Prior art keywords
die
mould
convex closure
mold insert
pole shoe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610955749.0A
Other languages
Chinese (zh)
Inventor
胡培东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinese Zhenhua Electron Yuguang Electrician Ltd Co (state-Owned 771 Factory)
Original Assignee
Chinese Zhenhua Electron Yuguang Electrician Ltd Co (state-Owned 771 Factory)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinese Zhenhua Electron Yuguang Electrician Ltd Co (state-Owned 771 Factory) filed Critical Chinese Zhenhua Electron Yuguang Electrician Ltd Co (state-Owned 771 Factory)
Priority to CN201610955749.0A priority Critical patent/CN106270159A/en
Publication of CN106270159A publication Critical patent/CN106270159A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D35/00Combined processes according to or processes combined with methods covered by groups B21D1/00 - B21D31/00
    • B21D35/002Processes combined with methods covered by groups B21D1/00 - B21D31/00
    • B21D35/003Simultaneous forming, e.g. making more than one part per stroke
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D28/00Shaping by press-cutting; Perforating
    • B21D28/02Punching blanks or articles with or without obtaining scrap; Notching
    • B21D28/14Dies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/08Dies with different parts for several steps in a process
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/02Advancing work in relation to the stroke of the die or tool
    • B21D43/021Control or correction devices in association with moving strips
    • B21D43/023Centering devices, e.g. edge guiding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D43/00Feeding, positioning or storing devices combined with, or arranged in, or specially adapted for use in connection with, apparatus for working or processing sheet metal, metal tubes or metal profiles; Associations therewith of cutting devices
    • B21D43/02Advancing work in relation to the stroke of the die or tool
    • B21D43/025Fault detection, e.g. misfeed detection
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D45/00Ejecting or stripping-off devices arranged in machines or tools dealt with in this subclass
    • B21D45/003Ejecting or stripping-off devices arranged in machines or tools dealt with in this subclass in punching machines or punching tools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D45/00Ejecting or stripping-off devices arranged in machines or tools dealt with in this subclass
    • B21D45/10Combined ejecting and stripping-off devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Press Drives And Press Lines (AREA)

Abstract

The invention discloses a kind of eight continuous preparation methoies of C-shaped pole shoe one mould and the progressive die, it is to first pass through to rush convex closure male mold inserts on billot, go out 8 groups of convex closures and through hole, then in billot moving process successively through blanking die mold insert with abnormity punch by C-shaped pole shoe stamping-out depanning corresponding with through hole for 8 groups of convex closures, the described progressive die includes die block, it is sequentially provided with on die block and rushes convex closure male mold inserts and 8 different blanking die mold inserts, rush convex closure male mold inserts and be provided with and rush convex closure punch and punching concave die;Described die block be arranged over upper bolster, the lower section of upper bolster be provided with the special-shaped punch corresponding with blanking die mold insert and with rush convex closure male mold inserts corresponding rush convex closure die mold insert, rush convex closure die mold insert and be provided with and rush convex closure die and piercing punch.It is high that the present invention has production efficiency, and process time is short, saves the feature of human resources.

Description

A kind of eight continuous preparation methoies of C-shaped pole shoe one mould and the progressive die
Technical field
The present invention relates to a kind of C-shaped pole shoe continuous molding Preparation Method and the progressive die, particularly a kind of C-shaped pole shoe one mould eight Preparation method and the progressive die continuously.
Background technology
The each cast of C-shaped pole shoe has 8 kinds of different sizes, annual output more about 800,000, former large batch of pole shoe Punch process is the processing of most basic single process stamping die, and eight kinds of pole shoes need just can complete with eight secondary blanking dies, and rush Full feeding by hand during pressure, causes many process time, the waste of human resources, also restricts production simultaneously in production process Demand.
Summary of the invention
It is an object of the invention to, it is provided that a kind of eight continuous preparation methoies of C-shaped pole shoe one mould and the progressive die.The present invention has Having production efficiency high, process time is short, saves the feature of human resources.
Technical scheme: a kind of eight continuous preparation methoies of C-shaped pole shoe one mould, is to first pass through to rush convex closure punch edge Part goes out 8 groups of convex closures and through hole on billot, then successively through blanking die mold insert and abnormity punch in billot moving process By C-shaped pole shoe stamping-out depanning corresponding with through hole for 8 groups of convex closures.
Aforesaid eight continuous preparation methoies of C-shaped pole shoe one mould, single stamping-out terminates rear discharging spring to be withstood stripper plate and makes Its holding contacts with billot, and train wheel bridge is lifted up with upper bolster, de-after abnormity punch and piercing punch completely disengage from billot Flitch is lifted up again.
Aforesaid eight continuous preparation methoies of C-shaped pole shoe one mould, after single stamping-out terminates, floating roof pin and the floating roof pin of rectangle to On billot jack-up disengaged it from the surface of die block.
Aforesaid eight continuous preparation methoies of C-shaped pole shoe one mould, guide hole die and guide hole punch be equidistant stamping-out on billot Guide hole, in billot moving process, when guide hole moves to the underface of the vertical shank of step pitch guide pin, vertical shank inserts and leads Hole, step pitch detection guide pin one end snaps in annular groove, and the conducting of mould power supply starts stamping-out, when billot is not moved to tram Time, vertical shank can not insert guide hole, and step pitch detection guide pin departs from annular groove, and mould power supply disconnects, and mould stops.
A kind of progressive die realizing aforementioned C-shaped pole shoe one eight continuous preparation methoies of mould, includes die block, die It is sequentially provided with in fixed plate and rushes convex closure male mold inserts and 8 different blanking die mold inserts, rush and set on convex closure male mold inserts Rush convex closure punch and punching concave die;Described die block be arranged over upper bolster, the lower section of upper bolster is provided with and blanking Special-shaped punch that die mold insert is corresponding and corresponding with rushing convex closure male mold inserts rush convex closure die mold insert, rushes on convex closure die mold insert It is provided with and rushes convex closure die and piercing punch.
Aforesaid eight progressive dies of C-shaped pole shoe one mould, described blanking die mold insert includes first group be sequentially arranged Blanking die mold insert, second group of blanking die mold insert and the 3rd group of blanking die mold insert, first group of blanking die mold insert and second Group blanking die mold insert is respectively provided with 3 blanking dies, and the 3rd group of blanking die mold insert is provided with 2 blanking dies.
Aforesaid eight progressive dies of C-shaped pole shoe one mould, the lower section of described upper bolster be the most also sequentially provided with train wheel bridge, Baffle plate and stripper plate, described abnormity punch is located on train wheel bridge, and one end of abnormity punch is through baffle plate and stripper plate, described Rushing convex closure die mold insert to be located on stripper plate, the top of described piercing punch is connected on train wheel bridge, described upper bolster and backstop Discharging spring it is provided with between plate.
Aforesaid eight progressive dies of C-shaped pole shoe one mould, the both sides of described die block upper surface are provided with 7 type baffle plates, institute State stripper plate and be provided with the baffle plate escape groove corresponding with 7 type baffle plates;Described die block is provided with floating roof pin and rectangle is floating roof Pin, rectangle floating roof pin top be formed around fillet R;Stripper plate above the floating roof pin of rectangle is provided with T-shaped jigger pin.
Aforesaid eight progressive dies of C-shaped pole shoe one mould, the discharge end of described die block is provided with cutting assembly.
Aforesaid eight progressive dies of C-shaped pole shoe one mould, the feed end of described die block is additionally provided with guide hole die, described Train wheel bridge is provided with the guide hole punch corresponding with guide hole die;The middle part of described stripper plate is provided with step pitch guide pin, and described step pitch is led Pin includes vertical shank, and the top of vertical shank is provided with annular groove, and the side of annular groove is provided with step pitch detection guide pin.
Beneficial effects of the present invention:
1, the present invention is by the die of the 8 kinds of difform C-shaped pole shoes of design of imposition layout on die block, can continuous punching Determine variform C-shaped pole shoe in 8, substantially increase the productivity ratio height of C-shaped pole shoe, shorten process time and improve labor Dynamic utilization rate, meanwhile, when this uses, operator have only in side feeding, and hands need not enter deathtrap, produce Safer.And the present invention can be equipped with automatic feeding at feed end, it is easy to automatization, can be mass-produced.
2, the present invention arranges stripper plate by the lower section at upper bolster, can prevent billot from being taken up by abnormity punch, improve Efficiency, safety and the product quality produced.
3, the present invention is by arranging floating roof pin and the floating roof pin of rectangle on die block, it is to avoid be bonded at after punching strip The surface of fixed plate, meanwhile, adds the floating roof pin of rectangle, and arranges fillet at the top of the floating roof pin of rectangle, and its liftout is effective, And floating roof pin can be avoided to scratch billot surface.
4, the present invention arranges cutting assembly by the discharge end at die block, when punching strip C-shaped pole shoe becomes useless After material, can directly waste material be cut off, it is simple to following process.
5, the present invention is by arranging guide hole module and step pitch detection guide pin, in billot feeding process, first on billot Stamping-out guide hole, then utilizes step pitch detection guide pin to position the stroke of billot, when billot does not puts in place, stops stamping-out, protect Quality and the mold use life-span of product are demonstrate,proved.
Accompanying drawing explanation
Accompanying drawing 1 is the structural representation of the present invention;
Accompanying drawing 2 is the top view of die shoe;
Accompanying drawing 3 is the upward view of upper bolster;
Accompanying drawing 4 is for rushing convex closure male mold inserts structural representation;
Accompanying drawing 5 is for rushing convex closure die mold insert structural representation;
Accompanying drawing 6 is the structural representation of the floating roof pin of rectangle;
Accompanying drawing 7 is the structural representation of step pitch detection guide pin;
Accompanying drawing 8 is the structural representation of one of which C-shaped pole shoe.
Description of reference numerals: 1-die shoe, 2-lower mold backing plate, 3-die block, 4-pin A, 5-guide pin bushing, the de-material of 6- Plate, 61-baffle plate escape groove, 7-baffle plate, 8-train wheel bridge, 9-upper die plate, 10-upper bolster, 11-pin B, 12-guide pillar, 13- Pin C, 14-step pitch guide pin, 15-pin D, 16-step pitch detection guide pin, the vertical shank of 161-, 162-annular groove, 17-abnormity Punch, 18-discharging spring, 19-rushes convex closure die mold insert, and 191-rushes convex closure die, 192-piercing punch, 193-step, 20-T Type jigger pin, 21-rushes convex closure male mold inserts, 211-punching concave die, and 212-rushes convex closure punch, and 22-7 type baffle plate, 23-rectangle is floating roof Pin, the floating roof pin of 24-, the contour limited post of 25-pin E, 26-, 27-pin F, 28-trip bolt, the 3rd group of blanking die edge of 29- Part, 30-cutting assembly, 31-guide hole die, 32-guide hole punch, second group of blanking die mold insert of 33-, first group of blanking of 34-is recessed Mould mold insert.
Detailed description of the invention
Embodiments of the invention: the progressive die of a kind of C-shaped pole shoe one eight continuous preparation methoies of mould, as shown in figures 1-8, bag Having included die block 3, die block 3 is fixed on die shoe 1, is additionally provided with lower mold between die shoe 1 and die block 3 Backing plate 2, between die block 3 and die shoe 1, via pins A4 and pin E25 fix, die block 3 is sequentially provided with rush convex Bag male mold inserts 21 and 8 different blanking die mold inserts, rush convex closure male mold inserts 21 and be provided with and rush convex closure punch 212 He Punching concave die 211;Described die block 3 be arranged over upper bolster 10, between upper bolster 10 and die shoe 1 through guide pin bushing 5 and Guide pillar 12 positions, the lower section of upper bolster 10 be provided with the special-shaped punch 17 corresponding with blanking die mold insert and with rush convex closure male mold inserts 21 correspondences rush convex closure die mold insert 19, rush convex closure die mold insert 19 and be provided with and rush convex closure die 191 and piercing punch 192.
Described blanking die mold insert includes 34, the second group of blanking die of first group of blanking die mold insert being sequentially arranged Mold insert 33 and the 3rd group of blanking die mold insert 29, first group of blanking die mold insert 34 and second group of blanking die mold insert 33 are respectively provided with 3 blanking dies, the 3rd group of blanking die mold insert 29 is provided with 2 blanking dies.
The lower section of described upper bolster 10 is the most also sequentially provided with train wheel bridge 8, baffle plate 7 and stripper plate 6, upper bolster 10 And be additionally provided with upper die plate 9, baffle plate 7 and stripper plate 6 via pins B11 between train wheel bridge 8 and fix, upper bolster 10 and train wheel bridge 8 Via pins C13 is fixed, and can carry out movable spacing with via pins D15, described abnormity punch between stripper plate 6 and upper die plate 9 17 are located on train wheel bridge 8, and one end of abnormity punch 17 is through baffle plate 7 and stripper plate 6, and the described convex closure die mold insert 19 that rushes is located at On stripper plate 6, the top of described piercing punch 192 is connected on train wheel bridge 8, is provided with between described upper bolster 10 and baffle plate 7 Discharging spring 18.
The both sides of described die block 3 upper surface are provided with 7 type baffle plate 22,7 type baffle plate 22 via pins F27 and trip bolts 28 fix, and described stripper plate 6 is provided with the baffle plate escape groove 61 corresponding with 7 type baffle plates 22;Described die block 3 is provided with floating Ejector pin 24 and the floating roof pin of rectangle 23, rectangle floating roof pin 23 top be formed around fillet R;Stripper plate above the floating roof pin of rectangle 23 6 are provided with T-shaped jigger pin 20.
The discharge end of described die block 3 is provided with cutting assembly 30.
The feed end of described die block 3 is additionally provided with guide hole die 31, and described train wheel bridge 8 is provided with and guide hole die 31 Corresponding guide hole punch 32;The middle part of described stripper plate 6 is provided with step pitch guide pin 16, and described step pitch guide pin 16 includes vertical shank 161, the top of vertical shank 161 is provided with annular groove 162, and the side of annular groove 162 is provided with step pitch detection guide pin 14.
In order to fix the stroke of upper bolster 10, described die block 3 can also arrange contour limited post 26.
In order to ensure the clear angle of convex closure root and beneficially molding convex closure, the described surrounding rushing convex closure die 191 can also set Set high the step 193 of 0.3mm.
Operation principle: the billot of stamping-out c-type pole shoe is from the left-hand delivery of die block 3, spacing between 7 type baffle plates, In billot moving process from left to right, first upper bolster 10 is descending, utilizes guide hole punch 32 and guide hole die 31 to rush on billot Going out guide hole, upper bolster 10 is up, and then feeding is to next step, and upper bolster 10 is descending, utilize rush convex closure die 191 and rush convex closure convex Mould 212 goes out convex closure, goes out through hole through piercing punch 192 and punching concave die 211, and upper bolster 10 is up, then proceedes to feeding extremely Next step, upper bolster 10 is descending, is punched out first group of C-shaped pole shoe (totally 3), then upper mold through first group of blanking die mold insert 34 Seat 10 is up, and continuation feeding is to next step, and upper bolster 10 is the most descending, is punched out second group of C through second group of blanking die mold insert 33 Shape pole shoe (totally 3), then upper bolster 10 is up, and continuation feeding is to next step, and upper bolster 10 is the most descending, recessed through the 3rd group of blanking Mould mold insert 29 is punched out the 3rd group of C-shaped pole shoe (totally 2), and then upper bolster 10 continues up, and feeding, to next step, has become waste material Billot cut off through cutting assembly 30.In blanking process, when upper bolster 10 is descending, contour limited post 26 defines upper bolster 10 times The distance of row, it is to avoid excessive descending damage equipment and product quality, meanwhile, after upper bolster 10 is up, rectangle floating roof slightly 23 is upwards By billot jack-up, it is to avoid billot is bonded at and affects it on die block 3 and move, it addition, for the stroke accurately controlling billot, when When upper bolster 10 is descending, if the vertical shank 161 of step pitch detection guide pin 16 just injects in guide hole, then step pitch detection guide pin 14 One end keep contact in the annular groove 162 of vertical shank 161, if billot moves not in place, vertical shank 161 cannot Insert guide hole, then vertical shank 161 is by upwards jack-up, and step pitch detection guide pin 14 is forced mobile, the switch being connected with its one end Close, upper bolster 10 stops descending, it is to avoid dislocation stamping-out and affect product quality.

Claims (10)

1. eight continuous preparation methoies of C-shaped pole shoe one mould, it is characterised in that: it is to first pass through to rush convex closure male mold inserts (21) and exist 8 groups of convex closures and through hole is gone out, then successively through blanking die mold insert and abnormity punch (17) in billot moving process on billot By C-shaped pole shoe stamping-out depanning corresponding with through hole for 8 groups of convex closures.
Eight continuous preparation methoies of C-shaped pole shoe one mould the most according to claim 1, it is characterised in that: single stamping-out terminates Rear discharging spring (18) is withstood stripper plate (6) and is made it keep with billot to contact, and train wheel bridge (8) is lifted up with upper bolster (10), After abnormity punch (17) and piercing punch (192) completely disengage from billot, stripper plate (6) is lifted up again.
Eight continuous preparation methoies of C-shaped pole shoe one mould the most according to claim 1, it is characterised in that: single stamping-out terminates After, billot jack-up is upwards disengaged it from the surface of die block (3) by floating roof pin (24) and the floating roof pin of rectangle (23).
Eight continuous preparation methoies of C-shaped pole shoe one mould the most according to claim 1, it is characterised in that: guide hole die (31) With guide hole punch (32) equidistant stamping-out guide hole on billot, in billot moving process, when guide hole moves to step pitch guide pin (16) During the underface of vertical shank (161), vertical shank (161) inserts guide hole, and it is recessed that step pitch detection guide pin (14) one end snaps in annular Groove (162), the conducting of mould power supply starts stamping-out, and when billot is not moved to tram, vertical shank (161) can not insert leads Hole, step pitch detection guide pin (14) departs from annular groove (162), and mould power supply disconnects, and mould stops.
5. realize a progressive die for eight continuous preparation methoies of C-shaped pole shoe one mould, its feature described in any one of claim 1-4 It is: include die block (3), die block (3) is sequentially provided with and rushes convex closure male mold inserts (21) and 8 shapes are each Different blanking die mold insert, rushes convex closure male mold inserts (21) and is provided with and rushes convex closure punch (212) and punching concave die (211);Described Die block (3) be arranged over upper bolster (10), the lower section of upper bolster (10) is provided with corresponding with blanking die mold insert different Shape punch (17) and corresponding with rushing convex closure male mold inserts (21) rush convex closure die mold insert (19), rushes on convex closure die mold insert (19) It is provided with and rushes convex closure die (191) and piercing punch (192).
Eight progressive dies of C-shaped pole shoe one mould the most according to claim 5, it is characterised in that: described blanking die mold insert bag Include the first group of blanking die mold insert (34) being sequentially arranged, second group of blanking die mold insert (33) and the 3rd group of blanking die Mold insert (29), first group of blanking die mold insert (34) and second group of blanking die mold insert (33) are respectively provided with 3 blanking dies, and the 3rd Group blanking die mold insert (29) is provided with 2 blanking dies.
Eight progressive dies of C-shaped pole shoe one mould the most according to claim 5, it is characterised in that: under described upper bolster (10) Side is the most also sequentially provided with train wheel bridge (8), baffle plate (7) and stripper plate (6), and described abnormity punch (17) is located at train wheel bridge (8), on, one end of abnormity punch (17) is through baffle plate (7) and stripper plate (6), and described convex closure die mold insert (19) that rushes is located at de- On flitch (6), the top of described piercing punch (192) is connected on train wheel bridge (8), described upper bolster (10) and baffle plate (7) Between be provided with discharging spring (18).
Eight progressive dies of C-shaped pole shoe one mould the most according to claim 7, it is characterised in that: on described die block (3) The both sides on surface are provided with 7 type baffle plates (22), and described stripper plate (6) is provided with the baffle plate escape groove corresponding with 7 type baffle plates (22) (61);Described die block (3) is provided with floating roof pin (24) and the floating roof pin of rectangle (23), the four of rectangle floating roof pin (23) top It is provided with fillet R week;The stripper plate (6) of the floating roof pin of rectangle (23) top is provided with T-shaped jigger pin (20).
Eight progressive dies of C-shaped pole shoe one mould the most according to claim 5, it is characterised in that: described die block (3) Discharge end is provided with cutting assembly (30).
Eight progressive dies of C-shaped pole shoe one mould the most according to claim 7, it is characterised in that: described die block (3) Feed end be additionally provided with guide hole die (31), described train wheel bridge (8) is provided with the guide hole punch corresponding with guide hole die (31) (32);The middle part of described stripper plate (6) is provided with step pitch guide pin (16), and described step pitch guide pin (16) includes vertical shank (161), The top of vertical shank (161) is provided with annular groove (162), and the side of annular groove (162) is provided with step pitch detection guide pin (14).
CN201610955749.0A 2016-10-27 2016-10-27 A kind of eight continuous preparation methoies of C-shaped pole shoe one mould and the progressive die Pending CN106270159A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610955749.0A CN106270159A (en) 2016-10-27 2016-10-27 A kind of eight continuous preparation methoies of C-shaped pole shoe one mould and the progressive die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610955749.0A CN106270159A (en) 2016-10-27 2016-10-27 A kind of eight continuous preparation methoies of C-shaped pole shoe one mould and the progressive die

Publications (1)

Publication Number Publication Date
CN106270159A true CN106270159A (en) 2017-01-04

Family

ID=57719065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610955749.0A Pending CN106270159A (en) 2016-10-27 2016-10-27 A kind of eight continuous preparation methoies of C-shaped pole shoe one mould and the progressive die

Country Status (1)

Country Link
CN (1) CN106270159A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107350350A (en) * 2017-07-31 2017-11-17 慈溪市佳晶电子有限公司 A kind of continuous stamping die and process for stamping of earphone contact pin middle pipe
CN110918784A (en) * 2019-10-15 2020-03-27 东莞市振亮五金科技有限公司 Stamping station and mounting device for beautifying antenna heightening frame flange plate

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202877363U (en) * 2012-09-28 2013-04-17 重庆水轮机厂有限责任公司 Stator punching convex hull trimming die
CN204638911U (en) * 2015-05-22 2015-09-16 徐广宏 A kind of multistation progressive die device producing rotor in batches
CN204700163U (en) * 2015-06-12 2015-10-14 衡阳财经工业职业技术学院 A kind of backgauge punching and blanking progressive die automatically
CN204700162U (en) * 2015-06-12 2015-10-14 衡阳财经工业职业技术学院 A kind of no waste mine stock layout Die structure progressive die
CN205008488U (en) * 2015-09-30 2016-02-03 四川腾邦摩托车配件有限公司 A progressive stamping die for processing six grades of stator core

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202877363U (en) * 2012-09-28 2013-04-17 重庆水轮机厂有限责任公司 Stator punching convex hull trimming die
CN204638911U (en) * 2015-05-22 2015-09-16 徐广宏 A kind of multistation progressive die device producing rotor in batches
CN204700163U (en) * 2015-06-12 2015-10-14 衡阳财经工业职业技术学院 A kind of backgauge punching and blanking progressive die automatically
CN204700162U (en) * 2015-06-12 2015-10-14 衡阳财经工业职业技术学院 A kind of no waste mine stock layout Die structure progressive die
CN205008488U (en) * 2015-09-30 2016-02-03 四川腾邦摩托车配件有限公司 A progressive stamping die for processing six grades of stator core

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵广平等: "模具设计", 31 August 2008, 江西高校出版社, pages: 62 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107350350A (en) * 2017-07-31 2017-11-17 慈溪市佳晶电子有限公司 A kind of continuous stamping die and process for stamping of earphone contact pin middle pipe
CN107350350B (en) * 2017-07-31 2023-07-28 慈溪市佳晶电子有限公司 Continuous stamping die and stamping method for middle tube of earphone contact pin
CN110918784A (en) * 2019-10-15 2020-03-27 东莞市振亮五金科技有限公司 Stamping station and mounting device for beautifying antenna heightening frame flange plate

Similar Documents

Publication Publication Date Title
CN104785639B (en) A kind of automobile rear backrest left plate progressive die
CN202212463U (en) Cutting and punching die
CN202479354U (en) Waveform sheet progressive die
CN102847795A (en) Continuous stamping bending die
CN204308042U (en) A kind of compound progressive die
CN106270159A (en) A kind of eight continuous preparation methoies of C-shaped pole shoe one mould and the progressive die
CN206169046U (en) Eight moduluses of continuity of a C shape end terminal mould
CN103084463A (en) Lock pad punching blanking die
CN204974783U (en) Wheel nut multistation extrusion die
CN104985082A (en) Mold discharging device
CN202824387U (en) Continuous stamping bending die
CN203076410U (en) Blanking die for lock cushion punching
CN102962322A (en) Punching die for terminal block
CN202291066U (en) Safety buckle continuous stamping die structure
CN203875184U (en) Stamping die
CN105234271B (en) Lighter windshield progressive die
CN205183484U (en) Cut -out press structure in advance
CN212032915U (en) Contact forming tool
CN211757895U (en) Blanking die of automobile air outlet inner cone
CN211360281U (en) Side punching die
CN203830619U (en) Three-position tool adjusting mechanism for bearing forging
CN209613947U (en) A kind of positive stamping die
CN202021285U (en) Both-side simultaneous hole flanging mould of automobile U-shaped part
CN204892671U (en) Compound mould of backing plate formal dress punching press
CN203253816U (en) Drawing die of boss shell

Legal Events

Date Code Title Description
C06 Publication