CN106245659A - From embedded block reinforced structure tall earth fill means of defence - Google Patents

From embedded block reinforced structure tall earth fill means of defence Download PDF

Info

Publication number
CN106245659A
CN106245659A CN201610749505.7A CN201610749505A CN106245659A CN 106245659 A CN106245659 A CN 106245659A CN 201610749505 A CN201610749505 A CN 201610749505A CN 106245659 A CN106245659 A CN 106245659A
Authority
CN
China
Prior art keywords
building block
concrete
gsz
defence
reinforced structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610749505.7A
Other languages
Chinese (zh)
Inventor
丁宁
王猛
赵文军
余光辉
汪东兵
毕晓鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Construction Machine Construction Group Co ltd
Original Assignee
Shaanxi Construction Machine Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Construction Machine Construction Group Co ltd filed Critical Shaanxi Construction Machine Construction Group Co ltd
Priority to CN201610749505.7A priority Critical patent/CN106245659A/en
Publication of CN106245659A publication Critical patent/CN106245659A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated

Abstract

A kind of from embedded block reinforced structure tall earth fill means of defence, comprise the following steps: the first step, prepare material according to design specification, be equipped with construction equipment;Second step, measure unwrapping wire according to site operation drawing;3rd step, carry out foundation excavation, carry out compactness test before excavation, it is ensured that compactness meets design requirement;4th step, carry out reinforcement foundation colligation casting concrete according to site operation drawing;5th step, concrete reach to lay during final set state ground floor building block, and ground floor building block is in same axis and surfacing;6th step, backfill gravelly soil are also compacted, and the height after decking and rolling is consistent with ground floor building block end face absolute altitude;Inserting anchoring rods after the cleaning of 7th step, block surfaces, lay GSZ, GSZ one end is connected with anchoring rods;8th step, successively installation upper strata building block, interval carries out concrete and bears down on one, and the concrete that bears down on one carries out platform concrete front cover after reaching intensity.The present invention constructs simply, and side slope protection is effective.

Description

From embedded block reinforced structure tall earth fill means of defence
Technical field
The present invention relates to the realm of building construction, be specifically related to a kind of from embedded block reinforced structure tall earth fill protection side Method.
Background technology
During the casing pipe protection of side slope, major part engineering uses mortar flag stone to build up or arrange block stone barricade at present. Difficulty of construction and cost during existing tall earth fill construction of prevention work are relatively big, and the potential safety hazard in work progress is relatively Many.After having constructed, the rigidity characteristic due to stone masonry and concrete can not well adapt to slope deforming, thus easily makes Becoming side slope to damage rapidly, collapse, the repair difficulty after damage is big, difficult quality guarantee.Use the limit that back-filling way builds up Slope, particularly high slope are extremely difficult in protection process, owing to taking root in basis, domatic with self-assembling formation cannot be good Being adjacent to, do not have protection truly, and in work progress, operative's difficulty is too big, dangerous matter sources is more.
Summary of the invention
Present invention aims to above-mentioned the problems of the prior art, it is provided that a kind of high from the block reinforced structure of embedded Embankment method, difficulty of construction is less, and construction quality can be guaranteed, and the adaptability of deformation of banketing is good.
To achieve these goals, the technical solution used in the present invention comprises the following steps:
The first step, carry out material preparation according to design specification, and material of marching into the arena is rechecked, it is ensured that material Availability;It is equipped with construction equipment, facility is overhauled, it is ensured that facility can run well;
Second step, measure unwrapping wire according to site operation drawing;
3rd step, carry out foundation excavation, carry out compactness test before excavation, it is ensured that compactness meets design requirement;
4th step, carry out reinforcement foundation colligation casting concrete according to site operation drawing;
5th step, concrete reach to lay during final set state ground floor building block, and ground floor building block is on same axis and surface Smooth;
6th step, backfill gravelly soil are also compacted, and the height after decking and rolling is consistent with ground floor building block end face absolute altitude;
Inserting anchoring rods after the cleaning of 7th step, block surfaces, lay GSZ, GSZ one end is with anchoring rods even Connect;By euphroe, GSZ is carried out stretch-draw, make GSZ connected anchoring rods uniform force, finally carry out solid Fixed;
8th step, successively installation upper strata building block, check before often installing one layer whether last layer building block offsets, if going out Now skew corrects in time, and interval carries out concrete and bears down on one, and the concrete that bears down on one carries out platform concrete front cover after reaching intensity.
During surveying setting-out excavate axis range of error be ± 1cm, horizontal axis position after with level gauge by elevation with 10m Test point is arranged for interval.
Described reinforcement foundation carries out receiving light leveling after casting concrete, and leveling foundation measures the construction of top mark height hanging wire, Range of error is ± 1cm;The degree of depth on described basis is 20cm, and width is 60cm, and basis end face is provided with a size of 10cm × 10cm Pedal foot, ground floor building block is laid against the medial wall pedaling foot.
Hanging wire construction when described ground floor building block is installed, mortar levelling is passed through at surface irregularity position.
Backfill gravelly soil rams repeatedly to roll by frog compactor and jumping and makes compactness reach standard.
Described GSZ includes main muscle grid and time muscle grid, main muscle Grill space 1m, secondary muscle Grill space 0.33m。
Described GSZ is by carrying out stretch-draw after U-shaped clenching admittedly.
Described GSZ uses polythene material to make, and spreads with rubble when installing upper strata building block above GSZ If track.
Platform concrete uses C20 concrete, and width is 1.6m, and on platform, indwelling construction joint and draining ramp, wipe one's face and look for Covering curing after flat, arranges guard rail, forbids that personnel trample walking at it.
Building block carries out concrete every 2m and bears down on one;Platform moves back platform every 2m and carries out the domatic backfill of next stage, sets up every 6m Platform gutter.
Compared with prior art, the present invention has following beneficial effect: more conventional builds side slope protection construction method by laying bricks or stones, The present invention constructs with backfill soil from embedded building block, GSZ simultaneously, decreases technological process, substantially increases work effect Rate, makes the gradient of high slope backfill side slope be guaranteed, solves slope tamping, it is ensured that slope stability, it is ensured that engineering matter Amount.Use in building process from embedded building block and flexibly connect, made armour for ductility necessarily, it is possible to adapt to side slope soil Body deforms within the specific limits and is not destroyed, and conveniently carries out later period maintenance management, is green side slope and raising side slope simultaneously Artistry and sight provide controls space.GSZ forms entirety with building block after installing, and effectively achieves the steady of side slope Gu, building block checks whether last layer building block offsets, and prevents cumulative errors before often installing one layer.The present invention constructs letter Single, safety, implementation quality is excellent, and the casing pipe protection for side slope provides new solution route.
Accompanying drawing explanation
The structural representation of ground floor building block is installed on the basis of Fig. 1;
The mounting structure schematic diagram of Fig. 2 GSZ;
Detailed description of the invention
The present invention is described in further detail below in conjunction with the accompanying drawings.
The present invention, from embedded block reinforced structure tall earth fill means of defence, comprises the following steps:
1, preparation of construction: work out from embedded block wall special construction plan, determines that sequence of construction ensures on-the-spot construction Condition (water, electricity, builder's road) can meet the construction requirement at scene;Material beam worker is carried out according to design and specification related request Make, and material of marching into the arena is rechecked, it is ensured that the availability of material;It is equipped with corresponding construction machine according to selected arrangement and method for construction Tool.Facility are overhauled, it is ensured that the normal operation of facility, situation without exception.
2, surveying setting-out:
According to site operation drawing, surveyor uses GPS surveying setting-out, it is ensured that self-embedding barricade axis and foundation excavation axle Line meets design requirement, and range of error is ± 1cm.Horizontal axis utilizes level gauge by elevation by mono-test point of 10m behind location Arrange.
3, foundation excavation: workmen carries out compactness test to basic part, when compactness meets ability after design requires Can excavate, axis, elevational point that site operation person provides according to construction drawing and surveyor carry out technology to field worker Tell somebody what one's real intentions are, during hand excavation basis, work progress must guarantee that horizontal axis and absolute altitude meet design requirement by hanging wire.
4, reinforcement foundation colligation and concreting: base has been excavated and carried out reinforcing bar binding according to drawing, and arranges mixed Solidifying soil cushion block, it is ensured that the protective layer of reinforcing bar, colligation requires after completing that in concreting process, special messenger is responsible for receiving light leveling, leveling The top mark height hanging wire construction provided according to survey crew, it is desirable to error is ± 1cm.Depth of foundation is 20cm, and width is 60cm, Basis end face has 10cm × 10cm's to pedal foot, pedals foot and must pour with basis simultaneously, it is ensured that bulk strength, as shown in Figure 1;
5, ground floor building block is installed: concreting lays ground floor building block after completing to require at least 24 hours, it is ensured that mixed Solidifying soil has reached final set state, disposes too early and building block top may be caused because of concrete strength not to be uneven.Use transporter Bundled building block is transported to job site by tool, when installing ground floor building block, it is desirable to workmen must construct, on basis by hanging wire It is levelling that surface irregularity position can use a small amount of mortar to carry out, it is ensured that flat at same axis and building block end face of ground floor building block Whole degree.
6, gravelly soil backfill and compacting: finished product gravelly soil is transported to job site decking and rolling, it is desirable to after decking and rolling Height is consistent with building block end face absolute altitude, uses artificial leveling, thus prevent machinery when leveling after block wall in the range of 1.0 meters By basis and block wall crimp, during artificial leveling, large clod is removed, tamp after leveling, 1 meter of scope after barricade Inside carry out hand compaction, use frog compactor and jumping rammer repeatedly to roll, until it reaches degree of compaction standard;
7, spread GSZ and be connected with anchoring rods: after gravelly soil has been backfilling and compacted, in cleaning block surfaces and hole Soil rock ballast, inserts in building block the second round by anchoring rods, and (main muscle grid or secondary muscle grid are wanted according to design to lay GSZ Ask, main muscle Grill space 1 meter, secondary muscle Grill space 0.33 meter), GSZ one end is connected with anchoring rods, at the other end Use euphroe that GSZ is carried out stretch-draw, it is desirable to it is equal that stretch-draw has backfilled rear GSZ connected anchoring rods stress Even, the GSZ completing stretch-draw is fixed, as shown in Figure 2 according to design requirement;
Illustrating after building block has been connected with GSZ in roller compaction process, GSZ discontinuity can cause building block Locally building block horizontal axis receives impact.Therefore utilize U-shaped nail that GSZ is stuck at building block one meter, carry out geotechnique's lattice During grid stretching process, this meter of region does not stresses thus without because stretching force is crossed senior general and building block caused uneven displacement, one meter In the range of use artificial backfill, during being backfilling and compacted, in the range of one meter, building block still can be caused pulling force by GSZ stress, So that GSZ forms entirety with from embedded block wall, produce slope stabilization effect;
8, second and third layer of building block it is installed: before second layer building block is installed, it is necessary to check whether last layer building block offsets Phenomenon, it is desirable to before every layer of building block construction, special messenger carries out checking and correcting in time, in order to avoid producing cumulative errors when building building block by laying bricks or stones;Cause GSZ is high-density polyethylene material, forbids that vehicle rolls upper during construction, when allocating and transporting finished product building block, must use gravelly soil Lay a track, pass through for loader;
9, upper strata building block is installed the most successively, pour bear down on one, platform front cover: carry out building block installation and gravelly soil successively and backfill, Every two meters of building blocks carry out concrete and bear down on one work after completing, during model sheetinstallat must hanging wire construction, before pouring the concrete that bears down on one, inspection Look between template and building block whether can spillage and the steadiness of template, during concreting must special messenger levelling;Bear down on one concrete Reaching form removal after intensity, carry out platform concrete front cover, berm width is 1.6m, uses C20 concrete enclosing, by design requirement Indwelling construction joint and draining ramp, special messenger wipes one's face levelling, and concreting carries out covering curing after completing, and arranges guard rail, prohibits Only personnel trample walking at it;Setting up platform and move back platform and carry out the domatic backfill of next stage for every two meters high, every 6m sets up platform to arrange Ditch.
Points for attention during construction:
1) perform in strict accordance with " concrete structure engineering construction quality accident specification " GB50204 during concrete construction;
2) all facility must check before construction, it is ensured that the serviceability rate of equipment;
3) various raw-material test methods and pilot project should meet relative national standards;
4) concrete strength and test evaluation should meet GBJ107 pertinent regulations, and test method should meet the relevant of GBJ81 Regulation;
5) presentation quality, with reference to GB-8293-1997 standard about in product appearance quality test method regulation measurer and Measuring method detects;
6) building block detects according to " Test methods for the small concrete hollow block " GB/4111-1997 standard test;
7) water absorption rate and frost resistance all perform according to correlation method in GB/4111-1997 standard;
8) should be smooth from the appearance of embedded block, corner is complete, and dimensional discrepancy and open defect should meet relevant regulations;
9) from embedded building block inspection lot and sampling inspection strict implement relevant regulations, inspection lot is carried out physics, mechanical property Can detect, this batch of material after inspection lot is qualified, can be used;
10) pour base concrete and ground floor building block can must be installed after concrete reaches final set condition;
11) have to check for before every layer of building block is installed whether upper strata building block is toppled, offset and twisted phenomena, timely hanging wire Adjust, it is to avoid produce cumulative errors;
12) in the range of embedded block wall back of the body 1m, use hand compaction, use frog hammer or vertical ramming machine anti- Roll again, testing staff must every layer carry out compacting degree detection, reach design require after can carry out subsequent processing;
13) GSZ is connected with pitman, it is desirable to connected anchoring rods uniform force after GSZ stretch-draw, Thus play slope stabilization effect.
In sum, means of defence of the present invention, in implementation process, enters with backfill soil from embedded building block, GSZ simultaneously OK, because of the process characteristic of itself, more conventional builds side slope protection construction method by laying bricks or stones, decreases technological process, substantially increase Work efficiency, makes the gradient of high slope backfill side slope be guaranteed, the problem solving slope tamping, it is ensured that stablizing of side slope Property, it is ensured that construction quality, especially use in building process from embedded building block and flexibly connect, made armour standby necessarily Ductility, it is possible to adapt to slope soil and deform within the specific limits and be not destroyed, conveniently carry out later period maintenance management;It is simultaneously The artistry sight of green side slope and raising side slope provides the space controlled, and the casing pipe protection for side slope provides new solution Certainly approach.

Claims (10)

1. one kind from embedded block reinforced structure tall earth fill means of defence, it is characterised in that comprise the following steps:
The first step, carry out material preparation according to design specification, and material of marching into the arena is rechecked, it is ensured that material available Property;It is equipped with construction equipment, facility is overhauled, it is ensured that facility can run well;
Second step, measure unwrapping wire according to site operation drawing;
3rd step, carry out foundation excavation, carry out compactness test before excavation, it is ensured that compactness meets design requirement;
4th step, carry out reinforcement foundation colligation casting concrete according to site operation drawing;
5th step, concrete reach to lay during final set state ground floor building block, and ground floor building block is in same axis and surfacing;
6th step, backfill gravelly soil are also compacted, and the height after decking and rolling is consistent with ground floor building block end face absolute altitude;
Inserting anchoring rods after the cleaning of 7th step, block surfaces, lay GSZ, GSZ one end is connected with anchoring rods; By euphroe, GSZ is carried out stretch-draw, make GSZ connected anchoring rods uniform force, be finally fixed;
8th step, successively installation upper strata building block, check before often installing one layer whether last layer building block offsets, if occurring inclined The correction in time of shift-in row, interval carries out concrete and bears down on one, and the concrete that bears down on one carries out platform concrete front cover after reaching intensity.
It is the most according to claim 1 from embedded block reinforced structure tall earth fill means of defence, it is characterised in that: measure Excavating axis based error scope during unwrapping wire is ± 1cm, with level gauge, with 10m interval, elevation is arranged detection behind horizontal axis location Point.
It is the most according to claim 1 from embedded block reinforced structure tall earth fill means of defence, it is characterised in that: described Reinforcement foundation carry out receiving light leveling after casting concrete, leveling according to measuring the construction of top mark height hanging wire, range of error is ± 1cm;The degree of depth on described basis is 20cm, and width is 60cm, and basis end face is provided with the foot of pedaling of a size of 10cm × 10cm, ground floor Building block is laid against the medial wall pedaling foot.
It is the most according to claim 1 from embedded block reinforced structure tall earth fill means of defence, it is characterised in that: described Ground floor building block install time hanging wire construction, mortar levelling is passed through at surface irregularity position.
It is the most according to claim 1 from embedded block reinforced structure tall earth fill means of defence, it is characterised in that: backfill Gravelly soil rams repeatedly to roll by frog compactor and jumping and makes compactness reach standard.
It is the most according to claim 1 from embedded block reinforced structure tall earth fill means of defence, it is characterised in that: described GSZ include main muscle grid and time muscle grid, main muscle Grill space 1m, secondary muscle Grill space 0.33m.
7. according to described in claim 1 or 6 from embedded block reinforced structure tall earth fill means of defence, it is characterised in that: Described GSZ is by carrying out stretch-draw after U-shaped clenching admittedly.
8. according to described in claim 1 or 6 from embedded block reinforced structure tall earth fill means of defence, it is characterised in that: Described GSZ uses polythene material to make, and lays track with rubble when installing upper strata building block above GSZ.
It is the most according to claim 1 from embedded block reinforced structure tall earth fill means of defence, it is characterised in that: platform Concrete uses C20 concrete, and width is 1.6m, indwelling construction joint and draining ramp on platform, levelling rear covering curing of wiping one's face.
It is the most according to claim 1 from embedded block reinforced structure tall earth fill means of defence, it is characterised in that: build Block carries out concrete every 2m and bears down on one;Platform moves back platform every 2m and carries out the domatic backfill of next stage, sets up platform gutter every 6m.
CN201610749505.7A 2016-08-26 2016-08-26 From embedded block reinforced structure tall earth fill means of defence Pending CN106245659A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610749505.7A CN106245659A (en) 2016-08-26 2016-08-26 From embedded block reinforced structure tall earth fill means of defence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610749505.7A CN106245659A (en) 2016-08-26 2016-08-26 From embedded block reinforced structure tall earth fill means of defence

Publications (1)

Publication Number Publication Date
CN106245659A true CN106245659A (en) 2016-12-21

Family

ID=57596636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610749505.7A Pending CN106245659A (en) 2016-08-26 2016-08-26 From embedded block reinforced structure tall earth fill means of defence

Country Status (1)

Country Link
CN (1) CN106245659A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086333A (en) * 2017-11-28 2018-05-29 中国二十冶集团有限公司 The control method of filling roadbed stability of slope
CN110258625A (en) * 2019-07-03 2019-09-20 深圳建中路桥工程有限公司 A kind of construction method of filled-up ground retaining wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1880587A (en) * 2005-06-17 2006-12-20 长沙理工大学 Flexible reinforced retaining structure and construction method therefor
US20080298902A1 (en) * 2000-12-13 2008-12-04 New Technology Resources, Inc. Environment resistant retaining wall block and methods of use thereof
CN103669399A (en) * 2013-12-30 2014-03-26 青岛旭域土工材料股份有限公司 Concrete panel reinforced retaining wall and construction method thereof
CN103774616A (en) * 2014-01-22 2014-05-07 安徽水安建设集团股份有限公司 Construction method for ecological retaining wall built by self-embedded blocks
CN203924106U (en) * 2013-12-23 2014-11-05 新兴县新城镇洪光水泥制品厂 A kind of reinforced soil retaining wall is used from embedded dust block
CN204608802U (en) * 2015-04-30 2015-09-02 陕西建工机械施工集团有限公司 A kind of from embedded building block and domatic wall

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080298902A1 (en) * 2000-12-13 2008-12-04 New Technology Resources, Inc. Environment resistant retaining wall block and methods of use thereof
CN1880587A (en) * 2005-06-17 2006-12-20 长沙理工大学 Flexible reinforced retaining structure and construction method therefor
CN203924106U (en) * 2013-12-23 2014-11-05 新兴县新城镇洪光水泥制品厂 A kind of reinforced soil retaining wall is used from embedded dust block
CN103669399A (en) * 2013-12-30 2014-03-26 青岛旭域土工材料股份有限公司 Concrete panel reinforced retaining wall and construction method thereof
CN103774616A (en) * 2014-01-22 2014-05-07 安徽水安建设集团股份有限公司 Construction method for ecological retaining wall built by self-embedded blocks
CN204608802U (en) * 2015-04-30 2015-09-02 陕西建工机械施工集团有限公司 A kind of from embedded building block and domatic wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴贻起: "《复合地基渠系工程施工新技术》", 30 September 2014 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108086333A (en) * 2017-11-28 2018-05-29 中国二十冶集团有限公司 The control method of filling roadbed stability of slope
CN110258625A (en) * 2019-07-03 2019-09-20 深圳建中路桥工程有限公司 A kind of construction method of filled-up ground retaining wall

Similar Documents

Publication Publication Date Title
CN106641440B (en) A kind of transverse crossing railway line underground piping jacking construction method
CN101963061B (en) Construction method for underground box culvert of existing railway line
CN103758084B (en) A kind of ecological riverway interlocking type building block and construct the construction that protects bank
CN105274922B (en) A kind of antiskid key steel-pipe pile composite construction and method for repairing landslide roadbed
CN106930319A (en) A kind of high slope framed revetment and its construction method
CN108824220A (en) A kind of cast-in-place support and construction method of the rigid structure of cantilever T-type
CN102430277B (en) Coarse grid sunk well for physically processing waste water and construction method thereof
CN103205978A (en) High-permeability zone under-water-level elevator foundation pit open caisson moulding bed construction method
CN111910679B (en) Construction method of overlong and ultrahigh-weight retaining wall under complex terrain
CN110344423A (en) A kind of drop shaft sinking forms the construction method of water level for local deep foundation pit under high water level
CN112593559A (en) Construction method for deep foundation pit supporting of micro-pile prestressed anchor cable composite soil nailing wall
CN107447778A (en) The heightening and consolidation structure and method of a kind of in-service reinforced concrete retaining wall
CN108842819A (en) A kind of urban track traffic cable run method for tunnel construction
CN105953078B (en) The protective device of high-pressure gas pipeline and guard method
CN106436788A (en) Foundation reinforcement and inclination correction method for friction piles of high-rise building
CN113774917B (en) Safe construction method for earth and rockfill excavation and side slope supporting engineering
CN112281857A (en) Deep foundation pit excavation construction method
CN106812153A (en) Beam and slab type construction elevator foundation construction engineering method in a kind of backfill
CN111322087A (en) Construction method for soft soil highway tunnel entrance semi-open semi-hidden tunnel in mountainous area
CN110735436A (en) cutting rock slope reinforced structure
CN101638898B (en) Suspension type construction method of top pipe shaft
CN207331740U (en) A kind of heightening and consolidation structure of in-service reinforced concrete retaining wall
CN211421169U (en) Fill side slope gravity type retaining wall reinforced structure
CN207331739U (en) A kind of heightening and consolidation structure of in-service reinforced concrete retaining wall
CN106837341A (en) A kind of construction method of Metro construction shaft wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161221