CN106245808A - Blast furnace discharge yard factory building wall skin installation method - Google Patents

Blast furnace discharge yard factory building wall skin installation method Download PDF

Info

Publication number
CN106245808A
CN106245808A CN201610770733.2A CN201610770733A CN106245808A CN 106245808 A CN106245808 A CN 106245808A CN 201610770733 A CN201610770733 A CN 201610770733A CN 106245808 A CN106245808 A CN 106245808A
Authority
CN
China
Prior art keywords
wall skin
wall
skin
installation
purlin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610770733.2A
Other languages
Chinese (zh)
Inventor
蒋双全
郭建华
李进
王凯
肖健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201610770733.2A priority Critical patent/CN106245808A/en
Publication of CN106245808A publication Critical patent/CN106245808A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The invention discloses one and be capable of walling system integral installation, reduce work high above the ground, improve the blast furnace discharge yard factory building wall skin installation method of installation effectiveness.This installation method includes step: 1) according to the mounting design size of wall skin, determines assembled place;2) in consolidation shed, place wall skin post, and ensure that wall skin post is in same level;3) wall skin purlin, wall skin tie rod, purlin angle brace structure are installed successively;4), after the installation of wall dermal system, the linearity unification to wall severe edema due to hypofunction of the spleen Pingdu, wall skin purlin is adjusted, it is ensured that meet drawing and code requirement;5), after being completed, carry out successively welding, checking and accepting, to welding position benefit brush anticorrosive coat;6) by hanging apparatus, wall skin after assembling is lifted, install.Use blast furnace discharge yard factory building wall skin installation method high-altitude of the present invention working procedure link few, safety, reliably;Installation accuracy is high, and welding quality is good;The integral installation time is short, saves duration, low cost.

