CN106247962A - RODIP chain and swing rod chain test system and method - Google Patents
RODIP chain and swing rod chain test system and method Download PDFInfo
- Publication number
- CN106247962A CN106247962A CN201610751890.9A CN201610751890A CN106247962A CN 106247962 A CN106247962 A CN 106247962A CN 201610751890 A CN201610751890 A CN 201610751890A CN 106247962 A CN106247962 A CN 106247962A
- Authority
- CN
- China
- Prior art keywords
- chain
- test
- rodip
- main frame
- swing rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B11/00—Measuring arrangements characterised by the use of optical techniques
- G01B11/14—Measuring arrangements characterised by the use of optical techniques for measuring distance or clearance between spaced objects or spaced apertures
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B11/00—Measuring arrangements characterised by the use of optical techniques
- G01B11/16—Measuring arrangements characterised by the use of optical techniques for measuring the deformation in a solid, e.g. optical strain gauge
Abstract
The invention provides a kind of RODIP chain and swing rod chain test system and method, this system includes: the left test main frame of on-line measurement and right test main frame are implemented in the pitch deformation for RODIP chain and swing rod chain;The left cleaning systems cleaned online for RODIP chain and swing rod chain and right cleaning systems;For realizing regular automatic measurement, it is not required to the special regular device automatically starting test artificially got involved for a long time.For there is the nonsynchronous problem of left and right chain or having driven RODIP chain and the swing rod chain of the problem engaging inefficacy in the present invention, the position at problem chain link place can be detected, it is easy to rejecting problem chain link thus eliminates major accident hidden danger, for not yet forming the asynchronous problem of left and right chain or driving RODIP chain and the swing rod chain of engagement Problem of Failure, the regular on-line checking of automatization can be passed through, prevent from forming above two problem, ensure that the operation steady in a long-term of RODIP chain and swing rod chain.
Description
Technical field
The present invention relates to automatic online field tests and automatic online cleaning field, particularly relate to a kind of RODIP
(wheel reversely impregnates conveying) chain and swing rod chain test system and method.
Background technology
Swing rod chain pretreatment in automobile industry coating workshop, electrophoresis process are main flow induction system, and RODIP chain
(the reverse dipping transport system of wheel) is pretreatment from now on, the induction system of electrophoresis process development trend.Because of chain link pitch deformation
And cause the left and right end of RODIP chain cross bar asynchronous, (or the left and right end of swing rod chain fork is asynchronous) is to cause whole conveying
Systemic-function lost efficacy/stuck main cause;The driving engagement inefficacy caused because of chain link pitch deformation is also one of reason of accident.
Thus, the pitch deformation enforcement on-line measurement to RODIP chain, swing rod chain is to ensure that this two classes drive system of RODIP chain, swing rod chain
The important measures of even running.There is the nonsynchronous problem of left and right chain of RODIP chain and swing rod chain in prior art, gets rid of
RODIP chain and swing rod chain drive the problem that engagement was lost efficacy.
Summary of the invention
The technical problem to be solved is to provide a kind of RODIP chain and swing rod chain test system and method, its energy
Enough RODIP chain and the nonsynchronous problem of left and right chain of swing rod chain, eliminating RODIP chain and swing rod chains effectively got rid of drive engagement
The problem lost efficacy.
According to an aspect of the present invention, it is provided that a kind of RODIP chain and swing rod chain test system, it is characterised in that its bag
Include:
Left test main frame, implements on-line measurement to the RODIP chain in left side and the pitch deformation of swing rod chain;
Right test main frame, implements on-line measurement to the RODIP chain on right side and the pitch deformation of swing rod chain;
Left cleaning systems, RODIP chain and swing rod chain to left side clean online;
Right cleaning systems, RODIP chain and swing rod chain to right side clean online;
Automatically start the special regular device of test, be used for realizing regular automatic measurement, be not required to for a long time artificially get involved;
Chain first and last detector, for guaranteeing the stringency of measurement process, it is ensured that a few joint, and many joints are measured each time
Starting point strict conformance;
PC data analysis module, for receiving left test main frame, after data that right test main frame records upload computer, uses this PC
Machine data analysis module carries out a series of analysis, such as: spatial distribution, statistical distribution, Annual distribution, test or observe and predict in advance
Accuse;
Left test main frame, right test main frame, left cleaning systems, right cleaning systems, automatically the special regular device of startup test, chain
Sub-first and last detector, PC data analysis module are all connected in a bus;
The structure of left test main frame is identical with the structure of right test main frame, all includes elements below:
Operation and control panel, convenient operation and control;
Oneth MCU, undertakes the effect controlling coordination center;
First video camera, is used for shooting image;
First selects row device, assists to choose optimal video line signal, to improve the precision and stability measured;
Second selects row device, assists to choose optimal video line signal, to improve the precision and stability measured;
Second video camera, is used for shooting image;
Picture signal pretreatment and input control device, do the pretreatment of binaryzation etc., control suitably meanwhile video signal
Signal feeds back to a MCU and supercomputing center;
Select row signal processing and shooting to trigger device, coordinate first to select row device, second select row device work, while provide in time
Optimal shooting trigger signals, makes test point close proximity to primary optical axis region, thus improves precision and the stability of measurement;
Background light device, improves the contrast of imaging, thus improves the precision of measurement;
Labelling drives isolation module, drives the work of labelling spray equipment, meanwhile, prevents the spray equipment interference to control centre;
Motor drives isolation module, drives motor to run, meanwhile, prevents the motor interference to control centre;
Electricallyerasable ROM (EEROM) EEPROM, is used for storing data;
Supercomputing center DSC, for calculating information etc.;
Communication control unit, controls the communication between left test main frame, right test main frame, controls left test main frame, right test master
Communication between machine and left cleaning systems, right cleaning systems;
Display, is used for showing test data;
Operation and control panel, background light device, labelling drive isolation module, motor to drive isolation module all with a MCU even
Connecing, the first video camera, the second video camera are all connected with picture signal pretreatment and input control device, first select row device, second
Row device is selected all to be connected with selecting row signal processing and shooting triggering device, picture signal pretreatment and input control device, choosing row letter
Number process and shooting trigger device, electricallyerasable ROM (EEROM), supercomputing center, communication control unit, display all with
A piece bus connects;
The structure of left cleaning systems is identical with the structure of right cleaning systems, all includes:
2nd MCU, undertakes the effect controlling coordination center;
Alternating current generator, converts electric energy into mechanical energy, and drive mechanism rotates;
Cylinder, can be converted to mechanical energy by compressed-air actuated pressure, and drive mechanism makees straight reciprocating motion;
Limit switch, under special circumstances for brush is forced to pull back;
Intervalometer, pulls back brush for timing;
Regulating QI depressor, for adjusting the air pressure of cylinder;
First selects the structure of row device to select the structure of row device identical with second, all includes:
Display screen, display parameter value in parameters setting process;
3rd MCU, undertakes the effect controlling coordination center;
Memorizer, is used for protecting stored memory device;
Variable connector, is used for choosing path;
Enumerator, is used for counting;
Amplifier, being used for can be the voltage of input signal or power amplification;
Schmidt trigger, converts for waveform, signal slowly is become precipitous rectangular signal;
Functional keys, for the setting of parameter.
Preferably, the timing system needed for described left test main frame is separately provided test automatically.
Preferably, communication control unit uses differential mode amplification circuit.
In order to solve above-mentioned technical problem, the present invention also provides for a kind of RODIP chain and swing rod chain method of testing, and its feature exists
In, it comprises the following steps:
Step one, must do cleaning thoroughly the feature according to technique to test point before test, necessary after having cleaned
Measure at once;
Step 2, makes the equivalent center line of left main frame and right main frame be perpendicular to the operation track of chain, in like manner, makes left cleaning system
The equivalent center line of system and right cleaning systems is perpendicular to the operation track of chain, controls left test main frame and left cleaning systems
Equivalent distances must be exactly equal to the pitch of K chain link, in like manner, controls the equivalent distances of right test main frame and right cleaning systems also
Must be exactly equal to the pitch of K chain link;
Step 3, by test open, the A part of stop sensor centering is placed on RODIP chain and swing rod chain number one cross bar left end root
At portion, and the B part of sensor centering is placed on left cleaning systems, under the mechanism that above-mentioned K counts down, it is ensured that measure work from
First chain link of the number one cross bar of RODIP chain and swing rod chain starts, to RODIP chain and the S of the J cross bar of swing rod chain
Individual chain section end;Step 4, when the opening of test, stop sensor are to when starting working after triggering for the first time, and cleaning is at once
Start, and test job is postponed starting, and start the work that counts down of K value for the first time, at the end of counting down for the first time, just open
Beginning to measure work, the regulatory requirement further according to each factory arranges the time cycle of measurement, the time cycle of automatic pure cleaning automatically;
Step 5, in test process, left and right test host synchronization ground to the chain link of process carry out pitch deformation quantity section by section
Test job, and record in the eeprom memory of main frame;The deformation quantity being once found to have a chain link exceedes marginal value, main
Machine is reported to the police, and drives spray equipment to spray labelling on problem chain link;
Step 6, when test open, stop sensor to second time trigger after power cut-off time, cleaning terminates at once, and
Carry out second time K value to count down at once;At the end of second time counts down, just terminate to measure work, and by result after measurement
Passing to the data of PC, input Microsoft Excel carries out reading, analyzing, and finally obtains a result.
The most progressive effect of the present invention is: the present invention is for having existed the nonsynchronous problem of left and right chain or having driven
The RODIP chain of the problem that dynamic engagement was lost efficacy and swing rod chain, can detect the position at problem chain link place, it is simple to rejects problem chain link
Thus eliminate major accident hidden danger, for not yet forming the asynchronous problem of left and right chain or driving the RODIP of engagement Problem of Failure
Chain and swing rod chain, can pass through the regular on-line checking of automatization, prevents from forming above two problem, ensures that RODIP chain
Operation steady in a long-term with swing rod chain.
Accompanying drawing explanation
By the detailed description non-limiting example made with reference to the following drawings of reading, the further feature of the present invention,
Purpose and advantage will become more apparent upon:
Fig. 1 is RODIP chain of the present invention and the structural representation of swing rod chain test system;
Fig. 2 is structure and the structural representation of right test main frame of left test main frame;
Fig. 3 is left cleaning systems and the structural representation of right cleaning systems;
Fig. 4 is RODIP chain of the present invention and the flow chart (including step S00 to S22) of swing rod chain test system;
Fig. 5 is the schematic diagram selecting row device of the present invention;
Fig. 6 be the present invention select the oscillogram on row device selected element;
Fig. 7 is the operational flow diagram (including step S101 to S115) selecting row device of the present invention;
Fig. 8 is the operational flow diagram selecting row device of the present invention.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in detail.Following example will assist in the technology of this area
Personnel are further appreciated by the present invention, but limit the present invention the most in any form.It should be pointed out that, the ordinary skill to this area
For personnel, without departing from the inventive concept of the premise, it is also possible to make some deformation and improvement.These broadly fall into the present invention
Protection domain.
As shown in Figures 1 to 8, RODIP chain of the present invention and swing rod chain test system include:
Left test main frame 10, implements on-line measurement to the RODIP chain in left side and the pitch deformation of swing rod chain;
Right test main frame 20, implements on-line measurement to the RODIP chain on right side and the pitch deformation of swing rod chain;
Left cleaning systems 30, RODIP chain and swing rod chain to left side clean online;
Right cleaning systems 40, RODIP chain and swing rod chain to right side clean online;
Automatically start the special regular device 50 of test, be used for realizing regular automatic measurement, be not required to for a long time artificially get involved;
Chain first and last detector 60, for guaranteeing the stringency of measurement process, it is ensured that a few joint, and many joints are surveyed each time
The starting point strict conformance of amount;
PC data analysis module 70, for receiving left test main frame, after data that right test main frame records upload computer, uses this
PC data analysis module carries out a series of analysis, such as: spatial distribution, statistical distribution, Annual distribution, test or observe and predict in advance
Accuse.
It is special that left test main frame 10, right test main frame 20, left cleaning systems 30, right cleaning systems 40, automatically startup are tested
All it is connected in a bus with timing means 50, chain first and last detector 60, PC data analysis module 70.
The structure of left test main frame 10 is identical with the structure of right test main frame 20, all includes elements below:
Operation and control panel, convenient operation and control;
Oneth MCU(microprogram control unit), undertake the effect controlling coordination center;
First video camera, is used for shooting image;
First selects row device, assists to choose optimal video line signal, to improve the precision and stability measured;
Second selects row device, assists to choose optimal video line signal, to improve the precision and stability measured;
Second video camera, is used for shooting image;
Picture signal pretreatment and input control device, do the pretreatment of binaryzation etc., control suitably meanwhile video signal
Signal feeds back to a MCU and supercomputing center;
Select row signal processing and shooting to trigger device, coordinate first to select row device, second select row device work, while provide in time
Optimal shooting trigger signals, makes test point close proximity to primary optical axis region, thus improves precision and the stability of measurement;
Background light device, improves the contrast of imaging, thus improves the precision of measurement;
Labelling drives isolation module, drives the work of labelling spray equipment, meanwhile, prevents the spray equipment interference to control centre;
Motor drives isolation module, drives motor to run, meanwhile, prevents the motor interference to control centre.
Electricallyerasable ROM (EEROM) (EEPROM), is used for storing data;
Supercomputing center (DSC), for calculating information etc.;
Communication control unit, controls the communication between left test main frame, right test main frame, controls left test main frame, right test master
Communication between machine and left cleaning systems, right cleaning systems;
Display, is used for showing test data.
Operation and control panel, background light device, labelling drive isolation module, motor to drive isolation module all with first
MCU connects, and the first video camera, the second video camera be all connected with picture signal pretreatment and input control device, first select row device,
Second selects row device to be all connected with selecting row signal processing and shooting triggering device, picture signal pretreatment and input control device, choosing
Row signal processing and shooting trigger device, electricallyerasable ROM (EEROM), supercomputing center, communication control unit, display
All it is connected with a bus.
The structure of left cleaning systems 30 is identical with the structure of right cleaning systems 40, all includes:
2nd MCU, undertakes the effect controlling coordination center;
Alternating current generator, converts electric energy into mechanical energy, and drive mechanism rotates;
Cylinder, can be converted to mechanical energy by compressed-air actuated pressure, and drive mechanism makees straight reciprocating motion;
Limit switch, under special circumstances for brush is forced to pull back;
Intervalometer, pulls back brush for timing;
Regulating QI depressor, for adjusting the air pressure of cylinder;
First selects the structure of row device to select the structure of row device identical with second, all includes:
Display screen, display parameter value in parameters setting process;
3rd MCU, undertakes the effect controlling coordination center;
Memorizer, is used for protecting stored memory device;
Variable connector SWH, is used for choosing path;
Enumerator, is used for counting;
Amplifier, being used for can be the voltage of input signal or power amplification;
Schmidt trigger Smt, converts for waveform, signal slowly is become precipitous rectangular signal;
Functional keys, for the setting of parameter.
Described left test main frame is separately provided the timing system needed for test automatically, which enhances stablizing of whole system
Property, decrease fixing link and the link that communicates.
Described communication control unit uses differential mode amplification circuit, so can improve the stability of whole system.
The present invention also provides for a kind of RODIP chain and swing rod chain method of testing, and it comprises the following steps:
Step one, must do cleaning thoroughly the feature according to technique to test point before test, necessary after having cleaned
Measure at once;
Step 2, makes the equivalent center line of left main frame and right main frame be perpendicular to the operation track of chain, in like manner, makes left cleaning system
The equivalent center line of system and right cleaning systems is perpendicular to the operation track of chain, controls left test main frame and left cleaning systems
Equivalent distances must be exactly equal to the pitch of K chain link (K be exactly the above-mentioned initial value counted down), in like manner, controls right test main
The equivalent distances of machine and right cleaning systems also must be exactly equal to the pitch of K chain link;
Step 3, by the opening of test, the A part of stop sensor centering is placed on RODIP chain number one cross bar (or swing rod chain first
Number fork) at left end root, and the B part of sensor centering is placed on left cleaning systems, under the mechanism that above-mentioned K counts down, really
From the beginning of protecting first chain link of the measurement work number one cross bar from RODIP chain, to the S chain of the J cross bar of RODIP chain
Section end, the regulatory requirement further according to each factory arranges the time cycle of measurement, the time cycle of automatic pure cleaning automatically;Step
Four, when the opening of test, stop sensor are to when starting working after triggering for the first time, and cleaning gets started, and test job
Postponement starts, and starts the work that counts down of K value for the first time.The implication of K is as follows: test main frame is equal to the spacing of cleaning systems
The pitch of K chain link.At the end of counting down, only just get started measurement work;
Step 5, in test process, left and right test host synchronization ground to the chain link of process carry out pitch deformation quantity section by section
Test job, and record in the eeprom memory of main frame.The deformation quantity being once found to have a chain link exceedes marginal value 1,
Main frame is reported to the police, and drives spray equipment to spray labelling on problem chain link;
Step 6, when test open, stop sensor to second time trigger after power cut-off time, cleaning terminates at once, and
Carry out second time K value to count down at once.At the end of second time counts down, just terminate to measure work, and by result after measurement
Passing to the data of PC, input Microsoft Excel carries out reading, analyzing, and finally obtains a result.
Test position must be done before testing and be cleaned thoroughly.On the one hand, because of the knot of chain used by RODIP chain, swing rod chain
The absolute value that structure determines single chain link pitch deformation quantity is less, and therefore, the requirement to certainty of measurement is the highest, generally 0.1 milli
Rice.On the other hand and, because pretreating process causes the equivalent thickness that link surface phosphide deposits, because electrophoresis process causes chain link
The equivalent thickness of surface oil lacquering, has all reached the degree of 1.5 millimeters-3.5 millimeters, thus has defined certainty of measurement and flood
The interference of property.Therefore, test point must be done cleaning thoroughly before test, and, according to the feature of technique, cleaning completes
After must measure at once, it can not be allowed to measure again after running one week, because the interference layer of link surface is often during that week
Have been over the order of magnitude of 0.1 millimeter.
Practical experience teaches that: forever must clean before measurement;And sometimes need only to pure cleaning, it is not necessary to measure.
Such as: if interlude length, the interference of link surface once deposited the thickest, it is necessary to first carry out pure cleaning, limit is carried out after
The operation that cleaning is just measured, to guarantee the precision of test.
In order to further ensure that the precision of measurement, during must avoiding cleaning, part chain link is always subject to than other chain link
The phenomenon that more cleanings process.Because accumulation over time, part is by the chain link of more cleanings, and its test value is often
More smaller than the test value of other chain links, thus have impact on the precision of test.Therefore, it is necessary to take the method counted down to avoid
State embarrassment.Method particularly includes: when the opening of test, stop sensor are to when starting working after triggering for the first time, and cleaning is at once
Start, and test job is postponed starting, and start the work that counts down of K value for the first time.The implication of K: test main frame and cleaning system
The spacing of system is equal to the pitch of K chain link.At the end of counting down, only just get started measurement work.Opening, stop when test
Sensor second time is triggered after power cut-off time, cleaning terminates at once, and carries out second time K value at once and count down.When
At the end of second time counts down, just terminate to measure work.
Test can be carried out the most automatically, it is not necessary to artificially gets involved." one can also be taked when equipment management personnel needs
Keyed " method at once measure or carry out pure cleaning.The most automatically measure and need to design a special timing means, should
Device must be easy to arrange, and must arrange the time cycle of measurement automatically (such as: one according to the regulatory requirement of each factory
Week, surrounding, one month, three months, etc.), the time cycle of automatic pure cleaning.
In order to keep good left and right synchronicity, left main frame must be perpendicular to chain with the equivalent center line of right main frame
Operation track;In like manner, the equivalent center line of left cleaning systems and right cleaning systems also must be perpendicular to the operation rail of chain
Road.Meanwhile, in order to ensure the synchronicity testing main frame with cleaning systems, the equivalent distances of left test main frame and left cleaning systems must
Must be exactly equal to the pitch of K chain link (K be exactly the above-mentioned initial value counted down);In like manner, right test main frame and right cleaning systems
Equivalent distances also must be exactly equal to the pitch of K chain link.In theory, above-mentioned two perpendicularity and the joint of two K chain links
A redundancy is had in value.In the practical operation of plant site, often utilize this redundancy as the means of checking.This
Rational checking means are provided for installation accuracy.
In test process, left and right test host synchronization ground to the chain link of process carry out pitch deformation section by section and measure
Trial work is made, and records in the eeprom memory of main frame.Once it is found to have the deformation quantity of a chain link more than the first marginal value,
Main frame is reported to the police, and drives spray equipment to spray labelling on problem chain link.
In test process, measured is carried out by telecommunications network in real time by left and right test main frame away from deformation quantity
Relatively, the absolute value of the difference of the pitch deformation quantity of left and right two chain links of the most same sequence number exceedes the marginal value 2 of setting,
Main frame is reported to the police, and drives spray equipment to spray labelling on problem chain link.
By the opening of test, the A part of stop sensor centering is placed on No. 1 cross bar of RODIP chain (or swing rod chain the 1st pendulum
Bar) at left end root, and the B part of sensor centering is placed on left cleaning systems, and under the mechanism that above-mentioned K counts down, just can be really
Guarantor's measurement work is from the beginning of first chain link of the RODIP chain No. 1 cross bar (or No. 1 fork of swing rod chain), to RODIP chain
The S chain section end of J cross bar (or J fork of swing rod chain).Wherein J is total horizontal stroke of whole piece RODIP chain
Bar number (or total fork logarithm of whole piece fork chain), S be chain number between two cross bars of RODIP chain (or
Chain number in one fork pitch of fork chain).
The data of PC it are uploaded to after measuring under such scheme, just can be so that reading, being easy to the order lattice of analysis
Formula is inputted Microsoft Excel by program.In the left area of form, the order from No. 1 cross bar to J cross bar lists each
The left and right pitch deformation quantity of individual cross bar, and both differences.Once cross bar pitch deformation quantity is more than the 3rd marginal value, just with
Yellow color alerts.It addition, the left and right pitch difference of each cross bar has determined that the crooked degree of this cross bar, once exceed and face
Dividing value cross bar exists for, because of the crooked excessively risk that cannot work, just warning with red color.For swing rod chain, it should by above-mentioned
Cross bar pitch makes fork pitch into, and meanwhile, the most left and right fork pitch difference, more than the 4th marginal value, may result in fork card
Dead accident.
In this Microsoft Excel, if the total chain number of chain is N, then the rule of listing of chain link is not to N from 1,
But first chain link in one cross bar pitch of correspondence is to the rule of S chain link.That is: in the right half area of Microsoft Excel,
In corresponding left area in each cross bar pitch first chain link to the deformation quantity of the left and right pitch of each chain link of S, and two
The difference of person.Once the pitch deformation quantity of chain link is more than the first marginal value, just with yellow color alerts.The once left and right pitch of chain link
Difference exceed marginal value 2, just warn with red color.For swing rod chain, above-mentioned cross bar pitch is expressed as fork pitch.
According to the Microsoft Excel of above-mentioned aligned transfer, the problem cross bar (problem fork) in corresponding form, problem chain link,
It become convenient substantially that find the problem cross bar on actual RODIP chain and actual swing rod chain, problem fork, problem chain link.For
RODIP chain, the in situ quantitation management work of swing rod chain provide a great convenience.
In measuring at the scene, measurement process can be caused serious interference effect by the left and right end root of cross bar/fork, and one
The just equivalence of individual root adds a chain link more, and whole piece chain adds up to get off, and the error of chain number/chain link ordinal number often reaches
40-50 saves, and some is even up to 70-80 joint.Such system cannot use at all.Use the signal of optical system imaging, and
Through tight logical calculated, completely solving cross bar/fork root affects a difficult problem for measurement process.
In view of the factor of synchronous head, all of employing imaging method carries out the system of chain link distortion measurement, all uses positive light
Pulse is as the basis measured.But, for the chain link distortion measurement of RODIP chain and swing rod chain, owing to required precision is high
And surface exists the interference layer of flooding property, cleaning systems are essential.And according to the relative property of position, cleaning position must be chain
What son ran meets face, peak, here it is test point.So, test point is exactly in the initial position of shading, and this is with traditional
Use positive light pulse just the opposite as the mechanism of Fundamentals of Measurement, therefore, it is necessary to use negative light pulse as the basis measured.And
The problem that negative light pulse method exists synchronous head interference.Eliminate synchronous head interference by program, the expense of control chip can be increased,
Increase cooccurrence probabilities, can disturbed test work;Increase a control chip and process this problem, then there is this chip and former core
Coordinate synchronization problem between sheet, or can disturbed test work.Therefore, synchronous head interference is eliminated by the method for hardware circuit
It it is a rational method.
In order to improve the stability of whole system, reduce fixing link and the link that communicates as far as possible, therefore, will automatically test institute
Within the timing subsystem needed is arranged in left test main frame, the most additionally it is separately provided.
In order to improve the stability of whole system, all of communication link all uses differential mode amplification circuit.
In order to protect optical system to improve the working life of whole system, two optical systems are all provided with and automatically open
The optical protective cover opening and being automatically switched off.Automatic opening protection function cover when starting to measure, terminates to be automatically switched off protective cover, no when measuring
Need artificial intervention.
In sum, for having there is the nonsynchronous problem of left and right chain or the problem driving engagement to lose efficacy in the present invention
RODIP chain and swing rod chain, the position at problem chain link place can be detected, it is simple to reject problem chain link thus eliminate major accident
Hidden danger is for not yet forming the asynchronous problem of left and right chain or driving RODIP chain and the swing rod chain of engagement Problem of Failure, permissible
By the regular on-line checking of automatization, prevent from forming above two problem, ensure that the long-term steady of RODIP chain and swing rod chain
Fixed operation.
Above the specific embodiment of the present invention is described.It is to be appreciated that the invention is not limited in above-mentioned
Particular implementation, those skilled in the art can make various deformation or amendment within the scope of the claims, this not shadow
Ring the flesh and blood of the present invention.
Claims (4)
1. a RODIP chain and swing rod chain test system, it is characterised in that comprising:
Left test main frame, implements on-line measurement to the RODIP chain in left side and the pitch deformation of swing rod chain;
Right test main frame, implements on-line measurement to the RODIP chain on right side and the pitch deformation of swing rod chain;
Left cleaning systems, RODIP chain and swing rod chain to left side clean online;
Right cleaning systems, RODIP chain and swing rod chain to right side clean online;
Automatically start the special regular device of test, be used for realizing regular automatic measurement, be not required to for a long time artificially get involved;
Chain first and last detector, for guaranteeing the stringency of measurement process, it is ensured that a few joint, and many joints are measured each time
Starting point strict conformance;
PC data analysis module, for receiving left test main frame, after data that right test main frame records upload computer, uses this PC
Machine data analysis module carries out a series of analysis, such as: spatial distribution, statistical distribution, Annual distribution, test or observe and predict in advance
Accuse;
Left test main frame, right test main frame, left cleaning systems, right cleaning systems, automatically the special regular device of startup test, chain
Sub-first and last detector, PC data analysis module are all connected in a bus;
The structure of left test main frame is identical with the structure of right test main frame, all includes elements below:
Operation and control panel, convenient operation and control;
Oneth MCU, undertakes the effect controlling coordination center;
First video camera, is used for shooting image;
First selects row device, assists to choose optimal video line signal, to improve the precision and stability measured;
Second selects row device, assists to choose optimal video line signal, to improve the precision and stability measured;
Second video camera, is used for shooting image;
Picture signal pretreatment and input control device, do the pretreatment of binaryzation etc., control suitably meanwhile video signal
Signal feeds back to a MCU and supercomputing center;
Select row signal processing and shooting to trigger device, coordinate first to select row device, second select row device work, while provide in time
Optimal shooting trigger signals, makes test point close proximity to primary optical axis region, thus improves precision and the stability of measurement;
Background light device, improves the contrast of imaging, thus improves the precision of measurement;
Labelling drives isolation module, drives the work of labelling spray equipment, meanwhile, prevents the spray equipment interference to control centre;
Motor drives isolation module, drives motor to run, meanwhile, prevents the motor interference to control centre;
Electricallyerasable ROM (EEROM) EEPROM, is used for storing data;
Supercomputing center DSC, for calculating information etc.;
Communication control unit, controls the communication between left test main frame, right test main frame, controls left test main frame, right test master
Communication between machine and left cleaning systems, right cleaning systems;
Display, is used for showing test data;
Operation and control panel, background light device, labelling drive isolation module, motor to drive isolation module all with a MCU even
Connecing, the first video camera, the second video camera are all connected with picture signal pretreatment and input control device, first select row device, second
Row device is selected all to be connected with selecting row signal processing and shooting triggering device, picture signal pretreatment and input control device, choosing row letter
Number process and shooting trigger device, electricallyerasable ROM (EEROM), supercomputing center, communication control unit, display all with
A piece bus connects;
The structure of left cleaning systems is identical with the structure of right cleaning systems, all includes:
2nd MCU, undertakes the effect controlling coordination center;
Alternating current generator, converts electric energy into mechanical energy, and drive mechanism rotates;
Cylinder, can be converted to mechanical energy by compressed-air actuated pressure, and drive mechanism makees straight reciprocating motion;
Limit switch, under special circumstances for brush is forced to pull back;
Intervalometer, pulls back brush for timing;
Regulating QI depressor, for adjusting the air pressure of cylinder;
First selects the structure of row device to select the structure of row device identical with second, all includes:
Display screen, display parameter value in parameters setting process;
3rd MCU, undertakes the effect controlling coordination center;
Memorizer, is used for protecting stored memory device;
Variable connector, is used for choosing path;
Enumerator, is used for counting;
Amplifier, being used for can be the voltage of input signal or power amplification;
Schmidt trigger, converts for waveform, signal slowly is become precipitous rectangular signal;
Functional keys, for the setting of parameter.
RODIP chain the most according to claim 1 and swing rod chain test system, it is characterised in that described left test main frame list
Automatically the timing system needed for test is solely set.
RODIP chain the most according to claim 1 and swing rod chain test system, it is characterised in that described communication control unit
Use differential mode amplification circuit.
4. a RODIP chain and swing rod chain method of testing, it is characterised in that it comprises the following steps:
Step one, must do cleaning thoroughly the feature according to technique to test point before test, necessary after having cleaned
Measure at once;
Step 2, makes the equivalent center line of left main frame and right main frame be perpendicular to the operation track of chain, in like manner, makes left cleaning system
The equivalent center line of system and right cleaning systems is perpendicular to the operation track of chain, controls left test main frame and left cleaning systems
Equivalent distances must be exactly equal to the pitch of K chain link, in like manner, controls the equivalent distances of right test main frame and right cleaning systems also
Must be exactly equal to the pitch of K chain link;
Step 3, by test open, the A part of stop sensor centering is placed on RODIP chain and swing rod chain number one cross bar left end root
At portion, and the B part of sensor centering is placed on left cleaning systems, under the mechanism that above-mentioned K counts down, it is ensured that measure work from
First chain link of the number one cross bar of RODIP chain and swing rod chain starts, to RODIP chain and the S of the J cross bar of swing rod chain
Individual chain section end;Step 4, when the opening of test, stop sensor are to when starting working after triggering for the first time, and cleaning is at once
Start, and test job is postponed starting, and start the work that counts down of K value for the first time, at the end of counting down for the first time, just open
Beginning to measure work, the regulatory requirement further according to each factory arranges the time cycle of measurement, the time cycle of automatic pure cleaning automatically;
Step 5, in test process, left and right test host synchronization ground to the chain link of process carry out pitch deformation quantity section by section
Test job, and record in the eeprom memory of main frame;The deformation quantity being once found to have a chain link exceedes marginal value, main
Machine is reported to the police, and drives spray equipment to spray labelling on problem chain link;
Step 6, when test open, stop sensor to second time trigger after power cut-off time, cleaning terminates at once, and
Carry out second time K value to count down at once;At the end of second time counts down, just terminate to measure work, and by result after measurement
Passing to the data of PC, input Microsoft Excel carries out reading, analyzing, and finally obtains a result.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610751890.9A CN106247962B (en) | 2016-08-30 | 2016-08-30 | RODIP chain and swing rod chain test macro and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610751890.9A CN106247962B (en) | 2016-08-30 | 2016-08-30 | RODIP chain and swing rod chain test macro and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106247962A true CN106247962A (en) | 2016-12-21 |
CN106247962B CN106247962B (en) | 2019-05-24 |
Family
ID=57597245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610751890.9A Active CN106247962B (en) | 2016-08-30 | 2016-08-30 | RODIP chain and swing rod chain test macro and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106247962B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1285336A1 (en) * | 1985-08-29 | 1987-01-23 | Украинский научно-исследовательский и проектно-конструкторский институт по обогащению и брикетированию углей "Укрнииуглеобогащение" | Device for taking samples from conveyer belts |
CN1686768A (en) * | 2005-05-08 | 2005-10-26 | 江苏天奇物流系统工程股份有限公司 | Swing link conveyer system |
CN201329916Y (en) * | 2008-12-11 | 2009-10-21 | 比亚迪股份有限公司 | Rotation dipping conveyor |
CN201678248U (en) * | 2009-11-24 | 2010-12-22 | 上海涌冠物流设备有限公司 | Horizontal returning swing rod chain conveying device |
CN102494629A (en) * | 2011-12-16 | 2012-06-13 | 上海诚诚欣信息科技有限公司 | Method and device for detecting transmission chain of assembling line |
CN202522205U (en) * | 2011-12-16 | 2012-11-07 | 上海诚诚欣信息科技有限公司 | Assembly line driving chain detection device |
CN204433711U (en) * | 2014-12-26 | 2015-07-01 | 白城天奇装备机械有限公司 | A sync detection device is rolled in swing rod chain and outlet |
-
2016
- 2016-08-30 CN CN201610751890.9A patent/CN106247962B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1285336A1 (en) * | 1985-08-29 | 1987-01-23 | Украинский научно-исследовательский и проектно-конструкторский институт по обогащению и брикетированию углей "Укрнииуглеобогащение" | Device for taking samples from conveyer belts |
CN1686768A (en) * | 2005-05-08 | 2005-10-26 | 江苏天奇物流系统工程股份有限公司 | Swing link conveyer system |
CN201329916Y (en) * | 2008-12-11 | 2009-10-21 | 比亚迪股份有限公司 | Rotation dipping conveyor |
CN201678248U (en) * | 2009-11-24 | 2010-12-22 | 上海涌冠物流设备有限公司 | Horizontal returning swing rod chain conveying device |
CN102494629A (en) * | 2011-12-16 | 2012-06-13 | 上海诚诚欣信息科技有限公司 | Method and device for detecting transmission chain of assembling line |
CN202522205U (en) * | 2011-12-16 | 2012-11-07 | 上海诚诚欣信息科技有限公司 | Assembly line driving chain detection device |
CN204433711U (en) * | 2014-12-26 | 2015-07-01 | 白城天奇装备机械有限公司 | A sync detection device is rolled in swing rod chain and outlet |
Non-Patent Citations (2)
Title |
---|
吴恺闻: "《自动化在线清洁摆杆链测试部位的系统的研究》", 《制造业自动化》 * |
陈宝歌 等: "《汽车电泳涂装RoDip-3系统与摆杆链系统的施工性能差异》", 《涂料工业》 * |
Also Published As
Publication number | Publication date |
---|---|
CN106247962B (en) | 2019-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3021814C2 (en) | Method for operating a diagnostic device for cylinders of multi-cylinder internal combustion engines and diagnostic device for these cylinders | |
CN101429913B (en) | High pressure co-rail intelligent diagnosis device | |
CN104438128A (en) | Method for detecting and sorting integrally-disassembled electric energy meter | |
CN102607630B (en) | Detection method, device and system of fault of encoder | |
CN101676699B (en) | Multipoint temperature acquisition method | |
CN105004282B (en) | Depth data detection means | |
CN101531258B (en) | Machine vision-based instant noodle seasoning packet automatic detection instrument and method | |
CN103886294A (en) | Method and system for recognizing number of movement times of arrester for convertor station based on images | |
EP0269606A2 (en) | Method of and device for testing an internal-combustion engine | |
CN105867360A (en) | Initial value prediction iterative learning fault diagnosis algorithm of electromechanical control system | |
CN204211272U (en) | Buncher completely takes turns length control system | |
CN104950489B (en) | A kind of liquid crystal display detection method | |
CN104931505A (en) | Machine visual surface detection system | |
AT519472B1 (en) | External shot counter for small arms | |
CN106247962A (en) | RODIP chain and swing rod chain test system and method | |
DE102017108289A1 (en) | Machine tool control device with malfunction diagnostic function of the sensor for detecting a 1-turn signal | |
DE102011007611A1 (en) | Device for determining injection quantity and/or injection rate of e.g. fuel injected into engine, has evaluation unit to determine injection quantity and/or injection rate depending on picked-up beam image of liquid and sensed condition | |
CN105005867A (en) | Industrial robot processing nonconforming product statistical device based on construction synchronization and method | |
CN109545113A (en) | A kind of method for processing abnormal data and device | |
CN108268903A (en) | Article control method, device, readable storage medium storing program for executing and control terminal | |
CN107231553A (en) | Corner location acquisition methods and device | |
CN106772684A (en) | Elevator light curtain reliability service life experiment device | |
CN106686374B (en) | Detection method, system and the device of screen color saturation degree | |
CN1388472A (en) | Method for estimating efficiency of automatic machine | |
CN114821025A (en) | Meter identification method and system based on deep learning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |