CN106223992B - High-temperature mine partial cooling system and method - Google Patents

High-temperature mine partial cooling system and method Download PDF

Info

Publication number
CN106223992B
CN106223992B CN201610756432.4A CN201610756432A CN106223992B CN 106223992 B CN106223992 B CN 106223992B CN 201610756432 A CN201610756432 A CN 201610756432A CN 106223992 B CN106223992 B CN 106223992B
Authority
CN
China
Prior art keywords
air
temperature
unit
expanding machine
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610756432.4A
Other languages
Chinese (zh)
Other versions
CN106223992A (en
Inventor
熊亚选
王振宇
陈红兵
王刚
徐鹏
李德英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Civil Engineering and Architecture
Original Assignee
Beijing University of Civil Engineering and Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Civil Engineering and Architecture filed Critical Beijing University of Civil Engineering and Architecture
Priority to CN201610756432.4A priority Critical patent/CN106223992B/en
Publication of CN106223992A publication Critical patent/CN106223992A/en
Application granted granted Critical
Publication of CN106223992B publication Critical patent/CN106223992B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F3/00Cooling or drying of air
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01CROTARY-PISTON OR OSCILLATING-PISTON MACHINES OR ENGINES
    • F01C13/00Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01CROTARY-PISTON OR OSCILLATING-PISTON MACHINES OR ENGINES
    • F01C20/00Control of, monitoring of, or safety arrangements for, machines or engines
    • F01C20/08Control of, monitoring of, or safety arrangements for, machines or engines characterised by varying the rotational speed

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Wind Motors (AREA)

Abstract

The embodiment of the present invention provides a kind of high-temperature mine partial cooling system and method.Wherein partial cooling system includes: including ground unit and downhole unit;Wherein: ground unit includes: air compressor unit, for compressing to ground air;And cooling unit, it is connected with the air compressor unit, for recycling through the thermal energy in the air compressor unit treated ground air;Downhole unit includes: expanding machine, is connected with the cooling unit, the pressure energy in treated for recycling cooling unit ground air;And injector, it is connected with the expanding machine, with injection entrance and injection entrance;Wherein, underground fresh air and treated after ground air mixes in the injector through the injection entrance and the injection entrance respectively through the expanding machine is sent to needing wind place.Partial cooling system of the invention effectively reduces the conveying capacity of ground air.

