CN106287123A - Walking beam cooler fixed frame installs leveling method - Google Patents
Walking beam cooler fixed frame installs leveling method Download PDFInfo
- Publication number
- CN106287123A CN106287123A CN201610633667.4A CN201610633667A CN106287123A CN 106287123 A CN106287123 A CN 106287123A CN 201610633667 A CN201610633667 A CN 201610633667A CN 106287123 A CN106287123 A CN 106287123A
- Authority
- CN
- China
- Prior art keywords
- bearing
- arm bar
- fixed frame
- cushion block
- foundation bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16M—FRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
- F16M9/00—Special layout of foundations with respect to machinery to be supported
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16M—FRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
- F16M5/00—Engine beds, i.e. means for supporting engines or machines on foundations
Abstract
The present invention relates to walking beam cooler fixed frame and leveling method is installed, including step: on the basis of being embedded with foundation bolt, find altitude datum with theodolite, make a mark on all foundation bolts according to this altitude datum, connect the labelling on foundation bolt with the chalk line stretched;According to the height of chalk line, bearing cushion block, erection support, arm bar seat are set, between bearing and arm bar seat, adjustment pad is set;The all bearings and the arm bar seat that complete one group of fixed frame are installed, and install arm bar on all arm bar seat tops of this group fixed frame;Repeating step, until often organizing the bearing of fixed frame, arm bar seat and all installations of arm bar, with the height of apparatus measures every arms bar, by levelling for arm bar, all bearings fasten completely with foundation bolt.This installation method, early stage chalk line ensures cushion block absolute altitude, it is ensured that bearing installation accuracy, and arm bar is only carried out the most levelling by the later stage, can reduce middle levelling link, significantly improve working performance.
Description
Technical field
The present invention relates to the installation method of walking beam cooler, the particularly levelling side of the installation of walking beam cooler fixed frame
Method.
Background technology
Walking beam cooler is generally of ten more organizes fixed frame, and often group fixed frame comprises again more than ten bearing of arrangement,
Being provided with arm bar seat on each bearing, all arm bar seats of one group of fixed frame support an arms bar jointly.
When cold bed is installed, needing to ensure that every arms bar height keeps consistent, current installation method is, first on the basis of arrange
Bearing cushion block, then places bearing on bearing cushion block, and with nut by bearing with on the basis of pre-buried fastening foundation bolt, depend on
The secondary all bearings completing one group of fixed frame are installed, and then utilize the height of apparatus measures upper surface of support, prop up by adjusting
Seat cushion block, by the most levelling for one group of bearing;Portion arranges adjustment cushion block, installs arm bar seat the most on each pedestal, uses instrument
Levelling to whole arm bar seats;Arm bar is installed subsequently on arm bar seat, again levelling to arm bar with instrument.Above-mentioned installation method needs
To bearing, arm bar seat, arm bar totally three times levelling, the bearing, the arm bar seat that have due to cold bed are large number of, and leveling procedures is adjusted repeatedly
Whole, workload is the biggest.
Summary of the invention
The technical problem to be solved is: provide a kind of walking beam cooler fixed frame to install leveling method, energy
It is simplified to fix framework and leveling procedures is installed, save man-hour.
The technical solution adopted for the present invention to solve the technical problems is:
Walking beam cooler fixed frame installs leveling method, the following steps carried out including order:
A, on the basis of being embedded with foundation bolt, find altitude datum with theodolite, according to this altitude datum all
Make a mark on foundation bolt, connect the labelling on foundation bolt with the chalk line stretched;
B, chalk line are as the object of reference of absolute altitude, according to the height of chalk line, arrange bearing cushion block, and described bearing cushion block is wedge
Shape, is placed in bearing on bearing cushion block, and the face making bearing cushion block contact with bearing is concordant with chalk line, by prefastened for bearing
On foundation bolt, installing arm bar seat, arrange adjustment pad between bearing and arm bar seat on bearing, described adjustment pad is plate
Shape;The all bearings and the arm bar seat that complete one group of fixed frame according to the method described above are installed, at all arms of this group fixed frame
Arm bar is installed on bar seat top;
C, repetition step B or repetition A, step B, all install until often organizing the bearing of fixed frame, arm bar seat and arm bar
Become, with the height of apparatus measures every arms bar, and adjust pad by increase and decrease or fine setting bearing cushion block makes all arm bar top height
Degree is consistent, is fastened completely with foundation bolt by all bearings.
Further, in described step B, according to the height of chalk line, bearing cushion block is set: be to arrange four bearing cushion blocks,
And four bearing cushion blocks are along criss-cross four angle point layouts, the wedge shape low side of each bearing cushion block is towards cruciform central;
In described step C, before all bearings and foundation bolt are fastened completely: also in original four bearing cushion block gaps
In reinstall four bearing cushion blocks, total of eight bearing cushion block is uniformly distributed along the circumference, and the wedge shape low side of eight bearing cushion blocks towards
Circular central.
