CN106241375B - A kind of glass transfer assembly line - Google Patents

A kind of glass transfer assembly line Download PDF

Info

Publication number
CN106241375B
CN106241375B CN201610806195.8A CN201610806195A CN106241375B CN 106241375 B CN106241375 B CN 106241375B CN 201610806195 A CN201610806195 A CN 201610806195A CN 106241375 B CN106241375 B CN 106241375B
Authority
CN
China
Prior art keywords
transmission
transmission line
trolley
line
transfer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610806195.8A
Other languages
Chinese (zh)
Other versions
CN106241375A (en
Inventor
郑国立
王生
郑长山
陈其华
李益淼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuyao Group (fujian) Machinery Manufacturing Co Ltd
Original Assignee
Fuyao Group (fujian) Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuyao Group (fujian) Machinery Manufacturing Co Ltd filed Critical Fuyao Group (fujian) Machinery Manufacturing Co Ltd
Priority to CN201610806195.8A priority Critical patent/CN106241375B/en
Publication of CN106241375A publication Critical patent/CN106241375A/en
Application granted granted Critical
Publication of CN106241375B publication Critical patent/CN106241375B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G49/00Conveying systems characterised by their application for specified purposes not otherwise provided for
    • B65G49/05Conveying systems characterised by their application for specified purposes not otherwise provided for for fragile or damageable materials or articles
    • B65G49/06Conveying systems characterised by their application for specified purposes not otherwise provided for for fragile or damageable materials or articles for fragile sheets, e.g. glass
    • B65G49/063Transporting devices for sheet glass
    • B65G49/064Transporting devices for sheet glass in a horizontal position

Landscapes

  • Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)
  • Surface Treatment Of Glass (AREA)

Abstract

The present invention relates to glass delivery technical field, particularly a kind of glass transfer assembly line, it is characterised in that:Including washing transmission line, at least two equidistant pre-treatment transmission lines arranged in parallel and the transfer transmission line between washing transmission line and pre-treatment transmission line, transfer transmission line includes stent, rack-mount guide rail and the transfer trolley being slidably mounted on guide rail, transfer trolley includes the first transmission trolley being fixedly connected and the second transmission trolley, when the first transmission trolley or the second transmission trolley are docked with pre-treatment transmission line, transfer transmission line is used to receive the glass on pre-treatment transmission line;When the first transmission trolley or the second transmission trolley are docked with washing transmission line, transfer transmission line is used for glass delivery to washing transmission line.Advantage is:Realize equipment line automatic operating, and the production capacity of whole baling line can be improved.

Description

A kind of glass transfer assembly line
Technical field:
The present invention relates to glass delivery technical field, particularly a kind of glass transfer assembly line, glass bag is particularly suitable for Assembling production lines.
Background technology:
The production process of automobile front windshield baling line is:By in the glass delivery on Pretreatment Line to rinsing maching into Row washing, then carries out these glass to bond base, bonds stent, installation wrapping strip, applies the packaging processes such as primary coat respectively.For Production cost to be saved, improves production efficiency, a packing lines are needed with the ability that Flexible production is carried out to multi items glass, and It is not limited in the glass of production single variety.Therefore, there is an urgent need to a kind of glass transfer assembly line to carry out line production, in the future Collect to be transferred in same rinsing maching from the glass of the different cultivars on different Pretreatment Lines and washed, realization pair The glass of multi items carries out Flexible production.
The content of the invention:
The technical problems to be solved by the invention are asked for above-mentioned technology existing for existing glass packaging transmission assembly line A kind of topic, there is provided glass transfer assembly line simple and compact for structure, efficiency of transmission is high.
The technical scheme adopted by the invention to solve the technical problem is that:A kind of glass transfer assembly line, it is characterised in that: Including washing transmission line, at least two equidistant pre-treatment transmission lines arranged in parallel and positioned at the washing transmission line and preceding Handle the transfer transmission line between transmission line, the transfer transmission line includes stent, installation guide rail on the bracket and can The transfer trolley being slidably mounted on the guide rail, the transfer trolley include the first transmission trolley and second being fixedly connected Trolley is transmitted, the first transmission trolley and the second spacing for transmitting trolley are equal to two adjacent pre-treatment transmission lines Spacing;The transfer trolley is slided along the guide rail so that it is described first transmission trolley or second transmission trolley with it is described before Handle transmission line or washing transmission line docking;When the described first transmission trolley or the second transmission trolley and the pre-treatment transmission line During docking, the transfer transmission line is used to receive the glass on pre-treatment transmission line;When the described first transmission trolley or the When two transmission trolleies are docked with the washing transmission line, the transfer transmission line is used for glass delivery to washing transmission line.
Further, the glass is passed in the washing transmission line, the first transmission trolley, the second transmission trolley and preceding processing Transmission direction on defeated line is transverse direction, and glide direction of the transfer trolley on the guide rail is longitudinal direction.
Further, the guide rail is axle center guide rail.
Further, the transfer trolley is driven by synchronous belt and is slided on the guide rail.
Further, the glass delivery face of the washing transmission line, transfer transmission line and pre-treatment transmission line is positioned at same On horizontal plane.
Further, washing transmission line, transfer transmission line and the pre-treatment transmission line are belt transmission line.
Further, the pre-treatment transmission line docked successively including multistage, the span line of respective individual transmission.
Further, the washing transmission line aligns with a wherein pre-treatment transmission line.
Further, the transfer trolley further includes connecting rod, and the first transmission trolley passes through connecting rod and described the Two transmission trolleies are connected.
Further, controller is further included, the controller is used to be arranged in a working cycles, from every pre-treatment Transmission line enters the quantity of the glass of the transfer transmission line.
Due to taking above-mentioned technical proposal, it has the advantages that the present invention:
1) glass of the different cultivars on different Pretreatment Lines can be collected and is transferred to same washing Washed in machine so that baling line has multi-thread multi-item production ability, improves equipment line automatic operating benefit;
2) glass is synchronously picked using the first transmission trolley and the second transmission trolley, can received at the same time from adjacent two Glass on pre-treatment transmission line, improves production efficiency;
3) each kind of pre-treatment transmission line input can according to the actual supply-demand relationship of different cultivars glass, be distributed The ratio of glass, so as to improve the production capacity of whole baling line.
Brief description of the drawings:
Fig. 1 is a kind of structure diagram of glass transfer assembly line of the present invention;
Attached figure label explanation:1 is washing transmission line, and 2 be pre-treatment transmission line, and 21 be the first pre-treatment transmission line, 22 It is the 3rd pre-treatment transmission line for the second pre-treatment transmission line, 23,24 be the 4th pre-treatment transmission line, and 241 be the first span line, 242 be the second span line, and 243 be the 3rd span line, and 3 be transfer transmission line, and 4 be stent, and 5 be guide rail, and 6 be transfer trolley, 61 It is the second transmission trolley for the first transmission trolley, 62,63 be connecting rod.
Embodiment:
Present disclosure is described further below in conjunction with attached drawing.
A kind of as shown in Figure 1, glass transfer assembly line of the present invention, it is characterised in that:Including washing transmission line 1, At least two equidistantly pre-treatment transmission lines 2 arranged in parallel and positioned at the pre-treatment transmission line 2 and washing transmission line 1 it Between transfer transmission line 3, the transfer transmission line 3 includes stent 4, the guide rail 5 on the stent 4 and slideably pacifying Transfer trolley 6 on the guide rail 5, the first transmission trolley 61 and second that the transfer trolley 6 includes being fixedly connected pass Defeated trolley 62, the spacing that the first transmission trolley 61 and second transmits trolley 62 are equal to the pre-treatment transmission of adjacent two The spacing of line 2, spacing are d;The transfer trolley 6 is slided along the guide rail 5 so that the first transmission trolley 61 or the Two transmission trolleies 62 are docked with the pre-treatment transmission line 2 or washing transmission line 1;When the described first transmission trolley 61 or second passes When defeated trolley 62 is docked with the pre-treatment transmission line 2, the transfer transmission line 3, which is used to receive, comes from pre-treatment transmission line 2 Glass;When the described first transmission trolley 61 or second, which transmits trolley 62, to be docked with the washing transmission line 1, the transfer passes Defeated line 3 is used for glass delivery to washing transmission line 1.
When two transmission lines dock, glass can be transmitted directly on another transmission lines along a transmission lines, by The spacing of trolley 62, the spacing of adjacent two pre-treatment transmission lines 2 are transmitted in the described first transmission trolley 61 and second Be d, when first transmission trolley docked with a pre-treatment transmission line 2 when, second transmit trolley just with another pre-treatment Transmission line 2 docks, the first transmission trolley and the second transmission trolley can contact pin at the same time, receive transmitted from two pre-treatments respectively Glass on line 2.The first transmission trolley 61 is connected by connecting rod 63 with the described second transmission trolley 62, the connecting rod 63 transmit the distance d of trolley 62 for limiting the first transmission trolley 61 and second, and make the first transmission 61 He of trolley Second transmission trolley 62 keeps synchronous slide on guide rail 5.
Preferably, washing transmission line 1, transfer transmission line 3 and the pre-treatment transmission line 2 are belt transmission line, more excellent Elect active band transmission line as, and glass delivery face is located in same level, facilitate transfer transmission line 3 and washing transmission line 1 and Pre-treatment transmission line 2 docks.
Further, the glass transmits trolley 61, second in the washing transmission line 1, first and transmits trolley 62 and preceding The transmission direction handled on transmission line 2 is transverse direction, and glide direction of the transfer trolley 6 on the guide rail 5 is longitudinal direction, horizontal To being substantially mutually perpendicular direction with longitudinal direction, transfer trolley 6 is facilitated to be docked with washing transmission line 1 and pre-treatment transmission line 2, institute Transfer trolley 6 is stated to slide on the guide rail 5 preferably by synchronous belt driving.As shown in Figure 1, guide rail 5 is generally two-part, Wherein one section be close to every pre-treatment transmission line 2 send bit end, in order to which the transfer trolley 6 on guide rail 5 and pre-treatment pass Defeated line docking;Another section of tab end close to the washing transmission line 1, in order to the transfer trolley 6 on guide rail 5 and washing Transmission line 1 docks.The guide rail 5 is preferably axle center guide rail, and the precision of axle center guide rail is high, and transmission speed is fast, and performance is stablized.
Further, every pre-treatment transmission line 2 docked successively including multistage, the span line of respective individual transmission, When the leading portion for being supported by glass is waiting transfer, do not support the back segment of glass to can continue to transmit, do not influence productive temp.Such as Shown in Fig. 1, the 4th pre-treatment transmission line 24 includes the first span line 241, the second span line 242 and the 3rd span line 243, each Span line is both provided with driving motor, and every section may be incorporated for a temporary sheet glass, when support glass on the first span line 241 When waiting transfer, the first span line 241 stops transmission, and the second span line can also continue to transmit, therefore, rear end can continue by Glass delivery is on the second span line 242;Transfer is waited when the first span line 241 and the second span line 242 support glass When, rear end can also continue on glass delivery to the 3rd span line 243.
Further, the washing transmission line 1 aligns with a wherein pre-treatment transmission line 2, i.e., the two is located at always On line, mobile transfer trolley 6, it is possible to by the first transmission trolley 61 or second transmit trolley 62 at the same time with washing transmission line 1 with This pre-treatment transmission line 2 docks.As shown in Figure 1, first transmission trolley 61 can at the same time with the 3rd pre-treatment transmission line 23 and Washing transmission line 1 docks, when glass is transferred to transfer trolley 6 from the pre-treatment transmission line 2, without adjusting transfer trolley 6 again Position, you can directly by the glass delivery to washing transmission line 1 on, improve production efficiency.
In the present invention, the principle that transfer trolley 6 can first connect according to arriving first, glass is received from pre-treatment transmission line 2. Further, glass transfer assembly line of the present invention further includes controller, and the controller is used to be arranged on a job In circulation, the quantity of the glass of the transfer transmission line 3 is transferred into from every pre-treatment transmission line 2, before can allocating in real time Handle the input ratio of transmission line 2.Automobile front windshield is according to the requirement of automobile main frame maker, it is necessary to complete to bond in baling line Base, bond stent, installation wrapping strip, apply the processes such as primary coat, and the process to be completed of different glass is different, some glass Complex procedures, the process of some glass is simple.It is fast compared with other lines for the simple glass of process on baling line, glass output, Need the glass overabsorption that leading portion send piece a little, for the relatively complicated glass of process, it is necessary to which leading portion send the glass of piece opposite It is less.The glass that indoor production line is packed due to input is all from same glass washing line (after the washing of same rinsing maching Slice), production operators need to according to pack it is indoor it is not collinear on the actual supply and demand size of glass, in real time allotment washing line leading portion Input ratio improve the production capacity of whole baling line, avoid the occurrence of caused by relation between supply and demand production line and block up line or idle wait Phenomena such as glass.
As shown in Figure 1, pre-treatment transmission line 2 is four equidistant first pre-treatment transmission lines 21, second arranged in parallel Pre-treatment transmission line 22, the 3rd pre-treatment transmission line 23 and the 4th pre-treatment transmission line 24.Transfer trolley 6 is picked on guide rail 5 Stop place during glass is equipped with three, respectively between the first pre-treatment transmission line 21 and the second pre-treatment transmission line 22, Between the second pre-treatment transmission line 22 and the 3rd pre-treatment transmission line 23 and positioned at the 3rd pre-treatment transmission line 23 and Between four pre-treatment transmission lines 24, three above stop place can receive glass, after having received glass, then by pre-set Nearby principle conveys glass toward washing transmission line 1 is interior.The stop place of the transfer trolley 6 shown in figure is positioned at the 3rd pre-treatment Between 23 and the 4th pre-treatment transmission line 24 of transmission line, at this time, first transmission trolley 61 at the same time with the 3rd pre-treatment transmission line 23 Docked with washing transmission line 1, the second transmission trolley 62 is docked with the 4th pre-treatment transmission line 24.Every pre-treatment can be set to pass Defeated line into piece ratio quantity, transmission line 2 is handled before then having picked every in set ratio in a contact pin cycle period On glass waiting, then, repeat above-mentioned contact pin process.
Above content has been described in detail a kind of glass transfer assembly line of the present invention, but the present invention from The limitation of specific embodiments described above content, so all any improvement carried out according to technical key point, etc. With modification and replacement etc., the scope of protection of the invention is belonged to.

Claims (10)

  1. A kind of 1. glass transfer assembly line, it is characterised in that:Including washing transmission line (1), at least two equidistantly it is arranged in parallel Pre-treatment transmission line (2) and positioned at it is described washing transmission line (1) and pre-treatment transmission line (2) between transfer transmission line (3), the transfer transmission line (3) includes stent (4), the guide rail (5) on the stent (4) and is slidably mounted in Transfer trolley (6) on the guide rail (5), the transfer trolley (6) include the first transmission trolley (61) and the being fixedly connected Two transmission trolleies (62), the spacing of the first transmission trolley (61) and the second transmission trolley (62) are equal to described in adjacent two The spacing of pre-treatment transmission line (2);The transfer trolley (6) is slided along the guide rail (5) so that the first transmission trolley (61) or the second transmission trolley (62) is docked with the pre-treatment transmission line (2) or washing transmission line (1);When the described first transmission When trolley (61) or the second transmission trolley (62) are docked with the pre-treatment transmission line (2), the transfer transmission line (3) is used to connect Receive the glass on pre-treatment transmission line (2);When described first transmission trolley (61) or second transmission trolley (62) with it is described When washing transmission line (1) docking, the transfer transmission line (3) is used for glass delivery to washing transmission line (1).
  2. 2. glass transfer assembly line according to claim 1, it is characterised in that:The glass is in the washing transmission line (1), the transmission direction on the first transmission trolley (61), the second transmission trolley (62) and pre-treatment transmission line (2) is transverse direction, institute Glide direction of the transfer trolley (6) on the guide rail (5) is stated as longitudinal direction.
  3. 3. glass transfer assembly line according to claim 1, it is characterised in that:The guide rail (5) is axle center guide rail.
  4. 4. glass transfer assembly line according to claim 1, it is characterised in that:The transfer trolley (6) passes through synchronous belt Driving is slided on the guide rail (5).
  5. 5. glass transfer assembly line according to claim 1, it is characterised in that:The washing transmission line (1), transfer transmission The glass delivery face of line (3) and pre-treatment transmission line (2) is located in same level.
  6. 6. glass transfer assembly line according to claim 1, it is characterised in that:The washing transmission line (1), transfer transmission Line (3) and pre-treatment transmission line (2) are belt transmission line.
  7. 7. glass transfer assembly line according to claim 6, it is characterised in that:The pre-treatment transmission line (2) includes more Duan Yici docking, the span line of respective individual transmission.
  8. 8. glass transfer assembly line according to claim 6, it is characterised in that:The washing transmission line (1) and wherein one Bar pre-treatment transmission line (2) aligns.
  9. 9. glass transfer assembly line according to claim 1, it is characterised in that:The transfer trolley (6) further includes connection Bar (63), the first transmission trolley (61) are connected by connecting rod (63) with the described second transmission trolley (62).
  10. 10. glass transfer assembly line according to claim 1, it is characterised in that:Controller is further included, the controller is used In being arranged in a working cycles, the glass of the transfer transmission line (3) is transferred into from every pre-treatment transmission line (2) Quantity.
CN201610806195.8A 2016-09-07 2016-09-07 A kind of glass transfer assembly line Active CN106241375B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610806195.8A CN106241375B (en) 2016-09-07 2016-09-07 A kind of glass transfer assembly line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610806195.8A CN106241375B (en) 2016-09-07 2016-09-07 A kind of glass transfer assembly line

Publications (2)

Publication Number Publication Date
CN106241375A CN106241375A (en) 2016-12-21
CN106241375B true CN106241375B (en) 2018-04-17

Family

ID=57599480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610806195.8A Active CN106241375B (en) 2016-09-07 2016-09-07 A kind of glass transfer assembly line

Country Status (1)

Country Link
CN (1) CN106241375B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111890612A (en) * 2020-08-03 2020-11-06 盐城工学院 Multi-machine-position tire glue injection type mold production line
CN112938396A (en) * 2021-01-26 2021-06-11 中联重科股份有限公司 Conveying system and conveying method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005061309A1 (en) * 2005-12-21 2007-07-05 Siemens Ag Sorting device for sorting of articles, has several buffer channels, in which several articles can be arranged, and in and out movable vessel is provided at inlet end or outlet end of buffer channels along the end
CN101891063A (en) * 2010-07-14 2010-11-24 深圳市华星光电技术有限公司 Production line diverging conveying framework and traverse conveyer belt platform thereof
FR2967145A1 (en) * 2010-11-08 2012-05-11 Savoye Automated storage system for preparation of parcel of e.g. tools in mechanical engineering industry, has risers comprising lift strut cooperating with guiding units of platform, where lift strut is formed by post of structure of rack
CN102502233A (en) * 2011-12-26 2012-06-20 常州天华新能源科技有限公司 Lamination flow distribution and convergence transmission device for solar cell panel
CN104307871A (en) * 2014-10-20 2015-01-28 中色科技股份有限公司 Process production method with multiple cast ingot heating furnaces simultaneously parallel to hot rolling direction
CN205346242U (en) * 2016-01-29 2016-06-29 英德欧姆智能机械有限公司 Intelligence glass arranges piece system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005061309A1 (en) * 2005-12-21 2007-07-05 Siemens Ag Sorting device for sorting of articles, has several buffer channels, in which several articles can be arranged, and in and out movable vessel is provided at inlet end or outlet end of buffer channels along the end
CN101891063A (en) * 2010-07-14 2010-11-24 深圳市华星光电技术有限公司 Production line diverging conveying framework and traverse conveyer belt platform thereof
FR2967145A1 (en) * 2010-11-08 2012-05-11 Savoye Automated storage system for preparation of parcel of e.g. tools in mechanical engineering industry, has risers comprising lift strut cooperating with guiding units of platform, where lift strut is formed by post of structure of rack
CN102502233A (en) * 2011-12-26 2012-06-20 常州天华新能源科技有限公司 Lamination flow distribution and convergence transmission device for solar cell panel
CN104307871A (en) * 2014-10-20 2015-01-28 中色科技股份有限公司 Process production method with multiple cast ingot heating furnaces simultaneously parallel to hot rolling direction
CN205346242U (en) * 2016-01-29 2016-06-29 英德欧姆智能机械有限公司 Intelligence glass arranges piece system

Also Published As

Publication number Publication date
CN106241375A (en) 2016-12-21

Similar Documents

Publication Publication Date Title
CN106241375B (en) A kind of glass transfer assembly line
CN203993060U (en) A kind of pipeline system lock screw and some glue double apparatus for work
CN104128794A (en) Assembly line type screw locking and adhesive dispensing double-station operating device
CN207289806U (en) A kind of grinding cleaning system for axle shell
CN206939674U (en) A kind of transmission system for lifting material
CN109968036A (en) Continuous material belt type metalwork high-efficiency electroplating cutting integration assembly line
CN203889534U (en) Double-station shuttle machine
CN207759529U (en) A kind of double-speed chain multistation production line
CN104495318A (en) Dynamic guardrail and buffer device
CN201686030U (en) Device for fully automatically distributing oral liquid bottles in tracks in oral liquid production line
CN108438793A (en) A kind of flexible production line and separate drive body device
CN103950274B (en) A kind of multichannel serigraphy line
CN106881427A (en) Conveying device, process units, multistage pressure forming machine and the method for being manufactured product by workpiece by means of process units
CN106697405B (en) Mixed packaging equipment and method for sanitary products
CN115649787A (en) Unmanned aerial vehicle production line communication testing device and testing method
CN105033602A (en) Triaxial gantry buckle assembling system
CN206614537U (en) A kind of mechanical arm handling equipment
CN202779349U (en) Production system for liquid crystal display screen backlight module group hardware front frame and backplane
CN210364671U (en) Ampoule box holds in palm and weighs to reject and add a return mechanism
CN205311967U (en) Feeding marshalling grasping system
CN201105913Y (en) Manually-operated suspension system
CN104766405A (en) Delivery system for vending machine
CN214848182U (en) Production line of winding machine
CN207788248U (en) It can be applied to three station Integrated design mechanisms of aluminium section bar automatic assembly line
CN202807825U (en) Plate turnover machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant