CN106231837A - Installation method of electronic and communication equipment - Google Patents
Installation method of electronic and communication equipment Download PDFInfo
- Publication number
- CN106231837A CN106231837A CN201610638820.2A CN201610638820A CN106231837A CN 106231837 A CN106231837 A CN 106231837A CN 201610638820 A CN201610638820 A CN 201610638820A CN 106231837 A CN106231837 A CN 106231837A
- Authority
- CN
- China
- Prior art keywords
- communication apparatus
- electronics
- precast base
- ground
- installation method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004891 communication Methods 0.000 title claims abstract description 33
- 238000009434 installation Methods 0.000 title claims abstract description 21
- 238000000034 method Methods 0.000 title claims abstract description 15
- 239000003292 glue Substances 0.000 claims abstract description 11
- 238000004140 cleaning Methods 0.000 claims abstract description 4
- 230000001105 regulatory effect Effects 0.000 claims description 3
- 230000003749 cleanliness Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 4
- 238000009408 flooring Methods 0.000 description 3
- 238000010295 mobile communication Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K5/00—Casings, cabinets or drawers for electric apparatus
- H05K5/02—Details
- H05K5/0217—Mechanical details of casings
- H05K5/0234—Feet; Stands; Pedestals, e.g. wheels for moving casing on floor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16M—FRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
- F16M11/00—Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Mechanical Engineering (AREA)
- Foundations (AREA)
Abstract
The invention provides a method for installing electronic and communication equipment, which comprises the following steps: 1) taking the prefabricated base, and checking the flatness of the prefabricated base; 2) leveling and cleaning the ground to ensure the cleanliness of the ground; 3) fixing the prefabricated base on the ground through glue; 4) and fixing the electronic and communication equipment on the prefabricated base. The prefabricated base is directly fixed on the ground by adopting the strength glue, and the electronic and communication equipment is fixed on the prefabricated base to complete the installation of the electronic and communication equipment.
Description
[technical field]
The invention belongs to equipment installing area, particularly relate to the installation method of a kind of electronics, communication apparatus.
[background technology]
Existing electronic equipment, communication apparatus are (such as cabinet-type equipment: outdoor integrated communication machine cabinet, mobile communication base station, removable
Unload integrated cabinet, outdoor communicating cabinet, mobile communication base station, outdoor/outdoor integrated cabinet, integration beautify rack, or such as
Tower bar kind equipment: support bar, beautify tower, roof pole, roof mast, roof bracing wire mast etc.) typically all it is installed on roof, family
On outer ground or flooring, in order to ensure the stationarity that electronic equipment, communication apparatus are installed, also for avoiding equipment directly
It is fixed on ground by expansion bolt thus destroys body of wall/flooring, be usually and first pour out one with concrete on the ground
Ground or reinforce beam body, then on ground or beam body is locked by bolt, then is arranged on base by electronic equipment, communication apparatus
Go up or be directly installed on bolt fixing, but such operating process complex procedures, take a lot of work laborious, bother very much, especially
Tower bar kind equipment, if it is installed on roof/flooring, it is necessary to be to be fixedly installed in above beam body, so in a lot of situations
Under the most do not possess execution conditions.
For the problems referred to above, we have proposed a solution.
[summary of the invention]
It is an object of the invention to be to overcome the deficiencies in the prior art, it is provided that a kind of electronics, the installation method of communication apparatus, work
Sequence is simple, convenient and quick construction.
In order to solve the technical problem of above-mentioned existence, the present invention uses following technical proposals:
A kind of electronics, the installation method of communication apparatus, comprise the following steps:
1), take precast base, check the flatness of precast base;
2), smooth, cleaning ground, it is ensured that the cleannes on ground;
3), precast base is fixed on ground by glue;
4), electronics, communication apparatus are fixed on precast base.
Further in improvement project, in step 4), electronics, communication apparatus are secured by bolts on precast base, prefabricated
Base is provided with prefabricated installation bolt.
Further in improvement project, in step 4), electronics, communication apparatus are welded on precast base.
Further in improvement project, in step 4), electronics, communication apparatus are fixed on precast base by glue.
Further in improvement project, described precast base is provided with the fine setting spiral shell for regulating precast base flatness
Silk.Compared with prior art, the invention has the beneficial effects as follows: the present invention fixes by precast base directly uses intensity glue
In ground, then electronics, communication apparatus are fixed on the mode of precast base to complete the installation of electronics, communication apparatus, with tradition
The mode needing casting concrete ground in advance is compared, and the installation method operation that the present invention provides is simple, convenient and quick construction, greatly
Shorten greatly the engineering time, save manpower and materials.
The present invention is described in further detail with detailed description of the invention below in conjunction with the accompanying drawings:
[accompanying drawing explanation]
Fig. 1 is the scheme of installation of the embodiment of the present invention one;
Fig. 2 is the scheme of installation of the embodiment of the present invention two.
[detailed description of the invention]
A kind of electronics, the installation method of communication apparatus, comprise the following steps:
1), take precast base 10, check the flatness of precast base 10;
2), smooth, cleaning ground 20, it is ensured that the cleannes on ground 20;
3), precast base 10 is fixed on ground 20 by glue;
4), electronics, communication apparatus 30 are fixed on precast base 10.
In scheme of installation as shown in Figure 1 and Figure 2, it is glue layer 40 between precast base and ground, depending on precast base 10
Depending on the size of equipment to be installed, the viscosity of glue has to comply with standard and the requirement of construction.And, such as embodiment two institute
In the installation of the tower bar kind equipment shown, the specification of precast base 10 needs the high computational according to equipment to determine.
In Specific construction operates, in step 4), electronics, the mounting means of communication apparatus 30 are determined on a case-by-case basis, typically
Be according to electronics, communication apparatus 30 volume and weight size depending on, can be secured by bolts on precast base 10, the most pre-
Prefabricated installation bolt is needed, naturally it is also possible to be fixed on precast base 10 by the way of welding on base 10 processed, or directly
Connect employing glue to fix on precast base 10.It addition, be provided with for regulating precast base on described precast base 10
The fine adjustment screw of 10 flatness, thus can regulate levelness and the flatness of precast base 10 by fine adjustment screw, protects
Card electronics, communication apparatus 30 after mounting smooth.
Although the present invention being described in detail with reference to above example, but by the disclosure, those skilled in the art are shown
And be clear to, and in the case of the principle and scope of the present invention limited without departing from described claim, can be right
The present invention makes a variety of changes or revises.Therefore, the detailed description of disclosure embodiment is only used for explaining rather than for limiting
The present invention, but it is defined by the subject-matter of the claims the scope of protection.
Claims (5)
1. an electronics, the installation method of communication apparatus, it is characterised in that comprise the following steps:
1), take precast base, check the flatness of precast base;
2), smooth, cleaning ground, it is ensured that the cleannes on ground;
3), precast base is fixed on ground by glue;
4), electronics, communication apparatus are fixed on precast base.
A kind of electronics the most according to claim 1, the installation method of communication apparatus, it is characterised in that electronics in step 4),
Communication apparatus is secured by bolts on precast base, and precast base is provided with prefabricated installation bolt.
A kind of electronics the most according to claim 1, the installation method of communication apparatus, it is characterised in that electronics in step 4),
Communication apparatus is welded on precast base.
A kind of electronics the most according to claim 1, the installation method of communication apparatus, it is characterised in that electronics in step 4),
Communication apparatus is fixed on precast base by glue.
A kind of electronics the most according to claim 1, the installation method of communication apparatus, it is characterised in that the described prefabricated end
Seat is provided with the fine adjustment screw for regulating precast base flatness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610638820.2A CN106231837A (en) | 2016-08-05 | 2016-08-05 | Installation method of electronic and communication equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610638820.2A CN106231837A (en) | 2016-08-05 | 2016-08-05 | Installation method of electronic and communication equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106231837A true CN106231837A (en) | 2016-12-14 |
Family
ID=57547930
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610638820.2A Pending CN106231837A (en) | 2016-08-05 | 2016-08-05 | Installation method of electronic and communication equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106231837A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114583586A (en) * | 2022-04-28 | 2022-06-03 | 四川聚诚达环保科技有限公司 | Multidimensional-installed municipal power distribution box and installation method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203866857U (en) * | 2014-05-23 | 2014-10-08 | 张伟博 | Universal base for mounting MINI equipment cabinet |
CN205046620U (en) * | 2015-07-20 | 2016-02-24 | 四川明珠泵业有限公司 | Prefabricated pump station of irrigating by lifting water to a higher level with a water pump, etc |
-
2016
- 2016-08-05 CN CN201610638820.2A patent/CN106231837A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203866857U (en) * | 2014-05-23 | 2014-10-08 | 张伟博 | Universal base for mounting MINI equipment cabinet |
CN205046620U (en) * | 2015-07-20 | 2016-02-24 | 四川明珠泵业有限公司 | Prefabricated pump station of irrigating by lifting water to a higher level with a water pump, etc |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114583586A (en) * | 2022-04-28 | 2022-06-03 | 四川聚诚达环保科技有限公司 | Multidimensional-installed municipal power distribution box and installation method |
CN114583586B (en) * | 2022-04-28 | 2022-08-19 | 四川聚诚达环保科技有限公司 | Multidimensional-installed municipal power distribution box and installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104563528B (en) | The quick positioning apparatus of prefabrication prefabricated panel and method | |
CN101525945B (en) | Installation and positioning method for steel casting spatial position | |
KR101826011B1 (en) | Pipe module and construction method thereof | |
CN104227297B (en) | A kind of gas tank weldering is front to installation | |
CN204785424U (en) | Electric power angle steel tower equipment box mounting base | |
CN103061524B (en) | Movable copying positioning frame of steel structure complex joint | |
CN103737235B (en) | Case beam dividing plate positioning tool and localization method | |
CN105133754A (en) | Prefabricated concrete shear wallboard counterbore guide type mounting device and method | |
CN104675179B (en) | Jack up head tower installation hanger device and head tower construction method | |
CN106231837A (en) | Installation method of electronic and communication equipment | |
CN103956865B (en) | Closed assembly yoke process in hydrogenerator stator same machine hole | |
CN206530078U (en) | A kind of support meanss | |
CN202081669U (en) | Integrated flange coupling three-pipe tower communication base station | |
CN106320186B (en) | A kind of skewback embedded anchor bar positioning system and construction method | |
CN104480976B (en) | A kind of visual dead load test on pile foundation remote wireless monitoring system | |
CN110130653A (en) | A kind of restricted area inner frame girder steel utilizes the construction method of elevator lifting | |
CN105239804A (en) | Assembly and lift-erecting method of indirect air-cooling system stretching platforms | |
CN205707151U (en) | A kind of hull flat segmentation bracing frame | |
CN104340820A (en) | Car frame without lower beam | |
CN104328981B (en) | A kind of door and window auxiliary frame locating mounting method | |
CN110397878A (en) | A kind of street lamp being readily transported | |
CN205739905U (en) | A kind of guide rail bracket of elevator | |
CN205476444U (en) | Light -duty support post based on low level jacking die carrier system | |
CN104889776A (en) | Sintering machine air box machining tool | |
CN201799846U (en) | Tooling device for shaft alignment of equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161214 |