CN106291441A - A kind of test method examining electric energy meter blocking factor to affect - Google Patents

A kind of test method examining electric energy meter blocking factor to affect Download PDF

Info

Publication number
CN106291441A
CN106291441A CN201610600359.1A CN201610600359A CN106291441A CN 106291441 A CN106291441 A CN 106291441A CN 201610600359 A CN201610600359 A CN 201610600359A CN 106291441 A CN106291441 A CN 106291441A
Authority
CN
China
Prior art keywords
temperature
electric energy
test
energy meter
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610600359.1A
Other languages
Chinese (zh)
Other versions
CN106291441B (en
Inventor
刘型志
侯兴哲
郑可
黄可
胡晓锐
陈文礼
杨芾藜
李小俊
孙凯霞
闫章勇
范中义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
Zhengzhou Wonder Electrical Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
State Grid Corp of China SGCC
Zhengzhou Wonder Electrical Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd, State Grid Corp of China SGCC, Zhengzhou Wonder Electrical Power Co Ltd filed Critical Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
Priority to CN201610600359.1A priority Critical patent/CN106291441B/en
Publication of CN106291441A publication Critical patent/CN106291441A/en
Application granted granted Critical
Publication of CN106291441B publication Critical patent/CN106291441B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Abstract

The invention discloses a kind of test method examining electric energy meter blocking factor to affect, the single-phase electric energy meter being in true power utilization environment is combined factor impact test, to overcome currently available technology above shortcomings, for examination electric energy meter environmental suitability, effective test method is proposed, for analyzing the test data supporting improving electric energy meter field running quality offer science.The testing inspection of following items can be realized respectively: voltage gradually changes and detects with hot and humid blocking factor;Frequency change+hot and humid blocking factor detects;Voltage x current greatly detects with low temperature and low humidity blocking factor;Voltage x current is minimum and low temperature and low humidity blocking factor detects;Load changing, hot and humid and mass data communication blocking factor detection;Voltage is slow rises slow fall, hot and humid and mass data communication blocking factor detection.

Description

A kind of test method examining electric energy meter blocking factor to affect
Technical field
The present invention relates to electric energy meter field tests, a kind of test method examining electric energy meter blocking factor to affect.
Background technology
At present the capability and performance of single-phase intelligent electric energy meter is examined, be all based on test chamber environment, for all tested epi-positions Apply same nature current capacity, complete every test one by one by national standard and relevant art specification.In process of the test mostly Number situation be the voltage x current that adds of tested top application for the most sinusoidal wave, and different influence factors is examined, needs Complete on different testing equipments respectively.Test on electric energy meter calibrating apparatus as examined electric effect factor to need; Test in humiture test box as examined climatic effect factor to need;As examined magnetic field factor to need at magnetic field test dress Put and test.The single factors affecting electric energy meter operation all can only be examined by these tests, and electric energy meter is at the scene Running environment be sufficiently complex, influence factor is also many, be in most cases simultaneously by electrically, Many impacts such as weather, magnetic field, are singly to examine single influence factor, are not enough to reappear the on-the-spot operation ring that electric energy meter is complicated Border.
Therefore, problem present in real exposure electric energy meter running at the scene, and it is carried out science divide Analysis, needs real simulation electric energy meter field running environment, adds various factors for electric energy meter simultaneously.Test method simultaneously Also should make a change with experimental condition, the experimental condition that national standard and technical specification specify is basic, needs basis at this The experimental condition of upper extension electric energy meter, such as extension electricabsorption agent variable quantity scope, increase impact load affects, enters electric energy meter Row mass data communication etc..
Summary of the invention
The purpose of the present invention is to propose to a kind of test method examining electric energy meter blocking factor to affect.
It is an object of the invention to be achieved through the following technical solutions:
The test method of the examination electric energy meter blocking factor impact that the present invention provides, comprises the following steps:
S1: the core electric energy meter that needs checking is arranged at the trial zone of electric energy meter environmental suitability evaluating platform;
S2: firing test presets examination item, and described default examination item includes below scheme:
S21: the voltage being added on electric energy meter by change and temperature humidity value also obtain electric energy meter test data;
S22: the electric voltage frequency being added on electric energy meter by change and temperature humidity value also obtain electric energy meter test data;
S23: by the voltage on electric energy meter being increased to maximum and temperature being reduced to low-temperature values and obtains electric energy meter Test data;
S24: by the voltage on electric energy meter being increased to minimum and temperature being reduced to low-temperature values and obtains electric energy meter Test data;
S25: the load that is added on electric energy meter by change, increase temperature humidity value and carry out mass data communication and obtain Electric energy meter test data;
S26: the voltage that is added on electric energy meter by change, increase temperature humidity value and carry out mass data communication and obtain Electric energy meter test data;
S3: obtain the test data of each default examination item;
S4: analyzing and processing test data obtains electric energy meter blocking factor affects the result of appraisal.
Further, the voltage being added on electric energy meter by change in described step S21 and temperature humidity value also obtain electric energy Table test data, specifically comprise the following steps that
Step 211: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step 212: the voltage circuit taken temperature, current loop, pulse signal and 485 signals are accessed test platform;
Step 213: room temperature in temperature control box is set and is reference temperature and time delay waits ambient temperature-stable;
Step 214: add reference voltage, reference current and reference frequency for tested top application;
Step 215: room temperature in temperature control box is set to humid tropical condition and time delay waits ambient temperature-stable;
Step 216: arrange and change reference current, the reference frequency test the error of electric energy meter being added on electric energy meter Value;
Step 217: the max value of error of record compares with reference condition elementary error, calculates error knots modification;
Step 218: automatically judge conclusion (of pressure testing) according to error knots modification in-scope;
Step 219: in recovery temperature control box, room temperature is reference temperature, off-test.
Further, the electric voltage frequency being added on electric energy meter by change in described step S22 and temperature humidity value are also obtained Electric energy meter test data, specifically comprise the following steps that
Step S221: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step S222: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step S223: arranging room temperature in temperature control box by platform courses program is reference temperature, and time delay waits environment temperature Degree is stable;
Step S224: apply reference voltage, reference frequency, read tested table register electric quantity data;
Step S225: then room temperature in temperature control box is set to humid tropical condition: time delay waits ambient temperature-stable;
Step S226: setting voltage frequency variation rate and time;
Step S227: setting voltage rate of change;
Step S228: frequency change applies reference voltage, reference frequency after terminating again, reads tested table register electricity Data;
Step S229: whether the tested table register electric quantity data read before and after changing according to frequency changes, from Dynamic judgement conclusion (of pressure testing);
Step S2210: in recovery temperature control box, room temperature is reference temperature, off-test.
Further, by the voltage on electric energy meter being increased to maximum and temperature being reduced to low in described step S23 Temperature value also obtains electric energy meter test data, specifically comprises the following steps that
Step S231: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step S232: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step S233: arranging room temperature in temperature control box by platform courses program is reference temperature, and time delay waits environment temperature Degree is stable;
Step S234: apply reference voltage, reference current, test elementary error in reference frequency, power factor 1.0;
Step S235: voltage is improved to the highest gage work voltage, electric current is improved to maximum current;
Step S236: arrange room temperature in temperature control box, time delay waits ambient temperature-stable;
Step S237: keep the significant voltage after improving and extreme currents, again survey in reference frequency, power factor 1.0 Examination elementary error;
Step S238: compare with reference condition elementary error, recording error knots modification;
Step S239: automatically judge conclusion (of pressure testing) according to error knots modification;
Step S2310: in recovery temperature control box, room temperature is reference temperature, off-test.
Further, by the voltage on electric energy meter being increased to minimum and temperature being reduced to low in described step S24 Temperature value also obtains electric energy meter test data, specifically comprises the following steps that
Step S241: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step S242: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step S243: arranging room temperature in temperature control box by platform courses program is reference temperature, and time delay waits environment temperature Degree is stable;
Step S244: apply reference voltage, reference current, test elementary error in reference frequency, power factor 1.0;
Step S245: voltage is down to minimum gage work voltage, electric current is down to starting current;
Step S246: arrange room temperature in temperature control box, time delay waits ambient temperature-stable;
Step S247: keep the minimum voltage after reducing and minimum electric current, again survey in reference frequency, power factor 1.0 Examination elementary error;
Step S248: compare with reference condition elementary error, recording error knots modification;
Step S249: automatically judge conclusion (of pressure testing) according to error knots modification;
Step S2410: in recovery temperature control box, room temperature is reference temperature, off-test.
Further, the load that is added on electric energy meter by change in described step S25, increase temperature humidity value and carry out sea Amount data communication also obtains electric energy meter test data, specifically comprises the following steps that
Step S251: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step S252: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step S253: arrange room temperature and humidity in temperature control box, time delay waits ambient temperature-stable;
Step S254: reference voltage, Imax electric current, reference frequency, power factor 1.0 are set;
Step S255: load changing number of times and power-off and power up cycle are set;
Step S256: setting and the number of times of electric energy meter communication and communication time interval, acquiescence receives electric energy meter return value 0 second Start communication next time;
Step S257: accumulative actual electric energy of having good luck of being taken temperature during whole load changing, simultaneously anti-by setting the frequency Re-reading take tested table register data;Load changing process terminates, and terminates and by communication of taking temperature;
Step S258: during load changing, real-time judgment is the most successful with communication of being taken temperature;Load changing terminates to judge Whether actual have good luck electric energy and the theory of being taken temperature electric energy difference of having good luck meets standard criterion requirement;
Step S259: in recovery temperature control box, room temperature is reference temperature, off-test.
Further, the voltage that is added on electric energy meter by change in described step S26, increase temperature humidity value and carry out sea Amount data communication also obtains electric energy meter test data, specifically comprises the following steps that
Step S261: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step S262: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step S263: arrange room temperature and humidity in temperature control box by platform courses program, time delay waits that ambient temperature is steady Fixed;
Step S264: reference voltage, reference frequency, power factor 1.0 are set;
Step S265: read tested table register charge value record;
Step S266: the slow liter of voltage is set and delays fall change frequency;
Step S267: voltage is set and delays eustasy speed;
Step S268: minimum minium operation voltage and the maximum operating voltage upper limit of voltage up-down change are set;
Step S269: setting and the number of times of electric energy meter communication and communication time interval, acquiescence receives electric energy meter return value 0 second Start communication next time;
Step S2610: repeatedly reading tested table register charge value, recording impulse sends number simultaneously;
Step S2611: whether change according to depositor charge value before and after test and whether have pulse to send in process of the test Automatically conclusion (of pressure testing) is judged;
Step S2612: in recovery temperature control box, room temperature is reference temperature, off-test.
Owing to have employed technique scheme, present invention have the advantage that:
The present invention provides a kind of test method examining electric energy meter blocking factor to affect, to being in true power utilization environment Single-phase electric energy meter is combined factor impact test, to overcome currently available technology above shortcomings, for examination electric energy meter Environmental suitability proposes effective test method, for analyzing the test number improving electric energy meter field running quality offer science According to support.The testing inspection of following items can be realized respectively: voltage gradually changes and detects with hot and humid blocking factor;Frequency Change+hot and humid blocking factor detects;Voltage x current greatly detects with low temperature and low humidity blocking factor;Voltage x current is minimum and low Temperature low humidity blocking factor detection;Load changing, hot and humid and mass data communication blocking factor detection;The slow fall of the slow liter of voltage, Hot and humid and mass data communication blocking factor detects.
Other advantages, target and the feature of the present invention will be illustrated to a certain extent in the following description, and And to a certain extent, will be apparent to those skilled in the art based on to investigating hereafter, or can To be instructed from the practice of the present invention.The target of the present invention and other advantages can be realized by description below and Obtain.
Accompanying drawing explanation
The accompanying drawing of the present invention is described as follows.
Fig. 1 is the test method flow chart of the examination electric energy meter blocking factor impact of the present invention.
Fig. 2 is that the voltage of the present invention gradually changes+hot and humid testing process.
Fig. 3 is the frequency change+hot and humid testing process of the present invention.
Fig. 4 be the present invention voltage x current greatly+low-temperature test flow process.
Fig. 5 be the voltage x current of the present invention minimum+low-temperature test flow process.
Fig. 6 is the load changing+hot and humid+mass data communication test flow process of the present invention.
Fig. 7 is that slow liter of voltage of the present invention delays fall+hot and humid+mass data communication test flow process.
Detailed description of the invention
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
As it is shown in figure 1, the test method that the examination electric energy meter blocking factor that the present embodiment provides affects, including following step Rapid:
S1: the core electric energy meter that needs checking is arranged at the trial zone of electric energy meter environmental suitability evaluating platform;
S2: firing test presets examination item, and described default examination item includes below scheme:
S21: the voltage being added on electric energy meter by change and temperature humidity value are tested to be affected produced by electric energy meter;
S22: the electric voltage frequency and the temperature humidity value that are added on electric energy meter by change are tested produced by electric energy meter Impact;
S23: by the voltage on electric energy meter being increased to maximum and temperature is reduced to low-temperature values testing electric energy The produced impact of table;
S24: by the voltage on electric energy meter being increased to minimum and temperature is reduced to low-temperature values testing electric energy The produced impact of table;
S25: the load that is added on electric energy meter by change, increase temperature humidity value and carry out mass data communication and test Affect produced by electric energy meter;
S26: the voltage that is added on electric energy meter by change, increase temperature humidity value and carry out mass data communication and test Affect produced by electric energy meter;
S3: obtain the test data of each default examination item;
S4: analyzing and processing test data obtains electric energy meter blocking factor affects the result of appraisal.
Wherein, the specifically comprising the following steps that of each default examination item
Such as Fig. 2, voltage gradually changes+and hot and humid testing procedure is as follows:
Step 211: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step 212: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step 213: arranging room temperature in temperature control box by platform courses program is reference temperature 23 DEG C, and time delay waits environment Temperature stabilization;
Step 214: add reference voltage, reference current, reference frequency for tested top application, tests electric energy in power factor 1.0 Table elementary error, and record;
Step 215: then room temperature in temperature control box is set to humid tropical condition: temperature 60 C, humidity 95%, time delay Wait ambient temperature-stable;
Step 216: reference current, reference frequency, power 1.0 is set, respectively 0.9 times of reference voltage, reference voltage, 1.1 times of reference voltage test Basic Error of Energy Meter, and recording error maximum;
Step 217: the max value of error of record compares with reference condition elementary error, calculates error knots modification;
Step 218: automatically judge conclusion (of pressure testing) according to error knots modification in-scope;
Step 219: in recovery temperature control box, room temperature is reference temperature, off-test.
Such as Fig. 3, frequency change+hot and humid testing procedure is as follows:
Step 221: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step 222: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step 223: arranging room temperature in temperature control box by platform courses program is reference temperature 23 DEG C, and time delay waits environment Temperature stabilization;
Step 224: apply reference voltage, reference frequency, read tested table register electric quantity data;
Step 225: then room temperature in temperature control box is set to humid tropical condition: temperature 60 C, humidity 95%, time delay Wait ambient temperature-stable;
Step 226: setting voltage frequency variation rate is every five seconds for example 0.1Hz, transformation period is 30 minutes;
Step 227: voltage sets speed to be changed repeatedly 45.00~65.00Hz;
Step 228: frequency change applies reference voltage, reference frequency after terminating again, reads tested table register electricity Data;
Step 229: whether the tested table register electric quantity data read before and after changing according to frequency changes, automatically Judge conclusion (of pressure testing);
Step 2210: in recovery temperature control box, room temperature is reference temperature, off-test.
Such as Fig. 4, voltage x current greatly+low-temperature test step is as follows:
Step 231: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step 232: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step 233: arranging room temperature in temperature control box by platform courses program is reference temperature 23 DEG C, and time delay waits environment Temperature stabilization;
Step 234: apply reference voltage, reference current, test elementary error in reference frequency, power factor 1.0;
Step 235: voltage is improved to the highest gage work voltage, electric current is improved to maximum current (for directly connecing Enter formula table to improve to 10Ib, transformer access type table is improved to 1.5Imax);Wherein, direct access: 10Ib;Transformer Access type: 1.5Imax;
Step 236: in arranging temperature control box, room temperature is-40 DEG C, time delay waits ambient temperature-stable;
Step 237: keep the significant voltage after improving and extreme currents, again test in reference frequency, power factor 1.0 Elementary error;
Step 238: compare with reference condition elementary error, recording error knots modification;
Step 239: whether surpass 2 times of class indexs 70% of being taken temperature according to error knots modification and automatically judge conclusion (of pressure testing);
Step 2310: in recovery temperature control box, room temperature is reference temperature, off-test.
Such as Fig. 5, voltage x current is minimum+and low-temperature test step is as follows:
Step 241: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step 242: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step 243: arranging room temperature in temperature control box by platform courses program is reference temperature 23 DEG C, and time delay waits environment Temperature stabilization;
Step 244: apply reference voltage, reference current, test elementary error in reference frequency, power factor 1.0;
Step 245: voltage is down to minimum gage work voltage, electric current is down to starting current;
Step 246: in arranging temperature control box, room temperature is-40 DEG C, time delay waits ambient temperature-stable;
Step 247: keep the minimum voltage after reducing and minimum electric current, again test in reference frequency, power factor 1.0 Elementary error;
Step 248: compare with reference condition elementary error, recording error knots modification;
Step 249: whether surpass 2 times of class indexs 70% of being taken temperature according to error knots modification and automatically judge conclusion (of pressure testing);
Step 2410: in recovery temperature control box, room temperature is reference temperature, off-test.
Such as Fig. 6, load changing+hot and humid+mass data communication test step is as follows:
Step 251: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step 252: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step 253: arranging room temperature in temperature control box by platform courses program is 60 DEG C, humidity 95%, time delay waits ring Border temperature stabilization;
Step 254: reference voltage, Imax electric current, reference frequency, power factor 1.0 are set;
Step 255: load changing number of times and power-off and power up cycle are set;
Step 256: setting and the number of times of electric energy meter communication and communication time interval, acquiescence receives electric energy meter return value 0 second Start communication next time;
Step 257: accumulative actual electric energy of having good luck of being taken temperature during whole load changing, simultaneously by setting the frequency repeatedly Read tested table register data.Load changing process terminates, and terminates and by communication of taking temperature;
Step 258: during load changing, real-time judgment is the most successful with communication of being taken temperature;Load changing terminates to judge Whether actual have good luck electric energy and the theory of being taken temperature electric energy difference of having good luck meets standard criterion requirement;
Step 259: in recovery temperature control box, room temperature is reference temperature, off-test.
Such as Fig. 7, the slow fall+hot and humid+mass data communication test step of the slow liter of voltage is as follows:
Step 261: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step 262: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step 263: arranging room temperature in temperature control box by platform courses program is 60 DEG C, humidity 95%, time delay waits ring Border temperature stabilization;
Step 264: reference voltage, reference frequency, power factor 1.0 are set;
Step 265: read tested table register charge value record;
Step 266: the slow liter of voltage is set and delays fall change frequency;
Step 267: the slow liter of voltage is set and delays fall rate of change every five seconds for example change 1%Un (Un refers to reference voltage);
Step 268: (U1 is under minimum running voltage in 90%U1~110%U2 slow liter slow fall change repeatedly to arrange voltage Limit, U2 is the maximum operating voltage upper limit);Wherein, U1 is minimum minium operation voltage;U2 is the maximum operating voltage upper limit;Acquiescence Voltage changing rate every five seconds for example 1%Un;
Step 269: setting and the number of times of electric energy meter communication and communication time interval, acquiescence receives electric energy meter return value 0 second Start communication next time;
Step 2610: repeatedly reading tested table register charge value, recording impulse sends number simultaneously;
Step 2611: whether change according to depositor charge value before and after test and whether have pulse to send certainly in process of the test Dynamic judgement conclusion (of pressure testing);
Step 2612: in recovery temperature control box, room temperature is reference temperature, off-test.
Finally illustrating, above example is only in order to illustrate technical scheme and unrestricted, although with reference to relatively The present invention has been described in detail by good embodiment, it will be understood by those within the art that, can be to the skill of the present invention Art scheme is modified or equivalent, and without deviating from objective and the scope of the technical program, it all should be contained in the present invention Protection domain in the middle of.

Claims (7)

1. examine the test method that electric energy meter blocking factor affects for one kind, it is characterised in that: comprise the following steps:
S1: the core electric energy meter that needs checking is arranged at the trial zone of electric energy meter environmental suitability evaluating platform;
S2: firing test presets examination item, and described default examination item includes below scheme:
S21: the voltage being added on electric energy meter by change and temperature humidity value also obtain electric energy meter test data;
S22: the electric voltage frequency being added on electric energy meter by change and temperature humidity value also obtain electric energy meter test data;
S23: by the voltage on electric energy meter being increased to maximum and temperature being reduced to low-temperature values and obtains electric energy meter test Data;
S24: by the voltage on electric energy meter being increased to minimum and temperature being reduced to low-temperature values and obtains electric energy meter test Data;
S25: the load that is added on electric energy meter by change, increase temperature humidity value and carry out mass data communication and obtain electric energy Table test data;
S26: the voltage that is added on electric energy meter by change, increase temperature humidity value and carry out mass data communication and obtain electric energy Table test data;
S3: obtain each test data and the test data of default examination item;
S4: analyzing and processing test data and test data obtain the electric energy meter result of appraisal under the influence of blocking factor.
2. the test method of examination electric energy meter blocking factor impact as claimed in claim 1, it is characterised in that: described step The voltage being added on electric energy meter by change in S21 and temperature humidity value also obtain electric energy meter test data, specifically comprise the following steps that
Step 211: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step 212: the voltage circuit taken temperature, current loop, pulse signal and 485 signals are accessed test platform;
Step 213: room temperature in temperature control box is set and is reference temperature and time delay waits ambient temperature-stable;
Step 214: add reference voltage, reference current and reference frequency for tested top application;
Step 215: room temperature in temperature control box is set to humid tropical condition and time delay waits ambient temperature-stable;
Step 216: arrange and change reference current, the reference frequency test the error amount of electric energy meter being added on electric energy meter;
Step 217: the max value of error of record compares with reference condition elementary error, calculates error knots modification;
Step 218: automatically judge conclusion (of pressure testing) according to error knots modification in-scope;
Step 219: in recovery temperature control box, room temperature is reference temperature, off-test.
3. the test method of examination electric energy meter blocking factor impact as claimed in claim 1, it is characterised in that: described step The electric voltage frequency being added on electric energy meter by change in S22 and temperature humidity value also obtain electric energy meter test data, concrete steps As follows:
Step S221: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step S222: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step S223: arranging room temperature in temperature control box by platform courses program is reference temperature, time delay waits that ambient temperature is steady Fixed;
Step S224: apply reference voltage, reference frequency, read tested table register electric quantity data;
Step S225: then room temperature in temperature control box is set to humid tropical condition: time delay waits ambient temperature-stable;
Step S226: setting voltage frequency variation rate and time;
Step S227: setting voltage rate of change;
Step S228: frequency change applies reference voltage, reference frequency after terminating again, reads tested table register electricity number According to;
Step S229: whether the tested table register electric quantity data read before and after changing according to frequency changes, and automatically sentences Determine conclusion (of pressure testing);
Step S2210: in recovery temperature control box, room temperature is reference temperature, off-test.
4. the test method of examination electric energy meter blocking factor impact as claimed in claim 1, it is characterised in that: described step By the voltage on electric energy meter being increased to maximum and temperature being reduced to low-temperature values and obtains electric energy meter test number in S23 According to, specifically comprise the following steps that
Step S231: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step S232: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step S233: arranging room temperature in temperature control box by platform courses program is reference temperature, time delay waits that ambient temperature is steady Fixed;
Step S234: apply reference voltage, reference current, test elementary error in reference frequency, power factor 1.0;
Step S235: voltage is improved to the highest gage work voltage, electric current is improved to maximum current;
Step S236: arrange room temperature in temperature control box, time delay waits ambient temperature-stable;
Step S237: keep the significant voltage after improving and extreme currents, again test base in reference frequency, power factor 1.0 This error;
Step S238: compare with reference condition elementary error, recording error knots modification;
Step S239: automatically judge conclusion (of pressure testing) according to error knots modification;
Step S2310: in recovery temperature control box, room temperature is reference temperature, off-test.
5. the test method of examination electric energy meter blocking factor impact as claimed in claim 1, it is characterised in that: described step By the voltage on electric energy meter being increased to minimum and temperature being reduced to low-temperature values and obtains electric energy meter test number in S24 According to, specifically comprise the following steps that
Step S241: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step S242: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step S243: arranging room temperature in temperature control box by platform courses program is reference temperature, time delay waits that ambient temperature is steady Fixed;
Step S244: apply reference voltage, reference current, test elementary error in reference frequency, power factor 1.0;
Step S245: voltage is down to minimum gage work voltage, electric current is down to starting current;
Step S246: arrange room temperature in temperature control box, time delay waits ambient temperature-stable;
Step S247: keep the minimum voltage after reducing and minimum electric current, again test base in reference frequency, power factor 1.0 This error;
Step S248: compare with reference condition elementary error, recording error knots modification;
Step S249: automatically judge conclusion (of pressure testing) according to error knots modification;
Step S2410: in recovery temperature control box, room temperature is reference temperature, off-test.
6. the test method of examination electric energy meter blocking factor impact as claimed in claim 1, it is characterised in that: described step The load that is added on electric energy meter by change in S25, increase temperature humidity value and carry out mass data communication and obtain electric energy meter Test data, specifically comprise the following steps that
Step S251: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step S252: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step S253: arrange room temperature and humidity in temperature control box, time delay waits ambient temperature-stable;
Step S254: reference voltage, Imax electric current, reference frequency, power factor 1.0 are set;
Step S255: load changing number of times and power-off and power up cycle are set;
Step S256: setting and the number of times of electric energy meter communication and communication time interval, acquiescence receives electric energy meter return value and starts for 0 second Communication next time;
Step S257: accumulative actual electric energy of having good luck of being taken temperature during whole load changing, is read by the setting frequency simultaneously repeatedly Take tested table register data;Load changing process terminates, and terminates and by communication of taking temperature;
Step S258: during load changing, real-time judgment is the most successful with communication of being taken temperature;Load changing terminates to judge tested Table is actual, and whether electric energy and theory electric energy difference of having good luck of having good luck meets standard criterion requirement;
Step S259: in recovery temperature control box, room temperature is reference temperature, off-test.
7. the test method of examination electric energy meter blocking factor impact as claimed in claim 1, it is characterised in that: described step The voltage that is added on electric energy meter by change in S26, increase temperature humidity value and carry out mass data communication and obtain electric energy meter Test data, specifically comprise the following steps that
Step S261: first two pieces are participated in being taken temperature of test and inserts room in humiture test box;
Step S262: the voltage circuit taken temperature, current loop, pulse signal, 485 signals are accessed test platform;
Step S263: arrange room temperature and humidity in temperature control box by platform courses program, time delay waits ambient temperature-stable;
Step S264: reference voltage, reference frequency, power factor 1.0 are set;
Step S265: read tested table register charge value record;
Step S266: the slow liter of voltage is set and delays fall change frequency;
Step S267: voltage is set and delays eustasy speed;
Step S268: minimum minium operation voltage and the maximum operating voltage upper limit of voltage up-down change are set;
Step S269: setting and the number of times of electric energy meter communication and communication time interval, acquiescence receives electric energy meter return value and starts for 0 second Communication next time;
Step S2610: repeatedly reading tested table register charge value, recording impulse sends number simultaneously;
Step S2611: whether change according to depositor charge value before and after test and whether have pulse to send automatically in process of the test Judge conclusion (of pressure testing);
Step S2612: in recovery temperature control box, room temperature is reference temperature, off-test.
CN201610600359.1A 2016-07-27 2016-07-27 A kind of test method that examination electric energy meter blocking factor influences Active CN106291441B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610600359.1A CN106291441B (en) 2016-07-27 2016-07-27 A kind of test method that examination electric energy meter blocking factor influences

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610600359.1A CN106291441B (en) 2016-07-27 2016-07-27 A kind of test method that examination electric energy meter blocking factor influences

Publications (2)

Publication Number Publication Date
CN106291441A true CN106291441A (en) 2017-01-04
CN106291441B CN106291441B (en) 2019-04-16

Family

ID=57662396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610600359.1A Active CN106291441B (en) 2016-07-27 2016-07-27 A kind of test method that examination electric energy meter blocking factor influences

Country Status (1)

Country Link
CN (1) CN106291441B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110007263A (en) * 2019-05-17 2019-07-12 贵州电网有限责任公司 The test device and method that voltage flicker and temperature influence electric energy meter measurement error
CN110031792A (en) * 2019-05-17 2019-07-19 贵州电网有限责任公司 Consider the Basic Error of Energy Meter test device and method of temperature and curent change

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104316894A (en) * 2014-10-16 2015-01-28 国家电网公司 Simulation and calibration method for practical running environment of electric energy meter
CN104820202A (en) * 2015-06-01 2015-08-05 国家电网公司 Electric energy meter testing device
CN104865549A (en) * 2015-04-23 2015-08-26 国网上海市电力公司 Reliability evaluation method and system of electric energy metering device
CN105158722A (en) * 2015-04-23 2015-12-16 国网上海市电力公司 Evaluation method for performance index of electric energy meter
CN105607027A (en) * 2015-12-17 2016-05-25 郑州三晖电气股份有限公司 High-low temperature weather effect testing device for electric energy meter

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104316894A (en) * 2014-10-16 2015-01-28 国家电网公司 Simulation and calibration method for practical running environment of electric energy meter
CN104865549A (en) * 2015-04-23 2015-08-26 国网上海市电力公司 Reliability evaluation method and system of electric energy metering device
CN105158722A (en) * 2015-04-23 2015-12-16 国网上海市电力公司 Evaluation method for performance index of electric energy meter
CN104820202A (en) * 2015-06-01 2015-08-05 国家电网公司 Electric energy meter testing device
CN105607027A (en) * 2015-12-17 2016-05-25 郑州三晖电气股份有限公司 High-low temperature weather effect testing device for electric energy meter

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张垠等: "关于智能电能表运行仿真试验及评价方法的探讨", 《华东电力》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110007263A (en) * 2019-05-17 2019-07-12 贵州电网有限责任公司 The test device and method that voltage flicker and temperature influence electric energy meter measurement error
CN110031792A (en) * 2019-05-17 2019-07-19 贵州电网有限责任公司 Consider the Basic Error of Energy Meter test device and method of temperature and curent change

Also Published As

Publication number Publication date
CN106291441B (en) 2019-04-16

Similar Documents

Publication Publication Date Title
CN102645619B (en) Evaluating method of electric equipment partial discharge detection system and electric equipment partial discharge detection device
CN108872820B (en) Method and system for evaluating insulation aging state of oil impregnated paper in high-voltage current transformer
CN104849685A (en) Partial discharge detector performance evaluation method
CN109001664A (en) A kind of transient state recording type fault detector waveform contrastive test method
CN104459588A (en) System and method for current sensor test
CN106291441A (en) A kind of test method examining electric energy meter blocking factor to affect
CN108120949A (en) A kind of intelligent electric energy meter accelerated degradation test method
CN116540682A (en) Method, system, device, equipment and medium for testing analog single machine
CN113110370A (en) Test system and method
JP2010210510A (en) Insulation inspection apparatus and method
CN103698639B (en) Crystal oscillator waveform parameter automatic measurement system and method
Montanari et al. Random sampling and data processing for PD-pulse height and shape analysis
CN103197276A (en) Reliability automatic detecting device of intelligent energy meter
CN109000823A (en) The conductor temperature measurement method and system of cold contract cable middle joint
Waldi et al. An optimized method of partial discharge data retrieval technique for phase resolved pattern
CN114527315B (en) System and method for monitoring reliability of measuring equipment
CN207232366U (en) A kind of transformer high-frequency test instrument sensitivity and the inspection circuit of the linearity
Castello et al. Integration of power quality and fault data into a PMU-based Wide Area Monitoring System
CN108491862A (en) A kind of transformer equipment sensor group data fusion and wireless assemblage method and system
JP2000214206A (en) Circuit substrate inspecting method and circuit substrate inspecting apparatus
CN113504498B (en) Performance detection method and system of partial discharge intelligent sensing terminal
Sanahuja et al. Testing biquad filters under parametric shifts using xy zoning
CN104678177B (en) The method of testing and device of a kind of insulating materials based on radiation source mode
Zondervan et al. A new multi-purpose partial discharge analyser for on-site and on-line diagnosis of high voltage components
CN215728764U (en) Integrated calibration system of transformer equipment insulation on-line monitoring device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant