CN106271262A - Efficient hold down gag before the weldering of inductance pedestal - Google Patents
Efficient hold down gag before the weldering of inductance pedestal Download PDFInfo
- Publication number
- CN106271262A CN106271262A CN201610871056.3A CN201610871056A CN106271262A CN 106271262 A CN106271262 A CN 106271262A CN 201610871056 A CN201610871056 A CN 201610871056A CN 106271262 A CN106271262 A CN 106271262A
- Authority
- CN
- China
- Prior art keywords
- connecting plate
- plate
- inductance pedestal
- inductance
- pedestal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0426—Fixtures for other work
- B23K37/0435—Clamps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K2101/00—Articles made by soldering, welding or cutting
- B23K2101/36—Electric or electronic devices
Abstract
The invention discloses efficient hold down gag before a kind of inductance pedestal weldering, it includes connecting plate, compress platform, feed portion, feed portion includes frame, upper vibrations supply disk, upper rebound, upper receiving portion, upper compressed part, upper acceptance division includes first median plate, it is respectively arranged in the first clamping plate of first median plate both sides, the first clamping plate is driven to open the upper folding cylinder of Guan Bi, inductance pedestal side is provided with projection, the bottom of the side that two the first clamping plates are relative is provided with the first boss, first boss and first median plate are formed and the mounting groove matched with protruding inductance base ends.Inductance pedestal is delivered on acceptance division by feed portion by the present invention, by hold down gag, the inductance pedestal on acceptance division is pressed on connecting plate in an orderly manner, then unification carries out welding sequence, due to inductance pedestal ordered arrangement, the available multiple welding guns of welding synchronize to carry out to be possible with that welding gun is regular is repeatedly performed, and greatly improve welding efficiency.
Description
Technical field
The present invention relates to inductance pedestal and produce equipment, particularly to efficient hold down gag before a kind of inductance pedestal weldering.
Background technology
Existing inductance pedestal needs to carry out welding sequence after molding completes again, but owing to inductance pedestal volume is little, number
Measuring various, if welding inductance pedestal one by one, speed of welding is relatively slow, needs to take a significant amount of time and manpower, how to realize
Rapid welding is current problem demanding prompt solution in batches.
Summary of the invention
It is an object of the invention to provide efficient hold down gag before a kind of inductance pedestal weldering.
For reaching above-mentioned purpose, the technical solution used in the present invention is: efficient hold down gag before a kind of inductance pedestal weldering, it
Including the connecting plate for accepting inductance pedestal, for supporting the compression platform of described connecting plate, for being carried by inductance pedestal
The feed portion after to connecting plate and compressed inductance pedestal, described feed portion includes frame, is installed in described frame
Upper vibrations supply disk be connected with described upper vibrations supply disk delivery outlet and offer the upper rebound of transition passage, installation
In described transition passage downstream and offer receive passage upper receiving portion, drive described reception passage towards for laying inductance
The upper compressed part that the connecting plate of pedestal moves, described upper receiving portion is installed in described upper compressed part, and described upper acceptance division includes
First median plate, be respectively arranged in described first median plate both sides the first clamping plate, drive the first clamping plate open Guan Bi on open
Closing cylinder, described inductance pedestal side is provided with projection, and the bottom of the side that two described first clamping plates are relative is provided with the
One boss, during Guan Bi, the first boss matches with the formation of described first median plate and the inductance base ends with described projection
Mounting groove, described protruding load is located on described first boss, and upper compressed part includes the installing plate being arranged in described frame, fixes
On described installing plate sidewall and be positioned at the upper extension board above upper acceptance division, be installed on described upper extension board and piston rod with
The upper driving cylinder that described upper acceptance division is fixedly connected, during compression, described connecting plate is positioned at immediately below described upper receiving portion.
