CN106223926A - A kind of multichannel is managed continuously - Google Patents

A kind of multichannel is managed continuously Download PDF

Info

Publication number
CN106223926A
CN106223926A CN201610713350.1A CN201610713350A CN106223926A CN 106223926 A CN106223926 A CN 106223926A CN 201610713350 A CN201610713350 A CN 201610713350A CN 106223926 A CN106223926 A CN 106223926A
Authority
CN
China
Prior art keywords
section
capillary tubing
inner tube
continuously
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610713350.1A
Other languages
Chinese (zh)
Other versions
CN106223926B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Bang Fu Environmental Protection Technology Co., Ltd.
Original Assignee
王伟
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王伟 filed Critical 王伟
Priority to CN201610713350.1A priority Critical patent/CN106223926B/en
Publication of CN106223926A publication Critical patent/CN106223926A/en
Application granted granted Critical
Publication of CN106223926B publication Critical patent/CN106223926B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/295Gasification of minerals, e.g. for producing mixtures of combustible gases
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B36/00Heating, cooling or insulating arrangements for boreholes or wells, e.g. for use in permafrost zones
    • E21B36/001Cooling arrangements

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)
  • Measuring Temperature Or Quantity Of Heat (AREA)

Abstract

The present invention relates to a kind of multichannel manage continuously.Its technical scheme is: pipe entirety is sequentially connected with by A section, B section, C section continuously, and wherein, C section is that sub-prime injects continuous tube body, keeps fire away and is in low-temperature space;B section includes outer tube, inner tube, thermocouple cable; cavity between described outer tube and inner tube connects with capillary tubing; make cavity be filled with the liquid of high temperature resistance burnout-proof by capillary tubing, and liquid is put by multiple spray-holes ejection formation that A section inwall is provided with and burnt out protection zone;Described A section is nozzle body, and inside is equipped with thermocouple, is delivered on ground instrument, and then control carry or decline coiled tubing by the signal of telecommunication by thermocouple cable.Providing the benefit that: water is delivered to the cavity between outer tube and the inner tube of B section by capillary tubing, four aperture ejections from the inwall of A section, B section has just become " boiler tube " of inner filling water, thus has avoided ascending pipe when flame four is altered and be burned.

Description

A kind of multichannel is managed continuously
Technical field
The present invention relates to a kind of gasification coal mining pipe continuously, manage continuously particularly to a kind of multichannel.
Background technology
Along with the development of gasification coal-mining technique, the continuous pipe of horizontal well drags and injects fluid to down-hole and make coal seam burn in order product The technology of unboiled water coal gas and semiwater gas is the most ripe.But due to the problem of coal seam permeability, flame burns injection even sometimes The nozzle back of continuous pipe, makes the continuous pipe of injection be blown, and nozzle and thermocouple are ineffective, and surface fluids injects and is forced to interrupt, Again after the down-hole string that restoration fluids injects, re-inject, thus can affect quality and speed that gasification is mined.
Summary of the invention
The purpose of the present invention is aiming at the drawbacks described above that prior art exists, it is provided that a kind of multichannel is managed continuously.
A kind of multichannel is managed continuously, and its technical scheme is: pipe entirety is sequentially connected with by A section, B section, C section continuously, wherein, and C Section is that sub-prime injects continuous tube body, keeps fire away and is in low-temperature space, by continuous pipe 5, capillary tubing 4 and thermocouple cable 3 even Connect composition, capillary tubing 4 and thermocouple cable 3 and be installed in continuous pipe 5 inner chamber;One end of B section is connected with A section, the other end and C section Connecting, B section includes outer tube 1, inner tube 2, thermocouple cable 3, and the cavity between described outer tube 1 and inner tube 2 is with capillary tubing 4 even Logical, make cavity be filled with the liquid of high temperature resistance burnout-proof by capillary tubing 4, and liquid is provided with many by A section inwall The ejection of individual spray-hole 11 forms burnout-proof protection zone;Described A section is nozzle body 8, and inside is equipped with thermocouple 10, passes through thermocouple The signal of telecommunication is delivered on ground instrument, and then control carry or decline pipe continuously by cable 3.
Above-mentioned continuous pipe 5 and inner tube 2 are provided with the endoporus of welding ring 6, the endoporus of this welding ring 6 and inner tube 2 in junction Align welded seal firm.
Above-mentioned outer tube 1 is identical with the size of the diameter of the continuous pipe 5 of C section and wall thickness, the external diameter of the inner tube 2 of B section and C section Capillary tubing 4 match, the size of the cross-sectional area of the annular space that the external diameter of the internal diameter of B section outer tube 1 and inner tube 2 is formed, It is five times of area of passage of capillary tubing 4, and the length of described B section is not more than 50 meters.
The manufacture method of the continuous pipe of multichannel that the present invention mentions, comprises the following steps that:
(1) capillary tubing 4 and thermocouple cable 3 together being penetrated continuous pipe 5, the method for penetrating is to use continuous tube apparatus only will In pipe enters the well of applicable continuous length of tube for 5 times continuously, then capillary tubing and the thermocouple cable connecting thermocouple, one removes Continuously in pipe 5, it is desirable to capillary tubing 4 length is more than or equal to the overall length of continuous pipe 5, and a segment distance, and thermocouple end are stretched out in two ends Stretch out the length of continuous pipe 5 more than A section plus the overall length of B section, then trip out that to pass through well stand-by;
(2) A section is welded with B section, first the inner tube 2 of B section and the endoporus of A section is aligned welded seal firm, and the stretching resistance of weld seam is not Less than inner tube stretching resistance 80%;Again the endoporus of the endoporus of welding ring 6 Yu inner tube 2 is aligned welded seal firm, the tension of weld seam Power is not less than the 80% of inner tube stretching resistance;Then welded for outer tube 1 ring 6 is enclosed within inner tube 2, finally the weld seam at outer tube 1 two ends Firm with A section and welding ring 6 welded seal respectively, the seal pressure of weld seam meets fluid infusion pressure requirement, the tension of weld seam Power is more than the 80% of outer tube stretching resistance;
(3) B section is welded with C section, first thermocouple cable 3 is penetrated B section together with the welded ring of thermocouple 6 and stretch before welding To A section, and thermocouple 10 being fixed on A section, then process capillary tubing 4 solder side connects with the capillary tubing eyelet welding of welding ring 6 Face shape is coincide consistent, then it is firm, finally that capillary tubing 4 and the capillary tubing welding hole in welding ring 6 are aligned welded seal The continuous pipe 5 of C section is firm with outer tube 1 welded seal of B section.
The invention has the beneficial effects as follows: formed multichannel by A, B, C tri-sections and manage continuously, fixing temperature measuring equipment (thermocouple), Control to inject direction and the flow velocity of fluid, make burner hearth try one's best away from ascending pipe, prevent ascending pipe from crossing cause thermal damage;Water is passed through Capillary tubing delivers to the cavity between outer tube and the inner tube of B section, four aperture ejections from the inwall of A section, and B section has just become internal Water-filled " boiler tube ", thus avoid ascending pipe when flame four is altered and be burned;C section is the main paragraph of the continuous pipe of multichannel, Reduce the injection pressure of host for increasing the area of main channel as far as possible, reduce the cost of the continuous pipe of main paragraph multichannel, carry High economy.
Accompanying drawing explanation
Accompanying drawing 1 is the structural representation of the present invention;
Accompanying drawing 2 is the F-F sectional view of the present invention;
Accompanying drawing 3 is the D-D sectional view of the present invention;
Accompanying drawing 4 is the E-E sectional view of the present invention;
Accompanying drawing 5 is the G-G sectional view of the present invention;
In upper figure: outer tube 1, inner tube 2, thermocouple cable 3, capillary tubing 4, continuous pipe 5, welding ring 6, outer tube and nozzle body weld bond 7, nozzle body 8, inner tube and nozzle body weld bond 9, thermocouple 10, spray-hole 11.
Detailed description of the invention
In conjunction with accompanying drawing 1-5, the invention will be further described:
The multichannel that the present invention mentions is managed continuously, and its technical scheme is: pipe entirety is sequentially connected with by A section, B section, C section continuously, its In, C section is that sub-prime injects continuous tube body, keeps fire away and is in low-temperature space, by continuous pipe 5, capillary tubing 4 and thermocouple cable 3 connect composition, and capillary tubing 4 and thermocouple cable 3 are installed in continuous pipe 5 inner chamber;One end of B section is connected with A section, the other end with C section connects, and B section includes outer tube 1, inner tube 2, thermocouple cable 3, the cavity between described outer tube 1 and inner tube 2 and capillary tubing 4 Connection, makes cavity be filled with the liquid of high temperature resistance burnout-proof by capillary tubing 4, and liquid uses water herein, and water passes through A section inwall Multiple spray-holes 11 ejection being provided with forms burnout-proof protection zone;Described A section is nozzle body 8, and inside is equipped with thermocouple 10, It is delivered on ground instrument, and then control carry or decline coiled tubing by the signal of telecommunication by thermocouple cable 3.
And, A section, B section, C section three are welded as a whole, and outward appearance is just the same with isodiametric homogeneity coiled tubing, root According to the difference of down-hole injected media, its material can be the tubing of the different-diameter that the materials such as rustless steel, steel alloy, carbon steel are made The burnout-proof multichannel being welded is managed continuously.
Wherein, continuous pipe 5 and inner tube 2 are provided with the endoporus pair of welding ring 6, the endoporus of this welding ring 6 and inner tube 2 in junction Positive welded seal is firm, and can be seen that outer tube and nozzle body weld bond 7 and inner tube and nozzle body weld bond 9 by sectional view.
Above-mentioned outer tube 1 is identical with the size of the diameter of the continuous pipe 5 of C section and wall thickness, the external diameter of the inner tube 2 of B section and C section Capillary tubing 4 match, the size of the cross-sectional area of the annular space that the external diameter of the internal diameter of B section outer tube 1 and inner tube 2 is formed, It is five times of area of passage of capillary tubing 4, and the length of described B section is not more than 50 meters.
The present invention first chosen material: according to choosings such as the character of injected media host adjuvant, injection pressure flow, temperature Take the thickness of the material of steel, steel plate, inject continuous pipe diameter and include that supervisor and auxiliary pipe calculate processing and be responsible for and needed for auxiliary pipe Width of steel band, use be suitable for welding method, welding equipment in straight weld pipe-forming machine group, weld inner tube, outer tube, capillary steel Pipe, then according to process the accessory of each section of A, B, C respectively shown in Fig. 1.
As a example by note pure oxygen: A section is the assembly welding of 316L rustless steel thick-walled pipe and the nozzle body of 316L rustless steel round steel processing Its length of part is not more than 1 meter, and its effect is: pipe enters well continuously, fixing thermocouple, processes inner nozzle and the welding B of B section water The solder side of section inner and outer tubes, the area of passage of nozzle should be less than the area of passage of C section capillary tubing.
B section is the isometric ERW of the different-diameter that 316L stainless steel band welds, the size of outer tube 1 diameter and wall thickness with The continuous pipe 5 of C section is identical, and the external diameter of the inner tube 2 of B section is that the area of passage size according to C section capillary tubing 4 determines, outside B section The size of the cross-sectional area of the annular space that the external diameter of the internal diameter of pipe 1 and inner tube 2 is formed, be capillary tubing 4 area of passage 5 Times.The thickness of inner tube 2 is calculated according to bearing capacity.The length of the B section length according to horizontal segment and the homogenizing degree in coal seam Determine, generally no greater than 50 meters.The processing dimension of E E section welding ring, internal diameter is identical with inner tube diameter, and external diameter is less than and connects The internal diameter of nearly completion 1.Capillary tubing welding hole is identical with capillary tubing 4 internal diameter.
The C section multichannel continuous tube body continuous pipe of section 5 and the diameter of capillary tubing 4, wall thickness are according to each via fluid Injection rate, injection pressure determines, length determines according to the well total length of horizontal well.
Thermocouple cable 3 is through the heat-resisting wire of the whole continuous Guan Tongchang of multichannel, and Main Function is by the electricity of down-hole Rheology passes to ground instrument, is outsourcing piece.
The manufacture method of the continuous pipe of multichannel that the present invention mentions, comprises the following steps that:
(1) capillary tubing 4 and thermocouple cable 3 together being penetrated continuous pipe 5, the method for penetrating is to use continuous tube apparatus only will In pipe enters the well of applicable continuous length of tube for 5 times continuously, then capillary tubing and the thermocouple cable connecting thermocouple, one removes Continuously in pipe 5, it is desirable to capillary tubing 4 length is more than or equal to the overall length of continuous pipe 5, and a segment distance, and thermocouple end are stretched out in two ends Stretch out the length of continuous pipe 5 more than A section plus the overall length of B section, then trip out that to pass through well stand-by;
(2) A section is welded with B section, first the inner tube 2 of B section and the endoporus of A section is aligned welded seal firm, and the stretching resistance of weld seam is not Less than inner tube stretching resistance 80%;Again the endoporus of the endoporus of welding ring 6 Yu inner tube 2 is aligned welded seal firm, the tension of weld seam Power is not less than the 80% of inner tube stretching resistance;Then welded for outer tube 1 ring 6 is enclosed within inner tube 2, finally the weld seam at outer tube 1 two ends Firm with A section and welding ring 6 welded seal respectively, the seal pressure of weld seam meets fluid infusion pressure requirement, the tension of weld seam Power is more than the 80% of outer tube stretching resistance;
(3) B section is welded with C section, first thermocouple cable 3 is penetrated B section together with the welded ring of thermocouple 6 and stretch before welding To A section, and thermocouple 10 being fixed on A section, then process capillary tubing 4 solder side connects with the capillary tubing eyelet welding of welding ring 6 Face shape is coincide consistent, then it is firm, finally that capillary tubing 4 and the capillary tubing welding hole in welding ring 6 are aligned welded seal The continuous pipe 5 of C section is firm with outer tube 1 welded seal of B section, and weld seam requires with the outer sealing of tube of B section identical.

Claims (1)

1. a multichannel is managed continuously, it is characterized in that: continuously pipe entirety is sequentially connected with by A section, B section, C section, and wherein, C section is point Matter injects continuous tube body, keeps fire away and is in low-temperature space, by pipe (5), capillary tubing (4) and thermocouple cable (3) continuously even Connect composition, capillary tubing (4) and thermocouple cable (3) and be installed in pipe (5) inner chamber continuously;One end of B section is connected with A section, another End is connected with C section, and B section includes outer tube (1), inner tube (2), thermocouple cable (3), the sky between described outer tube (1) and inner tube (2) Chamber connects with capillary tubing (4), makes cavity be filled with the liquid of high temperature resistance burnout-proof by capillary tubing (4), and liquid leads to Cross multiple spray-holes (11) ejection formation burnout-proof protection zone that A section inwall is provided with;Described A section is nozzle body (8), and internal Equipped with thermocouple (10), it is delivered on ground instrument, and then control carry or decline continuously by the signal of telecommunication by thermocouple cable (3) Pipe;
Described pipe (5) and inner tube (2) continuously are provided with welding ring (6), the endoporus of this welding ring (6) and inner tube (2) in junction Endoporus to align welded seal firm;
Described outer tube (1) is identical with size and the wall thickness of the diameter of pipe (5) continuously of C section, the external diameter of the inner tube (2) of B section and C The capillary tubing (4) of section matches, the cross-sectional area of the annular space that the external diameter of the internal diameter of B section outer tube (1) and inner tube (2) is formed Size, be five times of area of passage of capillary tubing (4), and the length of described B section be not more than 50 meters.
CN201610713350.1A 2014-08-01 2014-08-01 A kind of multichannel is continuously managed Active CN106223926B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610713350.1A CN106223926B (en) 2014-08-01 2014-08-01 A kind of multichannel is continuously managed

