CN106256681A - Deck passages frame erection method - Google Patents
Deck passages frame erection method Download PDFInfo
- Publication number
- CN106256681A CN106256681A CN201610733005.4A CN201610733005A CN106256681A CN 106256681 A CN106256681 A CN 106256681A CN 201610733005 A CN201610733005 A CN 201610733005A CN 106256681 A CN106256681 A CN 106256681A
- Authority
- CN
- China
- Prior art keywords
- cross bar
- retainer ring
- dop
- vertical rod
- latch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C5/00—Equipment usable both on slipways and in dry docks
- B63C5/02—Stagings; Scaffolding; Shores or struts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63C—LAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
- B63C5/00—Equipment usable both on slipways and in dry docks
- B63C5/02—Stagings; Scaffolding; Shores or struts
- B63C2005/025—Stagings, or scaffolding, i.e. constructions providing temporary working platforms on slipways, in building or repair docks, or inside hulls
Abstract
The present invention relates to a kind of deck passages frame and connect erection method, said method comprising the steps of: a collection of vertical rod of unified making and cross bar, wherein vertical rod is 2.1 meters, and cross bar is 1.1 meters;Vertical rod is arranged to the multiple row that left and right is parallel, each vertical rod top is all welded and is provided with a retainer ring, it is connected by cross bar between the retainer ring of adjacent (include left and right and front and back) two vertical rods, described cross bar two ends are provided with dop, described dop is placed in retainer ring, offering fixed jack on described dop, be fitted with latch in described fixed jack, the dop of described cross bar is connected by latch and retainer ring are fixing.One deck passages frame erection method of the present invention, which eliminate the method using conventional fastener to connect, use plug-in type mode, make to take tear open convenient, its coupling point is not likely to produce the situation of meeting and discussing, and the amount of labour used is few, effectively reduces labor intensity to a certain extent, shorten and take the time of tearing open, improve work efficiency.
Description
Technical field
The present invention relates to a kind of deck passages frame and connect erection method, belong to and build ship technical field.
Background technology
The passage rack that shiprepair deck is set up is easy to the built on stilts of all kinds of construction pipeline, and personnel's is current, and the past sets up actual
During channel material exist and use (height of passage rack, width uneven) lack of standardization, the standard set up can not keep consistent, existing
Field needs more workman to coordinate material transfer to set up, and operating personnel's Commercial cultivation rate is the highest.
Summary of the invention
The technical problem to be solved is to provide a kind of deck passages frame erection method for above-mentioned prior art,
Its coupling point is not likely to produce the situation of meeting and discussing, and the amount of labour used is few, effectively reduces labor intensity to a certain extent, shortens and take
Tear the time open, improve work efficiency.
The present invention solves the technical scheme that the problems referred to above are used: a kind of deck passages frame erection method, described method
Comprise the following steps:
The a collection of vertical rod of unified making and cross bar, wherein vertical rod is 2.1 meters, and cross bar is 1.1 meters;
Vertical rod is arranged to the multiple row that left and right is parallel, and each vertical rod top is all welded and is provided with a retainer ring, adjacent (about including
Front and back) being connected by cross bar between the retainer ring of two vertical rods, described cross bar two ends are provided with dop, described dop holding
In retainer ring, described dop offering fixed jack, be fitted with latch in described fixed jack, the dop of described cross bar leads to
Cross that latch and retainer ring are fixing to be connected.
Compared with prior art, it is an advantage of the current invention that:
One deck passages frame erection method of the present invention, its cross bar and vertical rod all use unified standard, it is ensured that the height of passage
And width, and eliminate the method using conventional fastener to connect, and using plug-in type mode, make to take and tear open convenient, its steel pipe connects
Head point is not likely to produce the situation of meeting and discussing, and the amount of labour used is few, effectively reduces labor intensity to a certain extent, shortens the time of tearing open of taking,
Improve work efficiency.
Accompanying drawing explanation
Fig. 1 is the principle schematic of the present invention a kind of deck passages frame erection method.
Wherein:
Vertical rod 1
Retainer ring 2
Cross bar 3
Dop 4
Fixed jack 5
Latch 6.
Detailed description of the invention
Below in conjunction with accompanying drawing embodiment, the present invention is described in further detail.
As it is shown in figure 1, a kind of deck passages frame erection method in the present embodiment, said method comprising the steps of:
The a collection of vertical rod of unified making and cross bar, wherein vertical rod is 2.1 meters, and cross bar is 1.1 meters;
Vertical rod is arranged to the multiple row that left and right is parallel, and each vertical rod top is all welded and is provided with a retainer ring, adjacent (about including
Front and back) being connected by cross bar between the retainer ring of two vertical rods, described cross bar two ends are provided with dop, described dop holding
In retainer ring, described dop offering fixed jack, be fitted with latch in described fixed jack, the dop of described cross bar leads to
Cross that latch and retainer ring are fixing to be connected.
In addition to the implementation, present invention additionally comprises other embodiments, all employing equivalents or equivalence to replace
The technical scheme that mode is formed, all should fall within the scope of the hereto appended claims.
Claims (1)
1. a deck passages frame erection method, it is characterised in that said method comprising the steps of:
The a collection of vertical rod of unified making and cross bar, wherein vertical rod is 2.1 meters, and cross bar is 1.1 meters;
Vertical rod is arranged to the multiple row that left and right is parallel, and each vertical rod top is all welded and is provided with a retainer ring, adjacent two vertical rods
Retainer ring between be connected by cross bar, described cross bar two ends are provided with dop, and described dop is placed in retainer ring, described
Offering fixed jack on dop, be fitted with latch in described fixed jack, the dop of described cross bar passes through latch and retainer ring
Fixing connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610733005.4A CN106256681A (en) | 2016-08-27 | 2016-08-27 | Deck passages frame erection method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610733005.4A CN106256681A (en) | 2016-08-27 | 2016-08-27 | Deck passages frame erection method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106256681A true CN106256681A (en) | 2016-12-28 |
Family
ID=57713774
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610733005.4A Pending CN106256681A (en) | 2016-08-27 | 2016-08-27 | Deck passages frame erection method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106256681A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2467668Y (en) * | 2001-04-13 | 2001-12-26 | 李曦 | ] shape wedge locking multifunction scaffold |
CN101761223A (en) * | 2008-11-17 | 2010-06-30 | 无锡速捷脚手架工程有限公司 | Method for installation of scaffold component |
CN202266009U (en) * | 2011-09-06 | 2012-06-06 | 朱文越 | Ringlock scaffold |
CN202279217U (en) * | 2011-09-05 | 2012-06-20 | 浙江造船有限公司 | Pin-type scaffold |
CN202810166U (en) * | 2012-10-16 | 2013-03-20 | 孙金桥 | Plate button type steel pipe scaffold |
-
2016
- 2016-08-27 CN CN201610733005.4A patent/CN106256681A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2467668Y (en) * | 2001-04-13 | 2001-12-26 | 李曦 | ] shape wedge locking multifunction scaffold |
CN101761223A (en) * | 2008-11-17 | 2010-06-30 | 无锡速捷脚手架工程有限公司 | Method for installation of scaffold component |
CN202279217U (en) * | 2011-09-05 | 2012-06-20 | 浙江造船有限公司 | Pin-type scaffold |
CN202266009U (en) * | 2011-09-06 | 2012-06-06 | 朱文越 | Ringlock scaffold |
CN202810166U (en) * | 2012-10-16 | 2013-03-20 | 孙金桥 | Plate button type steel pipe scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202305142U (en) | Automatic leakage detecting device of inner container of water heater | |
CN203729202U (en) | Combined bridge deck | |
CN106256681A (en) | Deck passages frame erection method | |
CN206107514U (en) | Deck passageway frame connection structure | |
CN104358400B (en) | A kind of convenient disc type scaffold installed | |
CN202483160U (en) | Transparent template | |
CN106184652A (en) | Deck passages frame connecting structure | |
CN205051274U (en) | Cable protection tube | |
CN204525233U (en) | Annular work piece cleaning frock | |
CN205147135U (en) | Expander roll locking device | |
CN205976227U (en) | Pier stud tray reinforcement mould | |
CN104014950A (en) | Reinforcement steel framework seam welder with steel bar penetrating assisting plate and use method thereof | |
CN204224854U (en) | Gantry structure frame for computerized embroidery machine | |
CN201755732U (en) | Boiler tube bank lifting beam processing device | |
CN202087947U (en) | Joint close machine for two weld joints of square steeltube | |
CN205761940U (en) | Standard knot monolithic paint hanger | |
CN202731922U (en) | Supporting device of main ore pass well | |
CN207069964U (en) | Photovoltaic panel installing support | |
CN205764592U (en) | Angle steel cat ladder forming frock | |
CN202061942U (en) | Square pipe straightening machine set | |
CN203411226U (en) | Common lifting device for cable bridge and vent pipeline | |
CN204199283U (en) | Construction work micro hydraulic hammer stake machine | |
CN205764593U (en) | Pipe cat ladder forming frock | |
CN204893272U (en) | Can dismantlement activity bed -jig | |
CN202968729U (en) | Electroplating rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161228 |