Description

High-temperature mine partial cooling system and method
Technical field
The present invention relates to the falling temperature techniques and waste heat hydraulic recovery technical field in high-temperature mine, and in particular to Yi Zhonggao Warm mine partial cooling system and method.
Background technique
With the fast development of economy and society, the mankind are in the demand of the energy and will be chronically at becoming for growth Gesture.Although having obtained quick development in the utilization technology of renewable energy (such as solar energy, wind energy), but China is to coal Demand still occupy 70% or so of national non-renewable energy total energy consumption.In the case of coal resources are certain, coal is needed The continuous of the amount of asking increases the increase for being just necessarily accompanied with coal mining depth, and with the increase subsurface environment of depth in mine Temperature and humidity can be higher and higher, as the temperature of part driving face alreadys exceed 40 DEG C.Obviously, the high temperature and humidity ring of underground Border seriously affects the physical and mental health of worker and the operation condition of equipment component, and labor productivity also substantially reduces therewith.
The equipment, work by using mobile cold source in each job site or resting space, to underground main at present Make personnel and space carries out the mode of partial cooling to solve the high temperature defect of subsurface environment.The partial cooling mode of high-temperature mine The main partial cooling including vapour compression refrigerator and the ice cube partial cooling based on phase transformation etc..Steam compression type refrigeration There is the defects of big, investment of equipment is at high cost, operation and maintenance are inconvenient, condenser heat extraction is difficult that take up space in unit.It is based on The ice cube partial cooling mode of phase transformation needs constantly from ground to delivered downhole ice cube, the problems such as often blocking, and And there is also convey defect at high cost.Generally higher in view of the air themperature of subsurface environment, the refrigerating capacity needed is often very big, Partial cooling technology is urgently to be further improved.
Summary of the invention
Technical problem
In view of this, how the technical problem to be solved by the present invention is to realizing effective system to the subsurface environment of high temperature Under the premise of cold, the flexibility of refrigerating efficiency and refrigeration application is improved, the conveying capacity of ground air is reduced.
Solution
In order to solve the above-mentioned technical problem, an embodiment according to the present invention provides a kind of high-temperature mine partial cooling System.The partial cooling system includes ground unit and downhole unit;Wherein:
Ground unit includes:
Air compressor unit, for being compressed to ground air;And
Cooling unit, is connected with the air compressor unit, for recycling after air compressor unit processing Ground air in thermal energy;
Downhole unit includes:
Expanding machine is connected with the cooling unit, the pressure in treated for recycling cooling unit ground air Power energy;And
Injector is connected with the expanding machine, with injection entrance and injection entrance;
Wherein, underground fresh air and through the expanding machine treated ground air respectively through the injection entrance and the spray After entry portal mixes in the injector, send to needing wind place.
For above-mentioned high-temperature mine partial cooling system, in a kind of possible embodiment, the expanding machine is connected with Generator, the generator are connected with the load in subsurface environment.
For above-mentioned high-temperature mine partial cooling system, in a kind of possible embodiment, the partial cooling system is also Including control unit, the control unit includes the second valve of controller Yu the controller communication;
Wherein, second valve is set to the injection inlet of the injector, and the control unit is by adjusting described the The aperture of two valves changes into the underground fresh air in the injector;
Wherein, the controller also with the power generation mechatronics, encourage by adjusting the generator by the control unit Magnetoelectricity stream changes the revolving speed of the generator.
For above-mentioned high-temperature mine partial cooling system, in a kind of possible embodiment, the control unit further includes With the sensor group of the controller communication, the sensor group includes:
Flow sensor, for detecting the flow of the air stream by the expanding machine;
Pressure sensor, the pressure of the air stream for detecting the expanding machine downstream;
First temperature sensor, the temperature of the air stream for detecting the expanding machine downstream;And
Second temperature sensor, the temperature of the air stream for detecting the injector downstream.
For above-mentioned high-temperature mine partial cooling system, in a kind of possible embodiment, the control unit also with sky Air compressor group and the cooler group communicate respectively, for set the air compressor unit outlet pressure and the cooling The outlet temperature of unit.
For above-mentioned high-temperature mine partial cooling system, in a kind of possible embodiment, the generator with it is described Controller is connected, for powering to controller.
For above-mentioned high-temperature mine partial cooling system, in a kind of possible embodiment, the cooling unit is water The outlet of cooling type cooler group, the cooling unit of the water-cooled is connected with hot-water cylinder or heat-accumulator tank;Or
The cooling unit is the cooling unit of ventilation type, and the outlet of the cooling unit of the ventilation type is connected to heating demands field It closes.
For above-mentioned high-temperature mine partial cooling system, in a kind of possible embodiment, the cooling unit and institute It states and is additionally provided with moisture separator between expanding machine.
In order to solve the above-mentioned technical problem, according to another embodiment of the present invention, a kind of high-temperature mine part system is provided Cooling method.The partial cooling method includes:
Ground air is converted to high pressure air flow after air compressor unit compression;
After the pressure-air flows through the heat exchange of cooler group, high pressure low temperature air-flow is converted to;
The expanded machine pressure recovery energy of the high pressure low temperature air-flow, the pressure energy of recycling are converted into electricity by generator Energy;
After underground fresh air mixes in injector with the ground air after expanded machine pressure recovery energy, feeding needs wind Place.
For above-mentioned high-temperature mine partial cooling method, in a kind of possible embodiment, the partial cooling method is also It include: air pressure and temperature of the control unit according to expanding machine downstream, by the exciting current and the first valve that control generator The aperture of door, the revolving speed by adjusting expanding machine and the flow into the underground fresh air in injector, so that under injector Temperature and the flow for swimming the air stream at end are up to standard.
Beneficial effect
High-temperature mine partial cooling system of the invention is recycled using the thermal energy of cooling unit recycling air by expanding machine Air pressure energy, and electric energy is translated by generator;By injector by expanding machine come out low-temp low-pressure air with Underground fresh air is mixed and then is sent to needing wind place, then is cooled down to the locally point of underground, and the defeated of ground air is reduced The amount of sending.
In addition, high-temperature mine partial cooling system of the invention has simple structure, compact to design, flexible operation and system Advantage at low cost is made, can be used for the partial cooling of the high-temperature mine of various scales and depth.
Detailed description of the invention
When considered in conjunction with the accompanying drawings, the present invention can be more completely and better understood.Attached drawing described herein is used to provide A further understanding of the present invention, examples and descriptions thereof are used to explain the present invention, does not constitute improper limitations of the present invention.
Fig. 1 shows structural schematic diagram one (controller and the sky of the high-temperature mine partial cooling system of one embodiment of the invention The cooling unit communication of air compressor group);
Fig. 2 shows the structural schematic diagram two of the high-temperature mine partial cooling system of one embodiment of the invention (controller not with The cooling unit communication of air compressor unit).
Description of symbols
10, controller;11, temperature controller;12, the first valve;13, flow sensor;14, pressure sensor;15, the first temperature Spend sensor;16, second temperature sensor;17, the second valve;20, filter;21, air compressor unit;22, cooling unit; 23, moisture separator;24, hot-water cylinder;30, expanding machine;31, generator;32, injector;33, entrance is sprayed;34, injection enters Mouthful;35, rectification adverser.
Specific embodiment
Below with reference to attached drawing various exemplary embodiments, feature and the aspect that the present invention will be described in detail.It is identical in attached drawing Appended drawing reference indicate element functionally identical or similar.Although the various aspects of embodiment are shown in the attached drawings, remove It non-specifically points out, it is not necessary to attached drawing drawn to scale.
Dedicated word " exemplary " means " being used as example, embodiment or illustrative " herein.Here as " exemplary " Illustrated any embodiment should not necessarily be construed as preferred or advantageous over other embodiments.
In addition, in order to better illustrate the present invention, numerous details is given in specific embodiment below. It will be appreciated by those skilled in the art that without certain details, the present invention equally be can be implemented.In some instances, for Ways and means well known to those skilled in the art are not described in detail, in order to highlight purport of the invention.
Embodiment 1
One embodiment of the present of invention provides a kind of high-temperature mine partial cooling system, mainly before energy regenerating It puts, effective partial cooling is realized to the hot environment of underground.
As shown in Figure 1, the partial cooling system mainly includes ground unit, downhole unit and control unit.Wherein:
Ground unit is mainly used for high pressure air flow that provide closely upper environment temperature, dry, and by the pressure air It circulates toward downhole unit.
Downhole unit is mainly used for the high pressure air flow for providing ground unit expansion cooling, and the air for making expansion cool down It is mixed with underground fresh air, the air stream for needing wind place can be led to by generating, and can be used for cooling down human body or local space etc..
Control unit is then communicated with ground unit and downhole unit respectively, is mainly used for the ginseng to ground unit and downhole unit Number is adjusted, so that the flow (can such as be described as unit of kg/minute) of the air stream of downhole unit downstream Reach the standard for needing wind place (such as can be personnel's chamber, equipment chamber, digging laneway and driving face) with temperature.
1) ground unit mainly includes the air compressor unit 21 being connected and cooling unit 22.The fresh sky of ground environment Gas obtains high temperature and pressure air after the compression of air compressor unit 21;After pressure-air exchanges heat through cooling unit 22, obtain High pressure low temperature air.
In a kind of possible embodiment, filter 20, ground ring can be equipped in the upstream of air compressor unit 21 The fresh air in border first carries out simple primary filtration via filter 20, filters biggish particle and other impurities in air Deng entering air compressor unit 21 by air hose later.
In a kind of possible embodiment, the mode that cooling unit 22 exchanges heat may include:
In the case of the temperature such as such as winter are lower, using air cooling principle, such as directly using surrounding air through cooling gas The high temperature and pressure air that entrance comes out air compressor unit 22 is handled, and cooling gas is discharged in the air heated after air cooling Behind outlet, into thermal energy recovery unit, such as it is used directly for the heating on the spot of ground unit, indoor heating heating demands field It closes.
Under the higher situation of the temperature such as such as summer, using water cooling principle, cooling water (such as can be pond water, river water with And underground water etc.) through coolant inlet enter cooling unit 22, with the height led in cooling unit 22 by air compressor unit 21 Pressure air exchanges heat, and the cooling water being heated up after heat exchange enters thermal energy recovery unit through cooling liquid outlet, can such as lead to Enter hot-water cylinder 24 to store directly for the use such as mine staff's bathing, can also will be wrapped by heat-accumulator tank (there is heat insulation function) The water body of heat content temporarily stores.
As can be seen that effectively being recycled by cooling unit 22 to the heat in high pressure-temperature air, by pressure-air It is changed into high pressure low temperature air.
In a kind of possible embodiment, it can be equipped with moisture separator 23 in the downstream of cooling unit 22, mainly For separating and being discharged the moisture in the high pressure low temperature air, a degree of dehumidifying, drying are carried out to air stream.
2) downhole unit mainly includes expanding machine 30 and the generator being respectively connected with expanding machine 30 31 and injector 32. Wherein:
Expanding machine 30 is mainly used for recycling the overbottom pressure in high pressure low temperature air, and high pressure low temperature air is changed into low-pressure low-temperature Air.
Generator 31 is mainly used for converting overbottom pressure to electric energy, and flows through expanding machine 30 by adjusting its revolving speed to adjust The flow of air stream.
Injector 32 is mainly used for mixing the low-pressure low-temperature air of 30 downstream of expanding machine and underground fresh air, by temperature and Flow air up to standard, which is streamed to underground, needs wind place, freezes to people or local environment.
In a kind of possible embodiment, expanding machine 30 is connected to after generator 31, and generator 31 can be further It is connected by rectification adverser 35 with controller 10, is powered for controller 10, it can also be with the electricity consumption of other in downhole unit Equipment is connected, such as may include headlamp, mine lamp charging device, pulp shooting machine, roof-bolter, drive hoeing machine and scratch board conveyor. The high pressure low temperature air obtained after the cell processing of ground enters expanding machine 30 through the first valve 12, and high pressure low temperature air makes to expand Machine 30 rotates, and the rotation of expanding machine 30 is further driven to 31 rotary electrification of generator, so that being able to will be more than in high pressure low temperature air Pressure is converted into electric energy.After the electric energy that generator 31 recycles is converted by rectification/inverter 35, by the direct current of generation or friendship Galvanic electricity provides electric energy for controller 10 and/or other electric appliances, to be able to make full use of the electric energy of recycling.30 pairs of height of expanding machine Force down warm air overbottom pressure recycled after so that the temperature of air is minimized, obtained low-pressure low-temperature air is through spurting into Mouth 33 enters injector 32, is sufficiently mixed with the underground fresh air entered in injector 32 through injection entrance 34, until injection After the air stream of 32 downstream of device reaches the target temperature and target flow of setting, being sent to by air outlet needs wind place.
Partial cooling system of the invention passes through the thermal energy that cooling unit 22 has recycled air stream, is recycled by expanding machine 30 The pressure energy of air stream, and the pressure energy of recycling is further converted to by electric energy by generator 31.Further, since being sent to needs The air stream in wind place is mixing by low-pressure low-temperature air and underground fresh air, therefore reduces the conveying of ground air Amount.
3) control unit mainly includes that (such as temperature controller 11 can be with for controller 10 and the temperature controller 11 communicated with controller 10 Belong to a part of cooling unit 22), valve group and sensor group.Valve group therein includes the first valve 12 and the second valve Door 17, sensor group includes flow sensor 13, pressure sensor 14, the first temperature sensor 15 and second temperature sensor 16。
In a kind of possible embodiment, flow sensor 13 is set to the upstream of expanding machine 30, for detecting by swollen The flow of the air stream of swollen machine 30.Pressure sensor 14 and the first temperature sensor 15 are set to the downstream of expanding machine 30, respectively For detecting the pressure and temperature of the air stream of 30 downstream of expanding machine.Second temperature sensor 16 is set under injector 32 Trip, the temperature of the air stream for detecting 32 downstream of injector.
Controller 10 mainly according to downhole unit need wind place required for air stream target temperature and target flow, The outlet pressure of air compressor unit 21 can directly be set out by communicating with air compressor unit 21, and by with it is cold But the temperature controller 11 of unit 22 communicates, and sets out the outlet temperature of cooling unit 22.
Controller 10 is also electrically connected with generator 31, mainly by changing the exciting current of generator 31 come regulator generator 31 revolving speed changes the revolving speed of expanding machine 30 will pass through the rotational speed regulation of generator 31, is changed by the revolving speed of expanding machine 30 Become further to adjust the pressure of the air stream of 30 downstream of expanding machine, is adjusted indirectly by the adjusting of the pressure to air stream The flow of the air stream of 30 downstream of expanding machine.
Wherein, the first valve 12 is set between ground unit and downhole unit, is mainly used for opening or be cut off into swollen The air stream of swollen machine 30.Wherein in the state that the first valve 12 is to open, according to the flow of the air stream of 30 downstream of expanding machine With temperature (air stream herein often temperature than need wind place need temperature it is low, flow is also relatively small, thus by with stream Adjustable, the higher underground fresh air of temperature is measured to be mixed, by underground fresh air " dilution " air stream, with reach dosage, The purpose of heating).Controller 10 comes by adjusting the aperture of the second valve 17 of 34 upstream of injection entrance for being set to injector 32 Change dilute strength, so that the temperature of the air stream at the air outlet of 32 downstream of injector and flow are up to standard.
Embodiment 2
Another embodiment of the invention provides a kind of high-temperature mine partial cooling method, partial cooling method master If the exciting current of generator 31 and the aperture of the second valve 17 are adjusted by control unit, sent with realizing to needing wind The temperature and flow of the air stream of point are up to standard.During this, also passes through the pressure energy of recycling air stream and is converted into electric energy, And the thermal energy of compressed air stream is effectively recycled.
Specifically, when underground is when needing wind place to need to provide the air stream of set temperature and flow, controller 10 is sent The signal of the first valve 12 is opened, the air stream of the high pressure low temperature after the cell processing of ground can be sent into swollen through the first valve 12 Swollen machine 30.Controller 10 receives (flow sensor 13, pressure sensor 14, the first temperature sensor 15, second temperature sensor 16) under the flow of the air stream for 30 upstream end of expanding machine detected, the pressure of the air stream of 30 downstream of expanding machine, expanding machine 30 Swim end air stream 32 downstream of temperature and injector air themperature signal, and according to the above-mentioned flow received, The exciting current of the generator 31 of downhole unit is adjusted in pressure and temperature signal, so that 32 upstream end of injector The temperature and flow of air stream are up to standard;Controller 10 sends signal to the second valve 17 simultaneously, by adjusting the second valve 17 Aperture, the setting by the way that the temperature of 32 upstream end of injector and flow to be reached to controller 10 are horizontal (with certain pressure, still Amount less, temperature it is low) air stream with through the second valve 17 entrance injector 32 underground fresh air mix after so that finally to The temperature and flow of the air stream for needing wind place to export of underground are up to standard.
By the adjusting of the aperture of the exciting current and the second valve 17 to generator 31 of controller 10, so that injector The temperature and flow of the air stream of 32 downstreams are up to standard.Adjusting method specifically includes that
1) flow of the air stream of 30 downstream of expanding machine is adjusted:
If flow sensor 13 detects the flow of the air stream of 30 upstream end of expanding machine lower than setting in controller 10 When flow, then controller 10 sends the signal for gradually decreasing exciting current to generator 31, so that generator 31 and expanding machine 30 revolving speed increases, and along with the raising of 30 revolving speed of expanding machine, is gradually increased by the flow of the air stream of expanding machine 30, until Until the flow of the air stream of 30 downstream of expanding machine reaches the flow set in controller 10;And if flow sensor 13 detects To 30 upstream end of expanding machine air stream flow be higher than controller 10 in set flow when, then controller 10 to excitation generate electricity Machine 31 sends the control signal that exciting current is gradually increased, so that the revolving speed of generator 31 and expanding machine 30 reduces, along with The reduction of 30 revolving speed of expanding machine, is gradually reduced by the flow of the air stream of expanding machine 30, until the sky of 30 downstream of expanding machine Until the flow of air-flow is at least up to the flow set in controller 10.For expanding machine 30, downstream end and upstream end Flow be it is equal, since the temperature of the air stream of the downstream is lower, so flow sensor is placed in expanding machine 30 Upstream end.For example, the temperature of the air stream of upstream end (expander inlet) is close or the environment of slightly less than ground unit Temperature, and the air themperature of downstream (expander outlet) can then reduce about 40 DEG C of (expander inlet pressures 0.6MPa, outlet pressures When power about 0.1Mpa), if therefore when flow sensor is placed in expander outlet, the performance requirement of flow sensor compared with Height can generate the increase in cost.
2) temperature of the air stream of 30 downstream of expanding machine is adjusted:
If the temperature of the air stream for 30 downstream of expanding machine that the first temperature sensor 15 detects is lower than in controller 10 When the temperature of setting, the exciting current control signal that controller 10 is sent to generator 31 is constant;And if the first temperature sensor When the temperature of the air stream of 15 30 downstreams of expanding machine detected is higher than the temperature set in controller 10, controller 10 is to encouraging Magnetic generator 31, which is sent, gradually decreases the control signal of exciting current, until the temperature of the air stream of 30 downstream of expanding machine it Until the temperature mostly set in controller 10.
3) air themperature and flow of 32 downstream of injector are adjusted:
When the flow of the air stream of 30 downstream of expanding machine is not less than the flow set in controller 10 and air stream Temperature not higher than the temperature set in controller 10 after, need the temperature and flow with further reference to 32 downstream of injector (demand for needing wind place), it is up to standard to the temperature and flow that make the air stream at air outlet by " incorporation " underground fresh air.
If the temperature of the air stream for 32 downstream of injector that second temperature sensor 16 detects is lower than in controller 10 When the target temperature of setting, controller 10 sends the signal for increasing valve opening to the second valve 17, until 32 downstream of injector Until the temperature of the air stream at end reaches the target temperature set in controller 10;And what if second temperature sensor 16 detected When the temperature signal of 32 downstream of injector is higher than the target temperature set in controller 10, controller 10 is sent out to the second valve 17 The signal for reducing valve opening is sent, until the temperature of the air stream of 32 downstream of injector reaches the target set in controller 10 Until temperature.
In the case of subsurface environment does not need to provide from the flow of fresh air of outdoor low-temp low-pressure, then controller 10 The signal for closing valve is sent to the first valve 12, cuts off air stream.
In a kind of possible embodiment, expanding machine 30 can select single-screw expander, and heat exchanger 13 can be selected Plate heat exchanger, the first valve 12 and the second valve 17 can select electropneumatic valve, the first temperature sensor 15 and second Temperature sensor 16 can choose thermocouple, and flow sensor 13 can select turbine meter.
In practical applications, start first to valve (12,17) and controller 10, then start 21 He of air compressor unit Cooling unit 22, controller 10 sends the signal for opening the first valve 12, so that system integrally enters starting state.In injector After the temperature and flow of air stream at 32 injection entrance 33 reach temperature and the traffic level of the setting of controller 10, control Device 10 sends the signal of the second valve 17 of starting, and by adjusting the aperture of the second valve 17, makes the low temperature at injection entrance 33 Low-pressure air and underground fresh air are sufficiently mixed in injector 32, until the temperature and flow of the air stream of 32 downstream of injector Reach the target temperature and target flow set in controller 10.By controller 10 to the temperature, pressure and flow of air stream It is detected, and the exciting current of generator 31 and the aperture of the second valve 17 is carried out in real time in real time by controller 10 Adjustment, so that system is in the operating status to tend towards stability always.
It should be noted that although with by controller 10 come the air stream of the downstream of setting air compressor set 21 It is as above that the temperature of pressure and the air stream of cooling 22 downstream of unit as example describes partial cooling system, but this field skill Art personnel it is understood that the present invention answer it is without being limited thereto.In fact, user can flexibly set completely according to practical application scene Above-mentioned pressure and temperature parameter.Vertical range as having 1km or so as underground at a distance from ground, controller 10 realize the convenience communicated in the not imagination with ground unit.So in a kind of possible embodiment, it can also be such as Fig. 2 Shown, controller 10 can not the pressure of 21 downstream of setting air compressor set and the temperature of cooling 22 downstream of unit (i.e. controller 10 is not communicated with air compressor unit 21 and cooling unit 22), and by artificial mode in air compressor Group 21 and the equipment of cooling unit 22 itself are come the corresponding pressure and temperature set, and other control principles are similar, herein not It repeats again.
As described above, embodiments of the present invention are described in detail, it is clear that as long as essentially without this hair is detached from Bright inventive point and effect, obvious variations to those skilled in the art, are also all contained in guarantor of the invention Within the scope of shield.

Claims (6)

1. a kind of high-temperature mine partial cooling system, which is characterized in that the partial cooling system includes that ground unit and underground are single Member;Wherein:
1) ground unit includes:
Air compressor unit, for being compressed to ground air;And
Cooling unit, is connected with the air compressor unit, for recycling through the air compressor unit treated ground Thermal energy in the air of face;
2) downhole unit includes:
Expanding machine is connected with the cooling unit, and the expanding machine is connected with generator, for recycling cooling unit processing The rear pressure energy in ground air is simultaneously converted into electric energy, and the generator is connected with the load in subsurface environment;With And
Injector is connected with the expanding machine, with injection entrance and injection entrance;
Wherein, it underground fresh air and through the injection entrance and described is spurted into respectively through the expanding machine treated ground air After mixing mouthful in the injector, send to needing wind place;
The partial cooling system further includes control unit, the control unit include controller and with the controller communication second Valve;
Wherein, second valve is set to the injection inlet of the injector, and the control unit is by adjusting second valve The aperture of door changes into the underground fresh air in the injector;
Wherein, the control unit changes revolving speed and/or the institute of the generator by adjusting the exciting current of the generator It states generator and provides electric energy for the control unit.
2. high-temperature mine partial cooling system according to claim 1, which is characterized in that the control unit further includes and institute The sensor group of controller communication is stated, the sensor group includes:
Flow sensor, for detecting the flow of the air stream by the expanding machine;
Pressure sensor, the pressure of the air stream for detecting the expanding machine downstream;
First temperature sensor, the temperature of the air stream for detecting the expanding machine downstream;And
Second temperature sensor, the temperature of the air stream for detecting the injector downstream.
3. high-temperature mine partial cooling system according to claim 1, which is characterized in that the control unit also with air pressure Contracting unit and the cooler group communicate respectively, for setting the outlet pressure and the cooling unit of the air compressor unit Outlet temperature.
4. high-temperature mine partial cooling system according to any one of claim 1 to 3, which is characterized in that the cooling Unit is the cooling unit of water-cooled, and the outlet of the cooling unit of the water-cooled is connected with hot-water cylinder or heat-accumulator tank;Or
The cooling unit is the cooling unit of ventilation type, and the outlet of the cooling unit of the ventilation type is connected to heating demands occasion.
5. high-temperature mine partial cooling system according to any one of claim 1 to 3, which is characterized in that the cooling Moisture separator is additionally provided between unit and the expanding machine.
6. a kind of high-temperature mine partial cooling method, which is characterized in that the partial cooling method includes: ground air through air pressure After the compression of contracting unit, high pressure-temperature air stream is converted to;
After the pressure-air flows through the heat exchange of cooler group, high pressure low temperature air-flow is converted to;
The expanded machine pressure recovery energy of the high pressure low temperature air-flow, the pressure energy of recycling are converted into electric energy by generator and are Load supplying in subsurface environment;
After underground fresh air mixes in injector with the ground air after expanded machine pressure recovery energy, it is sent into needing wind Point;
The partial cooling method further include:
Control unit passes through the exciting current and the second valve of control generator according to the air pressure and temperature of expanding machine downstream Aperture, by adjusting expanding machine revolving speed and enter injector in underground fresh air flow so that injector downstream The temperature and flow of the air stream at end are up to standard.
CN201610756432.4A 2016-08-29 2016-08-29 High-temperature mine partial cooling system and method Expired - Fee Related CN106223992B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610756432.4A CN106223992B (en) 2016-08-29 2016-08-29 High-temperature mine partial cooling system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610756432.4A CN106223992B (en) 2016-08-29 2016-08-29 High-temperature mine partial cooling system and method

Publications (2)

Publication Number Publication Date
CN106223992A CN106223992A (en) 2016-12-14
CN106223992B true CN106223992B (en) 2019-06-28

Family

ID=58071551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610756432.4A Expired - Fee Related CN106223992B (en) 2016-08-29 2016-08-29 High-temperature mine partial cooling system and method

Country Status (1)

Country Link
CN (1) CN106223992B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107747497A (en) * 2017-11-30 2018-03-02 中国科学院武汉岩土力学研究所 Heat exchange bolt-spary supports system and country rock cool-down method
CN108286454A (en) * 2018-01-30 2018-07-17 湖南科技大学 A kind of local cooling's method of high-temperature mine
CN111413061A (en) * 2020-04-14 2020-07-14 中国商用飞机有限责任公司 Low-temperature wind tunnel system
CN114777533B (en) * 2022-06-21 2022-09-06 四川大学 Heat exchange and heat recovery system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101169040A (en) * 2006-10-23 2008-04-30 兖矿新陆建设发展有限公司 Mine working face cooling system
CN102140927A (en) * 2011-04-29 2011-08-03 武汉纺织大学 Method and system for reducing temperature locally under coal mine shaft
CN103867241A (en) * 2012-12-18 2014-06-18 株式会社神户制钢所 Power generation device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PL212814B1 (en) * 2010-08-23 2012-11-30 Wonam Serwis Spolka Z Ograniczona Odpowiedzialnoscia Central air conditioning system for the mining headings

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101169040A (en) * 2006-10-23 2008-04-30 兖矿新陆建设发展有限公司 Mine working face cooling system
CN102140927A (en) * 2011-04-29 2011-08-03 武汉纺织大学 Method and system for reducing temperature locally under coal mine shaft
CN103867241A (en) * 2012-12-18 2014-06-18 株式会社神户制钢所 Power generation device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高温矿井独头掘进面降温技术研究与方案对比;宋桂梅、张朝昌;《矿业安全与环保》;20060215;第33卷(第1期);第43-45页

Also Published As

Publication number Publication date
CN106223992A (en) 2016-12-14

Similar Documents

Publication Publication Date Title
CN106223992B (en) High-temperature mine partial cooling system and method
CN206236758U (en) The humidity control system of modular extendable
CN107905897A (en) Gas turbine cycle flue gas waste heat recovery and inlet gas cooling association system and method
CN203177688U (en) Efficient water ring vacuum pump system for condensing steam turbine unit
CN110366662A (en) The local thermal energy customer component of region thermal energy distribution system and local heat energy generator component
CN204082093U (en) A kind of natural gas well head based on pressure energy generating and heat pump heats throttle system
CN106288077A (en) A kind of solar airconditioning system
CN106285762B (en) High-temperature high-humidity mine partial cooling system and method
CN205593128U (en) A high -efficient energy supply system for indoor skifield
CN107014113A (en) High temperature screw type water source heat pump device
CN204757451U (en) Solar energy auxiliary type heat pump set
CN207751178U (en) Cooling in summer recuperation of heat heat supply in winter heat pump hot-water system
CN201062898Y (en) Waste heat recovery that is hot-patching water circulation type attached heat pump device
CN107327311B (en) A kind of long tunnel gas source cooling system
CN206146023U (en) Extract secret hydrothermal heat preservation pit shaft system
CN202267266U (en) Water, ground and source triple co-generation unit
CN205135815U (en) System for distributed energy resource station refrigeration cycle water
CN204128099U (en) Multi-mode operation sweat cooling is for water-cooling device
CN103174474A (en) System used for improving combined cycle generator set vacuumizing efficiency and saving air conditioner power utilization
CN203177312U (en) Heating supply system
CN207963199U (en) Solar heat pump and water heating system
CN2558913Y (en) Solar and geothermal energy united central air conditioner
CN206469393U (en) Energy-saving air temperature control cleaning system
CN201706776U (en) Cold hot water piping system in mixing production
CN201062899Y (en) Waste heat recovery water-patching circulation type attached heat pump device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190628