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610713350.1A CN106223926B (en) 2014-08-01 2014-08-01 A kind of multichannel is continuously managed
CN201410375855.2A CN104153757B (en) 2014-08-01 2014-08-01 High-temperature-resistant and burnout-resistant multi-channel continuous tube

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410375855.2A Division CN104153757B (en) 2014-08-01 2014-08-01 High-temperature-resistant and burnout-resistant multi-channel continuous tube

Publications (2)

Publication Number Publication Date
CN106223926A true CN106223926A (en) 2016-12-14
CN106223926B CN106223926B (en) 2018-11-27

Family

ID=51879368

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201610713441.5A Active CN106285615B (en) 2014-08-01 2014-08-01 A kind of continuously pipe and manufacturing method
CN201610713116.9A Pending CN106285614A (en) 2014-08-01 2014-08-01 A kind of multichannel is managed continuously
CN201410375855.2A Active CN104153757B (en) 2014-08-01 2014-08-01 High-temperature-resistant and burnout-resistant multi-channel continuous tube
CN201610713350.1A Active CN106223926B (en) 2014-08-01 2014-08-01 A kind of multichannel is continuously managed

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201610713441.5A Active CN106285615B (en) 2014-08-01 2014-08-01 A kind of continuously pipe and manufacturing method
CN201610713116.9A Pending CN106285614A (en) 2014-08-01 2014-08-01 A kind of multichannel is managed continuously
CN201410375855.2A Active CN104153757B (en) 2014-08-01 2014-08-01 High-temperature-resistant and burnout-resistant multi-channel continuous tube

Country Status (1)

Country Link
CN (4) CN106285615B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285615B (en) * 2014-08-01 2019-07-02 青岛北船管业有限责任公司 A kind of continuously pipe and manufacturing method
CN104564008B (en) * 2014-12-18 2018-05-01 新奥科技发展有限公司 Underground coal gasification(UCG) device and its gasification process
CN105756653B (en) * 2015-11-11 2021-08-03 新奥科技发展有限公司 Nozzle and gas injection device with same
CN109653708A (en) * 2018-12-05 2019-04-19 西安石油大学 A kind of device of the component of the cooling downhole tool based on steam compression cycle

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201144684Y (en) * 2007-09-07 2008-11-05 新奥能源研究院有限公司 Underground gasification furnace air outlet pipe thermal expansion cold contraction and anti-leakage device
CN201170093Y (en) * 2007-09-18 2008-12-24 中国石油天然气股份有限公司 Multi-point temperature pressure dynamic monitoring instrument of horizontal well
CN202215234U (en) * 2011-08-05 2012-05-09 中国石油天然气股份有限公司 Under-well testing continuous tube with thermocouple tube and capillary arranged inside
CN103615199A (en) * 2013-11-28 2014-03-05 中国石油天然气股份有限公司 Oil extraction processing device for achieving steam injection, oil extraction and temperature-pressure real-time monitoring in shaft of horizontal well with three tubes
RU2519310C1 (en) * 2013-01-25 2014-06-10 Ефим Вульфович Крейнин Method of extraction of high-molecular raw material of oil and gas condensate field

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106285615B (en) * 2014-08-01 2019-07-02 青岛北船管业有限责任公司 A kind of continuously pipe and manufacturing method
CN204126625U (en) * 2014-08-01 2015-01-28 东营天华石油技术开发有限公司 A kind of high temperature resistance burnout-proof multichannel continuous-tube

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201144684Y (en) * 2007-09-07 2008-11-05 新奥能源研究院有限公司 Underground gasification furnace air outlet pipe thermal expansion cold contraction and anti-leakage device
CN201170093Y (en) * 2007-09-18 2008-12-24 中国石油天然气股份有限公司 Multi-point temperature pressure dynamic monitoring instrument of horizontal well
CN202215234U (en) * 2011-08-05 2012-05-09 中国石油天然气股份有限公司 Under-well testing continuous tube with thermocouple tube and capillary arranged inside
RU2519310C1 (en) * 2013-01-25 2014-06-10 Ефим Вульфович Крейнин Method of extraction of high-molecular raw material of oil and gas condensate field
CN103615199A (en) * 2013-11-28 2014-03-05 中国石油天然气股份有限公司 Oil extraction processing device for achieving steam injection, oil extraction and temperature-pressure real-time monitoring in shaft of horizontal well with three tubes

Also Published As

Publication number Publication date
CN106285614A (en) 2017-01-04
CN106285615A (en) 2017-01-04
CN104153757B (en) 2017-01-18
CN104153757A (en) 2014-11-19
CN106223926B (en) 2018-11-27
CN106285615B (en) 2019-07-02

Similar Documents

Publication Publication Date Title
CN106223926A (en) A kind of multichannel is managed continuously
AU2017392170A1 (en) Nozzle and injection device for use in underground coal gasification process and method for operating injection device
RU2706498C1 (en) Equipment for oxidizer injection during underground gasification of coal and its use
CN106121618B (en) For the oxidant injection device of Underground Coal Gasification Process and its application
CN204126625U (en) A kind of high temperature resistance burnout-proof multichannel continuous-tube
CN107956459A (en) A kind of foam injection device and its application method and installation method
CN110552677A (en) Mine type coal underground gasification furnace and gasification method
CN210135954U (en) V-shaped cone flowmeter special for coal gas
GB1283188A (en) Method and apparatus for connecting a pipeline across an obstruction
CN102146792B (en) Temperature and pressure monitoring cable with protection tube and manufacturing method thereof
CN103195470B (en) Drilling construction Gas gathering-device
CN102359800A (en) Locally-integrated butt-welding venturi tube
CN103510943A (en) Instrument for measuring initial velocity of gas discharged from deep drill hole for coal mine outburst prediction
CN203655265U (en) Gun drilling gas emission initial speed tester for outburst forecast of coal mine
CN203285426U (en) Underground ultra-long thermocouple multipoint distribution structure and outer tube protection structure
CN205297457U (en) A hole sealing device for determining gas pressure
CN206053927U (en) For the oxidant injection device of Underground Coal Gasification Process
CN206608160U (en) Shower nozzle equipment for coal underground gasifying technology
CN103470241B (en) Two bunches of jetting tubing strings and two bunches of jetting annular fracturing methods
CN214616480U (en) Oil field water injection well water injection layering multitube divides water injection system
CN210858689U (en) Mine type coal underground gasification furnace
CN203347719U (en) Pressure release device for well drilling core taking
CN207568581U (en) For the boundling pipe device of underground coal gasification(UCG) and bundle pipes conveying device
CN106499377A (en) Electric ignition system
CN203083622U (en) Anti-sulfur critical velocity flowmeter

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181012

Address after: 225400 north side of Huan Xi Road, Taixing hi tech Industrial Development Zone, Taizhou, Jiangsu

Applicant after: Taizhou Bang Fu Environmental Protection Technology Co., Ltd.

Address before: 257000 No. 88 Ji'nan Road, Dongying District, Dongying, Shandong.

Applicant before: Wang Wei

GR01 Patent grant
GR01 Patent grant