Description

Blast furnace discharge yard factory building wall skin installation method
Technical field
The present invention relates to the installation method of a kind of wall skin, especially a kind of blast furnace discharge yard factory building wall skin installation method.
Background technology
Known: blast furnace casting field system is the auxiliary equipment that blast furnace is important, and the molten iron of blast fumance is through cast house coagulation Soil platform iron runner flow to oscillating chute, then by railway transportation, scum then flow to granulated slag groove or dry pit, cast house by slag runner Platform has higher rainproof waterproof requirement, and cast house platform is rainproof mainly to be completed by cast house Factory Building.Traditional cast house Wall dermal system wall skin post, wall skin purlin, tie rod etc. use Assembly in pieces at height to install.Wall skin post is i.e. first installed on body of wall, then pacifies Dress wall skin purlin, tie rod, all operations all completes in high-altitude.
The technical disadvantages of traditional cast house wall dermal system Assembly in pieces at height:
1, the installation of wall skin post, wall skin purlin, tie rod etc. all completes in high-altitude, the particularly installation of wall skin purlin, personnel Can only stand in and operate on purlin, be unfavorable for that installation personnel operates, add high-altitude working procedure, operation security risk is installed in high-altitude Strengthen, be unfavorable for controlling installation accuracy, of poor quality, cost of labor is installed high;
2, the welding of wall skin purlin need to complete in high-altitude, is difficult to welding, and welding quality is difficult to ensure, solder joint is many, and bonding wire Drawing and set length, welding is time-consuming long, and efficiency is low.
Summary of the invention
The technical problem to be solved is to provide one and is capable of walling system integral installation, reduces high-altitude and makees Industry, improves the blast furnace discharge yard factory building wall skin installation method of installation effectiveness.
The technical solution adopted for the present invention to solve the technical problems is: blast furnace discharge yard factory building wall skin installation method, bag Include following steps:
1) according to the mounting design size of wall skin, enough spacious assembled place is determined;
2) first wall skin post is placed on the relevant position in assembled place, and wall skin post absolute altitude is adjusted in unification, it is ensured that Wall skin post is in same level;
3) wall skin purlin, wall skin tie rod, purlin angle brace structure are installed successively;
4) after wall skin post, wall skin purlin, wall skin tie rod, purlin angle brace installation, to wall severe edema due to hypofunction of the spleen Pingdu, wall skin purlin Linearity is unified to be adjusted, it is ensured that meet drawing and code requirement;
5) after being completed, starting welding, welding completes, and after acceptance(check), welding position is mended brush anticorrosive coat;
6) being lifted the wall skin after assembling by hanging apparatus, lifting point is arranged on wall skin post, after assembling Wall skin is lifted into installation site, is then connected on roofing by wall skin, until after wall skin post and roof structure are connected firmly, then solve Connection except hanging apparatus Yu wall skin;Complete wall pico-ampere dress.
Concrete, step 7) in time wall skin is lifted, use two 4 lift-on/lift-off systems of rope.
Concrete, step 5) described in anticorrosive coat be paint.
Concrete, step 6) described in hanging apparatus use crane or tower crane.
The invention has the beneficial effects as follows: blast furnace discharge yard factory building wall skin installation method of the present invention, in step 2) extremely 5) realize wall skin post, wall skin purlin, the assembly of wall skin tie rod, welding on the ground, in step 6) in realize whole to wall skin The lifting of body and installation, blast furnace discharge yard factory building wall skin installation method the most of the present invention has the advantages that
One, achieving the assembling on ground of the wall dermal system, ground construction speed of operation is fast, low cost, can effectively shorten work Phase, saving cost of labor expense;
Two, existing construction method security risk is big, installation quality is poor, and the installation method of the present invention is effectively reduced height Idle job, reduces high-altitude construction safety risk, is beneficial to safety and goes along with sb. to guard him, and reduces and leaves over construction tail item, effectively controls installation accuracy, carry High construction quality;
Three, existing construction method overhead welding amount is big, and welder is difficult to welding, and the installation method of the present invention mainly welds Task all can complete on ground, can effectively ensure that the quality such as welding, oil paint coating.
Accompanying drawing explanation
Fig. 1 is the structural representation of wall dermal system in the embodiment of the present invention;
Fig. 2 is the partial enlarged drawing of A in Fig. 1;
Figure indicates: 1-wall skin post, 2-wall skin purlin, 3-wall skin tie rod, 4-purlin angle brace.
Detailed description of the invention
The present invention is further described with embodiment below in conjunction with the accompanying drawings.
As it is shown in figure 1, blast furnace discharge yard factory building wall skin installation method of the present invention, comprise the following steps:
1) according to the mounting design size of wall skin, enough spacious assembled place is determined;
2) first wall skin post is placed on the relevant position in assembled place, and wall skin post absolute altitude is adjusted in unification, it is ensured that Wall skin post is in same level;
3) wall skin purlin 2, wall skin tie rod 3, purlin angle brace 4 structure are installed successively;
4) after wall skin post 1, wall skin purlin 2, wall skin tie rod 3, purlin angle brace 4 installation, to wall severe edema due to hypofunction of the spleen Pingdu, wall skin purlin The linearity of bar 2 is unified to be adjusted, it is ensured that meet drawing and code requirement;
5) after being completed, starting welding, welding completes, and after acceptance(check), welding position is mended brush anticorrosive coat;
6) being lifted the wall skin after assembling by hanging apparatus, lifting point is arranged on wall skin post 1, after assembling Wall skin is lifted into installation site, is then connected on roofing by wall skin, until after wall skin post and roof structure are connected firmly, then solve Connection except hanging apparatus Yu wall skin;Complete wall pico-ampere dress.
In step 1) in splicing place choose, wherein the mounting design size of wall skin refers to the installation that wall skin designs Size, according to the mounting design size Selection place of wall skin, it is possible to ensure that splicing place has enough construction spaces;Ensure wall The assembly of dermal system can be smoothed out.Further, when determining enough spacious assembled place, consideration crane walking in advance, The place such as erect-position, the radius of gyration.
In step 2) and step 3) according to the design drawing of wall dermal system, wall dermal system is assembled, in step 2) In first wall skin post 1 is installed, set up the skeleton of wall dermal system, consequently facilitating wall skin purlin 2, wall skin tie rod 3, purlin in subsequent step The installation of bar angle brace 4.In step 3) in first to install wall skin purlin be so that wall skin purlin 2 and wall skin post 1 form wall skin The profile of system, it is ensured that the dimensional accuracy that wall dermal system is overall after assembling.Assemble wall skin tie rod 3 the most again, purlin angle brace 4 ensures The stability of the structure of wall dermal system.
In step 4) in after wall skin post 1, wall skin purlin 2, wall skin tie rod 3, purlin angle brace 4 installation, the wall severe edema due to hypofunction of the spleen is put down Degree, the linearity unification of wall skin purlin are adjusted, it is ensured that meet drawing and code requirement;Level overall after wall skin is assembled The linearity of degree and wall skin purlin is unified to be adjusted, so that wall skin can be with the roof structure of wall skin to be installed after assembling Coupling, it is ensured that do not have the scale error between wall skin and roof structure during wall pico-ampere dress relatively big, cause cannot install or The situation of installation difficulty.
In step 5) in assemble back wall system weld so that walling system formed an entirety, and Design according to wall skin requires to carry out an acceptance inspection, it is ensured that the installation dimension of wall skin after assembling.
In step 6) in by hanging apparatus, wall skin is carried out integral hoisting installation, thus realizes the installation of wall skin.Specifically , by hanging apparatus, the wall skin after assembling being lifted, lifting point is arranged on wall skin post 1, and the wall skin after assembling hangs Install to installation site, then wall skin is connected on roofing, until wall skin post and roof structure, cast house steel column or braking system After system, wind truss are connected firmly, then release the connection of hanging apparatus and wall skin;Complete wall pico-ampere dress.
In sum, blast furnace discharge yard factory building wall skin installation method of the present invention, in step 2) to 5) on ground Upper realization is to wall skin post 1, wall skin purlin 2, wall skin tie rod 3, the assembly of purlin angle brace 4, welding, in step 6) in realize to wall skin Overall lifting and installation, blast furnace discharge yard factory building wall skin installation method the most of the present invention has the advantages that
One, achieving the assembling on ground of the wall dermal system, ground construction speed of operation is fast, low cost, can effectively shorten work Phase, saving cost of labor expense;
Two, existing construction method security risk is big, installation quality is poor, and the installation method of the present invention is effectively reduced height Idle job, reduces high-altitude construction safety risk, is beneficial to safety and goes along with sb. to guard him, and reduces and leaves over construction tail item, effectively controls installation accuracy, carry High construction quality;
Three, existing construction method overhead welding amount is big, and welder is difficult to welding, and the installation method of the present invention mainly welds Task all can complete on ground, can effectively ensure that the quality such as welding, oil paint coating.
In order to ensure the stability in wall skin hoisting process, simultaneously facilitate operation, concrete, step 7) in wall skin is carried out During lifting, use two 4 lift-on/lift-off systems of rope.
In order to cost-effective, concrete, step 5) described in anticorrosive coat be paint.
For the ease of operation, the most cost-effective, concrete, step 6) described in hanging apparatus use crane or tower Hang.

Claims (4)

1. blast furnace discharge yard factory building wall skin installation method, it is characterised in that comprise the following steps:
1) according to the mounting design size of wall skin, enough spacious assembled place is determined;
2) first wall skin post (1) is placed on the relevant position in assembled place, and wall skin post (1) absolute altitude is adjusted in unification, protects Card wall skin post (1) is in same level;
3) wall skin purlin (2), wall skin tie rod (3), purlin angle brace (4) structure are installed successively;
4) after wall skin post (1), wall skin purlin (2), wall skin tie rod (3), purlin angle brace (4) installation, to wall severe edema due to hypofunction of the spleen Pingdu, wall The linearity of skin purlin (2) is unified to be adjusted, it is ensured that meet drawing and code requirement;
5) after being completed, starting welding, welding completes, and after acceptance(check), welding position is mended brush anticorrosive coat;
6) being lifted the wall skin after assembling by hanging apparatus, lifting point is arranged on wall skin post (1), the wall after assembling Skin is lifted into installation site, is then connected on roofing by wall skin, until after wall skin post (1) and roof structure are connected firmly, then Release the connection of hanging apparatus and wall skin;Complete wall pico-ampere dress.
2. blast furnace discharge yard factory building wall skin installation method as claimed in claim 1, it is characterised in that: step 7) in wall skin is entered During row lifting, use two 4 lift-on/lift-off systems of rope.
3. blast furnace discharge yard factory building wall skin installation method as claimed in claim 1, it is characterised in that: step 5) described in anticorrosion Layer is paint.
4. blast furnace discharge yard factory building wall skin installation method as claimed in claim 1, it is characterised in that: step 6) described in hang Assembling device uses crane or tower crane.
CN201610770733.2A 2016-08-30 2016-08-30 Blast furnace discharge yard factory building wall skin installation method Pending CN106245808A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610770733.2A CN106245808A (en) 2016-08-30 2016-08-30 Blast furnace discharge yard factory building wall skin installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610770733.2A CN106245808A (en) 2016-08-30 2016-08-30 Blast furnace discharge yard factory building wall skin installation method

Publications (1)

Publication Number Publication Date
CN106245808A true CN106245808A (en) 2016-12-21

Family

ID=58079570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610770733.2A Pending CN106245808A (en) 2016-08-30 2016-08-30 Blast furnace discharge yard factory building wall skin installation method

Country Status (1)

Country Link
CN (1) CN106245808A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112647719A (en) * 2020-12-12 2021-04-13 中冶天工集团有限公司 Modular hoisting method for embedded wall frame structure of steel structure factory building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02132275A (en) * 1987-12-14 1990-05-21 Nippon Steel Corp External wall surface execution method for intermediate and low story steel framed building
CN201144524Y (en) * 2007-12-29 2008-11-05 中冶东方工程技术有限公司上海分公司 Reinforcement for detached wall stud
CN101864841A (en) * 2010-05-28 2010-10-20 武汉一冶机电工程有限责任公司 Integral mounting method of steel-structure factory building wall skin
CN204199799U (en) * 2014-10-15 2015-03-11 中国十七冶集团有限公司 The light-duty coke oven booth that the resistance to material of a kind of auxiliary coke oven is built by laying bricks or stones
CN104790556A (en) * 2015-05-01 2015-07-22 俞锡贤 Building envelope fireproof anti-seepage self-insulating outer wall and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02132275A (en) * 1987-12-14 1990-05-21 Nippon Steel Corp External wall surface execution method for intermediate and low story steel framed building
CN201144524Y (en) * 2007-12-29 2008-11-05 中冶东方工程技术有限公司上海分公司 Reinforcement for detached wall stud
CN101864841A (en) * 2010-05-28 2010-10-20 武汉一冶机电工程有限责任公司 Integral mounting method of steel-structure factory building wall skin
CN204199799U (en) * 2014-10-15 2015-03-11 中国十七冶集团有限公司 The light-duty coke oven booth that the resistance to material of a kind of auxiliary coke oven is built by laying bricks or stones
CN104790556A (en) * 2015-05-01 2015-07-22 俞锡贤 Building envelope fireproof anti-seepage self-insulating outer wall and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孟健等: "《图解建筑钢结构安装》", 31 January 2013 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112647719A (en) * 2020-12-12 2021-04-13 中冶天工集团有限公司 Modular hoisting method for embedded wall frame structure of steel structure factory building

Similar Documents

Publication Publication Date Title
CN107013038B (en) A kind of steel structure slipping of building roof lighting Zhongting changes column construction method
CN103075025B (en) Wholly lifting construction method for asymmetric structure of huge overhang steel of high-rise building
CN201411900Y (en) Hydraulic die lifter for chimneys
CN104032967B (en) Prefabricated assembled frame structure component construction method for hanging
CN103882990A (en) Rapid mechanical connecting device for building component and manufacturing method thereof
CN102296858A (en) Roof steel structure for cement production line clinker warehouse and construction method thereof
CN208965714U (en) A kind of prefabricated piping lane main frame structure of assembly concrete
CN106049766A (en) Combined eave system with large-span steel structure and bracket system wood structure and construction method of combined eave structure
CN107060349A (en) A kind of large-span steel girder upper air installing system in place and its construction
CN205296878U (en) Construct interim protective structure of cast -in -place reinforcing bar
CN106567548B (en) Rectangular raw coal bucket is segmented installation method
CN101566005A (en) Chimney hydraulic mould lifting device
CN102003074B (en) Construction method for indoor long-span steel connecting bridge
CN101818563B (en) Jack-up integral lifting mobile platform and using method
CN207538841U (en) A kind of hydraulic tunnel inverted arch cambered surface slip form construction device
CN102392532B (en) Construction method for built-in hanging scaffold of high-rise building
CN106245808A (en) Blast furnace discharge yard factory building wall skin installation method
CN103993739B (en) The construction method of granulation tower spraying layer stiff beam
CN205241086U (en) Template hoist and mount and ann gun carriage of disassembling and using
CN107285200A (en) A kind of high large-span truss integral translation construction method for hanging
CN209469875U (en) A kind of concrete pump pipe bending place support device
CN105800477A (en) Tunnel steel structure hoisting system using underground excavation workshop reverse process
CN205296213U (en) Utility tunnel lining cutting platform truck
CN114348882A (en) Hoisting method of refining tower
CN102733612B (en) Mounting method of electric hoist orbit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161221

RJ01 Rejection of invention patent application after publication