Warehousing forklift vertical reduction box fatigue experimental device Download PDF

Info

Publication number
CN106289761A
CN106289761A CN201610665413.0A CN201610665413A CN106289761A CN 106289761 A CN106289761 A CN 106289761A CN 201610665413 A CN201610665413 A CN 201610665413A CN 106289761 A CN106289761 A CN 106289761A
Authority
CN
China
Prior art keywords
reduction box
balladeur train
shaft
bearing
torque
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610665413.0A
Other languages
Chinese (zh)
Other versions
CN106289761B (en
Inventor
代冠军
孟介成
刘红
王军
韩志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Heli Co Ltd
Original Assignee
Anhui Heli Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Heli Co Ltd filed Critical Anhui Heli Co Ltd
Priority to CN201610665413.0A priority Critical patent/CN106289761B/en
Publication of CN106289761A publication Critical patent/CN106289761A/en
Application granted granted Critical
Publication of CN106289761B publication Critical patent/CN106289761B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts
    • G01M13/02Gearings; Transmission mechanisms
    • G01M13/025Test-benches with rotational drive means and loading means; Load or drive simulation

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
  • Forklifts And Lifting Vehicles (AREA)

Abstract

The present invention relates to warehousing forklift vertical reduction box fatigue experimental device, including reduction box, platen, and magnetic powder brake, sensor stand, bearing bracket and the column balladeur train assembly being successively set on platen;Equipped with torque and speed sensors on described sensor stand, equipped with at least one rolling bearing units on described bearing bracket, described rolling bearing units are built with splined shaft, one end of described splined shaft is connected with torque and speed sensors by shaft coupling, the other end of splined shaft is provided with internal splined hole, being fitted with external splines in described internal splined hole, described external splines connects the flange matched with reduction box outfan, and institute's magnetic powder brake is connected with torque and speed sensors by shaft coupling;The present invention uses the test method of two kinds of load of simulation so that the operating condition of test of reduction box is more identical with actual condition, improves the accuracy of result of the test.

Description

Warehousing forklift vertical reduction box fatigue experimental device
Technical field
The present invention relates to fork truck field, the fatigue experimental device of the vertical reduction box of a kind of warehousing forklift.
Background technology
Warehousing forklift reduction box is vertical installation on car load, and the input of reduction box is connected with travel driving motor, defeated Go out end equipped with tire.During travel driving motor operating, rotated by reduction box deceleration tire, i.e. drive car load walking.Should Reduction box is primarily subjected to two kinds of load at car load, and one is that on vertical direction, the part of car load acts on reduction box from heavy load, And this load becomes with duty (as unloaded level land traveling, fully loaded level land travel, the are fully loaded with climbing traveling etc.) difference of car load Change;Two is that the output loads duty with car load equally of reduction box is different and change.Stand currently for this reduction box Test is that simulation one of which load is tested mostly, and is mainly used in delivery test.As tired in used existing device to carry out Labor is tested, then have the disadvantage in that 1, be only capable of simulating one of which load and carry out fatigue test, and the accuracy of result of the test is relatively Low.2, for the reduction box of new research and development, it is impossible to simulation load suffered by actual condition, cause the Durability Test can not be the most sudden and the most violent Expose the weak spot of design.3, the reduction box quality problems for feeding back after sale are difficult to carry out recurrence of failure by bench test.
Summary of the invention
It is an object of the invention to provide the fatigue experimental device of the vertical reduction box of a kind of warehousing forklift, can truly simulate storehouse Store up the actual condition of the vertical reduction box of fork truck thus carry out fatigue detecting.
For solve the problems referred to above, the present invention by the following technical solutions:
Warehousing forklift vertical reduction box fatigue experimental device, including reduction box, platen, and the magnetic powder being successively set on platen Brake, sensor stand, bearing bracket and column balladeur train assembly;Sense equipped with rotational speed and torque on described sensor stand Device, equipped with at least one rolling bearing units on described bearing bracket, described rolling bearing units built with splined shaft, described splined shaft One end is connected with torque and speed sensors by shaft coupling, and the other end of splined shaft is provided with internal splined hole, in described internal splined hole Being fitted with external splines, described external splines connects the flange matched with reduction box outfan, and institute's magnetic powder brake is by connection Axial organ is connected with torque and speed sensors;
Described column balladeur train assembly is provided with by hydraulic oil cylinder driving and the balladeur train that vertically moves up and down, solid on described balladeur train Surely having bracket assembly, equipped with motor on described bracket assembly, the motor shaft of described motor vertically points to platen, described electricity The lower end of arbor is connected with axle sleeve, axle sleeve flange, universal joint, adapter sleeve flange, adapter sleeve and power shaft, institute from top to bottom in turn State power shaft to be connected with the input of reduction box by bearing flange.
Further, described column balladeur train assembly includes upright post base, is arranged on upright post base three arranged in triangle Guide pillar, and connect the crossbeam of three guide pillar upper ends;It is fixed with cylinder support on described crossbeam, in described cylinder support, passes through pin Axle is fixed with oil cylinder, and the tailpiece of the piston rod of described oil cylinder vertically points to platen, and passes equipped with pressure in piston rod end Sensor, described pull pressure sensor is connected by connecting plate and balladeur train are fixing, and on described balladeur train, corresponding three guide pillar positions are provided with Three bearings matched with guide pillar external cylindrical surface, described balladeur train is flexibly connected with guide pillar by bearing.
Further, described bracket assembly includes underframe and the electric machine support being fixed on underframe, the base surface of described underframe It is provided with the spacing hole matched with bearing flange.
Further, described axle sleeve is flexibly connected with power shaft, and the top of described power shaft is fixed with for spacing to axle sleeve Back-up ring.
The beneficial effects of the present invention is: the present invention can apply vertical load on a test platen to reduction box simultaneously With output loaded load, simulate the operating mode of reduction box under the transport conditions such as unloaded level land, fully loaded level land, fully loaded climbing, pass through The output speed of torque and speed sensors detection reduction box and the loading moment of torsion of magnetic powder brake, detected by pull pressure sensor The vertical magnitude of load that reduction box is applied by oil cylinder, thus carry out the fatigue test of reduction box;The present invention uses simulation two kinds The test method of load so that the operating condition of test of reduction box is more identical with actual condition, improves the accuracy of result of the test; For the reduction box of new research and development, using the test method of the present invention, (bench test can connect can to carry out verification experimental verification faster Continuous 24h carries out), and the weak spot in design can be completely revealed;Reduction box quality problems simultaneously for site feedback can be Carried out bench test by assembly of the invention at any time and carry out recurrence of failure, the most convenient.
Accompanying drawing explanation
Detailed description of the invention with regard to the present invention is described further below in conjunction with the accompanying drawings, wherein:
Fig. 1 is the front axis side view of the present invention;
Fig. 2 is the back side axis side view of the present invention;
Fig. 3 is the front view of the present invention;
Fig. 4 is the left view of the present invention;
Fig. 5 is the top view of the present invention;
Fig. 6 is the front view of column balladeur train assembly;
Fig. 7 is the left part sectional view of column balladeur train assembly;
Fig. 8 is the axis side view of column balladeur train assembly;
Fig. 9 is the phantom of reduction box and portion support assembly;
Figure 10 is the axis side view of reduction box and portion support assembly.
Detailed description of the invention
Warehousing forklift vertical reduction box fatigue experimental device shown in 1 to Fig. 5 referring to the drawings, including platen 1, and successively Magnetic powder brake 12, sensor stand 9, bearing bracket 6 and the column balladeur train assembly 22 being arranged on platen 1.Magnetic powders brake Device 12 and sensor stand 9 are installed on base 13, it is ensured that each several part is on same level height.
Equipped with torque and speed sensors 10 on described sensor stand 9, equipped with two axles of usheing to seat on described bearing bracket 6 Holding 7, described rolling bearing units 7 are built with splined shaft 5, and one end of described splined shaft 5 is by shaft coupling 8 and torque and speed sensors 10 Connecting, the other end of splined shaft 5 is machined with internal splined hole, is fitted with external splines 4 in described internal splined hole, and external splines 4 can be along Splined hole moves axially, and the other end of described external splines 4 connects the flange 3 matched with reduction box 2 outfan, magnetic powder system Dynamic device 12 is connected with torque and speed sensors 10 by shaft coupling 11.
With reference to shown in Fig. 6 to Fig. 8, described column balladeur train 22 assembly includes upright post base 36, is arranged on upright post base 36 Three guide pillars 32 of arrangement in triangle, and the crossbeam 28 of three guide pillar 32 upper ends is connected by baffle plate 27 and bolt.
It is fixed with cylinder support 29 on described crossbeam 28, in described cylinder support 29, is fixed with oil cylinder 31 by bearing pin 30, The tailpiece of the piston rod of described oil cylinder 31 vertically points to platen, and has been threaded connection pressure sensing in piston rod end Device 33, described pull pressure sensor 33 is connected by connecting plate 34 is fixing with balladeur train 35, corresponding three guide pillars on described balladeur train 35 32 positions are provided with three bearings 37 matched with guide pillar 32 external cylindrical surface, and described balladeur train 35 is movable with guide pillar 32 by bearing 37 Connect, and then balladeur train 35 can be driven to move up and down along guide pillar 32 with the piston rod action of oil cylinder 31.
Being fixed with bracket assembly on described balladeur train 35, shown bracket assembly includes underframe 14 and is fixed on the electricity on underframe 14 Machine support 24, on electric machine support 24, carrying is fixed with motor 23, and the motor shaft of described motor 23 vertically points to platen 1, The lower end of described motor shaft is equipped with axle sleeve 21, and axle sleeve flange 20 is fixed on axle sleeve 21, universal joint 19 upper end and axle sleeve flange 20 Connecting, the lower end of universal joint 19 is connected with adapter sleeve flange 18, and adapter sleeve flange 18 is arranged on adapter sleeve 17.
With reference to shown in Fig. 9 and Figure 10, shown adapter sleeve 17 is sleeved on power shaft 25, and adapter sleeve 17 is lived with power shaft 25 It is dynamically connected, a certain distance can be moved up and down along power shaft 25, by being fixed on the back-up ring 26 on power shaft 25 top to it upwards The position of movement carries out spacing.
Power shaft 25 designs and produces according to the motor shaft that reduction box 2 is equipped with and forms, and utilizes the motor on reduction box 2 simultaneously Hole, location, designs and produces bearing flange 16, and the bearing that power shaft 25 is carried with reduction box 2 by bearing flange 16 is connected.Described The base surface 15 of underframe 14 is provided with the spacing hole matched with bearing flange 16, and spacing hole determines the position of bearing flange 16.
The upper end of reduction box 2 is bolted on the floor board 15 of underframe 14, and the outfan of reduction box 2 is dismantled institute Mounting flange 3 after the tire of dress, flange 3 is connected with external splines 4, thus forms " motor+change speed gear box+rotational speed and torque a sensing Device+magnetic powder brake " driving-chain.
The process of the test of the present invention is as follows: install reduction box 2 to be tested by above-mentioned connected mode, when motor 23 drives When reduction box 2 operates, oil cylinder 31 squeezes into pressure oil pressurize simultaneously, and reduction box 2 i.e. applies the load of a vertical direction, simulation The car load vertical load that reduction box 2 is applied by car load under the transport conditions such as unloaded level land, fully loaded level land, fully loaded climbing.
Simultaneously control magnetic powder brake 12 current value, make magnetic powder brake 12 to the loading torque value of reduction box 2 and this Time the fork truck transport condition simulated of oil cylinder 31 consistent, i.e. oil cylinder 31 applies unloaded level land, fully loaded level land, fully loaded to reduction box 2 During the vertical load of the transport conditions such as climbing, magnetic powder brake 12 applies unloaded level land, fully loaded level land, full simultaneously to reduction box 2 Carry the output loaded load of the transport conditions such as climbing.
Set the duration of runs and the order of various transport condition, thus carry out the fatigue test to reduction box 2.Wherein, turn Speed torque sensor 10 loads moment of torsion for the output speed and magnetic powder brake 12 detecting reduction box 2.Pull pressure sensor 33 For detecting the vertical magnitude of load that reduction box 2 is applied by oil cylinder 31.
The above, the only preferable detailed description of the invention of the present invention, but scope is not limited thereto, and any Those familiar with the art in the technical scope of present disclosure, the change that can readily occur in or replacement, all answer Contain within protection scope of the present invention.Therefore scope is as the criterion with the protection domain of claims.

Claims (4)

1. warehousing forklift vertical reduction box fatigue experimental device, including reduction box, it is characterised in that also include platen, Yi Jiyi Secondary magnetic powder brake, sensor stand, bearing bracket and the column balladeur train assembly being arranged on platen;Described sensor stand On equipped with torque and speed sensors, equipped with at least one rolling bearing units on described bearing bracket, described rolling bearing units built with Splined shaft, one end of described splined shaft is connected with torque and speed sensors by shaft coupling, and the other end of splined shaft is provided with interior flower Keyhole, is fitted with external splines in described internal splined hole, described external splines connects the flange matched with reduction box outfan, Institute's magnetic powder brake is connected with torque and speed sensors by shaft coupling;
Described column balladeur train assembly is provided with by hydraulic oil cylinder driving and the balladeur train that vertically moves up and down, solid on described balladeur train Surely having bracket assembly, equipped with motor on described bracket assembly, the motor shaft of described motor vertically points to platen, described electricity The lower end of arbor is connected with axle sleeve, axle sleeve flange, universal joint, adapter sleeve flange, adapter sleeve and power shaft, institute from top to bottom in turn State power shaft to be connected with the input of reduction box by bearing flange.
Warehousing forklift the most according to claim 1 vertical reduction box fatigue experimental device, it is characterised in that described column is sliding Frame assembly includes upright post base, is arranged on upright post base three guide pillars of arrangement in triangle, and connects three guide pillar upper ends Crossbeam;It is fixed with cylinder support on described crossbeam, in described cylinder support, is fixed with oil cylinder, the work of described oil cylinder by bearing pin Stopper rod end vertically points to platen, and in piston rod end equipped with pull pressure sensor, described pull pressure sensor is passed through Connecting plate and balladeur train are fixing is connected, and on described balladeur train, three guide pillar positions of correspondence are provided with three and match with guide pillar external cylindrical surface Bearing, described balladeur train is flexibly connected with guide pillar by bearing.
Warehousing forklift the most according to claim 1 vertical reduction box fatigue experimental device, it is characterised in that described support is total Becoming to include underframe and the electric machine support being fixed on underframe, the base surface of described underframe is provided with the limit matched with bearing flange Hole, position.
Warehousing forklift the most according to claim 1 vertical reduction box fatigue experimental device, it is characterised in that described axle sleeve with Power shaft is flexibly connected, and the top of described power shaft is fixed with for the back-up ring spacing to axle sleeve.
CN201610665413.0A 2016-08-13 2016-08-13 The vertical reduction gearbox fatigue experimental device of warehousing forklift Active CN106289761B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610665413.0A CN106289761B (en) 2016-08-13 2016-08-13 The vertical reduction gearbox fatigue experimental device of warehousing forklift

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610665413.0A CN106289761B (en) 2016-08-13 2016-08-13 The vertical reduction gearbox fatigue experimental device of warehousing forklift

Publications (2)

Publication Number Publication Date
CN106289761A true CN106289761A (en) 2017-01-04
CN106289761B CN106289761B (en) 2018-12-18

Family

ID=57670691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610665413.0A Active CN106289761B (en) 2016-08-13 2016-08-13 The vertical reduction gearbox fatigue experimental device of warehousing forklift

Country Status (1)

Country Link
CN (1) CN106289761B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108444735A (en) * 2018-05-23 2018-08-24 柳州上汽汽车变速器有限公司 Automotive transmission assembly fatigue life test stand
CN109484896A (en) * 2019-01-14 2019-03-19 陕西誉邦科技股份有限公司 A kind of simple winding mechanism of disassembly
EP3822607A4 (en) * 2019-03-08 2022-04-13 Tianjin University High-precision comprehensive performance test instrument for precise speed reducer for robot

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103115771A (en) * 2013-01-22 2013-05-22 索特传动设备有限公司 Speed reducer test device and speed reducer production line
CN103149028A (en) * 2013-03-18 2013-06-12 索特传动设备有限公司 Testing device of speed reducer
KR20140035627A (en) * 2012-09-14 2014-03-24 우림기계(주) Device for testing planitary gear box
CN203962961U (en) * 2014-07-21 2014-11-26 大冶特殊钢股份有限公司 Oil-filling device
CN104568426A (en) * 2014-07-08 2015-04-29 蒋桂云 Comprehensive testing system for dynamic property of harmonic speed reducer
CN205449496U (en) * 2016-03-29 2016-08-10 江苏泰隆减速机股份有限公司 Vertical cycloidal -pin gear speed reducer loading testing arrangement
CN205910006U (en) * 2016-08-13 2017-01-25 安徽合力股份有限公司 Vertical reducing gear box fatigue test device of storage fork truck

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20140035627A (en) * 2012-09-14 2014-03-24 우림기계(주) Device for testing planitary gear box
CN103115771A (en) * 2013-01-22 2013-05-22 索特传动设备有限公司 Speed reducer test device and speed reducer production line
CN103149028A (en) * 2013-03-18 2013-06-12 索特传动设备有限公司 Testing device of speed reducer
CN104568426A (en) * 2014-07-08 2015-04-29 蒋桂云 Comprehensive testing system for dynamic property of harmonic speed reducer
CN203962961U (en) * 2014-07-21 2014-11-26 大冶特殊钢股份有限公司 Oil-filling device
CN205449496U (en) * 2016-03-29 2016-08-10 江苏泰隆减速机股份有限公司 Vertical cycloidal -pin gear speed reducer loading testing arrangement
CN205910006U (en) * 2016-08-13 2017-01-25 安徽合力股份有限公司 Vertical reducing gear box fatigue test device of storage fork truck

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108444735A (en) * 2018-05-23 2018-08-24 柳州上汽汽车变速器有限公司 Automotive transmission assembly fatigue life test stand
CN109484896A (en) * 2019-01-14 2019-03-19 陕西誉邦科技股份有限公司 A kind of simple winding mechanism of disassembly
EP3822607A4 (en) * 2019-03-08 2022-04-13 Tianjin University High-precision comprehensive performance test instrument for precise speed reducer for robot

Also Published As

Publication number Publication date
CN106289761B (en) 2018-12-18

Similar Documents

Publication Publication Date Title
CN108839725A (en) A kind of suspension and full backpack mobile robot
CN104502015B (en) The detection method of drum reaction type lift type automobile axle load brake composite inspection table
CN106706336B (en) Integrated vibration test platform for electric vehicle
CN103439117B (en) Vehicle electrical driving wheel multi-function test stand
US11169054B2 (en) Method and system for use in dynamometer testing of a motor vehicle
CN106394153A (en) Travelling and steering servo driving wheel integrating hydraulic brake and suspension system
CN104729863A (en) Multifunctional road detection device and test method for tires
CN106289761A (en) Warehousing forklift vertical reduction box fatigue experimental device
CN108583733B (en) AGV transport vehicle for carrying heavy tubular materials
CN103487265A (en) Automobile power steering system development and performance detection platform
CN106769081B (en) A kind of electric vehicle brake simulator stand and test method adapting to different automobile types
CN104535341B (en) A kind of multi-functional wheel testing machine
CN102358223A (en) Test car used for testing rodless airplane tractor
CN104880325B (en) A kind of heavy multiaxle trucks heavy duty reproduction formula braking performance test experimental rig
CN103323246A (en) Electric multiple unit transmission system axle box bearing six-degree-of-freedom dynamic simulation load test platform
CN107907331B (en) Wheel hub bearing rigidity testing machine
CN116986012B (en) Device and method for landing gear running obstacle crossing impact test of carrier-based aircraft
CN105784362A (en) Motive power machine closed loop single gear box side-inclination type single suspension hydraulic excitation testbed
CN107907353A (en) The automatically controlled steering simulator stand of passenger car
CN103335847A (en) Axle box bearing radial and axial static load test stand for motor train unit transmission system
CN205910006U (en) Vertical reducing gear box fatigue test device of storage fork truck
CN103105299A (en) Axle weight and brake and vehicle speed combined test bench
CN201193981Y (en) Intelligent on-line detection apparatus for railway bearing
CN107505132B (en) Bidirectional tiltable double-gear box closed loop torsion loading test bed
CN109085006A (en) Crane wind resistance non-skid property test device and test method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant