent/CN106291849B/en
Publication of CN106291849A publication Critical patent/CN106291849A/en
Application granted granted Critical
Publication of CN106291849B publication Critical patent/CN106291849B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/44Mechanical structures for providing tensile strength and external protection for fibres, e.g. optical transmission cables
    • G02B6/4479Manufacturing methods of optical cables
    • GPHYSICS
    • G02OPTICS
    • G02BOPTICAL ELEMENTS, SYSTEMS OR APPARATUS
    • G02B6/00Light guides; Structural details of arrangements comprising light guides and other optical elements, e.g. couplings
    • G02B6/44Mechanical structures for providing tensile strength and external protection for fibres, e.g. optical transmission cables
    • G02B6/4479Manufacturing methods of optical cables
    • G02B6/4484Manufacturing methods of optical cables with desired surplus length between fibres and protection features

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • General Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Medicinal Preparation (AREA)
  • Extrusion Moulding Of Plastics Or The Like (AREA)

Abstract

The invention provides the manufacturing process of a kind of great Yu long single beam tube, it can produce remaining length and require the long beam tube of single great Yu of 2.0~2.5 ‰, and fiber-draw strain meets the requirement of user, meets pulling tension requirements when constructing and the pulling tension requirements of longtime running simultaneously.Optical fiber sequentially passes through ointment filling system and plastic extrusion system from pay off rack to release certain laying tension, viscosity >=22000mPa.s when wherein the fine cream viscosity requirement in ointment filling system is 25 DEG C, dropping point >=220 DEG C, the PBT material that material selective freezing degree in plastic extrusion system is fast, the outside of single-core fiber is enclosed with ointment successively afterwards, pine set forms semi-finished product, semi-finished product are sequentially passed through the first segment tank that water temperature is 60 ± 2 DEG C, water temperature is to enter wheel after 55 ± 2 DEG C of second section tanks to lead structure, it is 20 ± 2 DEG C of the 3rd water-saving groove that semi-finished product enter water temperature after wheel leads and is set with three circles in structure, afterwards semi-finished product are carried out take-up by take-up pulley rolling, the speed of production of whole product line controls at 65m/min~75m/min.

Description

A kind of manufacturing process of great Yu long single beam tube
Technical field
The present invention relates to the technical field of fiber optic cable production, the manufacturing process of a kind of great Yu long single beam tube.
Background technology
Existing center tube structure sleeving core number is generally 4~12 cores, and casing diameter is 2.4~3.0mm, and excess length control exists 1.0~1.5 ‰, the central canal debugging of this structure is relatively easy, generally increases water temperature, the suitable wheel rim number of turns and takeup tension Just can meet technological requirement, this production technology is the most common, and debugging difficulty is little, and the long beam tube of single great Yu, remaining Length requires 2.0~2.5 ‰, and existing production technology production difficulty is big, because the fewest remaining long being more difficult to of optical fiber is done greatly, composite factor is also A lot, such as water temperature, long, material, speed etc., generally, cannot complete more than target first as apparatus and process and material lack Long test, the multiformity required along with user and the difference of use, the requirement of some user is more special, single beam tube Formula requires to put an optical fiber, and fiber-draw strain meets the requirement of user again, and pulling tension requirements during construction to be met and length The pulling tension requirements that phase is run.
Summary of the invention
For the problems referred to above, the invention provides the manufacturing process of a kind of great Yu long single beam tube, it can produce remaining length Require the long beam tube of single great Yu of 2.0~2.5 ‰, and fiber-draw strain meets the requirement of user, meets when constructing simultaneously Pulling tension requirements and the pulling tension requirements of longtime running.
A kind of manufacturing process of great Yu long single beam tube, it is characterised in that: optical fiber from pay off rack with certain laying tension Releasing sequentially passes through ointment filling system and plastic extrusion system, and wherein the fine cream viscosity requirement in ointment filling system is 25 DEG C Time viscosity >=22000mPa.s, dropping point >=220 DEG C, the PBT material that material selective freezing degree in plastic extrusion system is fast, it The outside of rear single-core fiber is enclosed with ointment successively, pine set forms semi-finished product, and it is 60 ± 2 DEG C that semi-finished product sequentially pass through water temperature First segment tank, water temperature are to enter wheel after 55 ± 2 DEG C of second section tanks to lead structure, and semi-finished product are after wheel leads and is set with three circles in structure Entering water temperature is 20 ± 2 DEG C of the 3rd water-saving groove, afterwards by take-up pulley rolling, semi-finished product is carried out take-up, the production speed of whole product line Degree controls at 65m/min~75m/min.
Its optical fiber laying tension being further characterized by described pay off rack is 45 ± 5g, it is ensured that optical fiber unwrapping wire is not trembled Dynamic;
Described wheel is led structure and is included main traction wheel, auxiliary traction wheel, after semi-finished product are set with three circles on main traction wheel, auxiliary On traction wheel, pitch of the laps does not passes through, and this process form guarantees that remaining length is not consumed;
The take-up pressure of described take-up pulley is set as 4N;
The speed of production of whole product line controls at 70m/min, it is ensured that what PBT expected fully shrinks cooling;
Described plastic extrusion system is by joining mould so that wall thickness reaches 0.45~0.50mm.
After using the present invention, PBT selects the material that degree of crystallinity is fast, PBT crystallization to have substantial connection with temperature and time, due to Semi-finished product sequentially pass through first segment tank that water temperature is 60 ± 2 DEG C, water temperature is to enter wheel after 55 ± 2 DEG C of second section tanks to lead knot Structure, it is 20 ± 2 DEG C of the 3rd water-saving groove that semi-finished product enter water temperature after wheel leads and is set with three circles in structure, and this technique can ensure that remaining length Not being consumed, be additionally controlled by speed of production, the speed of production of whole product line controls at 65m/min ~75m/min, it allows the Loose tube time of staying in the sink be extended, selects special appointment viscosity ointment when factice for filling Ensureing the most even stable of remaining length, it can produce remaining length and require the long beam tube of single great Yu of 2.0~2.5 ‰, and fiber-draw Strain meets the requirement of user, meets pulling tension requirements when constructing and the pulling tension requirements of longtime running simultaneously.
Accompanying drawing explanation
Fig. 1 is the front view structural representation inventing great Yu long single beam tube to be produced.
Detailed description of the invention
The manufacturing process of a kind of great Yu long single beam tube: optical fiber sequentially passes through to release certain laying tension from pay off rack Ointment filling system and plastic extrusion system, wherein the fine cream viscosity requirement in ointment filling system be viscosity when 25 DEG C >= 22000mPa.s, dropping point >=220 DEG C, the PBT material that material selective freezing degree in plastic extrusion system is fast, single-core fiber afterwards Outside be enclosed with ointment successively, pine set forms semi-finished product, the first water saving that semi-finished product sequentially pass through water temperature is 60 ± 2 DEG C Groove, water temperature are to enter wheel after 55 ± 2 DEG C of second section tanks to lead structure, and semi-finished product enter water temperature after wheel leads and is set with three circles in structure Being 20 ± 2 DEG C of the 3rd water-saving groove, afterwards by take-up pulley rolling, semi-finished product are carried out take-up, the speed of production of whole product line controls 65m/min~75m/min.
Optical fiber laying tension in pay off rack is 45 ± 5g, it is ensured that optical fiber unwrapping wire is not shaken;
Wheel leads structure and includes main traction wheel, auxiliary traction wheel, after semi-finished product are set with three circles on main traction wheel, in auxiliary traction On wheel, pitch of the laps does not passes through, and this process form guarantees that remaining length is not consumed;
The take-up pressure of take-up pulley is set as 4N;
The speed of production of whole product line controls at 70m/min, it is ensured that what PBT expected fully shrinks cooling;
Plastic extrusion system is by joining mould so that wall thickness reaches 0.45~0.50mm.
Specific embodiment one: optical fiber sequentially passes through ointment filling system from pay off rack to release certain laying tension and moulds Material extrusion system, the optical fiber laying tension in pay off rack is 40g, it is ensured that optical fiber unwrapping wire is not shaken, the fibre in ointment filling system The prosperous prosperous fine cream of dragon in Shenzhen selected by cream, viscosity >=22000mPa.s when its viscosity requirement reaches 25 DEG C, dropping point >=220 DEG C, plastics Cyclopentadienyl PBT is full of in the fast Suzhou of material selective freezing degree in extrusion system, and the outside of single-core fiber is enclosed with ointment, pine successively afterwards Set forms semi-finished product, semi-finished product sequentially passes through first segment tank that water temperature is 58 DEG C, water temperature is that 53 DEG C of second section tanks are laggard Entering wheel and lead structure, wheel leads structure and includes main traction wheel, auxiliary traction wheel, after semi-finished product are set with three circles on main traction wheel, auxiliary On traction wheel, pitch of the laps is not 18 DEG C of the 3rd water-saving groove by rear entrance water temperature, is received by take-up pulley rolling by semi-finished product afterwards Line, the take-up pressure of take-up pulley is set as that 4N, the speed of production of whole product line control at 65m/min, and plastic extrusion system passes through Join mould so that wall thickness reaches 0.45mm.
Specific embodiment two: optical fiber sequentially passes through ointment filling system from pay off rack to release certain laying tension and moulds Material extrusion system, the optical fiber laying tension in pay off rack is 45g, it is ensured that optical fiber unwrapping wire is not shaken, the fibre in ointment filling system The prosperous prosperous fine cream of dragon in Shenzhen selected by cream, viscosity >=22000mPa.s when its viscosity requirement reaches 25 DEG C, dropping point >=220 DEG C, plastics Cyclopentadienyl PBT is full of in the fast Suzhou of material selective freezing degree in extrusion system, and the outside of single-core fiber is enclosed with ointment, pine successively afterwards Set forms semi-finished product, semi-finished product sequentially passes through first segment tank that water temperature is 60 DEG C, water temperature is that 55 DEG C of second section tanks are laggard Entering wheel and lead structure, wheel leads structure and includes main traction wheel, auxiliary traction wheel, after semi-finished product are set with three circles on main traction wheel, auxiliary On traction wheel, pitch of the laps is not 20 DEG C of the 3rd water-saving groove by rear entrance water temperature, is received by take-up pulley rolling by semi-finished product afterwards Line, the take-up pressure of take-up pulley is set as that 4N, the speed of production of whole product line control at 70m/min, and plastic extrusion system passes through Join mould so that wall thickness reaches 0.48mm.
Specific embodiment three: optical fiber sequentially passes through ointment filling system from pay off rack to release certain laying tension and moulds Material extrusion system, the optical fiber laying tension in pay off rack is 50g, it is ensured that optical fiber unwrapping wire is not shaken, the fibre in ointment filling system The prosperous prosperous fine cream of dragon in Shenzhen selected by cream, viscosity >=22000mPa.s when its viscosity requirement reaches 25 DEG C, dropping point >=220 DEG C, plastics Cyclopentadienyl PBT is full of in the fast Suzhou of material selective freezing degree in extrusion system, and the outside of single-core fiber is enclosed with ointment, pine successively afterwards Set forms semi-finished product, semi-finished product sequentially passes through first segment tank that water temperature is 62 DEG C, water temperature is that 57 DEG C of second section tanks are laggard Entering wheel and lead structure, wheel leads structure and includes main traction wheel, auxiliary traction wheel, after semi-finished product are set with three circles on main traction wheel, auxiliary On traction wheel, pitch of the laps is not 22 DEG C of the 3rd water-saving groove by rear entrance water temperature, is received by take-up pulley rolling by semi-finished product afterwards Line, the take-up pressure of take-up pulley is set as that 4N, the speed of production of whole product line control at 75m/min, and plastic extrusion system passes through Join mould so that wall thickness reaches 0.50mm.
Above the specific embodiment of the present invention is described in detail, but content has been only the preferable enforcement of the invention Example, it is impossible to be considered the practical range for limiting the invention.All impartial changes made according to the invention application range Change and improvement etc., within all should still belonging to this patent covering scope.

Claims (6)

1. the manufacturing process of a great Yu long single beam tube, it is characterised in that: optical fiber is transferred with certain laying tension from pay off rack Go out to sequentially pass through ointment filling system and plastic extrusion system, when wherein the fine cream viscosity requirement in ointment filling system is 25 DEG C Viscosity >=22000mPa.s, dropping point >=220 DEG C, the PBT material that material selective freezing degree in plastic extrusion system is fast, afterwards The outside of single-core fiber is enclosed with ointment successively, pine set forms semi-finished product, that semi-finished product sequentially pass through water temperature is 60 ± 2 DEG C One water-saving groove, water temperature are to enter wheel after 55 ± 2 DEG C of second section tanks to lead structure, and semi-finished product lead at wheel that to be set with three circles in structure laggard Entering water temperature is 20 ± 2 DEG C of the 3rd water-saving groove, afterwards by take-up pulley rolling, semi-finished product is carried out take-up, the speed of production of whole product line Control at 65m/min~75m/min.
The manufacturing process of a kind of great Yu the most as claimed in claim 1 long single beam tube, it is characterised in that: in described pay off rack Optical fiber laying tension is 45 ± 5g, it is ensured that optical fiber unwrapping wire is not shaken.
The manufacturing process of a kind of great Yu the most as claimed in claim 1 long single beam tube, it is characterised in that: described wheel leads structure bag Having included main traction wheel, auxiliary traction wheel, after semi-finished product are set with three circles on main traction wheel, on auxiliary traction wheel, pitch of the laps does not passes through, should Process form guarantees that remaining length is not consumed.
The manufacturing process of a kind of great Yu the most as claimed in claim 1 long single beam tube, it is characterised in that: the receipts of described take-up pulley Line pressure is set as 4N.
The manufacturing process of a kind of great Yu the most as claimed in claim 1 long single beam tube, it is characterised in that: the production of whole product line Speed controlling is at 70m/min, it is ensured that what PBT expected fully shrinks cooling.
The manufacturing process of a kind of great Yu the most as claimed in claim 1 long single beam tube, it is characterised in that: described plastic extrusion system System is by joining mould so that wall thickness reaches 0.45~0.50mm.
CN201610830964.8A 2016-09-19 2016-09-19 A kind of manufacturing process of great Yu long single beam tube Active CN106291849B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610830964.8A CN106291849B (en) 2016-09-19 2016-09-19 A kind of manufacturing process of great Yu long single beam tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610830964.8A CN106291849B (en) 2016-09-19 2016-09-19 A kind of manufacturing process of great Yu long single beam tube

Publications (2)

Publication Number Publication Date
CN106291849A true CN106291849A (en) 2017-01-04
CN106291849B CN106291849B (en) 2019-02-19

Family

ID=57712133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610830964.8A Active CN106291849B (en) 2016-09-19 2016-09-19 A kind of manufacturing process of great Yu long single beam tube

Country Status (1)

Country Link
CN (1) CN106291849B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109061822A (en) * 2018-09-26 2018-12-21 江苏亨通光电股份有限公司 A kind of ultra-fine ant proof air-blowing optical cable and preparation method thereof
CN110376694A (en) * 2019-07-24 2019-10-25 浙江东通物联科技有限公司 A kind of single beam tube great Yu long false proof process
CN113478775A (en) * 2021-06-04 2021-10-08 苏州怡之康通讯器材有限公司 Optical fiber sheathing machine for communication optical cable and optical fiber sheathing process thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104228040A (en) * 2014-08-15 2014-12-24 汕头高新区奥星光通信设备有限公司 Optical fiber loose tube production device and working principle thereof
CN105136176A (en) * 2015-08-17 2015-12-09 缪文韬 Fiber optic sensor for improving spatial resolution and positioning precision of distributed optical fiber sensing system, and manufacturing method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104228040A (en) * 2014-08-15 2014-12-24 汕头高新区奥星光通信设备有限公司 Optical fiber loose tube production device and working principle thereof
CN105136176A (en) * 2015-08-17 2015-12-09 缪文韬 Fiber optic sensor for improving spatial resolution and positioning precision of distributed optical fiber sensing system, and manufacturing method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109061822A (en) * 2018-09-26 2018-12-21 江苏亨通光电股份有限公司 A kind of ultra-fine ant proof air-blowing optical cable and preparation method thereof
CN110376694A (en) * 2019-07-24 2019-10-25 浙江东通物联科技有限公司 A kind of single beam tube great Yu long false proof process
CN113478775A (en) * 2021-06-04 2021-10-08 苏州怡之康通讯器材有限公司 Optical fiber sheathing machine for communication optical cable and optical fiber sheathing process thereof

Also Published As

Publication number Publication date
CN106291849B (en) 2019-02-19

Similar Documents

Publication Publication Date Title
CN106291849A (en) A kind of manufacturing process of great Yu long single beam tube
CN109358399B (en) Layer-stranded miniature optical cable series production device and production process thereof
CN103112145B (en) Factice extruding device
WO2017084517A1 (en) Double-layer co-extrusion method for extremely-tiny air blown optical cable, and extremely-tiny air blown optical cable
CN104062728A (en) Micro-beam-tube easily-branched optical cable
CN105974538A (en) Full dry type bending-resistant pipeline output cable and manufacturing method thereof
CN107422438A (en) A kind of Full-dry optical fiber is with sleeve pipe and its manufacture method and made optical cable
CN105223669B (en) Stranded optical fiber optical cable three-layer co-extruded Loose tube method and three-layer loose tubes
CN104849825A (en) Full-dry air-blowing miniature optical cable
CN107045170A (en) Loose tube extrusion device
CN113866922A (en) Outdoor optical cable with large-core-number micro-beam tube and process manufacturing method thereof
CN103792634A (en) Aramid fibrous composite optical cable enhancing core containing flexible coating layer and preparing method thereof
CN105204133A (en) Preparation method of flat-shaped self-supporting access optical fiber ribbon optical cable and optical cable prepared through preparation method
CN104765117A (en) Low-friction wiring leading-in optical cable and manufacturing technique thereof
CN209746209U (en) Novel easily-branched 8-shaped optical cable and forming die thereof
CN104570248A (en) High-speed optical cable sleeve pipe production equipment
CN201592506U (en) High-speed optical fibre secondary coating production equipment
CN108426104A (en) Continuous fiber reinforced plastic pressure pipe and its manufacturing method and device
CN110142942B (en) Ultrahigh-speed secondary plastic coating production equipment and technology for air-blowing micro-cable micro-sleeve
CN107561662A (en) A kind of dual-purpose optical cable of branching shape indoor and outdoor and manufacture method
CN205910384U (en) Counter -bending pipeline of absolutely dry formula output optical cable
CN114721101A (en) Layer-stranded optical cable and preparation method thereof
CN107139415A (en) The process units and production method of a kind of surface coating phosphating steel wire
CN206884111U (en) A kind of process units of surface coating phosphating steel wire
CN103499859A (en) Full-medium flexible miniature wear-resistant lead-in optic cable and manufacturing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190102

Address after: 313000 No. 2299 Qiangyuan East Road, Nanxun Economic Development Zone, Huzhou City, Zhejiang Province

Applicant after: Zhejiang Dongtong Wulian Technology Co., Ltd.

Address before: 313009 No. 2299 Qiangyuan East Road, Nanxun Economic Development Zone, Huzhou City, Zhejiang Province

Applicant before: Zhejiang Hengtong optical network IOT Technology Co., Ltd.

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191106

Address after: 313009 No. 2299 East strong Garden Road, Nanxun Economic Development Zone, Huzhou, Zhejiang

Patentee after: Zhejiang Dongtong optical network IOT Technology Co., Ltd

Address before: 313000 Huzhou Province Economic Development Zone, Nanxun City, East Park Road, No. 2299

Patentee before: Zhejiang Dongtong Wulian Technology Co., Ltd.