The invention has the beneficial effects as follows: above-mentioned walking beam cooler fixed frame installs leveling method, utilizes theodolite on ground
Indicate absolute altitude on foot bolt, with the chalk line stretched as the datum line of absolute altitude, place bearing cushion block with chalk line for object of reference, protect
Card cushion block height is concordant with chalk line, and then erection support, holder top are placed and adjusted cushion block, installation arm bar seat, installation arm bar, complete
Become all arm bars to install, directly arm bar is measured levelling, after completing, bearing is fastened completely.In whole installation process, early stage is used
Chalk line ensures cushion block absolute altitude, it is ensured that bearing installation accuracy, and arm bar is only carried out the most levelling by the later stage, can reduce middle levelling ring
Joint, significantly improves working performance.
Accompanying drawing explanation
Fig. 1 be the present invention walking beam cooler fixed frame install levelling time schematic diagram;
In figure, reference is: basis 1, foundation bolt 11, chalk line 12, bearing cushion block 13, bearing 2, adjustment pad 21, arm
Bar seat 3, arm bar 4.
Detailed description of the invention
The present invention is further described with embodiment below in conjunction with the accompanying drawings:
Walking beam cooler fixed frame installs leveling method, the following steps carried out including order:
A, on the basis 1 being embedded with foundation bolt 11, find altitude datum with theodolite, according to this altitude datum in institute
Have on foundation bolt 11 and make a mark, connect the labelling on foundation bolt 11 with the chalk line 12 stretched;
B, chalk line 12 are as the object of reference of absolute altitude, according to the height of chalk line 12, arrange bearing cushion block 13, described bearing cushion block
13 is wedge shape, is placed on bearing cushion block 13 by bearing 2, and makes bearing cushion block 13 concordant with chalk line 12 with the face that bearing 2 contacts,
By prefastened for bearing 2 on foundation bolt 11, bearing 2 installed arm bar seat 3, between bearing 2 and arm bar seat 3, adjusting pad is set
Sheet 21, described adjustment pad 21 is tabular;The all bearings 2 and the arm bar seat 3 that complete one group of fixed frame according to the method described above are pacified
Dress, installs arm bar 4 on all arm bar seat 3 tops of this group fixed frame;
C, repetition step B or repetition A, step B, all install until often organizing the bearing 1 of fixed frame, arm bar seat 3 and arm bar 4
Complete, with the height of apparatus measures every arms bar 4, and adjust pad 21 by increase and decrease or fine setting bearing cushion block 13 makes all arm bars
4 upper height are consistent, fastened completely with foundation bolt 11 by all bearings 2.
As shown in Figure 1:
This installation leveling method, first makes the reference line of an absolute altitude on basis 1, is i.e. to utilize theodolite on basis 1
Pre-embedded anchoring bolts 11 on make elevation mark, then connect the elevation mark of foundation bolt 11, example with the chalk line 12 stretched
Chalk line 12 two ends as stretched are connected to two foundation bolt 11 elevation mark, then this chalk line 12 can be joined as absolute altitude
According to line.Can be that vertical and horizontal all draw and set chalk line 12 as required, make chalk line 12 through needing to place the position of cushion block, as
The reference of absolute altitude, then on the basis of chalk line 12, arranges bearing cushion block 13, lays bearing 2 on bearing cushion block 13.
Bearing cushion block 13 is wedge shape, can change the bearing 2 installation in this some position by adjusting the position of bearing cushion block 13
Highly, make bearing cushion block 13 concordant with chalk line 12 with the face that bearing 2 contacts during installation, it is ensured that the installation accuracy of bearing 2.
Subsequently by prefastened for bearing 2 on foundation bolt 11, such as it may be that bolt only reaches the tightening torque of 70%,
Or only fastening part bolt, it is simple to follow-up continuation adjusts.
Arm bar seat 3 is installed subsequently on bearing 2, needs between bearing 2 and arm bar seat 3 to arrange adjustment pad 21.With identical
Method completes all bearings 2 of one group of fixed frame and arm bar seat 3 is installed, and all arm bar seats 3 of this group install an arms bar
4, it is i.e. jointly to support an arms bar 4 on all arm bar seats 3 of this group.
According to circumstances, can be step A disposably complete the foundation bolt 11 of all groups of fixed frames elevation mark and
Chalk line 12 draws and sets, and then repeats step B and is sequentially completed and often organizes the bearing 1 of fixed frame, arm bar seat 3 and arm bar 4 and install;Can also
Being that packet is installed, such as step A once completes the elevation mark of the foundation bolt 11 of one group of fixed frame and chalk line 12 draws
If step B completes the bearing 1 of this group, arm bar seat 3 and arm bar 4 and installs, then repeat A, step B until completing all groups and fixing
The bearing 1 of framework, arm bar seat 3 and arm bar 4 are installed.
All after arm bar 4 installations, with the height of apparatus measures every arms bar 4, and by increase and decrease adjust pad 21 or
It is consistent that fine setting bearing cushion block 13 makes all arm bar 4 upper height ensure, finally by the tightest with foundation bolt 11 for all bearings 2
Gu, such as with all bolts of nut tightening bearing 2.
This installation method, when erection support 2, goes out altitude datum with chalk line 12 accurate marker, it is ensured that bearing 2 has higher
Installation accuracy, follow-up omission bearing is levelling and arm bar seat is levelling, directly levelling to all arm bars 4, reduces intermediate steps, energy
Save a large amount of man-hour.
It is furthermore preferred that in described step B, according to the height of chalk line 12, arrange bearing cushion block 13: be to arrange four seat cushions
Block 13, and four bearing cushion blocks 13 are along criss-cross four angle point layouts, the wedge shape low side of each bearing cushion block 13 is towards cross
Shape center;In described step C, before all bearings 2 are fastened completely with foundation bolt 11: also at original four bearing cushion blocks 13
Reinstalling four bearing cushion blocks 13 in gap, total of eight bearing cushion block 13 is uniformly distributed along the circumference, and the wedge of eight bearing cushion blocks 13
Shape low side is towards circular central.
When being i.e. to place bearing 2, by four bearing cushion blocks 13 of cross-shape layout's pad, it is simple to adjust bearing from each angle
2 gradients, follow-up arm bar 4 complete levelling after, then fill 4 bearing cushion blocks 13, altogether eight bearing cushion blocks 13 in bearing 2 bottom
Along annulus layout, bearing 2 is formed stable support, whole bolts of bearing 2 is fastened completely.
Claims (2)
1. walking beam cooler fixed frame installs leveling method, it is characterised in that include the following steps that carry out of order:
A, on the basis (1) being embedded with foundation bolt (11), find altitude datum with theodolite, according to this altitude datum in institute
Have on foundation bolt (11) and make a mark, connect the labelling on foundation bolt (11) with the chalk line (12) stretched;
B, chalk line (12) are as the object of reference of absolute altitude, according to the height of chalk line (12), arrange bearing cushion block (13), described seat cushion
Block (13) is wedge shape, is placed on bearing cushion block (13) by bearing (2), and makes the face that bearing cushion block (13) contacts with bearing (2)
Concordant with chalk line (12), by prefastened for bearing (2) on foundation bolt (11), at bearing (2) upper installation arm bar seat (3), bearing
(2) and arranging adjustment pad (21) between arm bar seat (3), described adjustment pad (21) is tabular;Complete one according to the method described above
All bearings (2) and arm bar seat (3) of group fixed frame are installed, and install on all arm bar seat (3) tops of this group fixed frame
Arm bar (4);
C, repetition step B or repetition A, step B, all pacify until often organizing the bearing (1) of fixed frame, arm bar seat (3) and arm bar (4)
Install into, with the height of apparatus measures every arms bar (4), and adjust pad (21) by increase and decrease or fine setting bearing cushion block (13) makes
All arm bar (4) upper height are consistent, fastened completely with foundation bolt (11) by all bearings (2).
2. walking beam cooler fixed frame as claimed in claim 1 installs leveling method, it is characterised in that in described step B,
According to the height of chalk line (12), bearing cushion block (13) is set: be to arrange four bearing cushion blocks (13), and four bearing cushion blocks (13)
Along criss-cross four angle point layouts, the wedge shape low side of each bearing cushion block (13) is towards cruciform central;
In described step C, before all bearings (2) and foundation bolt (11) are fastened completely: also at original four bearing cushion blocks
(13) reinstalling four bearing cushion blocks (13) in gap, total of eight bearing cushion block (13) is uniformly distributed along the circumference, and eight seat cushions
The wedge shape low side of block (13) is towards circular central.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610633667.4A CN106287123B (en) | 2016-08-04 | 2016-08-04 | Walking beam cooler fixed frame installs leveling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610633667.4A CN106287123B (en) | 2016-08-04 | 2016-08-04 | Walking beam cooler fixed frame installs leveling method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106287123A true CN106287123A (en) | 2017-01-04 |
CN106287123B CN106287123B (en) | 2018-07-27 |
Family
ID=57664903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610633667.4A Active CN106287123B (en) | 2016-08-04 | 2016-08-04 | Walking beam cooler fixed frame installs leveling method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106287123B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109000096A (en) * | 2018-07-26 | 2018-12-14 | 湘潭市恒欣实业有限公司 | The installation method of split type SQ-1200 endless rope series tractor winch |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080383A (en) * | 2010-12-31 | 2011-06-01 | 中国二十二冶集团有限公司 | Suspension type embedded part and hole reserved template fixing method |
CN103143907A (en) * | 2013-01-15 | 2013-06-12 | 中国核工业二三建设有限公司 | Method for installing heavy horizontal equipment in nuclear power station and positioning tooling for installation |
CN203270600U (en) * | 2013-02-01 | 2013-11-06 | 中国十七冶集团有限公司 | Fixed support for installing embedded bolts of high-precision equipment |
CN103741710A (en) * | 2013-12-17 | 2014-04-23 | 攀钢集团工程技术有限公司 | Construction method of installation equipment without sizing block |
JP2014163183A (en) * | 2013-02-27 | 2014-09-08 | Noritz Corp | Installation structure and installation method of housing equipment instrument |
CN105317052A (en) * | 2014-07-15 | 2016-02-10 | 五冶集团上海有限公司 | Tower crane foundation bolt fixing method |
-
2016
- 2016-08-04 CN CN201610633667.4A patent/CN106287123B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080383A (en) * | 2010-12-31 | 2011-06-01 | 中国二十二冶集团有限公司 | Suspension type embedded part and hole reserved template fixing method |
CN103143907A (en) * | 2013-01-15 | 2013-06-12 | 中国核工业二三建设有限公司 | Method for installing heavy horizontal equipment in nuclear power station and positioning tooling for installation |
CN203270600U (en) * | 2013-02-01 | 2013-11-06 | 中国十七冶集团有限公司 | Fixed support for installing embedded bolts of high-precision equipment |
JP2014163183A (en) * | 2013-02-27 | 2014-09-08 | Noritz Corp | Installation structure and installation method of housing equipment instrument |
CN103741710A (en) * | 2013-12-17 | 2014-04-23 | 攀钢集团工程技术有限公司 | Construction method of installation equipment without sizing block |
CN105317052A (en) * | 2014-07-15 | 2016-02-10 | 五冶集团上海有限公司 | Tower crane foundation bolt fixing method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109000096A (en) * | 2018-07-26 | 2018-12-14 | 湘潭市恒欣实业有限公司 | The installation method of split type SQ-1200 endless rope series tractor winch |
Also Published As
Publication number | Publication date |
---|---|
CN106287123B (en) | 2018-07-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202692960U (en) | Flexible support for measuring car body | |
CN208685460U (en) | Tubular arch arch rib adjuster | |
CN109208485A (en) | The method for rapidly positioning of positioning device and packaged type bridges Precast Pier Columns | |
CN106287123A (en) | Walking beam cooler fixed frame installs leveling method | |
CN215104724U (en) | Device for erecting, installing, fine-adjusting and positioning prefabricated bent cap | |
CN108103936B (en) | The method that prefabricated bent cap is installed on column | |
CN103953063A (en) | Vehicle engine test bed foundation | |
CN103572774A (en) | Leveling ruler flat underboarding mortar bedding method | |
CN208309824U (en) | Large-scale component temporarily slides support device | |
CN106567338A (en) | Curved leaning tower column first steel anchor box installation positioning and accuracy adjusting device | |
CN103669957B (en) | V-arrangement framework construction method for hanging | |
CN204244177U (en) | The photovoltaic module I-V curve testing auxiliary device of inclination angle-adjustable | |
CN206616694U (en) | Prefabricated superposed beam quickly positions adjustment frock with prefabricated post junction | |
CN102619149A (en) | Positioning device of plate type ballastless track I-shaped plate fastener and rapid positioning method | |
CN205858191U (en) | A kind of roof-bolter fixing device | |
CN209460042U (en) | A kind of assembled architecture prefabricated components structural clays device | |
CN207744300U (en) | A kind of dual leveling micromodule pedestal | |
CN2415115Y (en) | Shielding door system bottom bearing joint for underground railway platform | |
CN110593261A (en) | Vertical supporting pile verticality adjusting platform and construction method | |
CN201233232Y (en) | Passenger transport dedicated line railway foundation pile control network height measurement sign device | |
CN212956135U (en) | Adjusting lifting and supporting device for assembling super-large steel structure bridge sections | |
CN205134737U (en) | Steel stand with elevation self compensating column base structure | |
CN210597309U (en) | Vertical supporting pile verticality adjusting platform | |
CN210716576U (en) | Ground connecting device for helicopter assembling tool | |
CN103837357B (en) | A kind of construction and its design method of anti-earth's surface deformation test platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |