CN106251117A - A kind of scientific research project data processing method and system - Google Patents
A kind of scientific research project data processing method and system Download PDFInfo
- Publication number
- CN106251117A CN106251117A CN201610578232.4A CN201610578232A CN106251117A CN 106251117 A CN106251117 A CN 106251117A CN 201610578232 A CN201610578232 A CN 201610578232A CN 106251117 A CN106251117 A CN 106251117A
- Authority
- CN
- China
- Prior art keywords
- project
- established
- information
- established project
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q40/00—Finance; Insurance; Tax strategies; Processing of corporate or income taxes
- G06Q40/12—Accounting
- G06Q40/125—Finance or payroll
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Human Resources & Organizations (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Technology Law (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention belongs to technical field of information management, particularly relate to a kind of scientific research project data processing method and system.Described scientific research project data processing method comprises the following steps: step a: push established project essential information;Step b: formulate established project funds card number according to established project essential information;Step c: push established project amount information according to established project funds card number, and obtain established project and render an account information.Present invention achieves data and send the mode variation spreading to acquisition, thus improve data-handling efficiency, shorten data processing time;Have employed the server push technology of data base so that interconnection between data is common more accurate, and is difficult to lose, and ensure that established project is rendered an account the uniqueness of information.
Description
Technical field
The invention belongs to technical field of information management, particularly relate to a kind of scientific research project data processing method and system.
Background technology
For specification and reinforcement search research expense management, the scientific research project data process for Ge great colleges and universities or enterprise is generally adopted
The mode taken is: by scientific research system data-pushing of scientific research project being set up the project to data base, financial system unified going voluntarily obtain
Scientific research project project verification data and relevant project funds, and the information of rendering an account of scientific research project is sent to data base, then scientific research
Project is rendered an account information retrieval by system.
This way to manage suffers a disadvantage in that the project verification data of scientific research system can only push by wall scroll, and can not carry out criticizing
Amount pushes;Can only manually fetch the project of fetching renders an account information when, and automatically can not fetch in a certain period, it is impossible to realize
The data interconnection intercommunication of various ways and automatization.
Summary of the invention
The invention provides a kind of scientific research project data processing method and system, it is intended to solve at existing scientific research project data
The project verification data that reason mode exists can only wall scroll push and can not push in batches and the project information of rendering an account can only manually fetch and
The technical problem that can not automatically fetch.
Implementation of the present invention is as follows, a kind of scientific research project data processing method, comprises the following steps:
Step a: push established project essential information;
Step b: formulate established project funds card number according to established project essential information;
Step c: push established project amount information according to established project funds card number, and obtain established project and render an account letter
Breath.
The technical scheme that the embodiment of the present invention is taked also includes: in described step a, and described propelling movement established project is believed substantially
The propelling movement mode of breath includes: by the first data handling system, established project essential information is pushed to data base, standing of propelling movement
Item project essential information includes wall scroll established project essential information or batch established project essential information.
The technical scheme that the embodiment of the present invention is taked also includes: in described step b, described formulation established project funds card
Number formulation mode include: from data base, obtain established project essential information by the second data handling system, according to project verification
Project essential information is that each established project formulates unique established project funds card number respectively, and by established project funds card number
Push to data base.
The technical scheme that the embodiment of the present invention is taked also includes: in described step c, described according to established project funds card
Number push established project amount information, and obtain the established project information of rendering an account and specifically include: by the first data handling system from
Data base obtains established project funds card number, and according to established project funds card number by amount information corresponding for each established project
Push to data base respectively;Established project amount information is obtained from data base, according to each vertical by the second data handling system
Item project amount information processing established project is rendered an account, and information pushing of established project being rendered an account is to data base, by the first data
Processing system obtains established project from data base and renders an account information.
The technical scheme that the embodiment of the present invention is taked also includes: described first data handling system obtains established project and renders an account
The acquisition mode of information includes manually obtaining or automatically obtaining according to the acquisition time set.
The technical scheme that the embodiment of the present invention is taked also includes: also include after described step c: to established project essential information
It is shown with the established project information of rendering an account.
Another technical scheme that the embodiment of the present invention is taked is: a kind of scientific research project data handling system, including the first number
According to processing system and the second data handling system, described first data handling system is used for pushing established project essential information, institute
State the second data handling system for formulating established project funds card number according to established project essential information, at described first data
Reason system pushes established project amount information according to established project funds card number, and obtains established project and render an account information.
The technical scheme that the embodiment of the present invention is taked also includes: also include data base, described first data handling system and
Second data handling system is connected with data bank network respectively;Described first data handling system includes that essential information pushes mould
Block, card number acquisition module, amount info push module and data obtaining module of rendering an account;Described essential information pushing module is used for will
Established project essential information pushes to data base;Described card number acquisition module is for obtaining established project funds card from data base
Number;Described amount info push module is for dividing amount information corresponding for each established project according to established project funds card number
Do not push to data base;Described data obtaining module of rendering an account is rendered an account information for obtaining established project from data base.
The technical scheme that the embodiment of the present invention is taked also includes: described second data handling system includes that essential information obtains
Module, card number formulate module, amount data obtaining module and info push module of rendering an account;Described essential information acquisition module is used for
Established project essential information is obtained from data base;Described card number is formulated module and is used for according to established project essential information being each
Established project formulates unique established project funds card number respectively, and established project funds card number is pushed to data base;Described
Amount data obtaining module is for obtaining established project amount information from data base;Described info push module of rendering an account is for basis
Each established project amount information processing established project is rendered an account, and information pushing of established project being rendered an account is to data base.
The technical scheme that the embodiment of the present invention is taked also includes: described first data handling system also include arranging module and
Display module, described arrange module and renders an account the acquisition mode of information, acquisition time and project verification for arranging acquisition established project
Project essential information and established project are rendered an account the exhibition method of information;Described acquisition established project is rendered an account the acquisition mode bag of information
Include and rendered an account information by the artificial established project that obtains, or from data base, automatically obtain established project by the acquisition time set
Render an account information;Described display module is for being shown established project essential information and the established project information of rendering an account.
Relative to prior art, what the embodiment of the present invention produced has the beneficial effects that: the scientific research project of the embodiment of the present invention
Data processing method and system push project essential information by the first data handling system, and the second data handling system is according to item
After mesh essential information formulates funds card number, the first data handling system pushes corresponding project amount information according to funds card number,
And obtain corresponding information of rendering an account according to funds card number.The present invention can achieve data and send the mode variation spreading to acquisition, from
And improve data-handling efficiency, shorten data processing time;Have employed the server push technology of data base so that between data
Interconnection common more accurate, and be difficult to lose;It is each by the second data handling system according to established project essential information
Individual established project formulates unique established project funds card number respectively, thus ensures that established project is rendered an account the uniqueness of information.
Accompanying drawing explanation
Fig. 1 is the flow chart of the scientific research project data processing method of the embodiment of the present invention;
Fig. 2 is the structural representation of the scientific research project data handling system of the embodiment of the present invention.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, right
The present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, and
It is not used in the restriction present invention.
Refer to Fig. 1, be the flow chart of the scientific research project data processing method of the embodiment of the present invention.The embodiment of the present invention
Scientific research project data processing method comprises the following steps:
Step 100: established project essential information is pushed to data base by the first data handling system;
Step 200: obtain established project essential information from data base by the second data handling system, according to project verification item
Mesh essential information is that each established project formulates unique established project funds card number respectively, and is pushed away by established project funds card number
Deliver to data base;
Step 300: obtain established project funds card number from data base by the first data handling system, and according to project verification item
Amount information corresponding for each established project is pushed to data base by mesh funds card number respectively;
Step 400: obtain established project amount information by the second data handling system from data base, according to each project verification
Project amount information processing established project is rendered an account, and information pushing of established project being rendered an account is to data base;
Step 500: obtain established project by the first data handling system from data base and render an account information, and to established project
Essential information and the established project information of rendering an account are shown.
In the above-described embodiments, the first data handling system and the second data handling system can push simultaneously or obtain respectively
The established project data of varying number, established project amount information or established project are rendered an account information, such as, push wall scroll project verification item
Mesh data, established project amount information or established project are rendered an account information, or batch pushes a plurality of established project data, established project
Amount information or established project are rendered an account information, thus improve data-handling efficiency, shorten data processing time.
In the embodiment of the present invention, the first data handling system includes but not limited to need to carry out funds reimbursement or project docking
System, the scientific research system etc. of such as colleges and universities or enterprise;Second data handling system includes but not limited to submit an expense account needs funds
Or project docking is analyzed the system of process, the such as financial system etc. of colleges and universities or enterprise.First data handling system and the
Two data handling systems have employed the server push technology of data base so that the interconnection between data is common more accurate,
And be difficult to lose.
In the above-described embodiments, the present invention by the second data handling system according to established project essential information be each stand
Project formulates unique established project funds card number respectively, thus ensures that established project is rendered an account the uniqueness of information.
In the above-described embodiments, obtain the render an account acquisition mode of information of established project to include: obtain project verification item by artificial
Mesh is rendered an account information, or sets the acquisition time (such as morning) by the first data handling system, the first data handling system according to
This acquisition time automatically obtains established project from data base and renders an account information;Established project essential information and established project are rendered an account
The exhibition method that information is shown includes: being shown by webpage, microblogging or the various network platform, concrete exhibition method is also
Can be set by the first data handling system, after setting exhibition method, the first data handling system is getting project verification
Project render an account information time then according to set exhibition method automatically the established project information of rendering an account is shown;Realize data to process
Automatization.
Refer to Fig. 2, be scientific research project data processing method and the structural representation of system of the embodiment of the present invention.This
The scientific research project data processing method of bright embodiment and system include that the first data handling system, data base and the second data process
System, the first data handling system and the second data handling system are connected with data bank network respectively.
Specifically, the first data handling system includes arranging module, essential information pushing module, card number acquisition module, volume
Degree info push module, render an account data obtaining module and display module;
Module is set and renders an account the acquisition mode of information, acquisition time and established project base for arranging acquisition established project
This information and established project are rendered an account the exhibition method of information;Wherein, obtain the render an account acquisition mode of information of established project to include: logical
Cross the artificial established project that obtains to render an account information, or by acquisition time of setting automatically from data base acquisition established project render an account
Information;The exhibition method being shown established project essential information and the established project information of rendering an account includes: by webpage, microblogging
Or the various network platform is shown, after setting exhibition method, the first data handling system is rendered an account getting established project
During information, the established project information of rendering an account then automatically is shown by display module according to the exhibition method set;Realize at data
The automatization of reason.
Essential information pushing module is for pushing to data base by established project essential information;
Card number acquisition module is for obtaining established project funds card number from data base;
Amount info push module is used for amount information corresponding for each established project according to established project funds card number
Push to data base respectively;
Data obtaining module of rendering an account is rendered an account information for obtaining established project from data base;
Display module is for being shown established project essential information and the established project information of rendering an account.
Second data handling system include essential information acquisition module, card number formulate module, amount data obtaining module and
Render an account info push module;
Essential information acquisition module is for obtaining established project essential information from data base;
Card number is formulated module and is used for according to established project essential information being that each established project formulates unique project verification respectively
Project funds card number, and established project funds card number is pushed to data base;Wherein, by according to established project essential information being
Each established project formulates unique established project funds card number respectively, thus ensures that established project is rendered an account the uniqueness of information.
Amount data obtaining module is for obtaining established project amount information from data base;
Info push module of rendering an account, and will project verification for rendering an account according to each established project amount information processing established project
Project renders an account information pushing to data base.
In the above-described embodiments, the first data handling system and the second data handling system can push simultaneously or obtain respectively
The established project data of varying number, established project amount information or established project are rendered an account information, such as, push wall scroll project verification item
Mesh data, established project amount information or established project are rendered an account information, or batch pushes a plurality of established project data, established project
Amount information or established project are rendered an account information, thus improve data-handling efficiency, shorten data processing time.
The scientific research project data processing method of the embodiment of the present invention and system push project by the first data handling system
Essential information, the second data handling system formulates after funds card number according to project essential information, the first data handling system according to
Funds card number pushes corresponding project amount information, and obtains corresponding information of rendering an account according to funds card number.The present invention can realize
Data send the mode variation spreading to acquisition, thus improve data-handling efficiency, shorten data processing time;Have employed data
The server push technology in storehouse so that the interconnection between data is common more accurate, and is difficult to lose;At the second data
Reason system is that each established project formulates unique established project funds card number respectively according to established project essential information, thus protects
Card established project is rendered an account the uniqueness of information.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all essences in the present invention
Any amendment, equivalent and the improvement etc. made within god and principle, should be included within the scope of the present invention.
Claims (10)
1. a scientific research project data processing method, comprises the following steps:
Step a: push established project essential information;
Step b: formulate established project funds card number according to established project essential information;
Step c: push established project amount information according to established project funds card number, and obtain established project and render an account information.
Scientific research project data processing method the most according to claim 1, it is characterised in that in described step a, described in push away
The propelling movement mode sending established project essential information includes: established project essential information pushed to by the first data handling system
Data base, the established project essential information of propelling movement includes wall scroll established project essential information or batch established project essential information.
Scientific research project data processing method the most according to claim 2, it is characterised in that in described step b, described system
The formulation mode determining established project funds card number includes: obtain established project base from data base by the second data handling system
This information, is that each established project formulates unique established project funds card number respectively according to established project essential information, and will
Established project funds card number pushes to data base.
Scientific research project data processing method the most according to claim 3, it is characterised in that in described step c, described
Push established project amount information according to established project funds card number, and obtain the established project information of rendering an account and specifically include: by the
One data handling system obtains established project funds card number from data base, and according to established project funds card number by each project verification item
The amount information that mesh is corresponding pushes to data base respectively;Established project amount is obtained from data base by the second data handling system
Information, renders an account according to each established project amount information processing established project, and information pushing of established project being rendered an account is to data
Storehouse, obtains established project by the first data handling system from data base and renders an account information.
Scientific research project data processing method the most according to claim 4, it is characterised in that described first data handling system
Obtain the render an account acquisition mode of information of established project to include manually obtaining or automatically obtaining according to the acquisition time set.
6. according to the scientific research project data processing method described in any one of claim 1 to 5, it is characterised in that after described step c
Also include: established project essential information and the established project information of rendering an account are shown.
7. a scientific research project data handling system, including the first data handling system and the second data handling system, its feature
Being, described first data handling system is used for pushing established project essential information, and described second data handling system is used for root
Formulating established project funds card number according to established project essential information, described first data handling system is according to established project funds card
Number push established project amount information, and obtain established project and render an account information.
Scientific research project data handling system the most according to claim 7, it is characterised in that also include data base, described
One data handling system and the second data handling system are connected with data bank network respectively;Described first data handling system includes
Essential information pushing module, card number acquisition module, amount info push module and data obtaining module of rendering an account;Described essential information
Pushing module is for pushing to data base by established project essential information;Described card number acquisition module is vertical for obtaining from data base
Item project funds card number;Described amount info push module is for corresponding by each established project according to established project funds card number
Amount information push to data base respectively;Described data obtaining module of rendering an account is rendered an account letter for obtaining established project from data base
Breath.
Scientific research project data handling system the most according to claim 8, it is characterised in that described second data handling system
Module, amount data obtaining module and info push module of rendering an account is formulated including essential information acquisition module, card number;Described substantially
Data obtaining module is for obtaining established project essential information from data base;Described card number formulates module for according to project verification item
Mesh essential information is that each established project formulates unique established project funds card number respectively, and is pushed away by established project funds card number
Deliver to data base;Described amount data obtaining module is for obtaining established project amount information from data base;Described information of rendering an account
Pushing module is for rendering an account according to each established project amount information processing established project, and information pushing of established project being rendered an account
To data base.
Scientific research project data handling system the most according to claim 8, it is characterised in that described first data process system
System also includes arranging module and display module, and the described module that arranges obtains established project render an account the acquisition side of information for arranging
Formula, acquisition time and established project essential information and established project are rendered an account the exhibition method of information;Described acquisition established project
The acquisition mode of information of rendering an account includes being rendered an account information by the artificial established project that obtains, or by acquisition time of setting automatically from
Data base obtains established project render an account information;Described display module is for rendering an account to established project essential information and established project
Information is shown.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610578232.4A CN106251117A (en) | 2016-07-21 | 2016-07-21 | A kind of scientific research project data processing method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610578232.4A CN106251117A (en) | 2016-07-21 | 2016-07-21 | A kind of scientific research project data processing method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106251117A true CN106251117A (en) | 2016-12-21 |
Family
ID=57603427
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610578232.4A Pending CN106251117A (en) | 2016-07-21 | 2016-07-21 | A kind of scientific research project data processing method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106251117A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1783118A (en) * | 2004-11-30 | 2006-06-07 | 英业达股份有限公司 | Item managing system and its method |
CN103530524A (en) * | 2013-10-24 | 2014-01-22 | 徐州通软计算机系统集成有限公司 | Medical information intelligent data platform, use method and application thereof |
CN103699953A (en) * | 2013-11-06 | 2014-04-02 | 北京驭时德隆科技有限公司 | Project management system, and data processing method and device thereof |
CN105303332A (en) * | 2015-11-30 | 2016-02-03 | 国家电网公司 | Electric power engineering project management system |
-
2016
- 2016-07-21 CN CN201610578232.4A patent/CN106251117A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1783118A (en) * | 2004-11-30 | 2006-06-07 | 英业达股份有限公司 | Item managing system and its method |
CN103530524A (en) * | 2013-10-24 | 2014-01-22 | 徐州通软计算机系统集成有限公司 | Medical information intelligent data platform, use method and application thereof |
CN103699953A (en) * | 2013-11-06 | 2014-04-02 | 北京驭时德隆科技有限公司 | Project management system, and data processing method and device thereof |
CN105303332A (en) * | 2015-11-30 | 2016-02-03 | 国家电网公司 | Electric power engineering project management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210357479A1 (en) | Methods and apparatus for sorting data | |
CN104040535B (en) | Custom browser-side spreadsheet functions | |
CN112948427B (en) | Data query method, device, equipment and storage medium | |
US20200193372A1 (en) | Information processing method and apparatus | |
CN104520851A (en) | Generating queries based upon data points in a spreadsheet application | |
CN109272543B (en) | Method and apparatus for generating a model | |
CN103927337B (en) | Data processing method and device for incidence relation in on-line analytical processing | |
CN106537371A (en) | Visualization suggestions | |
CN107729399A (en) | The method and apparatus of data processing | |
CN106534355A (en) | Medical informatization auxiliary prescribing system and method | |
US9158786B1 (en) | Database selection system and method to automatically adjust a database schema based on an input data | |
CN109271160B (en) | Activity rule establishing method, activity rule establishing device, computer system and medium | |
CN106021528A (en) | Data processing method and device | |
CN103034504A (en) | Application method and device of template website | |
CN114022188A (en) | Target crowd circling method, device, equipment and storage medium | |
CN103078946A (en) | Mass real-time data distributing method and mass real-time data access method | |
CN110895591A (en) | Method and device for positioning self-picking point | |
CN106251117A (en) | A kind of scientific research project data processing method and system | |
CN105608210A (en) | Data storage method and device | |
CN102999518B (en) | A kind of Graphics Device Interface method for managing resource and device | |
US20190057068A1 (en) | Techniques for document marker tracking | |
CN111612321B (en) | Staff work configuration method and device | |
CN104333578A (en) | Distributed data exchange system and method | |
CN108959309A (en) | The method and apparatus of data analysis | |
CN111488890B (en) | Training method and device for object detection model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161221 |