CN106245806B - 装配式混凝土整体无热桥板墙的钩挂螺栓连接方法 - Google Patents
装配式混凝土整体无热桥板墙的钩挂螺栓连接方法 Download PDFInfo
- Publication number
- CN106245806B CN106245806B CN201610692730.1A CN201610692730A CN106245806B CN 106245806 B CN106245806 B CN 106245806B CN 201610692730 A CN201610692730 A CN 201610692730A CN 106245806 B CN106245806 B CN 106245806B
- Authority
- CN
- China
- Prior art keywords
- sleeper
- heat bridge
- interior row
- outlet
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 92
- 241001669679 Eleotris Species 0.000 claims abstract description 70
- 238000009413 insulation Methods 0.000 claims abstract description 26
- 239000011178 precast concrete Substances 0.000 claims abstract description 9
- 230000003014 reinforcing effect Effects 0.000 claims description 38
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 239000004744 fabric Substances 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 28
- 238000005516 engineering process Methods 0.000 abstract description 8
- 238000005265 energy consumption Methods 0.000 abstract description 3
- 230000002708 enhancing effect Effects 0.000 abstract description 2
- 238000013461 design Methods 0.000 description 13
- 238000000034 method Methods 0.000 description 10
- 238000004519 manufacturing process Methods 0.000 description 5
- 238000009417 prefabrication Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 210000003205 muscle Anatomy 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000004134 energy conservation Methods 0.000 description 2
- 238000003912 environmental pollution Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- -1 electricity Substances 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 239000000047 product Substances 0.000 description 1
- 230000007115 recruitment Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 239000000523 sample Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Building Environments (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610692730.1A CN106245806B (zh) | 2016-08-22 | 2016-08-22 | 装配式混凝土整体无热桥板墙的钩挂螺栓连接方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610692730.1A CN106245806B (zh) | 2016-08-22 | 2016-08-22 | 装配式混凝土整体无热桥板墙的钩挂螺栓连接方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106245806A CN106245806A (zh) | 2016-12-21 |
CN106245806B true CN106245806B (zh) | 2018-11-27 |
Family
ID=57592474
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610692730.1A Active CN106245806B (zh) | 2016-08-22 | 2016-08-22 | 装配式混凝土整体无热桥板墙的钩挂螺栓连接方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106245806B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107965080B (zh) * | 2018-01-19 | 2023-07-07 | 辽宁工业大学 | 顶层模块化楼盖板及其安装方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SE9701500D0 (sv) * | 1997-04-20 | 1997-04-20 | George Wegler | Anordning vid väggupplag |
JP2003227192A (ja) * | 2002-01-31 | 2003-08-15 | Like:Kk | 木造建築物の壁構造 |
CN2740700Y (zh) * | 2003-03-25 | 2005-11-16 | 寇金生 | 排柱薄壁板式墙板混凝土结构全装配式房屋 |
CN103790282A (zh) * | 2012-11-05 | 2014-05-14 | 沈阳建筑大学 | 格构式无热桥自保温混凝土夹芯墙板 |
CN103993679B (zh) * | 2014-04-25 | 2016-02-10 | 四川大学 | 低层装配式复合墙体房屋螺栓连接节点结构 |
CN204738402U (zh) * | 2015-04-01 | 2015-11-04 | 长沙远大住宅工业集团有限公司 | 全装配式建筑预制构件螺栓加榫铆联结结构 |
CN205100399U (zh) * | 2015-11-02 | 2016-03-23 | 上海城建建设实业(集团)有限公司 | 预制剪力墙连接结构 |
-
2016
- 2016-08-22 CN CN201610692730.1A patent/CN106245806B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN106245806A (zh) | 2016-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106121107B (zh) | 装配式混凝土板及其板干式连接方法 | |
CN106149937B (zh) | 装配式混凝土梁及其干式连接方法 | |
CN106320601B (zh) | 装配式混凝土整体无热桥板墙及其竖向连接方法 | |
CN106284681B (zh) | 装配式混凝土整体无热桥板墙与套口楼板连接方法 | |
CN209468856U (zh) | 一种装配式混凝土柱梁连接节点 | |
CN107747378A (zh) | 快速安装承重保温装饰一体复合板加工方法 | |
CN106245806B (zh) | 装配式混凝土整体无热桥板墙的钩挂螺栓连接方法 | |
CN109296074A (zh) | 一种装配式混凝土柱梁连接节点 | |
CN206016002U (zh) | 装配式混凝土梁 | |
CN208777440U (zh) | 干式施工双层芯板暗柱剪力键混凝土墙板 | |
CN106223532B (zh) | 装配式混凝土整体无热桥墙板 | |
CN207597635U (zh) | 快速安装承重保温装饰一体复合板l形墙 | |
CN106284739B (zh) | 装配式混凝土整体无热桥角板 | |
CN206189730U (zh) | 一种装配式混凝土整体无热桥板墙的钩挂螺栓连接节点 | |
CN209369023U (zh) | 干式施工双层芯板保温混凝土墙板与楼板的连接节点 | |
CN106638956A (zh) | 混凝土墙板与肋梁楼板干式连接节点 | |
CN207812740U (zh) | 快速安装承重保温装饰一体复合板一字形墙 | |
CN207597695U (zh) | 快速安装承重保温装饰一体复合板 | |
CN207892081U (zh) | 快速安装承重保温装饰一体复合板t形墙 | |
CN206616695U (zh) | 一种混凝土墙板与肋梁楼板干式连接节点 | |
CN206189606U (zh) | 一种装配式混凝土整体无热桥板墙与套口楼板连接节点 | |
CN206408743U (zh) | 一种装配式混凝土节点 | |
CN206034685U (zh) | 干式连接装配式混凝土宽柱高梁的结构围护一体化体系 | |
CN108678259A (zh) | 干式施工双层芯板保温混凝土屋面板 | |
CN208441226U (zh) | 干式施工双层芯板暗柱剪力键装配式混凝土墙板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191210 Address after: 215300 Building 1, No.139, Minxin Road, Yushan Town, Kunshan City, Suzhou City, Jiangsu Province Patentee after: Bohong Environmental Construction Co.,Ltd. Address before: 110168 Liaoning province Shenyang Hunnan Hunnan Road No. 9 Patentee before: SHENYANG JIANZHU University |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210331 Address after: 215300 4-5 / F, building B, 499 tulip Road, Kunshan Development Zone, Suzhou City, Jiangsu Province Patentee after: Jiangsu Zhongkang Construction Co.,Ltd. Address before: 215300 Building 1, 139 Minxin Road, Yushan Town, Kunshan City, Suzhou City, Jiangsu Province Patentee before: Bohong Environmental Construction Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210511 Address after: 223005 Dahuang village, Heping Town, qingjiangpu District, Huai'an City, Jiangsu Province (300 meters south of Sinopec gas station) Patentee after: Jiangsu Zhongyou Construction Engineering Co.,Ltd. Address before: 215300 4-5 / F, building B, 499 tulip Road, Kunshan Development Zone, Suzhou City, Jiangsu Province Patentee before: Jiangsu Zhongkang Construction Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210825 Address after: 223800 No. c1716, Jinpeng International Plaza, 1588 Hongzehu Road, Sucheng District, Suqian City, Jiangsu Province Patentee after: Suqian shangze Construction Engineering Co.,Ltd. Address before: 223005 Dahuang village, Heping Town, qingjiangpu District, Huai'an City, Jiangsu Province (300 meters south of Sinopec gas station) Patentee before: Jiangsu Zhongyou Construction Engineering Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211201 Address after: 211600 # 31 Jiankang Road, Jinhu County, Huai'an City, Jiangsu Province Patentee after: Jiangsu Jin Jian Construction Group Co.,Ltd. Address before: 223800 No. c1716, Jinpeng International Plaza, 1588 Hongzehu Road, Sucheng District, Suqian City, Jiangsu Province Patentee before: Suqian shangze Construction Engineering Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220223 Address after: 223800 shop 5-111, Guotai Plaza, Sucheng District, Suqian City, Jiangsu Province Patentee after: Jiangsu Jinqu Architectural Decoration Engineering Co.,Ltd. Address before: 211600 # 31 Jiankang Road, Jinhu County, Huai'an City, Jiangsu Province Patentee before: Jiangsu Jin Jian Construction Group Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230905 Address after: 223800 No. c1716, Jinpeng International Plaza, 1588 Hongzehu Road, Sucheng District, Suqian City, Jiangsu Province Patentee after: Suqian shangze Construction Engineering Co.,Ltd. Address before: 223800 shop 5-111, Guotai Plaza, Sucheng District, Suqian City, Jiangsu Province Patentee before: Jiangsu Jinqu Architectural Decoration Engineering Co.,Ltd. |