CN106284814A - A kind of Combined machine room furred ceiling and installation method thereof - Google Patents
A kind of Combined machine room furred ceiling and installation method thereof Download PDFInfo
- Publication number
- CN106284814A CN106284814A CN201610885152.3A CN201610885152A CN106284814A CN 106284814 A CN106284814 A CN 106284814A CN 201610885152 A CN201610885152 A CN 201610885152A CN 106284814 A CN106284814 A CN 106284814A
- Authority
- CN
- China
- Prior art keywords
- main joist
- keel
- assembly
- machine room
- corner
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/006—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/02—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation having means for ventilation or vapour discharge
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
- E04B9/12—Connections between non-parallel members of the supporting construction
- E04B9/122—Connections between non-parallel members of the supporting construction one member passing through the other member, both members laying at least partly in the same plane
- E04B9/125—Connections between non-parallel members of the supporting construction one member passing through the other member, both members laying at least partly in the same plane both members being continuous members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
- E04B9/12—Connections between non-parallel members of the supporting construction
- E04B9/16—Connections between non-parallel members of the supporting construction the members lying in different planes
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/30—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by edge details of the ceiling; e.g. securing to an adjacent wall
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Duct Arrangements (AREA)
- Non-Portable Lighting Devices Or Systems Thereof (AREA)
Abstract
The invention discloses a kind of Combined machine room furred ceiling and installation method thereof, this furred ceiling includes main joist assembly, false keel assembly, support component and keel connecting member are propped up in corner, main joist assembly includes horizontal main joist and longitudinal main joist, laterally the two ends of main joist are provided with corner and prop up support component, corner is propped up the top of support component and keel connecting member and is equipped with hanger rod component, false keel assembly includes horizontal false keel and longitudinal false keel, main joist assembly is positioned at the lower section of false keel assembly, it is provided with vertical keel between main joist assembly and false keel assembly, main joist assembly be arranged over VMC (Ventilation Mechanical Control System).The method includes: (a) installs corner and prop up support component;B () installs main joist assembly;C () installs vertical keel and false keel assembly;D () installs VMC (Ventilation Mechanical Control System);E () installs illuminator;F () installs decorative panel.This Combined machine room installation of ceiling is convenient, overall appearance generous comfortable, good visual effect, sound construction are stable, it is easy to maintenance to dismount.
Description
Technical field
The present invention relates to machine room furred ceiling field, particularly relate to a kind of Combined machine room furred ceiling and installation method thereof.
Background technology
Along with computer techno-stress technology fast development, the arrival of information age, all trades and professions informatization gesture exists
Must go.The enterprise operation availability of information age is defined as the work of four levels by U.S.'s Usability Study center, from personnel
The availability of management, to the availability of workflow, to the availability of IT information technology, and most basic one layer is network environment
Availability, i.e. NCPI (the computer room engineering that NCPI-namely we often refer to).NCPI is machine
A part that be closely related with IT system in room, crucial, be by capital construction, supply of electric power, air regulation, refrigeration system,
The part composition such as fire-fighting system, monitoring system, system administration services.NCPI refers to as guaranteeing that computer room is (also referred to as in data
The heart) key equipment and device can safe and stable and reliability service and the foundation engineering of design configurations, computer room basis sets
System equipment operation management and data message in the construction machine room to be executed safely provide guarantee environment, work to be
Personnel create healthy suitable working environment.
Wherein the ceiling structure of machine room is the important component part of computer room construction, and the top of ceiling structure is not only installed with by force
Electricity, light current, wire casing and pipeline, and VMC (Ventilation Mechanical Control System) and illuminator are installed, its mounting design should consider the entirety of machine room
Elegant in appearance comfortable, it is also contemplated that security performance and the installation and maintenance of machine room, and on the ceiling structure of prior art can not meet
State requirement.
Summary of the invention
Present invention aim at solving above-mentioned technical problem present in prior art, it is provided that a kind of Combined machine room furred ceiling
And installation method, this Combined machine room installation of ceiling is convenient, overall appearance generous comfortable, good visual effect, sound construction are steady
Fixed, dismount easy to maintenance.
In order to solve above-mentioned technical problem, the present invention adopts the following technical scheme that
A kind of Combined machine room furred ceiling, including main joist assembly, false keel assembly, support component is propped up in corner and Os Draconis connect
Part, main joist assembly includes horizontal main joist and longitudinal main joist, between horizontal main joist and longitudinal main joist by Os Draconis even
Fitting is fixing to be connected, and the two ends of horizontal main joist are provided with corner and prop up support component, and corner is propped up support component and is fixedly installed on metope, wall
Angle is propped up the top of support component and keel connecting member and is equipped with hanger rod component, and false keel assembly includes horizontal false keel and the most secondary dragon
Bone, connects by keel connecting member is fixing between horizontal false keel and longitudinal false keel, and main joist assembly is positioned at false keel assembly
Lower section, be provided with vertical keel between main joist assembly and false keel assembly, main joist assembly be arranged over VMC (Ventilation Mechanical Control System), newly
Wind system includes blower fan and fresh air pipeline, and fresh air pipeline includes that outdoor new wind inlet pipe, dirty wind discharge pipe, new wind send into pipe and dirty wind
Inlet pipe, the input of blower fan is provided with outdoor newly wind inlet pipe and dirty wind discharge pipe, and the outfan of blower fan is provided with new wind and sends into pipe and dirt
Wind inlet pipe, new wind sends into pipe connection has new wind to send into plate, and dirty wind inlet pipe connects has dirty wind to enter plate.By arrange main joist assembly and
False keel assembly, main joist assembly and false keel assembly are arranged on different vertical directions, add erecting for fixing support
To Os Draconis, form this Combined machine room furred ceiling with solid space moulding, not only make this ceiling structure entirety the most aobvious attractive in appearance greatly
Just, it is rich in solid space stereovision, and it is more firm to make this ceiling structure be more easy to installation, structure, also allows for dismounting in the future
Maintenance.This VMC (Ventilation Mechanical Control System) utilizes the power drive heat exchanger high speed rotating of blower fan to make air flow produce radial force, destroys heat
" stationary point " of exchanger wall is to improve heat exchanger effectiveness.Utilize the temperature difference inside and outside machine room, make machine room inner air and outer air each
Utilize wall to realize heat exchange in the passage of flowing, complete recuperation of heat, to reach energy-conservation purpose.VMC (Ventilation Mechanical Control System) is arranged on main dragon
The top of bone assembly, and pipe laying formula VMC (Ventilation Mechanical Control System), blower fan uses mute type bidirectional flow duct type constant-temperature fan, inlet/outlet pipe
Road is reasonably distributed, has the function of two-way ventilation, can replace with equivalent indoor-outdoor air, energy-saving efficiency good.
Further, between false keel assembly and vertical keel, be formed with mounting groove, mounting groove include the first mounting groove, second
Mounting groove and the 3rd mounting groove, be provided with illumination king light in the first mounting groove, be provided with new wind and send into plate, the 3rd peace in the second mounting groove
It is provided with dirty wind in tankage and enters plate.By being formed with three mounting grooves between false keel assembly and vertical keel, in the first mounting groove
Illumination king light is installed, new wind feeding plate is installed in the second mounting groove, dirty wind is installed in the 3rd mounting groove and enters plate, wherein first install
Groove can design multiple as required.Such mounting design, not only meets the mounting arrangement of illuminator and VMC (Ventilation Mechanical Control System)
Requirement, and novel in design, greatly increase the space hierarchy of whole ceiling structure.
Further, main decorative panel, horizontal false keel and longitudinal false keel it are provided with between horizontal main joist and longitudinal main joist
Between be provided with secondary decorative panel, be provided with connection decorative panel between vertical keel.
Further, corner is propped up support component and is included supporting seat, locating piece and contiguous block, and the upper end of locating piece connects contiguous block,
Contiguous block is provided with link slot, and link slot connects hanger rod component, the lower end connecting support seat of locating piece, supports seat and is provided with illumination
Side lamp.
Further, locating piece is provided with locating slot, and locating slot matches with horizontal main joist.
Further, locating piece is provided with spacer, is provided with support bar between spacer and contiguous block.
Further, hanger rod component includes suspension rod, screw rod and fixed cover, and the upper end of suspension rod connects the metope on machine room roof, hangs
The lower end of bar connects rotating shaft, and suspension rod is provided with rotation nut with the junction of rotating shaft, and rotating shaft connects screw rod, and screw rod is arranged at connection
In the side opening of groove, the end of screw rod is provided with the junction of T-shaped screw, rotating shaft and screw rod and is provided with fixed cover.
A kind of Combined machine room installation of ceiling method, including following installation steps:
A () is installed corner and is propped up support component: first by design drawing requirement, and measurement, unwrapping wire are to determine that support component is propped up at machine in corner
Position on room metope, then props up the installation site rig punching of support component, then by steel nail or self tapping spiral shell according to corner
Corner is propped up support component and is installed on metope by silk, is finally fixed in the link slot of contiguous block the lower end of hanger rod component, suspension rod
The upper end of assembly is fixed on the metope on machine room roof;
B () installs main joist assembly: be first inserted in the locating slot that support component is propped up in corner one end of horizontal main joist, horizontal
It is inserted in the locating slot that support component is propped up in opposite side corner to the other end of main joist, completes first horizontal main joist is installed
Install;Then according to the setting spacing of drawing, on the longitudinal direction of machine room plane, at interval of the distance of 1.2m, according to above-mentioned
Mounting means, successively install corner prop up support component and horizontal main joist, complete the installation of horizontal main joist;Then according to drawing
Setting spacing, on the horizontal direction of machine room plane, at interval of the distance of 1.2m, by keel connecting member by longitudinal direction main joist
It is installed on horizontal main joist;Finally at the hanger rod component installed above of keel connecting member;
C () installs vertical keel and false keel assembly: first according to design drawing in the centre position of main joist assembly, pass through
Keel connecting member installs 4 vertical keels, then installs horizontal false keel in the lower end of vertical keel, then at horizontal false keel
The longitudinal false keel of upper installation, makes to be formed between false keel assembly and vertical keel the first mounting groove, finally according to above-mentioned installation
Mode, is respectively mounted vertical keel and false keel assembly, forms the second mounting groove and the 3rd in the left and right sides of the first mounting groove
Mounting groove;
D () installs VMC (Ventilation Mechanical Control System): first fix a new wind mounting seat on main joist assembly, and by assembling in new wind
In mounting seat;Then new wind inlet pipe and dirty wind discharge pipe outside the input installation room of blower fan, and in the outfan installation of blower fan
New wind sends into pipe and dirty wind inlet pipe;Then prop up in corner on the metope above support component and make a call to two passages with rig, at two
Passage is respectively mounted one piece of fixed plate, new wind inlet pipe outside one of fixed plate junction chamber, and other one piece of fixed plate connects dirt
Wind discharge pipe;Last new wind feeding plate of installing in the second mounting groove, and in the 3rd mounting groove, the dirty wind of installation enters plate, Qi Zhongxin
Wind is sent into plate and is connected new wind feeding pipe, and dirty wind enters plate and connects dirty wind inlet pipe.
E () installs illuminator: first install illumination king light in the first mounting groove, and prop up propping up of support component in each corner
Illumination side lamp is installed on support seat, forms the illuminator of whole machine room;
F () installs decorative panel: first install main dress with steel nail or self-tapping screw between horizontal main joist and longitudinal main joist
Plaque, then installs secondary decorative panel, finally vertically with steel nail or self-tapping screw between horizontal false keel and longitudinal false keel
Install with steel nail or self-tapping screw between Os Draconis and connect decorative panel.
In step (d), the installation of new wind mounting seat needs to correct with level gauge or horizontal tube, it is ensured that at blower fan
In horizontal level, the installation making blower fan and fresh air pipeline is straight, and boil on the nape opposite the mouth is accurate.
In step (f), main decorative panel and surrounding metope to stay suitable space, with revealing bright metal bead or complementary color furred ceiling
Make uniform.
Due to the fact that and have employed technique scheme, have the advantages that
The present invention is a kind of Combined machine room furred ceiling and installation method thereof, and this Combined machine room installation of ceiling is convenient, overall
Elegant in appearance comfortable, good visual effect, sound construction are stable, it is easy to maintenance to dismount.
By arrange main joist assembly and false keel assembly, main joist assembly and false keel assembly be arranged on different vertical
On direction, add the vertical keel for fixing support, form this Combined machine room furred ceiling with solid space moulding, not only
Make this ceiling structure entirety the most aobvious elegant in appearance, be rich in solid space stereovision, and make this ceiling structure be more easy to install, structure
More firm, also allow for dismounting maintenance in the future.This VMC (Ventilation Mechanical Control System) utilizes the power drive heat exchanger high speed rotating of blower fan to make
Air flow produces radial force, destroys " stationary point " of heat exchanger wall to improve heat exchanger effectiveness.Utilize the temperature inside and outside machine room
It is poor to spend, and makes machine room inner air and outer air utilize wall to realize heat exchange in the passage of each flowing, completes recuperation of heat, to reach energy-conservation
Purpose.VMC (Ventilation Mechanical Control System) is arranged on the top of main joist assembly, and pipe laying formula VMC (Ventilation Mechanical Control System), and blower fan uses mute type two-way
Stream duct type constant-temperature fan, inlet and outlet piping is reasonably distributed, has the function of two-way ventilation, can put with equivalent indoor-outdoor air
Change, energy-saving efficiency good.
By being formed with three mounting grooves between false keel assembly and vertical keel, illumination is installed main in the first mounting groove
Lamp, installs the dirty wind of installation in new wind sends into plate, the 3rd mounting groove and enters plate in the second mounting groove, wherein the first mounting groove can basis
Need, design multiple.Such mounting design, not only meets the mounting arrangement requirement of illuminator and VMC (Ventilation Mechanical Control System), and
Modern design, greatly increases the space hierarchy of whole ceiling structure.
Support component is propped up by support seat as the load-bearing end of whole ceiling structure in corner, is fixed on metope, can have
Effect improves the stability of whole ceiling structure;By Design Orientation block, the locating slot on locating piece matches with horizontal main joist,
Make horizontal main joist be installed on corner well to prop up in support component;By arranging link slot on contiguous block, convenient fixed installation
Hanger rod component.
Accompanying drawing explanation
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of a kind of Combined machine room furred ceiling in the present invention;
Fig. 2 is the structural representation that in the present invention, support component is propped up in corner;
Fig. 3 is the structural representation of keel connecting member in the present invention;
Fig. 4 is the structural representation that support component connection is propped up in middle hanger assembly of the present invention and corner;
Fig. 5 is middle hanger assembly of the present invention and the structural representation of keel connecting member connection.
Detailed description of the invention
As shown in Figures 1 to 5, the present invention is a kind of Combined machine room furred ceiling, including main joist assembly 1, false keel assembly
2, support component 3 and keel connecting member 4 are propped up in corner, and main joist assembly 1 includes horizontal main joist 6 and longitudinal main joist 7, horizontal main dragon
Connecting by keel connecting member 4 is fixing between bone 6 and longitudinal main joist 7, the two ends of horizontal main joist 6 are provided with corner and prop up support component
3, corner is propped up support component 3 and is fixedly installed on metope, and corner is propped up the top of support component 3 and keel connecting member 4 and is equipped with suspension rod group
Part 5, false keel assembly 2 includes horizontal false keel 8 and longitudinal false keel 9, passes through between horizontal false keel 8 and longitudinal false keel 9
Keel connecting member 4 is fixing to be connected, and main joist assembly 1 is positioned at the lower section of false keel assembly 2, main joist assembly 1 and false keel assembly 2
Between be provided with vertical keel 10, main joist assembly 1 be arranged over VMC (Ventilation Mechanical Control System), VMC (Ventilation Mechanical Control System) includes blower fan 11 and fresh wind tube
Road, fresh air pipeline includes that outdoor new wind inlet pipe 12, dirty wind discharge pipe 13, new wind send into pipe 14 and dirty wind inlet pipe 15, blower fan 11
Input is provided with outdoor new wind inlet pipe 12 and dirty wind discharge pipe 13, and the outfan of blower fan 11 is provided with new wind feeding pipe 14 and dirty wind enters
Pipe 15, new wind sends into pipe 14 connection has new wind to send into plate 16, and dirty wind inlet pipe 15 connects has dirty wind to enter plate 17.By arranging main joist
Assembly 1 and false keel assembly 2, main joist assembly 1 and false keel assembly 2 are arranged on different vertical directions, add for solid
The fixed vertical keel 10 supported, forms this Combined machine room furred ceiling with solid space moulding, not only makes this ceiling structure whole
Body the most aobvious elegant in appearance, be rich in solid space stereovision, and make this ceiling structure be more easy to install, structure more firm, the most just
Keep in repair in dismounting in the future.This VMC (Ventilation Mechanical Control System) utilizes the power drive heat exchanger high speed rotating of blower fan 11 to make air flow produce
Radial force, destroys " stationary point " of heat exchanger wall to improve heat exchanger effectiveness.Utilize the temperature difference inside and outside machine room, in making machine room
Outer air utilizes wall to realize heat exchange in the passage of each flowing, completes recuperation of heat, to reach energy-conservation purpose.New wind system
System is arranged on the top of main joist assembly 1, and pipe laying formula VMC (Ventilation Mechanical Control System), and blower fan 11 uses mute type bidirectional flow duct type permanent
The new blower fan 11 of temperature, inlet and outlet piping is reasonably distributed, has the function of two-way ventilation, can replace with equivalent indoor-outdoor air, energy-conservation effect
Rate is good.
Being formed with mounting groove between false keel assembly 2 and vertical keel 10, mounting groove includes that the first mounting groove 18, second is pacified
Tankage 19 and the 3rd mounting groove 20, be provided with illumination king light 38 in the first mounting groove 18, be provided with new wind and send in the second mounting groove 19
Plate 16, is provided with dirty wind and enters plate 17 in the 3rd mounting groove 20.By being formed with three peaces between false keel assembly 2 and vertical keel 10
Tankage, installs illumination king light 38, installs new wind and send into plate 16, the 3rd mounting groove 20 in the second mounting groove 19 in the first mounting groove 18
Interior dirt wind of installing enters plate 17, and wherein the first mounting groove 18 can design multiple as required.Such mounting design is not only full
The foot mounting arrangement requirement of illuminator and VMC (Ventilation Mechanical Control System), and novel in design, greatly increase whole ceiling structure
Space hierarchy.
Laterally be provided with between main joist 6 and longitudinal main joist 7 main decorative panel 21, horizontal false keel 8 and longitudinal false keel 9 it
Between be provided with secondary decorative panel 22, be provided with connection decorative panel 23 between vertical keel 10.
Corner is propped up support component 3 and is included supporting seat 24, locating piece 25 and contiguous block 26, and the upper end of locating piece 25 connects contiguous block
26, contiguous block 26 is provided with link slot 27, and link slot 27 connects hanger rod component 5, the lower end connecting support seat 24 of locating piece 25,
Support seat 24 is provided with illumination side lamp 28.Locating piece 25 is provided with locating slot 29, and locating slot 29 matches with horizontal main joist 6.Fixed
Position block 25 is provided with spacer 30, is provided with support bar 31 between spacer 30 and contiguous block 26.Support component 3 is propped up by supporting in corner
Seat 24, as the load-bearing end of whole ceiling structure, is fixed on metope, can be effectively improved the stability of whole ceiling structure;
By Design Orientation block 25, the locating slot 29 on locating piece 25 matches with horizontal main joist 6, makes horizontal main joist 6 well
It is installed on corner to prop up in support component 3;By arranging link slot 27 on contiguous block 26, convenient fixed installation hanger rod component 5.
Hanger rod component 5 includes suspension rod 32, screw rod 33 and fixed cover 34, and the upper end of suspension rod 32 connects the metope on machine room roof,
The lower end of suspension rod 32 connects rotating shaft 35, and suspension rod 32 is provided with rotation nut 36 with the junction of rotating shaft 35, and rotating shaft 35 connects screw rod
33, screw rod 33 is arranged in the side opening of link slot 27, and the end of screw rod 33 is provided with T-shaped screw 37, rotating shaft 35 and the company of screw rod 33
The place of connecing is provided with fixed cover 34.Hanger rod component 5 by arranging rotating shaft 35 and screw rod 33 in suspension rod 32 lower end, and by design fixed cover
34 and rotate nut 36, play the most hard-wired effect.
A kind of Combined machine room installation of ceiling method, including following installation steps:
A () is installed corner and is propped up support component 3: first by design drawing requirement, and measurement, unwrapping wire are to determine that corner is propped up support component 3 and existed
Position on machine room metope, then props up the installation site rig punching of support component 3, then by steel nail or self tapping according to corner
Corner is propped up support component 3 and is installed on metope by screw, and the lower end of hanger rod component 5 is finally fixed on the link slot 27 of contiguous block 26
In, the upper end of hanger rod component 5 is fixed on the metope on machine room roof.
B () installs main joist assembly 1: first one end of horizontal main joist 6 is inserted in corner and props up the locating slot 29 of support component 3
In, the other end of horizontal main joist 6 is inserted in the locating slot 29 that support component 3 is propped up in opposite side corner, completes to install first horizontal stroke
Installation to main joist 6;Then according to the setting spacing of drawing, on the longitudinal direction of machine room plane, at interval of 1.2m away from
From, according to above-mentioned mounting means, corner is installed successively and props up support component 3 and horizontal main joist 6, complete the peace of horizontal main joist 6
Dress;Then according to the setting spacing of drawing, on the horizontal direction of machine room plane, at interval of the distance of 1.2m, by Os Draconis even
Longitudinal direction main joist 7 is installed on horizontal main joist 6 by fitting 4;Finally at the hanger rod component installed above 5 of keel connecting member 4.
C () installs vertical keel 10 and false keel assembly 2: first according to design drawing in the centre position of main joist assembly 1,
By keel connecting member 4,4 vertical keels 10 are installed, then horizontal false keel 8 are installed in the lower end of vertical keel 10, then exist
Longitudinal false keel 9 is laterally installed on false keel 8, makes between false keel assembly 2 and vertical keel 10, to form the first mounting groove 18,
After according to above-mentioned mounting means, be respectively mounted vertical keel 10 and false keel assembly 2 in the left and right sides of the first mounting groove 18,
Form the second mounting groove 19 and the 3rd mounting groove 20.Main joist assembly 1, false keel assembly 2 and the vertical keel 10 installed is
Big elastic deformation amount≤10%, amount of plastic deformation≤2%, maximum deflection >=3%, impact strength primes >=5NM.
D () installs VMC (Ventilation Mechanical Control System): first fix a new wind mounting seat 39 on main joist assembly 1, and installed by blower fan 11
In new wind mounting seat 39, the installation of new wind mounting seat 39 needs to correct with level gauge or horizontal tube, it is ensured that blower fan 11
Being horizontal, the installation making blower fan 11 and fresh air pipeline is straight, and boil on the nape opposite the mouth is accurate;Then at the input installation room of blower fan 11
Outer new wind inlet pipe 12 and dirty wind discharge pipe 13, and at the outfan of blower fan 11, new wind is installed and sends into pipe 14 and dirty wind inlet pipe 15;Connect
To prop up in corner and make a call to two passages with rig on the metope above support component 3, be respectively mounted one piece at two passages and fix
Plate, new wind inlet pipe 12 outside one of fixed plate junction chamber, other one piece of fixed plate connects dirty wind discharge pipe 13;Last second
Installing new wind in mounting groove 19 and send into plate 16, and the dirty wind of installation enters plate 17 in the 3rd mounting groove 20, wherein new wind sends into plate 16
Connecting new wind and send into pipe 14, dirty wind enters plate 17 and connects dirty wind inlet pipe 15.
E () installs illuminator: first install illumination king light 38 in the first mounting groove 18, and prop up support component in each corner
Illumination side lamp 28 is installed on the support seat 24 of 3, forms the illuminator of whole machine room.While illuminator is installed, furred ceiling
The both sides of structure upper are installed with forceful electric power, light current, wire casing and pipeline, for machine room cabling, be also installed with and disappear on furred ceiling surface layer
Anti-alarm detector, the generation of the accident such as fire preventing.
F () installs decorative panel: first install main with steel nail or self-tapping screw between horizontal main joist 6 and longitudinal main joist 7
Decorative panel 21, then installs secondary decorative panel 22 with steel nail or self-tapping screw between horizontal false keel 8 and longitudinal false keel 9,
After install with steel nail or self-tapping screw between vertical keel 10 and connect decorative panel 23, main decorative panel 21 to stay suitable with surrounding metope
Work as space, make uniform with the bright metal bead of dew or complementary color furred ceiling.Decorative panel uses aluminium alloy micropore ceiling, and it has following excellent
Point: one, attractive in appearance and the suitability is strong;Two, noninflammability, effectively prevents the generation of the accidents such as fire;Three, sound-absorbing and soundproof effect are good;
Four, install easy, easy to maintenance;Five, life of product is long.
These are only the specific embodiment of the present invention, but the technical characteristic of the present invention is not limited thereto.Any with this
Based on bright, for solving essentially identical technical problem, it is achieved essentially identical technique effect, done simple change, etc.
With replacement or modification etc., all it is covered by among protection scope of the present invention.
Claims (10)
1. a Combined machine room furred ceiling, it is characterised in that: include main joist assembly, false keel assembly, corner prop up support component and
Keel connecting member, described main joist assembly includes horizontal main joist and longitudinal main joist, described horizontal main joist and described longitudinal direction
Connecting by described keel connecting member is fixing between main joist, the two ends of described horizontal main joist are provided with described corner support group
Part, described corner props up support component and is fixedly installed on metope, and the top that support component and described keel connecting member are propped up in described corner is equal
Being provided with hanger rod component, described false keel assembly includes horizontal false keel and longitudinal false keel, described horizontal false keel and described vertical
Connecting by described keel connecting member is fixing between false keel, described main joist assembly is positioned under described false keel assembly
Side, is provided with vertical keel between described main joist assembly and described false keel assembly, being arranged over of described main joist assembly is new
Wind system, described VMC (Ventilation Mechanical Control System) includes that blower fan and fresh air pipeline, described fresh air pipeline include that outdoor new wind inlet pipe, dirty wind are discharged
Pipe, new wind send into pipe and dirty wind inlet pipe, and the input of described blower fan is provided with described outdoor new wind inlet pipe and described dirty wind discharge pipe,
The outfan of described blower fan is provided with described new wind and sends into pipe and described dirty wind inlet pipe, and described new wind feeding pipe connects has new wind to send into
Plate, described dirty wind inlet pipe connects has dirty wind to enter plate.
A kind of Combined machine room furred ceiling the most according to claim 1, it is characterised in that: described false keel assembly and described perpendicular
Being formed with mounting groove between Os Draconis, described mounting groove includes the first mounting groove, the second mounting groove and the 3rd mounting groove, described
It is provided with illumination king light in one mounting groove, is provided with described new wind in described second mounting groove and sends into plate, set in described 3rd mounting groove
Dirty wind is had to enter plate.
A kind of Combined machine room furred ceiling the most according to claim 1, it is characterised in that: described horizontal main joist and described vertical
Between main joist, it is provided with main decorative panel, between described horizontal false keel and described longitudinal false keel, is provided with secondary decorative panel, described
Connection decorative panel it is provided with between vertical keel.
A kind of Combined machine room furred ceiling the most according to claim 1, it is characterised in that: described corner is propped up support component and is included propping up
Support seat, locating piece and contiguous block, the upper end of described locating piece connects described contiguous block, and described contiguous block is provided with link slot, institute
Stating link slot and connect described hanger rod component, the lower end of described locating piece connects described support seat, and described support seat is provided with illumination
Side lamp.
A kind of Combined machine room furred ceiling the most according to claim 4, it is characterised in that: described locating piece is provided with location
Groove, described locating slot matches with described horizontal main joist.
A kind of Combined machine room furred ceiling the most according to claim 4, it is characterised in that: described locating piece is provided with location
Sheet, is provided with support bar between described spacer and described contiguous block.
A kind of Combined machine room furred ceiling the most according to claim 4, it is characterised in that: described hanger rod component include suspension rod,
Screw rod and fixed cover, the upper end of described suspension rod connects the metope on machine room roof, and the lower end of described suspension rod connects rotating shaft, described in hang
Bar is provided with rotation nut with the junction of described rotating shaft, and described rotating shaft connects described screw rod, and described screw rod is arranged at described connection
In the side opening of groove, the end of described screw rod is provided with T-shaped screw, and the junction of described rotating shaft and described screw rod is provided with described fixing
Set.
8. a Combined machine room installation of ceiling method as claimed in claim 1, it is characterised in that include following installation steps:
A () is installed corner and is propped up support component: first by design drawing requirement, and measurement, unwrapping wire are to determine that support component is propped up at machine room wall in corner
Position on face, then props up the installation site rig punching of support component according to corner, then will by steel nail or self-tapping screw
Corner is propped up support component and is installed on metope, is finally fixed in the link slot of contiguous block the lower end of hanger rod component, hanger rod component
Upper end be fixed on the metope on machine room roof;
B () installs main joist assembly: be first inserted in the locating slot that support component is propped up in corner one end of horizontal main joist, laterally lead
The other end of Os Draconis is inserted in the locating slot that support component is propped up in opposite side corner, completes to install the peace of first horizontal main joist
Dress;Then according to the setting spacing of drawing, on the longitudinal direction of machine room plane, at interval of the distance of 1.2m, according to above-mentioned
Mounting means, installs corner successively and props up support component and horizontal main joist, complete the installation of horizontal main joist;Then according to drawing
Set spacing, on the horizontal direction of machine room plane, at interval of the distance of 1.2m, by keel connecting member, longitudinal direction main joist is pacified
It is loaded on horizontal main joist;Finally at the hanger rod component installed above of keel connecting member;
C () installs vertical keel and false keel assembly: first according to design drawing in the centre position of main joist assembly, pass through Os Draconis
Connector installs 4 vertical keels, then installs horizontal false keel in the lower end of vertical keel, then pacifies on horizontal false keel
The longitudinal false keel of dress, makes to be formed between false keel assembly and vertical keel the first mounting groove, finally according to above-mentioned mounting means,
It is respectively mounted vertical keel and false keel assembly in the left and right sides of the first mounting groove, forms the second mounting groove and the 3rd installation
Groove;
D () installs VMC (Ventilation Mechanical Control System): first fix a new wind mounting seat on main joist assembly, and installed in new wind by assembling
In seat;Then new wind inlet pipe and dirty wind discharge pipe outside the input installation room of blower fan, and at the outfan new wind of installation of blower fan
Send into pipe and dirty wind inlet pipe;Then prop up in corner on the metope above support component and make a call to two passages with rig, two ventilations
Hole is respectively mounted one piece of fixed plate, new wind inlet pipe outside one of fixed plate junction chamber, and other one piece of fixed plate connects dirty wind row
Go out pipe;Last new wind feeding plate of installing in the second mounting groove, and the dirty wind of installation enters plate in the 3rd mounting groove, wherein new wind send
Entering plate and connect new wind feeding pipe, dirty wind enters plate and connects dirty wind inlet pipe.
E () installs illuminator: first install illumination king light in the first mounting groove, and prop up the support seat of support component in each corner
Upper installation illuminates side lamp, forms the illuminator of whole machine room;
F () installs decorative panel: first install main decorative panel with steel nail or self-tapping screw between horizontal main joist and longitudinal main joist,
Then between horizontal false keel and longitudinal false keel, with steel nail or self-tapping screw secondary decorative panel is installed, finally vertical keel it
Between install with steel nail or self-tapping screw and to connect decorative panel.
A kind of Combined machine room installation of ceiling method the most according to claim 8, it is characterised in that: described step (d)
In, the installation of described new wind mounting seat needs to correct with level gauge or horizontal tube, it is ensured that blower fan is horizontal, and makes
The installation of blower fan and fresh air pipeline is straight, and boil on the nape opposite the mouth is accurate.
A kind of Combined machine room installation of ceiling method the most according to claim 8, it is characterised in that: described step (f)
In, described main decorative panel and surrounding metope to stay suitable space, make uniform with the bright metal bead of dew or complementary color furred ceiling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610885152.3A CN106284814B (en) | 2016-10-11 | 2016-10-11 | A kind of Combined machine room furred ceiling and its installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610885152.3A CN106284814B (en) | 2016-10-11 | 2016-10-11 | A kind of Combined machine room furred ceiling and its installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106284814A true CN106284814A (en) | 2017-01-04 |
CN106284814B CN106284814B (en) | 2018-08-10 |
Family
ID=57718490
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610885152.3A Active CN106284814B (en) | 2016-10-11 | 2016-10-11 | A kind of Combined machine room furred ceiling and its installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106284814B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108166826A (en) * | 2018-01-15 | 2018-06-15 | 中建四局安装工程有限公司 | A kind of underground garage truck space guiding system and the installation method and structure of illumination |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4232594A (en) * | 1978-07-27 | 1980-11-11 | United States Gypsum Company | Modular ceiling panel unit usable with air distribution systems |
CN2929017Y (en) * | 2006-04-18 | 2007-08-01 | 浙江楚乔电气有限公司 | Builtin ventilation lighting device |
CN202064501U (en) * | 2011-05-10 | 2011-12-07 | 北京建工博海建设有限公司 | Equipment belt suspended ceiling adopting glassfibre sound panel |
CN102667023A (en) * | 2009-10-22 | 2012-09-12 | 亨泰尔公司 | Ceiling system with integrated equipment support structure |
EP2573290A1 (en) * | 2011-09-23 | 2013-03-27 | Rockwool International A/S | A support system for mounting a panel grid in ceiling or wall support structure |
CN203008195U (en) * | 2012-12-28 | 2013-06-19 | 胡崇亮 | Decorative plate piece |
CN203603338U (en) * | 2013-11-18 | 2014-05-21 | 深圳市好耐福建材有限公司 | U-shaped suspended ceiling system of anti-shock ceiling |
CN104294986A (en) * | 2014-11-04 | 2015-01-21 | 沈阿宝 | Soundproof ceiling |
-
2016
- 2016-10-11 CN CN201610885152.3A patent/CN106284814B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4232594A (en) * | 1978-07-27 | 1980-11-11 | United States Gypsum Company | Modular ceiling panel unit usable with air distribution systems |
CN2929017Y (en) * | 2006-04-18 | 2007-08-01 | 浙江楚乔电气有限公司 | Builtin ventilation lighting device |
CN102667023A (en) * | 2009-10-22 | 2012-09-12 | 亨泰尔公司 | Ceiling system with integrated equipment support structure |
CN202064501U (en) * | 2011-05-10 | 2011-12-07 | 北京建工博海建设有限公司 | Equipment belt suspended ceiling adopting glassfibre sound panel |
EP2573290A1 (en) * | 2011-09-23 | 2013-03-27 | Rockwool International A/S | A support system for mounting a panel grid in ceiling or wall support structure |
CN203008195U (en) * | 2012-12-28 | 2013-06-19 | 胡崇亮 | Decorative plate piece |
CN203603338U (en) * | 2013-11-18 | 2014-05-21 | 深圳市好耐福建材有限公司 | U-shaped suspended ceiling system of anti-shock ceiling |
CN104294986A (en) * | 2014-11-04 | 2015-01-21 | 沈阿宝 | Soundproof ceiling |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108166826A (en) * | 2018-01-15 | 2018-06-15 | 中建四局安装工程有限公司 | A kind of underground garage truck space guiding system and the installation method and structure of illumination |
Also Published As
Publication number | Publication date |
---|---|
CN106284814B (en) | 2018-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106545117A (en) | A kind of public utility Integral ceiling and its construction method | |
US10551077B2 (en) | Building structure for a multi-story building | |
CN106025848B (en) | A kind of switchgear house and its monitoring method with fire-alarm | |
KR20130037370A (en) | Outdoor unit bracket and outdoor unit comprising the same | |
CN102155761A (en) | Ceiling device integrated with air conditioner | |
CN106152349A (en) | A kind of subway station air conditioner environmental control system | |
CN106284814A (en) | A kind of Combined machine room furred ceiling and installation method thereof | |
CN108716571A (en) | Adjustable machine electric line suspension and support and its application method | |
CN205777006U (en) | A kind of public utility Integral ceiling | |
CN214307378U (en) | Push-pull device for installing air conditioner outdoor unit | |
CN113217712B (en) | Three-pipe comprehensive pipeline lateral support | |
CN208474665U (en) | Adjustable machine electric line suspension and support | |
US3566767A (en) | Air ventilating or air conditioning system | |
CN206338191U (en) | A kind of MVR compressors sound insulation cooling device | |
CN206205252U (en) | ceiling fixing device | |
CN205641266U (en) | Outer machine protection strutting arrangement of air conditioner | |
CN205825310U (en) | A kind of air-cooler being easily installed | |
CN204063476U (en) | Armored concrete air supply plenum chamber | |
CN206100669U (en) | Multifunctional power equipment box | |
CN210980289U (en) | Anti-deformation ventilation grid assembly | |
CN217461139U (en) | Novel comprehensive hanging system of data center | |
JP5665105B2 (en) | Centralized external piping apartment | |
CN216195918U (en) | A furred ceiling erection joint device for house construction | |
CN221298362U (en) | Curved veneer furred ceiling assembled mounting structure | |
CN103541482B (en) | Unit equipment band for building functional device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20180621 Address after: 310012 the 3 tier of E Software Park, Paradise Software Park, 3, West Dou Men Road, Xihu District, Hangzhou, Zhejiang. Applicant after: Zhejiang Dong Ding electronic Limited by Share Ltd Address before: 310018 No. 2 street, Xiasha Higher Education Park, Hangzhou, Zhejiang, 928 Applicant before: Zhejiang Sci-Tech University |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |