CN106225272A - Geothermal energy resources wellhead assembly - Google Patents

Geothermal energy resources wellhead assembly Download PDF

Info

Publication number
CN106225272A
CN106225272A CN201610776357.8A CN201610776357A CN106225272A CN 106225272 A CN106225272 A CN 106225272A CN 201610776357 A CN201610776357 A CN 201610776357A CN 106225272 A CN106225272 A CN 106225272A
Authority
CN
China
Prior art keywords
cooling water
hot water
valve
delivery pipe
reflux line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610776357.8A
Other languages
Chinese (zh)
Inventor
陈银海
陈弘诠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yancheng City Hengtong Petroleum Machinery Manufacturing Co Ltd
Original Assignee
Yancheng City Hengtong Petroleum Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yancheng City Hengtong Petroleum Machinery Manufacturing Co Ltd filed Critical Yancheng City Hengtong Petroleum Machinery Manufacturing Co Ltd
Priority to CN201610776357.8A priority Critical patent/CN106225272A/en
Publication of CN106225272A publication Critical patent/CN106225272A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K27/00Construction of housing; Use of materials therefor
    • F16K27/02Construction of housing; Use of materials therefor of lift valves
    • F16K27/0209Check valves or pivoted valves
    • F16K27/0218Butterfly valves
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/02Valve arrangements for boreholes or wells in well heads
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16KVALVES; TAPS; COCKS; ACTUATING-FLOATS; DEVICES FOR VENTING OR AERATING
    • F16K37/00Special means in or on valves or other cut-off apparatus for indicating or recording operation thereof, or for enabling an alarm to be given
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Check Valves (AREA)

Abstract

Geothermal energy resources wellhead assembly, including sleeve pipe, hot water delivery pipe road and cooling water reflux line, threaded with the well head of geothermal well in one end of described sleeve pipe, the other end is simultaneously connected with hot water delivery pipe road and cooling water reflux line, described sleeve pipe is provided with effusion meter with the junction in hot water delivery pipe road and cooling water reflux line, described sleeve pipe is provided with flange type sluice valve, described hot water delivery pipe road and cooling water reflux line and is provided with ultrasonic calorimeter, Pressure gauge and several valves.Heat, warm water in geothermal well can be transported in industry application by the present invention, and the underground heat well water that the most also can cool down after using is back in geothermal well, and hot water delivery pipe road and cooling water reflux line all can realize double shield sealing.

Description

Geothermal energy resources wellhead assembly
Technical field
The present invention relates to geothermal energy resources wellhead assembly, belong to geothermal well technical field.
Background technology
Geothermal well, refers to what the geothermal energy of well depth about 3500 meters or the water temperature thermal water more than 30 DEG C carried out generating electricity Method and apparatus, underground heat divides high temperature, middle gentle low temperature three class.High 150 DEG C, exist in vapour form, belong to high-temperature geothermal;90℃ ~150 DEG C, exist with forms such as the mixture of water and steam, belong to middle temperature underground heat;Higher than 25 DEG C, less than 90 DEG C, with warm water, temperature The form such as hot water, hot water exists, and belongs to low temperature underground heat.
High-temperature geothermal is suitable for generating, and middle temperature underground heat can generate electricity it can also be used to housing heating, and low temperature underground heat then can be used for washing Bath, medical treatment, it is also possible to for heating and chamber planting, aquaculture etc..
The water temperature of the geographical position normally hot well of China's East China one band, less than 90 degrees Celsius, is generally used for industrial On the way.And collection, conveying technology for geothermal well is the most immature, particularly with the wellhead assembly of geothermal well, also the most completely Ripe device.
Summary of the invention
In order to solve the problem of above-mentioned existence, the invention discloses a kind of geothermal energy resources wellhead assembly, its concrete technical scheme is such as Under:
Geothermal energy resources wellhead assembly, this wellhead assembly is installed on the well head of geothermal well, for being aspirated by the hot water in geothermal well Coming, the cooling water that the heat energy of this hot water is formed after being utilized is transported in geothermal well by this wellhead assembly, this wellhead assembly bag Including sleeve pipe, hot water delivery pipe road and cooling water reflux line, threadeds with the well head of geothermal well in one end of described sleeve pipe, another End is simultaneously connected with hot water delivery pipe road and cooling water reflux line, described sleeve pipe and hot water delivery pipe road and cooling water reflux line Junction be provided with effusion meter, described sleeve pipe is provided with flange type sluice valve, described hot water delivery pipe road and cooling water return duct Road is provided with ultrasonic calorimeter, Pressure gauge and several valves.
Ultrasonic flowmeter selected by described effusion meter, and described ultrasonic calorimeter selects Double-sound-track ultrasonic heat meter.
Valve on several described hot water delivery pipe roads includes flange form butterfly valve, swing check valve and flange form ball The erection sequence of valve, described Pressure gauge and several described valves is: from the connection end of hot water delivery pipe road and effusion meter to heat The water side in water delivery pipe road is flange form butterfly valve, Pressure gauge, swing check valve and flange type ball valve successively, and described hot water is defeated Going out the ultrasonic calorimeter on pipeline between Pressure gauge and swing check valve, this Pressure gauge passes through a threeway plug valve Door is installed with hot water delivery pipe road.
Valve on several described cooling water reflux lines includes flange form butterfly valve and flange type ball valve, described Pressure gauge With the erection sequence of valve several described it is: from the water inlet end of cooling water reflux line to cooling water reflux line and effusion meter Connection end be flange type ball valve, Pressure gauge and flange form butterfly valve successively, the ultrasound wave heat on described cooling water reflux line Epi-position is between Pressure gauge and flange form butterfly valve, and this Pressure gauge is pacified with cooling water reflux line by a three-way cock valve Dress.
Described cooling water reflux line extends transversely through inflow-rate of water turbine meter, extends through the cooling water reflux line of the effusion meter other end End be provided with flange form butterfly valve.
Being provided with the perforation of several cables and several suspension ring on described effusion meter, described cable punch inside diameter is φ 25mm, described cable perforation inner peripheral surface is provided with screw thread, and equipped with Gask-O-Seal and blind plugging.
Described sleeve pipe and flange type sluice valve and effusion meter, flange form butterfly valve, swing check valve and flange type ball valve are with right The hot water delivery pipe road answered or the junction of cooling water reflux line all use Flange joint, described flange connections all to use SW with outside ring seals.
Described flange form butterfly valve uses hard sealing, and flow resistance coefficient is not more than 0.2, can bidirectional bearing, and be provided with display its The indicator of butterfly plate position, the surfaces externally and internally of described flange form butterfly valve, all through blasting treatment, all scribbles two-layer epoxy resin enamelled coating, The gross thickness of two-layer epoxy resin enamelled coating is more than 0.3mm.
The operation principle of the present invention is:
The present invention, heat, warm water in geothermal well are pumped into well head, the entrance of heat, warm water by the immersible pump being arranged in geothermal well In sleeve pipe, open the flange type sluice valve on sleeve pipe, flange form butterfly valve, swing check valve and the flange on hot water delivery pipe road Formula ball valve, closes the flange form butterfly valve on cooling water reflux line and flange type ball valve, and heat, warm water enter hot water delivery pipe road, And then it is transported at commercial Application, effusion meter to be opened and the ultrasound wave heat being arranged on hot water delivery pipe road before conveying Table, it is simple to heat, the flow of warm water in monitoring pipeline at any time, to the heat in commercial Application and suction geothermal well, the flow of warm water Reference is provided.Piezometer on hot water delivery pipe road provides hydraulic parameters in pipeline.
After in heat, warm water, heat energy is utilized, heat, warm water become cooling water, close and are positioned at the immersible pump within geothermal well, close Close flange form butterfly valve, swing check valve and the flange type ball valve on hot water delivery pipe road, open on cooling water reflux line Flange form butterfly valve and flange type ball valve, be input to cooling water in sleeve pipe, and then is transmitted back in geothermal well.
The perforation of several cables and several suspension ring on effusion meter are deep into the diving within geothermal well for fixing The cable of pump and connecting line, and the cable of the monitoring device within geothermal well and connecting line.
The invention has the beneficial effects as follows:
1. the present invention, sleeve pipe threadeds with geothermal well import, beneficially the maintenance of later stage geothermal well and pacifying on sleeve pipe Dress measure;
2. the present invention, selects ultrasonic flowmeter, it is possible to the discharge in detection sleeve pipe in time, and is capable of allowing hot water export Pipeline and cooling water reflux line are simultaneously connected with the water side at effusion meter, when using different pipeline, it is possible to switch voluntarily;
3. being provided with ultrasonic calorimeter on the present invention, hot water delivery pipe road and cooling water reflux line, it is right to measure in time Answer the discharge in pipeline, provide reference data to commercial Application;
4. it is provided with Pressure gauge on the present invention, hot water delivery pipe road and cooling water reflux line, and Pressure gauge is with corresponding It is provided with three-way cock valve between pipeline, it is simple to manometric installation, also allows for from hot water delivery pipe road and cooling water backflow Pipeline takes out water sample, the various performance parameters of water in the corresponding pipeline of test;
5. the present invention, all of flange connections all uses SW with outside ring to seal, it is achieved fully seals, and can remedy in time Seal, it is simple to maintenance, reduce cost, reduce the trouble of dismounting;
6. the present invention, hot water delivery pipe road and cooling water reflux line are all at least provided with twice valve, it is achieved double shield is only Water, when maintenance or use, more secure;
7. the present invention, flange form butterfly valve has the advantages such as anticorrosion, environmental protection, flow resistance coefficient be little.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention,
Reference numerals list: 1 sleeve pipe, 2 flange type sluice valve, 3 cooling water reflux lines, 4 ultrasonic calorimeters, 5 Flange type ball valve, 6 swing check valves, 7 three-way cock valves, 8 Pressure gauges, 9 flange form butterfly valves, 10 hot water are defeated Go out pipeline, 11 suspension ring, 12 cable perforation.
Detailed description of the invention
Below in conjunction with the accompanying drawings and detailed description of the invention, it is further elucidated with the present invention.It should be understood that following detailed description of the invention is only For the present invention being described rather than limiting the scope of the present invention.
Fig. 1 is the structural representation of the present invention, visible in conjunction with accompanying drawing, these geothermal energy resources wellhead assembly, and this wellhead assembly is pacified It is loaded on the well head of geothermal well, for aspirating by the hot water in geothermal well, the cooling that the heat energy of this hot water is formed after being utilized Water is transported in geothermal well by this wellhead assembly, and this wellhead assembly includes sleeve pipe 1, hot water delivery pipe road 10 and cooling water backflow Pipeline 3, described one end of sleeve pipe 1 threadeds with the well head of geothermal well, and the other end is simultaneously connected with hot water delivery pipe road 10 and cold But water reflux line 3, described sleeve pipe 1 is provided with effusion meter with the junction in hot water delivery pipe road 10 and cooling water reflux line 3, Described sleeve pipe 1 is provided with flange type sluice valve 2, described hot water delivery pipe road 10 and cooling water reflux line 3 and is provided with ultrasound wave Calorimeter 4, Pressure gauge 8 and several valves.The present invention, when outwards pumping heat, warm water from geothermal well, closes cooling water Valve on reflux line 3, opens the valve on hot water delivery pipe road 10, and heat in geothermal well, that warm water is transported to hot water is defeated Go out pipeline 10, and then be transported to industrial use, after the heat pumped in geothermal well, warm water are used cooling, need backflow Time in geothermal well, close the valve on hot water delivery pipe road 10, open the valve on cooling water reflux line 3, cooling water from Cooling water reflux line 3 flows in sleeve pipe 1, and then is sent in geothermal well.
Ultrasonic flowmeter selected by described effusion meter, and described ultrasonic calorimeter 4 selects Double-sound-track ultrasonic heat meter 4. Ultrasonic flowmeter metering is more convenient, economical, accurate.
Valve on several described hot water delivery pipe roads 10 includes flange form butterfly valve 9, swing check valve 6 and flange form Ball valve 5, the erection sequence of described Pressure gauge 8 and several described valves is: from the connection in hot water delivery pipe road 10 with effusion meter The water side holding hot water delivery pipe road 10 is flange form butterfly valve 9, Pressure gauge 8, swing check valve 6 and flange type ball valve successively 5, the ultrasonic calorimeter 4 on described hot water delivery pipe road 10 between Pressure gauge 8 and swing check valve 6, this Pressure gauge 8 Installed with hot water delivery pipe road 10 by a three-way cock valve 7.Valve on hot water delivery pipe road 10 can accomplish sealing Time complete sealing, three-way cock valve 7 is easy to water sampling from hot water delivery pipe road 10.
Valve on several described cooling water reflux lines 3 includes flange form butterfly valve 9 and flange type ball valve 5, described pressure The erection sequence of power table 8 and several described valves is: from the water inlet end of cooling water reflux line 3 to cooling water reflux line 3 It is flange type ball valve 5, Pressure gauge 8 and flange form butterfly valve 9 successively with the connection end of effusion meter, on described cooling water reflux line 3 Ultrasonic calorimeter 4 between Pressure gauge 8 and flange form butterfly valve 9, this Pressure gauge 8 by a three-way cock valve 7 with Cooling water reflux line 3 is installed.Cooling water reflux line 3 arranges multiple valve, when re-using hot water delivery pipe road 10, it is achieved complete Full sealing cools down water reflux line 3 with sealing up, it is ensured that heat, the whole of warm water are carried by delivery pipeline, it is to avoid heat energy wave Taking, Pressure gauge 8 can monitor the water pressure in cooling water reflux line 3.
Described cooling water reflux line 3 extends transversely through inflow-rate of water turbine meter, extends through the cooling water return duct of the effusion meter other end The end in road 3 is provided with flange form butterfly valve 9.Elbow is not had, when cooling water return duct between cooling water reflux line 3 and effusion meter When starting reflux cooling water in road 3, being difficult to turn in effusion meter in time, cooling water is flushed to extend through stream under inertia force effect In the cooling water reflux line 3 of the gauge other end, then break-in under the turbulence and barrier effect of cooling water, flows in sleeve pipe 1, The cooling water reflux line 3 extending through the effusion meter other end has the effect of buffering change cooling current direction, it is to avoid cooling water punching Hit damage effusion meter or sleeve pipe 1, when also alleviating cooling water backflow, cooling water reflux line 3 and the vibration of sleeve pipe 1.
Several cables perforation 12 and several suspension ring 11 it are provided with, in described cable perforation 12 on described effusion meter Footpath is φ 25mm, and described cable 12 inner peripheral surface of boring a hole are provided with screw thread, and equipped with Gask-O-Seal and blind plugging.It is arranged on Immersible pump and the cable of the detection equipment of water below geothermal well are connected on ground be connected with power supply, and cable is through electricity Wire through-hole 12, and be fixed in cable perforation 12 by Gask-O-Seal and blind plugging, prevent at Changes in weather (wind, rain Deng), cause cable arbitrarily to swing, suspension ring 11 are also used for being fixedly mounted on the detection of immersible pump and water below geothermal well and set Standby connecting line.
Described sleeve pipe 1 and flange type sluice valve 2 and effusion meter, flange form butterfly valve 9, swing check valve 6 and flange type ball valve 5 Flange joint, described Flange joint is all used with the junction in corresponding hot water delivery pipe road 10 or cooling water reflux line 3 Place all uses SW with outside ring to seal.SW with outside ring seal flexibility is big, can on-call maintenance and make up packing less feelings Condition.
Described flange form butterfly valve 9 uses hard sealing, and flow resistance coefficient is not more than 0.2, can bidirectional bearing, and be provided with display its The indicator of butterfly plate position, the surfaces externally and internally of described flange form butterfly valve 9, all through blasting treatment, all scribbles two-layer epoxy resin coating Layer, the gross thickness of two-layer epoxy resin enamelled coating is more than 0.3mm.Flange form butterfly valve 9 good airproof performance, and little to the flow resistance coefficient of water, Internal structure is the most perishable.
Technological means disclosed in the present invention program is not limited only to the technological means disclosed in above-mentioned technological means, also includes The technical scheme being made up of above technical characteristic combination in any.
With the above-mentioned desirable embodiment according to the present invention for enlightenment, by above-mentioned description, relevant staff is complete Entirely can carry out various change and amendment in the range of without departing from this invention technological thought.The technology of this invention The content that property scope is not limited in description, it is necessary to determine its technical scope according to right.

Claims (8)

1. geothermal energy resources wellhead assembly, this wellhead assembly is installed on the well head of geothermal well, for being aspirated by the hot water in geothermal well Coming up, the cooling water that the heat energy of this hot water is formed after being utilized is transported in geothermal well by this wellhead assembly, it is characterized in that bag Including sleeve pipe, hot water delivery pipe road and cooling water reflux line, threadeds with the well head of geothermal well in one end of described sleeve pipe, another End is simultaneously connected with hot water delivery pipe road and cooling water reflux line, described sleeve pipe and hot water delivery pipe road and cooling water reflux line Junction be provided with effusion meter, described sleeve pipe is provided with flange type sluice valve, described hot water delivery pipe road and cooling water return duct Road is provided with ultrasonic calorimeter, Pressure gauge and several valves.
Geothermal energy resources wellhead assembly the most according to claim 1, is characterized in that ultrasonic flowmeter selected by described effusion meter, Described ultrasonic calorimeter selects Double-sound-track ultrasonic heat meter.
Geothermal energy resources wellhead assembly the most according to claim 1, is characterized in that on several described hot water delivery pipe roads Valve includes the installation of flange form butterfly valve, swing check valve and flange type ball valve, described Pressure gauge and several described valves Order is: from hot water delivery pipe road and effusion meter connect end to the water side in hot water delivery pipe road be successively flange form butterfly valve, Pressure gauge, swing check valve and flange type ball valve, the ultrasonic calorimeter on described hot water delivery pipe road be positioned at Pressure gauge and Between swing check valve, this Pressure gauge is installed with hot water delivery pipe road by a three-way cock valve.
Geothermal energy resources wellhead assembly the most according to claim 3, is characterized in that on several described cooling water reflux lines Valve include that the erection sequence of flange form butterfly valve and flange type ball valve, described Pressure gauge and several described valves is: from cold But the water inlet end of water reflux line to the connection end of cooling water reflux line and effusion meter be successively flange type ball valve, Pressure gauge and Flange form butterfly valve, the ultrasonic calorimeter on described cooling water reflux line between Pressure gauge and flange form butterfly valve, this pressure Power table is installed with cooling water reflux line by a three-way cock valve.
Geothermal energy resources wellhead assembly the most according to claim 1, is characterized in that described cooling water reflux line extends transversely through Inflow-rate of water turbine meter, the end of the cooling water reflux line extending through the effusion meter other end is provided with flange form butterfly valve.
Geothermal energy resources wellhead assembly the most according to claim 1, is characterized in that being provided with several electricity on described effusion meter Wire through-hole and several suspension ring, described cable punch inside diameter is φ 25mm, and described cable perforation inner peripheral surface is provided with Screw thread, and equipped with Gask-O-Seal and blind plugging.
7., according to the geothermal energy resources wellhead assembly described in claim 4 or 5, it is characterized in that described sleeve pipe and flange type sluice valve and stream Gauge, flange form butterfly valve, swing check valve and flange type ball valve and corresponding hot water delivery pipe road or cooling water return duct The junction in road all uses Flange joint, described flange connections all to use SW with outside ring to seal.
Geothermal energy resources wellhead assembly the most according to claim 7, is characterized in that described flange form butterfly valve uses hard sealing, stream Resistance coefficient is not more than 0.2, can bidirectional bearing, and be provided with the indicator showing its butterfly plate position, described flange form butterfly valve interior Outer surface, all through blasting treatment, all scribbles two-layer epoxy resin enamelled coating, and the gross thickness of two-layer epoxy resin enamelled coating is more than 0.3mm.
CN201610776357.8A 2016-08-31 2016-08-31 Geothermal energy resources wellhead assembly Pending CN106225272A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610776357.8A CN106225272A (en) 2016-08-31 2016-08-31 Geothermal energy resources wellhead assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610776357.8A CN106225272A (en) 2016-08-31 2016-08-31 Geothermal energy resources wellhead assembly

Publications (1)

Publication Number Publication Date
CN106225272A true CN106225272A (en) 2016-12-14

Family

ID=58072057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610776357.8A Pending CN106225272A (en) 2016-08-31 2016-08-31 Geothermal energy resources wellhead assembly

Country Status (1)

Country Link
CN (1) CN106225272A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101182832A (en) * 2007-11-20 2008-05-21 西安交通大学 Heat energy and solar complementary thermal current power generation system
CN101349450A (en) * 2008-06-27 2009-01-21 赵铭 Deep layer terrestrial heat renewable energy source winter heating method
WO2012019249A2 (en) * 2010-08-03 2012-02-16 Ignatious Isaakidis Isaakidis high temperature engineered geothermal systems (egs)
CN203053074U (en) * 2013-01-15 2013-07-10 郑州大学综合设计研究院 Closed recharge three-in-one device of deep layer geothermal well and water source heat pump well
CN203320611U (en) * 2013-06-30 2013-12-04 陕西麦客科技发展有限责任公司 Well mouth device of water source well
CN206037457U (en) * 2016-08-31 2017-03-22 盐城市恒通石油机械制造有限公司 Geothermal energy wellhead assembly

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101182832A (en) * 2007-11-20 2008-05-21 西安交通大学 Heat energy and solar complementary thermal current power generation system
CN101349450A (en) * 2008-06-27 2009-01-21 赵铭 Deep layer terrestrial heat renewable energy source winter heating method
WO2012019249A2 (en) * 2010-08-03 2012-02-16 Ignatious Isaakidis Isaakidis high temperature engineered geothermal systems (egs)
CN203053074U (en) * 2013-01-15 2013-07-10 郑州大学综合设计研究院 Closed recharge three-in-one device of deep layer geothermal well and water source heat pump well
CN203320611U (en) * 2013-06-30 2013-12-04 陕西麦客科技发展有限责任公司 Well mouth device of water source well
CN206037457U (en) * 2016-08-31 2017-03-22 盐城市恒通石油机械制造有限公司 Geothermal energy wellhead assembly

Similar Documents

Publication Publication Date Title
CN107121376B (en) High temperature and pressure gas-liquid two-phase H2S/CO2The corrosion simulated cyclic system of environment original position load
CN106233097A (en) The ultrasonic transducer shell being acoustically isolated and effusion meter
CN104807850B (en) It is a kind of measure oil/gas well wellbore fluids, oil well pipe thermodynamic parameter experimental provision and method
CN104373106A (en) Experimental method and experimental system of gas sealing performance of underground packer
CN109900629A (en) A kind of environmental device and test method for metallic material corrosion fatigue test
CN107246262A (en) A kind of leakage amount detecting device and method for simulating oil well pump working environment
CN106567998B (en) Gas pipeline leak detection simulation experiment platform based on fibre optic temperature sensor
CN207422701U (en) A kind of solar energy antifreezing device for drain pipe
CN202745854U (en) petroleum drilling hard shut-in simulation experiment device
CN206037457U (en) Geothermal energy wellhead assembly
CN107420628A (en) Leakage monitoring device and monitoring method in a kind of steam valve
CN106225272A (en) Geothermal energy resources wellhead assembly
CN206091920U (en) Geothermal well is taken out and is irritated dual -purpose wellhead assembly
CN111810117A (en) Casing damage well leakage point detection transplanting method
CN208396691U (en) For testing the imitative experimental appliance of natural gas well atomizing effect
CN112502661A (en) Geothermal well head device with test function
CN109708823A (en) A kind of experimental rig and test method for rotary seal structure test
CN202748299U (en) Corrosion testing device for oil well plug hanging ring
CN109374831A (en) Refrigerant and lubricating oil intermiscibility experimental apparatus for testing
CN206386109U (en) A kind of cement sheath sealing and the experimental provision of sleeve pipe lifting
CN105841775B (en) Water-producing gas well accumulated liquid pre-judgment experimental device and method
CN208634059U (en) A kind of submersible electric pump exit parameter measuring apparatus
CN209724325U (en) Pressure-measuring-point ice is stifled during preventing hydrate from hiding simulated experiment and the structure of de-plugging
CN208206231U (en) anti-freezing liquid level display
CN206488836U (en) Device for carrying out low-temperature test to water supply standpipe and water meter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161214

RJ01 Rejection of invention patent application after publication