CN106225483A - A kind of Flash Smelting Furnace open hearth top hot excavation filling mend method - Google Patents

A kind of Flash Smelting Furnace open hearth top hot excavation filling mend method Download PDF

Info

Publication number
CN106225483A
CN106225483A CN201610577709.7A CN201610577709A CN106225483A CN 106225483 A CN106225483 A CN 106225483A CN 201610577709 A CN201610577709 A CN 201610577709A CN 106225483 A CN106225483 A CN 106225483A
Authority
CN
China
Prior art keywords
brick
box
smelting furnace
flash smelting
brick box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610577709.7A
Other languages
Chinese (zh)
Other versions
CN106225483B (en
Inventor
李晓波
李龙平
来有寿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Jinchuan Non Ferrous Metals Co ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN201610577709.7A priority Critical patent/CN106225483B/en
Publication of CN106225483A publication Critical patent/CN106225483A/en
Application granted granted Critical
Publication of CN106225483B publication Critical patent/CN106225483B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D1/00Casings; Linings; Walls; Roofs
    • F27D1/16Making or repairing linings increasing the durability of linings or breaking away linings
    • F27D1/1621Making linings by using shaped elements, e.g. bricks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D1/00Casings; Linings; Walls; Roofs
    • F27D1/16Making or repairing linings increasing the durability of linings or breaking away linings
    • F27D2001/1605Repairing linings
    • F27D2001/161Hot repair

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The present invention proposes a kind of Flash Smelting Furnace open hearth top hot excavation filling mend method, by the method using preprepared hanger brick box to repair flash furnace roof replace traditional use formwork after carry out pouring into a mould or lay bricks by the way of reparation again.The process time is foreshortened to 6 8h by 40h, service life after reparation can extend to more than 12 months, the use cycle than 15 30 days of original castable refractory at least extends more than 10 times, simultaneously, the construction method of mending by replacing a damaged part using the present invention repairs Flash Smelting Furnace open hearth top, can complete, it is not necessary to lower the temperature burner hearth under hot, time is short, reproduces process simple.Additionally, the making of brick box and building by laying bricks or stones of refractory brick are all previously-completed in the place away from high temperature, save the engineering time, the safest.

Description

A kind of Flash Smelting Furnace open hearth top hot excavation filling mend method
Technical field
The invention belongs to smelting field of nonferrous metal, relate to a kind of Flash Smelting Furnace open hearth top hot excavation filling mend method.
Background technology
Flash Smelting Furnace is to make full use of the active surface that fine grinding material is huge, the smelting process of strengthening smelting course of reaction.Will Metal sulfide concentrate fine powder and flux drying spray in red-hot flash burner hearth together with air, formed good heat transfer, Mass transfer condition, makes chemical reaction carry out with high speed.May be used for the matte smelting of the sulphide ore such as copper, nickel and make copper and blow Refining.The structure of flash furnace reaction tower and sedimentation tank open hearth top commonly used hanging magnesium chromium refractory brick, owing to this structure is the most sudden and the most violent Dew in high temperature environments, directly withstands up to the washing away of sulfur dioxide flue gas of more than 1350 DEG C, corrodes.Therefore Flash Smelting Furnace is being given birth to During product, top hanging brick is the most thinning to come off, and causes furnace roof to alter fire, produces and interrupt.
Flash Smelting Furnace furnace roof traditional treatment method has two kinds at present, and one is furnace roof to be altered fire position processed by brickwork joint neat, edge Original hanger brick lower height position is welded template, builds new hanger brick by laying bricks or stones, then hanger brick rustless steel is hung brick in template Hook block hangs over furnace roof and hangs on brick frame.Two is to be welded template along original hanger brick lower height position, uses unsetting in template Refractory material casting is repaired.Both approaches is required for being welded template, during negative pressure in stove and temperature must be down to The lowest, process the time long, work under bad environment, Flash Smelting Furnace is produced and makes a big impact.
Summary of the invention
In order to solve above-mentioned deficiency of the prior art, it is an object of the invention to hot the mending by replacing a damaged part in a kind of Flash Smelting Furnace open hearth top and repair Compound recipe method.
For achieving the above object, the technical solution adopted in the present invention is: the hot excavation filling mend in a kind of Flash Smelting Furnace open hearth top Method, comprises the following steps:
A () measures the furnace roof area needing to repair;
B area that () repairs as required, makes brick box, brick box open topped, the end and sidewall and closes, and side wall upper part reserves brick box Hanging hole, the brick box degree of depth is not less than the height of furnace roof refractory brick, and the exterior surface area of brick box cross section is relative to face to be repaired Amass and reduce so that what sidewall was corresponding with this sidewall does not damages the assemblage gap of reserved at least 5mm between furnace roof refractory brick;
C () is laid bricks, build refractory brick, and require to place PVC expansion oplate according to laying fireproof bricks in brick box;
(d) blowing out be below-50pa by hearth vacuum control;
E the damage hanger brick that need to repair position is removed by (), the brick stubble after damaged hanger brick removing of making uniform;
F the brick box puzzling refractory brick is hung in furnace roof by () need to repair position, adjusts position, makes the height of brick in brick box and original stove Top hanger brick is concordant, and is fixed on pylon by brick box by hanging hole and brick box hanging hook;
G hanger brick in brick box is fixed on pylon by () with brick body hanging hook, brick body suspender member;
H gap asbestos cord between original to brick box and periphery hanger brick is tamped by () after, fill real with magnesium mud;
(i) heat up and resume production.
Described brick box hanging hook processes crotch in the cold state.
Magnesium mud used by described step (h) carries out mix and blend, mixing time five to six points with saturated salt before recording Clock.
Described brick box hanging hole sets one at each sidewall.
Described brick box is made up of the steel plate of thick 8mm.
The invention has the beneficial effects as follows: replaced by the method using preprepared hanger brick box to repair flash furnace roof Carrying out, after traditional employing formwork, the mode repaired of pouring into a mould or lay bricks again, the process time is foreshortened to 6-8h by 40h, after reparation Service life can extend to more than 12 months, and the use cycle than 15-30 days of original castable refractory at least extends 10 More than Bei, meanwhile, use the construction method of mending by replacing a damaged part of the present invention to repair Flash Smelting Furnace open hearth top, can complete under hot, it is not necessary to Lowering the temperature burner hearth, the time is short, reproduces process simple.Additionally, the building by laying bricks or stones all on the ground away from high temperature of the making of brick box and refractory brick Side is previously-completed, and saves the engineering time, the safest.
Accompanying drawing explanation
Fig. 1 is the structural representation on the Flash Smelting Furnace open hearth top that the present invention relates to;
Fig. 2 is the top construction schematic diagram that after prior art uses molding, unshape refractory cast repairing method is formed;
Fig. 3 is to build and hang, after prior art uses molding, the top construction schematic diagram that refractory brick repairing method is formed by laying bricks or stones;
When Fig. 4 is to use the method for the present invention to repair furnace roof, the repairing space formed after removing damaged hanger brick, brick stubble of making uniform shows It is intended to;
When Fig. 5 is to use the method for the present invention to repair furnace roof, makes and complete the brick box generalized section after hanger brick is built by laying bricks or stones;
Fig. 6 be use the present invention method repair furnace roof time, brick box position and hang on brick frame after schematic diagram;
When Fig. 7 is to use the method for the present invention to repair furnace roof, complete the schematic diagram after the hanging of hanging in brick box;
Wherein: 1-hanger brick, 2-pylon, 3-brick body hanging hook, 4-brick body suspender member, the unsetting castable of 5-, 6-are unsetting Refractory material casting template suspender member, 7-breakage hanger brick remove after brick stubble, 8-lay bricks template suspender member, 9-lay bricks template, 10-brick box hanging hook, 11-brick box, 12-brick box hang hole, 13-steel plate, 14-unshape refractory cast template, 15-anchoring Grab.
Detailed description of the invention
Below by embodiment, and combine accompanying drawing technical scheme is further elaborated with.
As shown in Figures 4 to 7, a kind of work progress that the present invention provides is simple, uses time length for Flash Smelting Furnace open hearth The construction restorative procedure that top hanger brick is mended by replacing a damaged part.Described construction method comprises the following steps:
(1) measure the furnace roof area needing to repair, on length and width direction, reduce 5mm according to the size measured, as reserved Assemblage gap, the brick box 11 opened wide with bottom steel plate 13 processing and fabricating and side-closed top, and open four on brick box sidewall Brick box hanging hole 12;
(2) in brick box 11, build hanger brick 1 by laying bricks or stones, and place PVC expansion oplate according to brick body expansion requirements;
(3) blowing out be below-50pa by hearth vacuum control;
(4) the damage hanger brick that need to repair position is removed, the brick stubble 7 after damaged hanger brick removing of making uniform;
(5) brick box 11 jack puzzling brick is hung in furnace roof and need to repair position, adjust position, make in brick box the height of brick with former There is top hanging brick concordant, and by four brick box hanging holes 12 and brick box hanging hook 10, brick box 11 is fixed on pylon 2;
(6) with brick body hanging hook 3, hanger brick in brick box 11 is fixed on pylon 2;
(7), after being tamped by the gap asbestos cord between original to brick box 11 and periphery hanger brick 1, fill real with magnesium mud;
(8) intensification is resumed production.
In above-mentioned embodiment, for ensureing that the intensity hanging brick hook is not damaged, make during its crotch red the most curved without baking, And crotch should be processed in the cold state.
In order to ensure that magnesium mud can have enough intensity after Fast Sintering and sintering, it is desirable to saturated halogen before recording Water is stirred mixing, mixing time five to six minutes to magnesium mud.
Brick box hangs in furnace roof and needs repairing area, positions and hang after being fixed on pylon, must be used by hanger brick in brick box Hanging hook is fixed on furnace roof and hangs on brick frame, and after preventing brick cassette bottom portion steel plate scaling loss, in brick box, hanger brick comes off.

Claims (5)

1. the hot excavation filling mend in a Flash Smelting Furnace open hearth top method, comprises the following steps:
A () measures the furnace roof area needing to repair;
B area that () repairs as required, makes brick box (11), brick box (11) open topped, the end and sidewall and closes, side wall upper part Reserved brick box hanging hole (12), brick box (11) degree of depth is not less than the height of furnace roof refractory brick, the outer surface of brick box (11) cross section Area reduces relative to area to be repaired so that what sidewall was corresponding with this sidewall do not damage between furnace roof refractory brick reserved at least The assemblage gap of 5mm;
C () is laid bricks, build refractory brick, and require to place PVC expansion oplate according to laying fireproof bricks in brick box (11);
(d) blowing out be below-50pa by hearth vacuum control;
E the damage hanger brick that need to repair position is removed by (), the brick stubble (7) after damaged hanger brick removing of making uniform;
F the brick box (11) puzzling refractory brick is hung in furnace roof by () need to repair position, adjusts position, makes in brick box the height of brick with former There is top hanging brick concordant, and by hanging hole and brick box hanging hook (10), brick box (11) is fixed on pylon (2);
G hanger brick in brick box (11) is fixed on pylon (2) by () with brick body hanging hook (3), brick body suspender member (4);
H gap asbestos cord between brick box (11) and the original hanger brick of periphery is tamped by () after, fill real with magnesium mud;
(i) heat up and resume production.
Flash Smelting Furnace open hearth top the most according to claim 1 hot excavation filling mend method, is characterized in that: described brick box hanging hook (10) crotch is processed in the cold state.
Flash Smelting Furnace open hearth top the most according to claim 1 hot excavation filling mend method, is characterized in that: magnesium used by step (h) Mud carries out mix and blend, mixing time five to six minutes with saturated salt before recording.
Flash Smelting Furnace open hearth top the most according to claim 1 hot excavation filling mend method, is characterized in that: described brick box hanging hole (12) one is set at each sidewall.
Flash Smelting Furnace open hearth top the most according to claim 1 hot excavation filling mend method, is characterized in that: described brick box (11) by The steel plate of thick 8mm is made.
CN201610577709.7A 2016-07-21 2016-07-21 A kind of hot excavation filling mend method in Flash Smelting Furnace open hearth top Active CN106225483B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610577709.7A CN106225483B (en) 2016-07-21 2016-07-21 A kind of hot excavation filling mend method in Flash Smelting Furnace open hearth top

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610577709.7A CN106225483B (en) 2016-07-21 2016-07-21 A kind of hot excavation filling mend method in Flash Smelting Furnace open hearth top

Publications (2)

Publication Number Publication Date
CN106225483A true CN106225483A (en) 2016-12-14
CN106225483B CN106225483B (en) 2018-08-10

Family

ID=57532010

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610577709.7A Active CN106225483B (en) 2016-07-21 2016-07-21 A kind of hot excavation filling mend method in Flash Smelting Furnace open hearth top

Country Status (1)

Country Link
CN (1) CN106225483B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110345772A (en) * 2019-06-06 2019-10-18 国家电投集团黄河上游水电开发有限责任公司 A kind of high-temperature flue is quickly met an urgent need method for repairing and mending
CN110779335A (en) * 2019-10-26 2020-02-11 上海二十冶建设有限公司 Integrated mounting method for prefabricated furnace top of rotary hearth furnace
CN110806106A (en) * 2019-10-29 2020-02-18 首钢京唐钢铁联合有限责任公司 Method and structure for repairing collapse of refractory material at top of heating furnace
CN112010652A (en) * 2020-08-26 2020-12-01 山东中阳碳素股份有限公司 Maintenance method for stopping furnace of petroleum coke calcining furnace fire path
CN112066735A (en) * 2020-07-30 2020-12-11 白银有色集团股份有限公司 Method for digging and repairing furnace arch of silver molten pool smelting furnace

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005132908A (en) * 2003-10-29 2005-05-26 Mitsubishi Chemicals Corp Heat insulation unit for hot repair of coke oven
WO2006092867A1 (en) * 2005-02-28 2006-09-08 The Kansai Coke And Chemicals Co., Ltd. Repair apparatus for coke oven
CN101957139A (en) * 2010-10-18 2011-01-26 哈尔滨东安汽车动力股份有限公司 Furnace lining repairing technology
JP4659777B2 (en) * 2007-03-13 2011-03-30 新日鉄エンジニアリング株式会社 Construction method using fireproof insulation brick for hearth
CN102564135A (en) * 2012-02-13 2012-07-11 中国十九冶集团有限公司 Construction method for patching of refractory materials of furnace top of heating furnace

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005132908A (en) * 2003-10-29 2005-05-26 Mitsubishi Chemicals Corp Heat insulation unit for hot repair of coke oven
WO2006092867A1 (en) * 2005-02-28 2006-09-08 The Kansai Coke And Chemicals Co., Ltd. Repair apparatus for coke oven
JP4659777B2 (en) * 2007-03-13 2011-03-30 新日鉄エンジニアリング株式会社 Construction method using fireproof insulation brick for hearth
CN101957139A (en) * 2010-10-18 2011-01-26 哈尔滨东安汽车动力股份有限公司 Furnace lining repairing technology
CN102564135A (en) * 2012-02-13 2012-07-11 中国十九冶集团有限公司 Construction method for patching of refractory materials of furnace top of heating furnace

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110345772A (en) * 2019-06-06 2019-10-18 国家电投集团黄河上游水电开发有限责任公司 A kind of high-temperature flue is quickly met an urgent need method for repairing and mending
CN110779335A (en) * 2019-10-26 2020-02-11 上海二十冶建设有限公司 Integrated mounting method for prefabricated furnace top of rotary hearth furnace
CN110806106A (en) * 2019-10-29 2020-02-18 首钢京唐钢铁联合有限责任公司 Method and structure for repairing collapse of refractory material at top of heating furnace
CN112066735A (en) * 2020-07-30 2020-12-11 白银有色集团股份有限公司 Method for digging and repairing furnace arch of silver molten pool smelting furnace
CN112010652A (en) * 2020-08-26 2020-12-01 山东中阳碳素股份有限公司 Maintenance method for stopping furnace of petroleum coke calcining furnace fire path

Also Published As

Publication number Publication date
CN106225483B (en) 2018-08-10

Similar Documents

Publication Publication Date Title
CN106225483A (en) A kind of Flash Smelting Furnace open hearth top hot excavation filling mend method
CN205501341U (en) Converter work lining structure
CN110317921B (en) Quick changing method for converter steel tapping hole
CN104006658B (en) The method for repairing and mending of metallurgical furnace exhaust fume collecting hood top interior wall
CN204718409U (en) A kind of can the anode furnace of hot replacing redox mouth brick
CN105605924B (en) The method for repairing and mending of fixed anode copper metallurgical furnace bottom brick
CN208883959U (en) A kind of gland-type smelting furnace
CN204381354U (en) A kind of external refining ladle
CN207585329U (en) A kind of secondary metal smelting furnace
CN207407693U (en) A kind of bath smelting furnace top furnace wall structure
CN109628704B (en) RH vacuum refining furnace and building method thereof
CN106636538A (en) Masonry method of converter hearth and molten pool part
CN207231201U (en) A kind of closed smelting furnace
CN207600178U (en) A kind of smelting furnace
CN207850037U (en) Smoke deflector in a kind of New Roller Kiln
JP2013129863A (en) Tuyere structure in refining furnace and method for cooling tuyere brick in copper refining furnace
CN207987313U (en) A kind of refining converter wind eye brick of copper smelting
CN207247906U (en) A kind of Metal Melting system
CN114659370B (en) Hot furnace hole-cutting maintenance technology for industrial silicon ore smelting furnace
CN104964564B (en) The method of the hot replacing of anode furnace oxidoreduction mouth brick
CN103512361B (en) Furnace brick patching method of oxygen enrichment top-blown copper metallurgical furnace
CN110132015A (en) A kind of shower furnace combustion chamber masonry construction and its technique
CN215328307U (en) Partition wall channel of silver furnace
CN218270240U (en) Kiln heat sink
CN214612592U (en) Main iron runner repairing mold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191028

Address after: 538002 Qisha Industrial Zone, Qisha Town, Gangkou District, Fangchenggang City, Guangxi Zhuang Autonomous Region (Jinchuan Industrial Park)

Patentee after: GUANGXI JINCHUAN NON-FERROUS METALS CO.,LTD.

Address before: 737103 No. 98, Jinchuan Road, Jinchang, Gansu

Patentee before: JINCHUAN GROUP Co.,Ltd.

TR01 Transfer of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A Hot State Repair Method for Open hearth Top of Flash Furnace

Effective date of registration: 20221121

Granted publication date: 20180810

Pledgee: China Construction Bank Corporation Fangchenggang branch

Pledgor: GUANGXI JINCHUAN NON-FERROUS METALS CO.,LTD.

Registration number: Y2022450000202

PE01 Entry into force of the registration of the contract for pledge of patent right