Optimizing, described feed portion also includes that the lower vibrations supply disk being installed in described frame and described lower vibrations supply
Charging tray delivery outlet is connected and offers the lower rebound of transition passage, be installed on described transition passage downstream and offer reception
The lower receiving portion of passage, drive described lower receiving portion receive passage towards moving down for laying the connecting plate of inductance pedestal
Compressed part, described lower receiving portion is installed in described lower compressed part, and described lower acceptance division includes second median plate, is respectively arranged in institute
State the second clamping plate of second median plate both sides, drive the second clamping plate to open the lower folding cylinder of Guan Bi, two described second folders
The bottom of the side that tight plate is relative is provided with the second boss, and during Guan Bi, the second boss is formed with band with described second median plate
Stating the mounting groove that the inductance base ends of projection matches, described projection is plugged in described mounting groove, and lower compressed part includes solid
On described installing plate sidewall and be positioned at the lower extension board immediately below upper extension, be installed on described lower extension board and piston rod
The lower driving cylinder being fixedly connected with described lower acceptance division, during compression, described connecting plate is positioned at directly over described lower acceptance division.
Further, described upper rebound and being respectively arranged below with of described lower rebound prop up a bracer, described connecting plate position
Being set to medium position, described upper vibrations supply disk is positioned on the left of connecting plate, and described lower vibrations supply disk is positioned on the right side of connecting plate, position
Described on the left of described connecting plate, the upper end of a bracer tilts towards upper vibrations supply disk, is positioned on the right side of described connecting plate
The upper end of described bracer tilts towards lower vibrations supply disk, and described bracer is provided with auxiliary support plate, and gripper shoe is L
Type, bottom pushes against on the sidewall of described upper rebound or lower rebound, and its upper-end part of driving is in described upper rebound or descends
The top of cab apron.
Further, described auxiliary support plate is positioned at the left part of described upper rebound or is positioned at the right-hand member of lower rebound
Portion.
Optimizing, described compression platform includes the rotating shaft being rotationally connected with in frame, is fixedly connected on described rotating shaft upper end
The platform body in portion, it is installed in described frame and is positioned at below described platform body for driving the driving of described axis of rotation
Portion, described connecting plate is positioned on described platform body, and described drive division includes the driven tooth that fixed cover is located in described rotating shaft
Wheel, the cylinder that drives being installed in described frame are meshed with described driven gear for driving described driven gear to rotate
Tooth bar, described tooth bar is connected with the piston rod of described driving cylinder and is slidably connected in described frame.
Further, being positioned at the described frame below described platform body and be provided with auxiliary support frame, described auxiliary supports
Frame includes being fixedly connected in described frame and be positioned at the support column below described platform body, is rotationally connected with described support column
Upper end and the periphery roller tangent with described platform body lower surface, the pivot center of described roller is through described rotating shaft
Pivot center.
Further, described platform body offers symmetrical two group locating slot, is often placed with one in group locating slot
Individual connecting plate, described locating slot sidewall is provided with spacing preiection, and the sidewall of described connecting plate is provided with and matches with described projection
Limited impression.
Optimizing, the upper and lower end face of described connecting plate is provided with the limit corresponding with the notch offered on described inductance pedestal
Position block, after compression, described inductance pedestal is arranged on described limited block.
Owing to technique scheme is used, the present invention compared with prior art has the advantage that the present invention passes through feed
Inductance pedestal is delivered on acceptance division by portion, by hold down gag, the inductance pedestal on acceptance division is pressed on connecting plate in an orderly manner
On, then unification carries out welding sequence, and due to inductance pedestal ordered arrangement, welding available multiple welding guns synchronization is carried out also can profit
It is repeatedly performed with welding gun is regular, greatly improves welding efficiency.
Accompanying drawing explanation
Accompanying drawing 1 is the three-dimensional view of the present invention;
Accompanying drawing 2 is the decomposition view of the present invention;
Accompanying drawing 3 is the three-dimensional view after the removing cover body of the present invention;
Accompanying drawing 4 is the three-dimensional view after the removing cover body of the present invention;
Accompanying drawing 5 is the partial view A of accompanying drawing 3;
Accompanying drawing 6 is the partial view B of accompanying drawing 4;
Accompanying drawing 7 is the partial view C of accompanying drawing 4.
Detailed description of the invention
The invention will be further described for embodiment shown in below in conjunction with the accompanying drawings.
As shown in Figure 1, 2, before the weldering of inductance pedestal, efficiently hold down gag includes the connecting plate 0 for accepting inductance pedestal, uses
In supporting the compression platform of described connecting plate 0, and inductance pedestal being pressed after inductance pedestal is delivered on connecting plate 0
Tight feed portion, electrical control cubicles 25.
Feed portion as described in Fig. 3,4,5,6,7 includes frame 1, be installed on as described in upper vibrations supply disk 2 in frame 1 and
Described upper vibrations supply disk 2 delivery outlet is connected and offers the upper rebound 3 of transition passage, is installed under described transition passage
Trip and offer and receive the upper receiving portion of passage, drive described reception passage towards moving for laying the connecting plate 0 of inductance pedestal
Dynamic upper compressed part, the lower vibrations supply disk 18 being installed in described frame 1, it is connected with described lower vibrations supply disk 18 delivery outlet
Connect and offer the lower rebound 29 of transition passage, be installed on described transition passage downstream and offer the lower acceptance receiving passage
Portion, drive described lower receiving portion receive passage towards for laying the lower compressed part that the connecting plate 0 of inductance pedestal moves.Described
Upper receiving portion is installed in described upper compressed part, and described lower receiving portion is installed in described lower compressed part.
Described upper acceptance division includes first median plate 4, the first clamping plate 5 being respectively arranged in described first median plate 4 both sides, drives
Dynamic first clamping plate 5 opens the upper folding cylinder 6 of Guan Bi, and described inductance pedestal side is provided with projection, two described first folders
The bottom of the side that tight plate 5 is relative is provided with the first boss 7, and during Guan Bi, the first boss 7 and described first median plate 4 are formed and band
The mounting groove that the inductance base ends of described projection matches, described protruding load is had to be located on described first boss 7, upper compressed part
Including the installing plate 8 being arranged in described frame 1, be fixed on described installing plate 8 sidewall and be positioned at above upper acceptance division upper
Extension board 9, it is installed on described upper extension board 9 and upper driving cylinder 10 that piston rod is fixedly connected with described upper acceptance division,
During compression, described connecting plate 0 is positioned at immediately below described upper receiving portion.Described lower acceptance division includes second median plate 11, is respectively mounted
The second clamping plate 12 in described second median plate 11 both sides, the second clamping plate 12 is driven to open the lower folding cylinder 13 of Guan Bi, two
The bottom of the side that individual described second clamping plate 12 is relative is provided with the second boss 14, during Guan Bi, and the second boss 14 and described the
In two, plate 11 is formed and the mounting groove matched with the inductance base ends of described projection, described projection be plugged in described in lay
In groove, lower compressed part includes being fixed on described installing plate 8 sidewall and being positioned at the lower extension board 15 immediately below extension, be installed on
On described lower extension board 15 and the lower driving cylinder 16 that is fixedly connected with described lower acceptance division of piston rod, during compression, described company
Fishplate bar 0 is positioned at directly over described lower acceptance division.
Described upper rebound 3 and being respectively arranged below with of described lower rebound 27 prop up a bracer 17, and described connecting plate 0 position is
Medium position, described upper vibrations supply disk 2 is positioned on the left of connecting plate 0, and described lower vibrations supply disk 18 is positioned on the right side of connecting plate 0,
The upper end being positioned at described bracer 17 on the left of described connecting plate 0 tilts towards upper vibrations supply disk 2, is positioned at described connecting plate
The upper end of described bracer 17 on the right side of in the of 0 tilts towards lower vibrations supply disk 18, and described bracer 17 is provided with auxiliary and supports
Plate 19, described auxiliary support plate 19 is L-shaped, and bottom pushes against on the sidewall of described upper rebound 3 or lower rebound 27, on it
End is positioned at described upper rebound 3 or the top of lower rebound 27.Described auxiliary support plate 19 is positioned at a left side for described upper rebound 3
End or be positioned at the right part of lower rebound 27.
Described compression platform includes the rotating shaft 20 being rotationally connected with in frame 1, is fixedly connected on described rotating shaft 20 upper end
Platform body 21, be installed in described frame 1 and be positioned at below described platform body 21 for driving described rotating shaft 20 to rotate
Drive division, described connecting plate 0 is positioned on described platform body 21, and described drive division includes that fixed cover is located at described rotating shaft 20
On driven gear 22, the driving cylinder 23 that is installed in described frame 1 is meshed for driving with described driven gear 22
Stating the tooth bar 24 that driven gear 22 rotates, described tooth bar 24 is connected with the piston rod of described driving cylinder 23 and is slidably connected to
In described frame 1.It is positioned at the described frame 1 below described platform body 21 and is provided with auxiliary support frame, described auxiliary support frame
Including being fixedly connected in described frame 1 and be positioned at the support column 26 below described platform body 21, being rotationally connected with described
Dagger 26 upper end and the periphery roller 28 tangent with described platform body 21 lower surface, the pivot center warp of described roller 28
Cross the pivot center of described rotating shaft 20.Symmetrical two group locating slot is offered, often in group locating slot on described platform body 21
Being placed with a connecting plate 0, described locating slot sidewall is provided with spacing preiection, and the sidewall of described connecting plate 0 is provided with described
The limited impression that projection matches.The upper and lower end face of described connecting plate 0 is provided with and the notch phase offered on described inductance pedestal
Corresponding limited block 27, after compression, described inductance pedestal is arranged on described limited block 27.
Above-described embodiment, only for technology design and the feature of the explanation present invention, its object is to allow person skilled in the art
Scholar will appreciate that present disclosure and implements according to this, can not limit the scope of the invention with this.All according to the present invention
The equivalence that spirit is made changes or modifies, and all should contain within protection scope of the present invention.
Claims (8)
1. efficient hold down gag before inductance pedestal weldering, it is characterised in that: it include the connecting plate for accepting inductance pedestal,
For supporting the compression platform of described connecting plate, and inductance pedestal being pressed after inductance pedestal is delivered on connecting plate
Tight feed portion, described feed portion includes frame, the upper vibrations supply disk that is installed in described frame and described upper vibrations feed
Dish delivery outlet is connected and offers the upper rebound of transition passage, be installed on described transition passage downstream and to offer reception logical
The upper receiving portion in road, drive described reception passage towards for laying the upper compressed part that the connecting plate of inductance pedestal moves, described
Upper receiving portion is installed in described upper compressed part, and described upper acceptance division includes first median plate, is respectively arranged in described first median plate
First clamping plate of both sides, driving the first clamping plate to open the upper folding cylinder of Guan Bi, described inductance pedestal side is provided with convex
Rising, the bottom of the side that two described first clamping plates are relative is provided with the first boss, during Guan Bi, and the first boss and described first
Middle plate forms the mounting groove matched with the inductance base ends with described projection, and described protruding load is located at described first boss
On, upper compressed part includes the installing plate being arranged in described frame, is fixed on described installing plate sidewall and is positioned at acceptance division
The upper extension board of top, it is installed on described upper extension board and upper driving gas that piston rod is fixedly connected with described upper acceptance division
Cylinder, during compression, described connecting plate is positioned at immediately below described upper receiving portion.
Efficient hold down gag before inductance pedestal the most according to claim 1 weldering, it is characterised in that: described feed portion also includes
The lower vibrations supply disk being installed in described frame is connected with described lower vibrations supply disk delivery outlet and offers transition passage
Lower rebound, be installed on described transition passage downstream and offer receive passage lower receiving portion, drive described lower receiving portion
Receive passage towards for laying the lower compressed part that the connecting plate of inductance pedestal moves, described lower receiving portion be installed on described under
In compressed part, described lower acceptance division includes second median plate, is respectively arranged in the second clamping plate of described second median plate both sides, driving
Second clamping plate opens the lower folding cylinder of Guan Bi, and it is convex that the bottom of the side that two described second clamping plates are relative is provided with second
Platform, during Guan Bi, the second boss is formed and laying that the inductance base ends with described projection matches with described second median plate
Groove, described projection is plugged in described mounting groove, and lower compressed part includes being fixed on described installing plate sidewall and being positioned at extension
Immediately below lower extension board, be installed on described lower extension board and lower driving that piston rod is fixedly connected with described lower acceptance division
Cylinder, during compression, described connecting plate is positioned at directly over described lower acceptance division.
Efficient hold down gag before inductance pedestal the most according to claim 2 weldering, it is characterised in that: described upper rebound and institute
That states lower rebound is respectively arranged below with a bracer, and described connecting plate position is medium position, and described upper vibrations supply disk is positioned at
On the left of connecting plate, described lower vibrations supply disk is positioned on the right side of connecting plate, is positioned at the upper of described bracer on the left of described connecting plate
End tilts towards upper vibrations supply disk, is positioned at the upper end of described bracer on the right side of described connecting plate towards lower vibrations feed
Dish tilts, and described bracer is provided with auxiliary support plate, and described auxiliary support plate is L-shaped, and its bottom pushes against in described upper mistake
On the sidewall of cab apron or lower rebound, its upper-end part of driving is in described upper rebound or the top of lower rebound.
Efficient hold down gag before inductance pedestal the most according to claim 3 weldering, it is characterised in that: described auxiliary support plate position
In the left part of described upper rebound or the right part that is positioned at lower rebound.
Efficient hold down gag before inductance pedestal the most according to claim 1 weldering, it is characterised in that: described compression platform includes
The rotating shaft, the platform body being fixedly connected on described rotating shaft upper end that are rotationally connected with in frame, be installed in described frame and
Being positioned at for driving the drive division of described axis of rotation below described platform body, described connecting plate is positioned over described platform body
On, described drive division include fixed cover be located at the driven gear in described rotating shaft, the driving cylinder that is installed in described frame and
Described driven gear is meshed for the piston of the tooth bar driving described driven gear to rotate, described tooth bar and described driving cylinder
Bar is connected and is slidably connected in described frame.
Efficient hold down gag before inductance pedestal the most according to claim 5 weldering, it is characterised in that: it is positioned at described platform body
The described frame of lower section is provided with auxiliary support frame, and described auxiliary support frame includes being fixedly connected in described frame and be positioned at institute
State the support column below platform body, be rotationally connected with described support column upper end and periphery and described platform body lower surface
Tangent roller, the pivot center of described roller is through the pivot center of described rotating shaft.
Efficient hold down gag before inductance pedestal the most according to claim 5 weldering, it is characterised in that: open on described platform body
Being provided with symmetrical two group locating slot, be often placed with a connecting plate in group locating slot, described locating slot sidewall is provided with spacing
Projection, the sidewall of described connecting plate is provided with the limited impression matched with described projection.
Efficient hold down gag before inductance pedestal the most according to claim 1 weldering, it is characterised in that: described connecting plate upper and lower
End face is provided with the limited block corresponding with the notch offered on described inductance pedestal, and after compression, described inductance pedestal is arranged in institute
State on limited block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610871056.3A CN106271262B (en) | 2016-09-30 | 2016-09-30 | Efficient pressing device before the weldering of inductance pedestal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610871056.3A CN106271262B (en) | 2016-09-30 | 2016-09-30 | Efficient pressing device before the weldering of inductance pedestal |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106271262A true CN106271262A (en) | 2017-01-04 |
CN106271262B CN106271262B (en) | 2018-02-06 |
Family
ID=57716538
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610871056.3A Active CN106271262B (en) | 2016-09-30 | 2016-09-30 | Efficient pressing device before the weldering of inductance pedestal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106271262B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107464682A (en) * | 2017-08-08 | 2017-12-12 | 达和精密电子(惠州)有限公司 | Inductance materials and parts production equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201285701Y (en) * | 2008-08-22 | 2009-08-05 | 深圳市力生机械设备有限公司 | Automatic assembling equipment for transformer |
CN201298446Y (en) * | 2008-09-10 | 2009-08-26 | 顾建伟 | Automatic assembly machine of inductive ballast |
CN101567257A (en) * | 2009-02-12 | 2009-10-28 | 卢云飞 | Automatic pin connecting machine for electrical inductance |
CN203503454U (en) * | 2013-07-08 | 2014-03-26 | 广东风华高新科技股份有限公司 | Automatic inductor manufacturing device |
CN204360914U (en) * | 2015-01-14 | 2015-05-27 | 方功理 | A kind of transformer fills iron core adhesive tape wrapping test machine automatically |
CN206122954U (en) * | 2016-09-30 | 2017-04-26 | 苏州品翔电通有限公司 | High -efficient closing device before inductance base welds |
-
2016
- 2016-09-30 CN CN201610871056.3A patent/CN106271262B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201285701Y (en) * | 2008-08-22 | 2009-08-05 | 深圳市力生机械设备有限公司 | Automatic assembling equipment for transformer |
CN201298446Y (en) * | 2008-09-10 | 2009-08-26 | 顾建伟 | Automatic assembly machine of inductive ballast |
CN101567257A (en) * | 2009-02-12 | 2009-10-28 | 卢云飞 | Automatic pin connecting machine for electrical inductance |
CN203503454U (en) * | 2013-07-08 | 2014-03-26 | 广东风华高新科技股份有限公司 | Automatic inductor manufacturing device |
CN204360914U (en) * | 2015-01-14 | 2015-05-27 | 方功理 | A kind of transformer fills iron core adhesive tape wrapping test machine automatically |
CN206122954U (en) * | 2016-09-30 | 2017-04-26 | 苏州品翔电通有限公司 | High -efficient closing device before inductance base welds |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107464682A (en) * | 2017-08-08 | 2017-12-12 | 达和精密电子(惠州)有限公司 | Inductance materials and parts production equipment |
Also Published As
Publication number | Publication date |
---|---|
CN106271262B (en) | 2018-02-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108723752A (en) | Jack intelligently wears pin machine | |
CN104015050B (en) | Lipstick packing tube automatic assembling | |
CN103286558B (en) | A kind of clip kludge | |
CN209207406U (en) | A kind of automobile clutch pressure plate protection device for installing | |
CN108146406A (en) | Battery for electric automobile replaces robot | |
CN109718998A (en) | Assembling dispensing all-in-one machine | |
CN205550723U (en) | Smooth moving point machine of gluing of regulation nature arc has | |
CN204124804U (en) | Spherical connecting bar feed mechanism | |
CN106271262A (en) | Efficient hold down gag before the weldering of inductance pedestal | |
CN204843487U (en) | Bolt processingequipment's O type circle mechanism of packing into | |
CN202244138U (en) | Filter stick counting and packing device | |
CN106429258B (en) | A kind of carrying position-limit mechanism of fire-fighting host shell | |
CN103260391A (en) | Assembling machine with transistor automatically sleeved with magnet ring | |
CN206122954U (en) | High -efficient closing device before inductance base welds | |
CN207431696U (en) | A kind of automatic screw for keyboard installs equipment | |
CN109112276A (en) | Automatic stopper machine for colloidal particle | |
CN106271261A (en) | The feeding machanism of prepressing device before the weldering of inductance pedestal | |
CN206047417U (en) | The feeding machanism of prepressing device before the weldering of inductance pedestal | |
CN207283354U (en) | A kind of linear motor coil holder, the glue-pressing device of coil | |
CN208497717U (en) | A kind of panel double-station alternately operating jig | |
CN207957704U (en) | A kind of packing device for chemical reagent canning line | |
CN207061267U (en) | A kind of handling equipment of tinuous production | |
CN206750267U (en) | Platen skin component | |
CN206382827U (en) | U.S. rule charger case presser feet machine is advised in one kind | |
CN109262165A (en) | A kind of hydraulic stem injured part prosthetic appliance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |