CN106282496B - A kind of Heavy Straightening Roller processing method - Google Patents

A kind of Heavy Straightening Roller processing method Download PDF

Info

Publication number
CN106282496B
CN106282496B CN201610796139.0A CN201610796139A CN106282496B CN 106282496 B CN106282496 B CN 106282496B CN 201610796139 A CN201610796139 A CN 201610796139A CN 106282496 B CN106282496 B CN 106282496B
Authority
CN
China
Prior art keywords
roll
quenching
suspension rod
top board
clamp nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610796139.0A
Other languages
Chinese (zh)
Other versions
CN106282496A (en
Inventor
周骏立
陈道龙
张彩红
诸天江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MAANSHAN HENGTAI HEAVY INDUSTRY MACHINE Co Ltd
Original Assignee
MAANSHAN HENGTAI HEAVY INDUSTRY MACHINE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MAANSHAN HENGTAI HEAVY INDUSTRY MACHINE Co Ltd filed Critical MAANSHAN HENGTAI HEAVY INDUSTRY MACHINE Co Ltd
Priority to CN201610796139.0A priority Critical patent/CN106282496B/en
Publication of CN106282496A publication Critical patent/CN106282496A/en
Application granted granted Critical
Publication of CN106282496B publication Critical patent/CN106282496B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/18Hardening; Quenching with or without subsequent tempering
    • C21D1/25Hardening, combined with annealing between 300 degrees Celsius and 600 degrees Celsius, i.e. heat refining ("Vergüten")
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D8/00Modifying the physical properties by deformation combined with, or followed by, heat treatment
    • C21D8/06Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of rods or wires
    • C21D8/065Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of rods or wires of ferrous alloys
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/38Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for roll bodies
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/12Ferrous alloys, e.g. steel alloys containing tungsten, tantalum, molybdenum, vanadium, or niobium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/18Ferrous alloys, e.g. steel alloys containing chromium

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Manufacturing & Machinery (AREA)
  • Heat Treatment Of Articles (AREA)

Abstract

The invention discloses a kind of Heavy Straightening Roller processing method, belong to smoothing roll manufacture field.The aligning roller working method of the present invention, using 9Cr2Mo materials finished product is obtained after forging processing, forging after modifier treatment, preliminary working, final heat treatment, finishing, wherein, the centre bore and end face of the body of roll are sealed using quenching frock in final heat treatment, and flatulence circle is set between top board and clamp nut, so as to form effective sealing;When carrying out Quenching Treatment, first the body of roll is preheated, then the high-temperature gas in centre bore discharged, then the body of roll is heated;Quenching and multiple temper are carried out again.The present invention makes to produce negative pressure in body of roll centre bore, and hardening media cannot be introduced into end face and centre bore, and body of roll firmness outside is high after quenching, and internal toughness is good, reduces deformation, while the effective generation for avoiding crackle.

Description

A kind of Heavy Straightening Roller processing method
Technical field
The present invention relates to smoothing roll processing technique field, more specifically to a kind of Heavy Straightening Roller processing method.
Background technology
Straightener is the plant equipment that aligning processing is carried out to section bar, bar, and its smoothing roll is critical component.For large-scale For smoothing roll, it is relatively large in diameter, and outer surface requires there is higher hardness, and center portion needs to keep preferable toughness, therefore how The heat treatment of smoothing roll is carried out, key technology during as production and processing.
For current smoothing roll, no matter roll neck size, in order to improve its combination property, it is necessary to carry out integral quenching Fire.For the concrete application of different material and smoothing roll, selection water quenching that can be appropriate or oil quenching.For oil quenching, it is unsuitable for table Surface hardness requires higher smoothing roll;For water quenching, because its cooling is excessively fierce, cracking is easy to for some materials.But No matter which kind of integral quenching mode is used at present, the problem of all there is end face or overall cracking, particularly in grinding stage, table Face can have annular crack, and the crackle is also difficult to eliminate by grinding, can only carry out surface reconditioning.And it is more serious for ftractureing Workpiece, directly scrap, cause product qualification rate extremely low.
Entered Exploring Analysis discovery, if to there is preferable performance, smoothing roll endoporus and end face can not carry out direct quenching, Particularly in the junction of endoporus and end face, once touching hardening media, concentrated stress will be formed in junction, during the later stage During effect processing, it is easy to ftracture.Therefore, the key of problem is how to carry out quenching protection to the endoporus and end face of smoothing roll.
Found by retrieval, it is middle in the prior art to there is related solution, such as number of patent application:ZL 200610106957.X, authorized announcement date:On July 8th, 2009, the patent formula discloses a kind of biliquid of 9Gr2Mo smoothing rolls Quenching process, it prevents hardening media from entering endoporus by filling loess in the gap location of smoothing roll endoporus and frock It is interior, and end face and endoporus are covered with pressing plate, quickly cooled down first with water quenching, austenite decomposition is prevented, then again in oil bath Quenched, reduce quenching distortion, prevent cracking.
It is this to fill other materials in smoothing roll endoporus to prevent the method that medium enters from more being commonly used at present, for Prevent from deforming and ftracture with certain effect.But inside stuffing can influence temperature, it is necessary to before tempering in tempering Filler is removed, tedious process.But if without filler, be difficult to be prevented effectively from shadow of the hardening media to quenching effect again Ring, cause manufacturing procedure to be contradicted with processing effect.
The content of the invention
1. the invention technical problem to be solved
It is an object of the invention to overcome the shortcomings of in the prior art smoothing roll after quenching easily occur crackle there is provided Processing is exhausted in a kind of Heavy Straightening Roller processing method, the present invention after preheat, makes generation negative pressure in body of roll centre bore, quenches Fiery medium cannot be introduced into end face and centre bore, and body of roll firmness outside is high after quenching, and internal toughness is good, effectively avoids crackle Generation.
2. technical scheme
To reach above-mentioned purpose, the technical scheme that the present invention is provided is:
A kind of Heavy Straightening Roller processing method of the present embodiment, using 9Cr2Mo materials by forging processing, forging after it is quenched Finished product is obtained after processing, preliminary working, final heat treatment, finishing;Wherein, put into during final heat treatment using quencher Row quenching protection, is first preheating to 580~650 DEG C, is then put into by quencher after row pump-down process and continues to heat, finally carried out Quenching Treatment.
Further, initial forging temperature during forging processing is 1000~1080 DEG C, and final forging temperature is 800~860 DEG C, forging After be cooled to oil cooling after 720~760 DEG C and, to 180~220 DEG C, be then transferred to 680~700 DEG C of tempering.
Further, the detailed process of its final heat treatment is:
1) body of roll after machining is inserted in the suspension rod of quenching frock, top board and flatulence is set in body of roll upper end Circle, and the filled high-temperature cotton between adjacent two part, seal the two ends of the body of roll by clamp nut;Install and hang in suspension rod upper end The body of roll, is hung in heating furnace by hook;
2) 580~650 DEG C are warming up to stove, are incubated 1~3 hour;
3) body of roll is hung out, unscrews clamp nut and be exhausted, then tighten clamp nut, by the body of roll hang in heating furnace after Continuous heating;Its exhaust process is:
A, the body of roll is hung out after, unscrew clamp nut;
B, slowly rotate top board, the discharge of centre bore inner high voltage gas;
C, clamp nut is screwed again, then the body of roll is hung in heating furnace and continues to heat;
4) 860~980 DEG C are heated to, 3~5 hours are incubated, the body of roll is then hung out and carries out Quenching Treatment;
5) step 4) quenching after the completion of carry out 2~3 tempers.
Further, the downrod lower end of the quenching frock, which is connected with baffle plate, suspension rod, is set with lower platen, in use, The both sides of lower platen are filled with high temperature cotton;Suspension rod middle and upper part is provided with external screw thread, and top board and flatulence circle are sleeved on suspension rod On, clamp nut is threadedly coupled with suspension rod, in the equal filled high-temperature cotton in the both sides up and down and flatulence circle inner chamber of top board and flatulence circle.
Further, the side wall of the clamp nut offers bayonet socket, and the bayonet socket is distributed along clamp nut radial symmetric.
Further, pull bar or draw ring are provided with the top board, for lifting top board exhaust.
Further, step 3) in exhaust process completed in 10 minutes.
Further, step 4) in Quenching Treatment process be:The body of roll from heating furnace hang out after be put into cooling water, 2~5 Sling after minute, cooling in atmosphere is placed into cooling water for 2~6 minutes, so repeatedly 3~5 times;Then the body of roll is hung in oil Cooled down in liquid.
Further, step 4) in when being quenched, the body of roll from heating furnace hang out after be put into cooling water, after 2~5 minutes Sling, cooling in atmosphere is placed into cooling water for 2~6 minutes, so repeatedly 3~5 times;Then the body of roll is immersed in cooling water Cooled down.
3. beneficial effect
The technical scheme provided using the present invention, compared with prior art, is had the advantages that:
(1) Heavy Straightening Roller processing method of the invention, in forging, control is begun to forge and final forging temperature, can use three piers Three pull out the technology of forging, and modifier treatment after being forged, and refine steel interior tissue, carbide can disperse be uniformly distributed, obtain Obtain preferable processing characteristics;During final heat treatment, processing is exhausted after preheat, makes to produce negative pressure in body of roll centre bore, quenches Fiery medium cannot be introduced into end face and centre bore, and body of roll firmness outside is high after quenching, and internal toughness is good, effectively avoids crackle Generation;
(2) Heavy Straightening Roller processing method of the invention, coordinates suspension rod to be sealed, pressing plate using top board and flatulence circle It can prevent hardening media from entering in end surface of roll and centre bore, so as to avoid the hardenability inside the body of roll;Heated When, first preheated, heated again after exhaust, can further improve sealing;Because gas is heated in body of roll centre bore Air pressure increases afterwards, is sealed after exhaust, then when being quenched, centre bore is internally formed negative pressure, makes top board and pushes Plate is tightly attached to end surface of roll, and hardening media cannot be introduced into, so as to be protected to end surface of roll and centre bore formation;
(3) Heavy Straightening Roller processing method of the invention, by flatulence circle filled high-temperature cotton have it is preferably close Effect is sealed, because conventional seals are directly to be tightened on pressing plate with bolt mostly, and screw thread is quenched and is situated between in itself and without sealing Matter is easy to enter centre bore by the gap between screw thread, and flatulence circle and high temperature cotton are added in the present invention, high temperature cotton energy Thread gaps are enough filled up, so that hardening media can not penetrate into, it is ensured that there is preferable quenching effect;
(4) Heavy Straightening Roller processing method of the invention, is first put into the body of roll in cooling water when being quenched and lifts again, By repeatedly operating repeatedly, body surface hardness is improved, then carrying out oil cooling, reducing the quenching distortion of the body of roll, effectively The body of roll is prevented to ftracture, it is ensured that there is preferable toughness body of roll center;
(5) Heavy Straightening Roller processing method of the invention, carries out multiple low-temperature tempering after quenching, be incubated at least six hour, The case hardness of smoothing roll is adjusted to setting with lonneal, lonneal is more abundant, and the toughness inside smoothing roll is better, Thermal crack resistant ability is higher.The increase of molybdenum content causes to contain more retained austenite after quenching in steel, most of residual after tempering Remaining austenite is changed into new martensite again, is thus favorably improved roll hardness, strengthens wearability and to reduce wear surface coarse Degree.
Brief description of the drawings
Fig. 1 is quenching technical flow chart of the invention;
Fig. 2 is the structural representation of quenching frock in the present invention;
Fig. 3 sets the structural representation of cylindrical bar for top board in the present invention.
Label declaration in schematic diagram:1st, baffle plate;2nd, lower platen;3rd, the body of roll;4th, top board;5th, flatulence circle;6th, high temperature cotton; 7th, clamp nut;8th, bayonet socket;9th, suspension rod.
Embodiment
To further appreciate that present disclosure, the present invention is described in detail in conjunction with the accompanying drawings and embodiments.
Embodiment 1
Contained component and its percentage by weight in a kind of Heavy Straightening Roller processing method of the present embodiment, 9Cr2Mo smoothing rolls For:C:0.85%th, Si:0.23%th, Mn:0.28%th, Cr:2.1%th, Mo:0.40%th, P≤0.02, S≤0.02, remaining be iron and Inevitable impurity.The material is obtained into after forging processing, forging after modifier treatment, preliminary working, final heat treatment, finishing Product.Wherein, initial forging temperature during forging processing is 1000~1080 DEG C, and final forging temperature is 800~860 DEG C, modifier treatment after forging It is that blank is cooled into oil cooling after 720~760 DEG C after forging, to 180~220 DEG C, to be then transferred to 680~700 DEG C of tempering.Through Crossing modifier treatment after forging refines steel interior tissue, carbide can disperse be uniformly distributed, obtain preferable processing characteristics.Should Material is heat-treated after forging and be machining, and putting into row using quencher in heat treatment process quenches protection.
With reference to Fig. 2, the quenching frock used in the present embodiment, including suspension rod 9, lower platen 2, top board 4 and flatulence circle 5, The lower end of suspension rod 9 is connected with baffle plate 1, suspension rod 9 and is set with lower platen 2, in use, the both sides of lower platen are filled with high temperature cotton 6, For sealing.The middle and upper part of suspension rod 9 is provided with external screw thread, and top board 4 and flatulence circle 5 are sleeved on suspension rod 9, the body of roll 3 are set with On suspension rod 9, and positioned between lower platen 2 and top board 4, clamp nut 7 is threadedly coupled with suspension rod 9, by clamp nut 7 Flatulence circle 5 and top board 4 are pressed on the upper surface of the body of roll 3, so as to form sealing, the end face and centre bore of the body of roll 3 are capped, and are protected Demonstrate,proving the end face and centre bore of smoothing roll will not be cooled quenching.In order to improve sealing property, in the upper of top board 4 and flatulence circle 5 The lower equal filled high-temperature cotton 6 in both sides and the inner chamber of flatulence circle 5, i.e., between the upper surface of the body of roll 3 and top board 4, top board 4 and flatulence circle Filled high-temperature cotton 6, and in the inside filled high-temperature cotton 6 of flatulence circle 5 between 5, between flatulence circle 5 and clamp nut 7.
Common press-loading apparatus is the fixation clip directly on body of roll upper surface mostly, then hardening media is easy to by screw thread Penetrate into centre bore, after filled high-temperature cotton 6, it is ensured that sealing effectiveness.The upper end of suspension rod 9 is provided with internal thread, for connecting shackle. It is structure as a whole if suspension hook is set with suspension rod, then the body of roll 3 can only be set with from the lower end of suspension rod 9, is unfavorable for subsequent exhaust behaviour Make.
By the quenching frock, it is to the quenching processing technology of smoothing roll:
1) body of roll 3 is inserted in suspension rod 9, top board 4 and flatulence circle 5 is set in the upper end of the body of roll 3, and filled out between adjacent two part High temperature cotton 6 is filled, the two ends of the body of roll 3 are sealed by clamp nut 7;Suspension hook is installed in the upper end of suspension rod 9, the body of roll 3 is put into heating Stove;
It is inserted in after the body of roll 3, first in the populated high temperature cotton in the both sides of lower platen 2, then again in the upper end of suspension rod 9 on the body of roll 3 End winds high temperature cotton, is screwed off top board 4 around high temperature cotton winding direction, is spread between top board 4 and the upper surface of the body of roll 3 If high temperature cotton;Then flatulence circle 5 is screwed off around high temperature cotton winding direction, high temperature cotton is laid between flatulence circle 5 and top board 4; Clamp nut 7 is finally screwed in, does not have high temperature cotton between clamp nut 7 and the external screw thread of suspension rod 9, but in clamp nut 7 and flatulence Laying high temperature cotton 6 between circle 5.
2) 580~650 DEG C are warming up to stove, are incubated 1~3 hour;
First 580~650 DEG C are heated to the body of roll 3 to preheat, due to the material of the body of roll 3 and of different sizes, therefore temperature Setting is different, and general roll neck is smaller, and heating is faster, and preheating temperature is lower, and soaking time is also shorter, and the main purpose of insulation is Ensure that centre bore temperature is also sufficiently high, air has pressure because of expansion in centre bore.
3) body of roll 3 is hung out, unscrews clamp nut 7 and be exhausted, then tighten clamp nut 7, the body of roll 3 is hung in into heating Stove continues to heat;
The operation of its exhaust process is as follows:
A, the body of roll 3 is hung out after, unscrew clamp nut 7;
B, slow rotation top board 4, rotational angle are less than 90 °, the discharge of centre bore inner high voltage gas;
C, clamp nut 7 is screwed again, then the body of roll 3 is hung in heating furnace and continues to heat.
Whole exhaust process control was completed in 10 minutes, it is to avoid the excessive drop temperature of the body of roll 3 starts hardening.After the body of roll 3 melts down Continue to be heated to hardening heat, actual temp can be set according to actual needs.Because in heating and quenching, the body of roll is with pressing The expansion of plate and suspension rod, shrinkage factor are different, are easily caused medium entrance, and flatulence circle 5 elasticity of itself can be carried out to deformation Compensation, so as to ensure whole process central hole in sealing state.
4) 860~980 DEG C are heated to, insulation is hung out for 3~5 hours carries out Quenching Treatment after the body of roll 3;
The hardness that specifically quenching mode can be according to actual needs is adjusted, and is not limited specifically.In order to reach compared with Good hardness and toughness, can carry out Quenching Treatment using water, the double modes of quenching of oil.Specifically, put after the body of roll 3 being hung out from heating furnace Enter in cooling water, surface temperature reduction is sling after 2~5 minutes;Internal temperature is outwards transmitted, and is cooled down 2~6 minutes in atmosphere Place into cooling water, so repeatedly 3~5 times;The outside of the body of roll 3 obtains higher hardness, then the body of roll 3 is hung in fluid Row cooling completely.
It should be noted that two ends interval water spray that can also be in the body of roll after the body of roll 3 is hung out from heating furnace is handled, during water spray Between be 1~2 minute, temperature recover after spray water again, spray water 2~3 times, then carry out subsequent treatment, i.e., the body of roll 3 is put into cold But in water, surface temperature reduction is sling after 2~5 minutes;Cooling is placed into cooling water for 2~6 minutes in atmosphere, so anti- It is put into fluid and cools down after multiple 3~5 times.
After Quenching Treatment, the firmness outside of the body of roll 3 reaches that middle part hardness is about HRC33~38 up to HRC58~65, Hardness is about HRC23~35 at center bore inner wall, it can be seen that hardness ecto-entad is gradually reduced.Wherein water quenching purpose, which is mainly, carries High surface hardness, body of roll inner hardness is also improved after oil quenching.Because centre bore is sealed, close to slow at kernel of section It is cold, preferable toughness can be kept.
5) 2~3 tempers are carried out after quenching.
Drawing process is:It is tempered at 180~200 DEG C, is incubated 9~12 hours;Then carry out twice temperature 180~ 190 DEG C, the lonneal for being incubated 6~8 hours.
By temper, it is equalized internal stress, after temper, the firmness outside of the body of roll 3 is reached up to HRC56 ~62, middle part tissue hardness be about at HRC30~35, center bore inner wall hardness be about HBC210~240.Although firmness change is not Greatly, but preferably stress concentration phenomenon is eliminated, it is to avoid the generation of crackle.In drawing process, mainly making should inside the body of roll Power is eliminated, and can be misaligned heart hole and be sealed.
Embodiment 2
It is 1~5mm that the semidiameter between top board 4, lower platen 2 and suspension rod 9 is controlled in the present embodiment, contributes to high temperature cotton Sealing filling, if gap is excessive, high temperature cotton is difficult to fill consolidation, and sealing effectiveness is undesirable.Radius is chosen in the present embodiment Difference is 2mm.The diameter of lower platen 2 and top board 4 is not less than 0.8 times of the end face diameter of the body of roll 3, so as to the end face of the body of roll Form protection.
Embodiment 3
The side wall of clamp nut 7 offers bayonet socket 8 in the present embodiment, and the bayonet socket 8 is distributed along the radial symmetric of clamp nut 7. After being heated to the body of roll 3, workman can not be close, therefore bayonet socket 8 can be blocked by clamp, so as to rotatably compress nut 7.Therefore, In the step a and step c of exhaust process, clamp or other device card card inlets 8 can be used, so as to rotate release clamp nut 7.Other structures can also be set to aid in the rotation of clamp nut 7, such as protrusion fixture block, neck, be not specifically limited.
Embodiment 4
Pull bar is set on top board 4 in the present embodiment, as shown in figure 3, the pull bar is cylindrical bar, radial symmetric is arranged on The upper surface of top board 4, is vented for lifting top board 4.Cylindrical bar can be entangled in step b with steel pipe, is then rotated.
In addition, step 4) in when being quenched, the body of roll 3 from heating furnace hang out after be put into cooling water, hung after 2~5 minutes Rise, cooling in atmosphere is placed into cooling water for 2~6 minutes, so repeatedly 3~5 times;Then the body of roll 3 is immersed in cooling water Cooled down.
When putting into row Quenching Treatment using unskilled labor, although inside is filled with solid filler, but it is difficult to prevent quenching to be situated between Matter is penetrated under pressing plate or out of screw thread, so can touch hardening media more than at centre bore and end contact, and is not had There is preferable temperature drop safeguard measure, cause centre bore and end face junction Cooling Quenching, form stress concentration, in tempering also very Difficulty is eliminated stress, then just causes the body of roll to be easy to crack in this place, or even straight knot cracking.
And the present invention puts into row Quenching Treatment using quencher, on the one hand, coordinate high temperature cotton to be sealed using flatulence circle, The body of roll is thermally deformed and compensated, sealing effectiveness is improved;On the other hand, carry out producing in pump-down process, centre bore in technique Raw negative pressure, by external pressure come auxiliary seal, can prevent medium from entering, further improve sealing effectiveness, it is ensured that in the body of roll Toughness at the heart, can effectively prevent stress concentration, it is to avoid smoothing roll ftractures.
Schematical above that the present invention and embodiments thereof are described, the description does not have restricted, institute in accompanying drawing What is shown is also one of embodiments of the present invention, and actual structure is not limited thereto.So, if the common skill of this area Art personnel are enlightened by it, without departing from the spirit of the invention, are designed and the technical scheme without creative Similar frame mode and embodiment, all should belong to protection scope of the present invention.

Claims (8)

1. a kind of Heavy Straightening Roller processing method, it is characterised in that:Using 9Cr2Mo materials by forging processing, forging after quenched place Finished product is obtained after reason, preliminary working, final heat treatment, finishing;Wherein, row is put into using quencher during final heat treatment Quenching protection, is first preheating to 580~650 DEG C, is then put into by quencher after row pump-down process and continues to heat, is finally quenched Fire processing;The detailed process of its final heat treatment is:
1) body of roll (3) after machining is inserted on the suspension rod (9) of quenching frock, suspension rod (9) and is set with lower platen (2), Top board (4) and flatulence circle (5) are set in the body of roll (3) upper end, top board (4) and flatulence circle (5) are sleeved on suspension rod (9), The body of roll (3) is located between lower platen (2) and top board (4), and the filled high-temperature cotton (6) between adjacent two part, in suspension rod (9) on Portion is provided with external screw thread, and clamp nut (7) is threadedly coupled with suspension rod (9), by clamp nut (7) that the two ends of the body of roll (3) are close Envelope;Suspension hook is installed in suspension rod (9) upper end, the body of roll (3) is hung in heating furnace;
2) 580~650 DEG C are warming up to stove, are incubated 1~3 hour;
3) body of roll (3) is hung out, unscrews clamp nut (7) and be exhausted, then tighten clamp nut (7), the body of roll (3) is hung in Heating furnace continues to heat;Its exhaust process is:
A, the body of roll (3) is hung out after, unscrew clamp nut (7);
B, slowly rotation top board (4), the discharge of centre bore inner high voltage gas;
C, clamp nut (7) is screwed again, then the body of roll (3) is hung in heating furnace and continues to heat;
4) 860~980 DEG C are heated to, 3~5 hours are incubated, the body of roll (3) is then hung out and carries out Quenching Treatment;
5) step 4) quenching after the completion of carry out 2~3 tempers.
2. a kind of Heavy Straightening Roller processing method according to claim 1, it is characterised in that:Beginning forging temperature during forging processing Spend for 1000~1080 DEG C, final forging temperature is 800~860 DEG C;Oil cooling is cooled to after 720~760 DEG C after forging to 180~220 DEG C, then it is transferred to 680~700 DEG C of tempering.
3. a kind of Heavy Straightening Roller processing method according to claim 1, it is characterised in that:The suspension rod of the quenching frock (9) lower end is connected with baffle plate (1), suspension rod (9) and is set with lower platen (2), in use, the both sides of lower platen are filled with high temperature Cotton (6);Suspension rod (9) middle and upper part is provided with external screw thread, and top board (4) and flatulence circle (5) are sleeved on suspension rod (9), compresses spiral shell Female (7) are threadedly coupled with suspension rod (9), are filled in the both sides up and down and flatulence circle (5) inner chamber of top board (4) and flatulence circle (5) High temperature cotton (6).
4. a kind of Heavy Straightening Roller processing method according to claim 3, it is characterised in that:The clamp nut (7) Side wall offers bayonet socket (8), and the bayonet socket (8) is distributed along clamp nut (7) radial symmetric.
5. a kind of Heavy Straightening Roller processing method according to claim 3, it is characterised in that:Set on the top board (4) Pull bar or draw ring are equipped with, for lifting top board (4) exhaust.
6. a kind of Heavy Straightening Roller processing method according to claim 1, it is characterised in that:Step 3) in exhaust process Completed in 10 minutes.
7. a kind of Heavy Straightening Roller processing method according to claim 1, it is characterised in that:Step 4) in Quenching Treatment Process is:The body of roll (3) from heating furnace hang out after be put into cooling water, sling, cool down 2~6 minutes in atmosphere after 2~5 minutes Place into cooling water, so repeatedly 3~5 times;Then the body of roll (3) is hung in fluid and cooled down.
8. a kind of Heavy Straightening Roller processing method according to claim 1, it is characterised in that:Step 4) in quenched When, the body of roll (3) from heating furnace hang out after be put into cooling water, sling after 2~5 minutes, cooling in atmosphere is put for 2~6 minutes again Enter in cooling water, so repeatedly 3~5 times;Then the body of roll (3) is immersed and cooled down in cooling water.
CN201610796139.0A 2016-08-31 2016-08-31 A kind of Heavy Straightening Roller processing method Active CN106282496B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610796139.0A CN106282496B (en) 2016-08-31 2016-08-31 A kind of Heavy Straightening Roller processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610796139.0A CN106282496B (en) 2016-08-31 2016-08-31 A kind of Heavy Straightening Roller processing method

Publications (2)

Publication Number Publication Date
CN106282496A CN106282496A (en) 2017-01-04
CN106282496B true CN106282496B (en) 2017-10-17

Family

ID=57709545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610796139.0A Active CN106282496B (en) 2016-08-31 2016-08-31 A kind of Heavy Straightening Roller processing method

Country Status (1)

Country Link
CN (1) CN106282496B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114032367B (en) * 2021-11-11 2023-06-27 中冶陕压重工设备有限公司 Double-liquid quenching heat treatment method for CrWMn spinning core mould

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86208192U (en) * 1986-10-28 1987-10-07 吴宗豪 Food treatment and fresh-keeping device
JP2003160853A (en) * 2001-11-22 2003-06-06 Cnk:Kk Method for carburizing narrow or deep hole
CN101134996A (en) * 2006-08-29 2008-03-05 中信重型机械公司 Double quenching technique for 9Cr2Mo leveler roll
CN102108469A (en) * 2010-10-26 2011-06-29 常州宝菱重工机械有限公司 Hot rolling hot straightening roll suitable for thick steel plates with thickness of less than or equal to 60mm and preparation method thereof
CN204138715U (en) * 2014-09-10 2015-02-04 上海中船三井造船柴油机有限公司 For the heat treated endoporus seal protecting device of piston rod
CN104451099A (en) * 2014-11-25 2015-03-25 江苏常宝普莱森钢管有限公司 Thermal treatment protection device for eliminating oxidation of inner surface of steel pipe and using method of thermal treatment protection device
CN104946982A (en) * 2014-03-25 2015-09-30 宝山钢铁股份有限公司 Wide thick plate hot-straightening machine working roll and manufacturing method thereof

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86208192U (en) * 1986-10-28 1987-10-07 吴宗豪 Food treatment and fresh-keeping device
JP2003160853A (en) * 2001-11-22 2003-06-06 Cnk:Kk Method for carburizing narrow or deep hole
CN101134996A (en) * 2006-08-29 2008-03-05 中信重型机械公司 Double quenching technique for 9Cr2Mo leveler roll
CN102108469A (en) * 2010-10-26 2011-06-29 常州宝菱重工机械有限公司 Hot rolling hot straightening roll suitable for thick steel plates with thickness of less than or equal to 60mm and preparation method thereof
CN104946982A (en) * 2014-03-25 2015-09-30 宝山钢铁股份有限公司 Wide thick plate hot-straightening machine working roll and manufacturing method thereof
CN204138715U (en) * 2014-09-10 2015-02-04 上海中船三井造船柴油机有限公司 For the heat treated endoporus seal protecting device of piston rod
CN104451099A (en) * 2014-11-25 2015-03-25 江苏常宝普莱森钢管有限公司 Thermal treatment protection device for eliminating oxidation of inner surface of steel pipe and using method of thermal treatment protection device

Also Published As

Publication number Publication date
CN106282496A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN104862615B (en) A kind of production technology of S31803 two-phase stainless steel flange
CN107138660B (en) A kind of high-carbon-chromium bearing steel warm-rolling loop forming method for realizing tissue nodularization
CN105112774B (en) The air-cooled hardening spring steel of the low middle carbon microalloy of high-strength tenacity and its shaping and Technology for Heating Processing
CN104073814B (en) A kind of Technology for Heating Processing of high-carbon-chromium bearing steel
CN104087742A (en) Differential temperature heat treatment method for centrifugal compound high-chromium steel roller
CN104561504A (en) Heat treatment method for one-piece casting hot-rolled strip supporting roller
CN106119511B (en) 9Cr2Mo smoothing roll heat treatment methods based on exhaust quenching technical
CN106906340B (en) A kind of fine grain heat treatment method
CN205999422U (en) A kind of gland seal Quenching Treatment device
CN103602798A (en) Method for heat treatment on high-hardness semi-steel roller
CN105483353B (en) The differential temperature heat treatment method of high carbon high speed steel roll
CN102796965A (en) Rolling mill support roll steel and heat treatment technology thereof
CN1211626A (en) Quench hardening technique and device for cold-rolling roll
CN106868267A (en) A kind of D2Steel roll double frequency heat treatment quenching process and device
CN106282496B (en) A kind of Heavy Straightening Roller processing method
CN105331794B (en) A kind of heat-treatment technology method for high-carbon half steel material collars
CN107442721A (en) A kind of warm and hot forging technique of mould
CN108950148A (en) Improve G115 steel large-sized heavy-wall tube radially tissue and performance uniformity method
CN206033795U (en) Adopt pit -type tempering furnace of carbon fiber heating tube heating
CN100436909C (en) Process for producing double layer concrete transport pipe
CN106119510B (en) A kind of smoothing roll quenching process
CN107245565A (en) The stress relief annealing method of the effective steel continuous casting round bloom of high-pressure boiler
CN104451348A (en) Preparation method of high-hardness and high-strength expanding pyramid of mechanical expanding mill
CN108746206A (en) With the method for high-carbon low-alloy steel continuous cast round billets Rolling Production quartering hammer piston rod steel
CN105755266A (en) Gear quenching technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant