CN106285018B - Pressing article, drip installation exercise method - Google Patents
Pressing article, drip installation exercise method Download PDFInfo
- Publication number
- CN106285018B CN106285018B CN201610742372.0A CN201610742372A CN106285018B CN 106285018 B CN106285018 B CN 106285018B CN 201610742372 A CN201610742372 A CN 201610742372A CN 106285018 B CN106285018 B CN 106285018B
- Authority
- CN
- China
- Prior art keywords
- drip
- pressing article
- installation
- pressing
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention provides a kind of pressing article, drip installation exercise methods, include the following steps:Operation preparation, setting-out label, the installation of wallboard pressing article, the installation of beam slab pressing article, beam, the window template drip that floats installation, installation quality inspection.Compared with the relevant technologies, advantageous effect of the present invention is, by formulating related job step, and normative operation standard.It improves pressing article, precision, the efficiency that drip is installed, and improves the safety of operation.
Description
【Technical field】
The present invention relates to technical field of building construction more particularly to a kind of pressing article, drip installation exercise methods.
【Background technology】
In construction, need to carry out pressing article, drip installation exercise, in the related technology, pressing article, drip peace
It fills operational method and relies on personal liability sense and Personal Skills without specification, installation quality and efficiency.The deficiency of the relevant technologies is, imitates
Rate is low, installation quality can not ensure, and there are security risks.
Therefore, it is really necessary to provide a kind of new pressing article, drip installation exercise method to overcome above-mentioned technical problem.
【Invention content】
The technical problem to be solved in the invention is to provide a kind of pressing plate that can improve efficiency, quality and security performance
Item, drip installation exercise method.
A kind of pressing article of the present invention, drip installation exercise method, include the following steps:
The first step:Operation prepares
1.1 in storehouse to be installed, will installation needed for Work tool fluted drill, electric hand drill, charging driver, drum,
Cutting machine, marking pen, hammer, crowbar and material M5 bolt and nuts are several is ready to, are placed on specified region;
1.2, according to material designing BOM table, check pressing article, drip model and quantity;
It is neatly packed by specification size, model, it is used in combination marking pen to mark;
Second step:Setting-out marks
2.1 get pressing article, drip installation drawing, and confide a technological secret with design, and audit examines drawing to errorless;
2.2, according to installation drawing, mark are carried out in the template that need to install pressing article, drip, according to wall pressing article-beam
Pressing article-beam drip, float window drip, carries out setting-out label;
Third walks:Wallboard pressing article is installed
3.1 find the wallboard for needing to install pressing article by drawing and setting-out label;
3.2 use hammer, crowbar form removal, are then carried to installation pressing plate strip area;
3.3 first, and template is kept flat to level ground, and concrete surface is placed on specific bit upward, by pressing article
It sets, vertical and horizontal both sides are put down, and are slammed with a foot and are stablized motionless, both hands fixation electric hand drill, vertical open pores;
3.4 are fastened bolt and nut with charging driver;
4th step:Beam slab pressing article is installed
4.1 find the beam side plate and beam side C slots for needing to install pressing article by drawing and setting-out label;
4.2 use hammer, crowbar form removal, are then carried to installation pressing plate strip area;
4.3 first, and template is kept flat to level ground, and concrete surface is placed on specific bit upward, by pressing article
It sets, vertical and horizontal both sides are put down, and are slammed with a foot and are stablized motionless, both hands fixation electric hand drill, vertical open pores;
4.4 are fastened bolt and nut with charging driver;
The template of pressing article will be installed, is carried to correct position and is installed;
5th step:Beam, the window template drip that floats installation
5.1 find the beam bottom plate and beam bottom C slots, Gu Ding for needing to install drip by drawing and setting-out label;
5.2 use hammer, crowbar form removal, are then carried to installation drip region;
5.3 first, and template is kept flat to level ground, and concrete surface is placed on specific bit upward, by drip
It sets, is fixed with drip tooling;It is slammed with a foot and stablizes motionless, both hands fixation electric hand drill, vertical open pores;
5.4 are fastened bolt and nut with charging driver;
5.5 will install the template of drip, are carried to correct position and are installed;
Complete pressing article, drip installation exercise.
3, pressing article according to claim 1, drip installation exercise method further include:
6th step:Installation quality inspection
Whether 6.1 inspection bolt and nuts fasten;
6.2 check that pressing article, whether there is or not faulting of slab ends phenomenons for drip;
6.3 check whether pressing article, drip are consistent with drawing, there is exhaustive.
Preferably, in 1.1 steps in the first step, the specifications and models of fluted drill are staight shank M5*57.
Preferably, it in 2.2 steps in second step, according to installation drawing, is done in the template that need to install pressing article, drip
The mark of good position and length.
Preferably, in 5.1 in the 5th step, Gu Ding includes spare Gu Ding.
Compared with the relevant technologies, advantageous effect of the present invention is, by formulating related job step, and normative operation mark
It is accurate.It improves pressing article, precision, the efficiency that drip is installed, and improves the safety of operation.
【Description of the drawings】
Fig. 1 be pressing article of the present invention, drip installation exercise method operation process chart.
In figure:1 prepares for operation, and 2 mark for setting-out, and 3 install for wallboard pressing article, and 4 install for beam slab pressing article, and 5 are
Beam, the window template drip that floats installation, 6 be installation quality inspection.
【Specific implementation mode】
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
Referring to attached drawing 1, a kind of pressing article of the present invention, drip installation exercise method include the following steps:1 is accurate for operation
Standby, 2 mark for setting-out, and 3 install for wallboard pressing article, and 4 install for beam slab pressing article, and 5 be beam, the window template drip that floats is installed, and 6
For installation quality inspection.
It is as follows:
The first step:Operation prepares
1.1 in storehouse to be installed, will installation needed for Work tool fluted drill, electric hand drill, charging driver, drum,
Cutting machine, marking pen, hammer, crowbar and material M5 bolt and nuts are several is ready to, are placed on specified region.
1.2, according to material designing BOM table, check pressing article, drip model and quantity.
It is neatly packed by specification size, model, it is used in combination marking pen to mark.
The points for attention of the first step are:Labor protection clothing, safety cap are dressed by standard before operation, fasten chin strap, work card
It is put into front work clothes pocket.
The operation or work standard of the first step is:Auxiliary tool is equipped with complete.
Second step:Setting-out marks
2.1 get pressing article, drip installation drawing, and confide a technological secret with design, and audit examines drawing to errorless.
2.2, according to installation drawing, mark are carried out in the template that need to install pressing article, drip, according to wall pressing article-beam
Pressing article-beam drip, float window drip, carries out setting-out label.
The points for attention of second step are:
1, when template setting-out marks, confirmation has carried out template coding.
2, spare top setting-out admittedly, which must not mark, omits.
The operation or work standard of second step is:
1, pressing article, the line position that drips are consistent with drawing;
2, setting-out label is clear, is easily understood;
Third walks:Wallboard pressing article is installed
3.1 find the wallboard for needing to install pressing article by drawing and setting-out label.
3.2 use hammer, crowbar form removal, are then carried to installation pressing plate strip area.
3.3 first, and template is kept flat to level ground, and concrete surface is placed on specific bit upward, by pressing article
It sets, vertical and horizontal both sides are put down, and are slammed with a foot and are stablized motionless, both hands fixation electric hand drill, vertical open pores.
3.4 are fastened bolt and nut with charging driver.
Third step points for attention be:
1, when electric hand drill trepanning, safety goggles need to be worn, fluted drill is vertically downward.
2, in installation region, live 5S is up to standard.
3, it after pressing article installs, is installed in time.
The operation or work standard of third step is as follows:
1, pressing article installation is correct, no faulting of slab ends.
2, formwork assembling and disassembling position is correct.
3, pressing article bolt and nut fastens non-loosening.
4, design standard is subject in pressing article hole position position.
4th step:Beam slab pressing article is installed
4.1 find the beam side plate and beam side C slots for needing to install pressing article by drawing and setting-out label.
4.2 use hammer, crowbar form removal, are then carried to installation pressing plate strip area.
4.3 first, and template is kept flat to level ground, and concrete surface is placed on specific bit upward, by pressing article
It sets, vertical and horizontal both sides are put down, and are slammed with a foot and are stablized motionless, both hands fixation electric hand drill, vertical open pores.
4.4 are fastened bolt and nut with charging driver.
The template of pressing article will be installed, is carried to correct position and is installed.
The points for attention of 4th step are:
1, when electric hand drill trepanning, safety goggles need to be worn, fluted drill is vertically downward;
2, in installation region, live 5S is up to standard;
3, it after pressing article installs, is installed in time.
The operation or work standard of 4th step is:
1, pressing article installation is correct, no faulting of slab ends;
2, formwork assembling and disassembling position is correct;
3, pressing article bolt and nut fastens non-loosening;
4, design standard is subject in pressing article hole position position;
5, beam side plate and beam side C slot interfaces gap are not more than 3mm.
5th step:Beam, the window template drip that floats installation
5.1 find the beam bottom plate and beam bottom C slots, Gu Ding for needing to install drip by drawing and setting-out label.
5.2 use hammer, crowbar form removal, are then carried to installation drip region.
5.3 first, and template is kept flat to level ground, and concrete surface is placed on specific bit upward, by drip
It sets, is fixed with drip tooling.It is slammed with a foot and stablizes motionless, both hands fixation electric hand drill, vertical open pores.
5.4 are fastened bolt and nut with charging driver.
5.5 will install the template of drip, are carried to correct position and are installed.Complete pressing article, drip installation
Operation.
The points for attention of 5th step are:
1, when electric hand drill trepanning, safety goggles need to be worn, fluted drill is vertically downward;2, in installation region, live 5S is up to standard;
3, it after drip installs, is installed in time.
The operation or work standard of 5th step is:
1, drip installation is correct, no faulting of slab ends;
2, formwork assembling and disassembling position is correct;
3, drip bolt and nut fastens non-loosening;
4, design standard is subject in string holes of dripping position position;
5, beam bottom plate, beam bottom C slots and top interface gap is not more than 3mm admittedly.6th step:Installation quality inspection
Whether 6.1 inspection bolt and nuts fasten.
6.2 check that pressing article, whether there is or not faulting of slab ends phenomenons for drip.
6.3 check whether pressing article, drip are consistent with drawing, there is exhaustive.The operation or work standard of 6th step is:
1, pressing article, drip installation site are consistent with drawing;
2, seam≤3mm, no faulting of slab ends;
3, formwork assembling and disassembling position consistency.
In 1.1 steps in the first step, the specifications and models of fluted drill are staight shank M5*57.
In 2.2 steps in second step, according to installation drawing, good position is done in the template that need to install pressing article, drip
With the mark of length.
In 5th step 5.1 in, Gu Ding include spare Gu Ding.
Compared with the relevant technologies, advantageous effect of the present invention is, by formulating related job step, and normative operation mark
It is accurate.It improves pressing article, precision, the efficiency that drip is installed, and improves the safety of operation.
Above-described is only embodiments of the present invention, it should be noted here that for those of ordinary skill in the art
For, without departing from the concept of the premise of the invention, improvement can also be made, but these belong to the protection model of the present invention
It encloses.
Claims (5)
1. a kind of pressing article, drip installation exercise method, which is characterized in that include the following steps:
The first step:Operation prepares
1.1 in storehouse to be installed, by the Work tool fluted drill needed for installation, electric hand drill, charging driver, drum, cutting
Machine, marking pen, hammer, crowbar and material M5 bolt and nuts are several is ready to, are placed on specified region;
1.2, according to material designing BOM table, check pressing article, drip model and quantity;
It is neatly packed by specification size, model, it is used in combination marking pen to mark;
Second step:Setting-out marks
2.1 get pressing article, drip installation drawing, and confide a technological secret with design, and audit examines drawing to errorless;
2.2, according to installation drawing, mark are carried out in the template that need to install pressing article, drip, according to wall pressing article-beam pressing plate
Item-beam drip, float window drip, carries out setting-out label;
Third walks:Wallboard pressing article is installed
3.1 find the wallboard for needing to install pressing article by drawing and setting-out label;
3.2 use hammer, crowbar form removal, are then carried to installation pressing plate strip area;
3.3 first, and template is kept flat to level ground, and concrete surface is placed on designated position upward, by pressing article, horizontal
Perpendicular both sides are put down, and are slammed with a foot and are stablized motionless, both hands fixation electric hand drill, vertical open pores;
3.4 are fastened bolt and nut with charging driver;
4th step:Beam slab pressing article is installed
4.1 find the beam side plate and beam side C slots for needing to install pressing article by drawing and setting-out label;
4.2 use hammer, crowbar form removal, are then carried to installation pressing plate strip area;
4.3 first, and template is kept flat to level ground, and concrete surface is placed on designated position upward, by pressing article, horizontal
Perpendicular both sides are put down, and are slammed with a foot and are stablized motionless, both hands fixation electric hand drill, vertical open pores;
4.4 are fastened bolt and nut with charging driver;
The template of pressing article will be installed, is carried to correct position and is installed;
5th step:Beam, the window template drip that floats installation
5.1 find the beam bottom plate and beam bottom C slots, Gu Ding for needing to install drip by drawing and setting-out label;
5.2 use hammer, crowbar form removal, are then carried to installation drip region;
5.3 first, and template is kept flat to level ground, and concrete surface is placed on designated position upward, by drip, uses
Drip tooling is fixed;It is slammed with a foot and stablizes motionless, both hands fixation electric hand drill, vertical open pores;
5.4 are fastened bolt and nut with charging driver;
5.5 will install the template of drip, are carried to correct position and are installed;
Complete pressing article, drip installation exercise.
2. pressing article according to claim 1, drip installation exercise method, which is characterized in that further include:
6th step:Installation quality inspection
Whether 6.1 inspection bolt and nuts fasten;
6.2 check that pressing article, whether there is or not faulting of slab ends phenomenons for drip;
6.3 check whether pressing article, drip are consistent with drawing, there is exhaustive.
3. pressing article according to claim 1 or 2, drip installation exercise method, which is characterized in that in the first step
In 1.1 steps, the specifications and models of fluted drill are staight shank M5*57.
4. pressing article according to claim 1 or 2, drip installation exercise method, which is characterized in that in second step
In 2.2 steps, according to installation drawing, good position and the mark of length are done in the template that need to install pressing article, drip.
5. pressing article according to claim 1 or 2, drip installation exercise method, which is characterized in that in the 5th step
In 5.1, Gu Ding includes spare Gu Ding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610742372.0A CN106285018B (en) | 2016-08-26 | 2016-08-26 | Pressing article, drip installation exercise method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610742372.0A CN106285018B (en) | 2016-08-26 | 2016-08-26 | Pressing article, drip installation exercise method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106285018A CN106285018A (en) | 2017-01-04 |
CN106285018B true CN106285018B (en) | 2018-08-31 |
Family
ID=57677926
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610742372.0A Active CN106285018B (en) | 2016-08-26 | 2016-08-26 | Pressing article, drip installation exercise method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106285018B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469292A (en) * | 2018-12-24 | 2019-03-15 | 漳州职业技术学院 | A kind of construction method of moulding and double drips |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07292953A (en) * | 1994-04-28 | 1995-11-07 | Ig Tech Res Inc | End construction |
JPH08199764A (en) * | 1995-01-25 | 1996-08-06 | Shinsei Kogyo Kk | Fixing method of external wall material for repair |
CN203613799U (en) * | 2013-12-16 | 2014-05-28 | 广东众科建筑技术发展有限公司 | Building aluminum alloy template profile |
CN204081479U (en) * | 2014-09-28 | 2015-01-07 | 中建四局第三建筑工程有限公司 | A kind of device making drip in aluminum alloy mould plate |
CN204357108U (en) * | 2014-12-18 | 2015-05-27 | 晟通科技集团有限公司 | Aluminum dipping form presser device |
-
2016
- 2016-08-26 CN CN201610742372.0A patent/CN106285018B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07292953A (en) * | 1994-04-28 | 1995-11-07 | Ig Tech Res Inc | End construction |
JPH08199764A (en) * | 1995-01-25 | 1996-08-06 | Shinsei Kogyo Kk | Fixing method of external wall material for repair |
CN203613799U (en) * | 2013-12-16 | 2014-05-28 | 广东众科建筑技术发展有限公司 | Building aluminum alloy template profile |
CN204081479U (en) * | 2014-09-28 | 2015-01-07 | 中建四局第三建筑工程有限公司 | A kind of device making drip in aluminum alloy mould plate |
CN204357108U (en) * | 2014-12-18 | 2015-05-27 | 晟通科技集团有限公司 | Aluminum dipping form presser device |
Also Published As
Publication number | Publication date |
---|---|
CN106285018A (en) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2534734A (en) | Systems and methods for optimizing drilling operations using transient cuttings modeling and real-time data | |
CN106285018B (en) | Pressing article, drip installation exercise method | |
CN205096590U (en) | Simple and easy auxiliary device of ceiling punching operation | |
CN206926013U (en) | A kind of sheet material worm hole repair apparatus | |
CN108071203A (en) | The technique quickly constructed in furniture construction of hydropower to plank base | |
CN102071791A (en) | Quick perforation method and device for suspended ceiling | |
CN206633231U (en) | Anti-skidding slot device is opened in a kind of stair step | |
CN209007098U (en) | A kind of steel plate drilling aid | |
CN205967519U (en) | Double -station drilling tool | |
CN103806625A (en) | Gypsum plaster board with construction positioning lines or grids and manufacturing technological method of gypsum plaster board | |
CN203783039U (en) | Gypsum plaster board with construction position lines or grids | |
CN109424130A (en) | The technique of plank base construction efficiency is improved in construction | |
CN203611536U (en) | Paving production device for exterior wall ceramic tiles | |
CN203716205U (en) | Pre-reinforcement pile hole construction equipment | |
CN209509933U (en) | A kind of build uses aluminum alloy mould plate window frame indent section components | |
CN202483122U (en) | Steel cladding concrete | |
CN206215955U (en) | A kind of novel drilling machine | |
CN206220418U (en) | A kind of fluting floor for facilitating user voluntarily to mat formation | |
CN206690188U (en) | A kind of architectural decoration perforating device | |
CN204701184U (en) | A kind of proof press being provided with color printing sample positioner | |
CN206570971U (en) | A kind of warming plate fixation hook | |
CN213087475U (en) | Brick axe for construction | |
CN212019446U (en) | Material trompil device for building engineering | |
CN203613802U (en) | Concrete structure temporary built-in fitting treatment device | |
CN212359041U (en) | Construction platform convenient to remove |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |