CN106223489A - A kind of precast reinforced concrete structure method of attachment - Google Patents
A kind of precast reinforced concrete structure method of attachment Download PDFInfo
- Publication number
- CN106223489A CN106223489A CN201610610898.3A CN201610610898A CN106223489A CN 106223489 A CN106223489 A CN 106223489A CN 201610610898 A CN201610610898 A CN 201610610898A CN 106223489 A CN106223489 A CN 106223489A
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- concrete structure
- precast reinforced
- precast
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 239000011150 reinforced concrete Substances 0.000 title claims abstract description 100
- 238000000034 method Methods 0.000 title claims abstract description 25
- 239000004567 concrete Substances 0.000 claims abstract description 47
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 38
- 239000011178 precast concrete Substances 0.000 claims abstract description 24
- 239000000463 material Substances 0.000 claims abstract description 9
- 230000015271 coagulation Effects 0.000 claims description 8
- 238000005345 coagulation Methods 0.000 claims description 8
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 239000002689 soil Substances 0.000 claims 3
- 238000010586 diagram Methods 0.000 description 16
- 238000010276 construction Methods 0.000 description 4
- 210000003205 muscle Anatomy 0.000 description 4
- 238000004873 anchoring Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 3
- 239000002002 slurry Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 239000011229 interlayer Substances 0.000 description 1
- 238000002372 labelling Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/41—Connecting devices specially adapted for embedding in concrete or masonry
Abstract
The present invention relates to a kind of precast reinforced concrete structure method of attachment, belong to precast concrete technical field.First precast concrete and the second precast concrete are linked to be entirety by described method of attachment, it is characterized in that, having at least one through hole on described first precast reinforced concrete structure, arrange reinforcing bar in described hole, described Bar Anchorage is in hole sidewalls concrete;Having concrete protruding on described second precast reinforced concrete structure, protruding end is stretched out anchor and is connected reinforcing bar;First precast reinforced concrete structure is installed, fill concrete or grouting material in described hole, then the second precast reinforced concrete structure is installed, the projection of described second precast reinforced concrete structure completely or partially stretches in described hole.
Description
Technical field
The invention belongs to prefabricated reinforced concrete structure technical field, it is adaptable to assembled monolithic concrete structure system.
Background technology
Precast concrete is to be suitable for industrialized version.Prefabricated structure in assembly integrated precast concrete structure
Connecting structure between part determines integrality performance of the structure.In existing precast concrete, the connection node between component is usually
The weak link of structure, affects stress performance;Bar connecting between the upper and lower prefabricated components of precast construction uses reinforced bar sleeve at present
Grouting connection, slurry anchor connection etc., work progress is complicated, construction quality is difficult to ensure.
Connection between existing prefabricated components is usually at lower member reserved steel bar, is inserted in upper component, such as steel
The technology such as muscle sleeve grouting connection, slurry anchor connection are by lower wall body Bar Anchorage in upper wall body, and grouting needs pressure, grouting
Quality is difficult to ensure, constructs complex.
Summary of the invention
The present invention provides the connection between the prefabricated components of the good precast concrete of a kind of easy construction, stress performance
Method.The method of attachment that the present invention proposes can ensure between precast reinforced concrete structure, interlayer connection integrity, easy construction,
Improve the performance of assembled monolithic concrete structure.
A kind of precast reinforced concrete structure method of attachment, by the first precast concrete and the second precast concrete structure
Part is linked to be entirety, described first precast reinforced concrete structure has at least one through hole, arranges steel in described hole
Muscle, described Bar Anchorage is in hole sidewalls concrete;By arranging hole, can improve between precast concrete and rear pouring concrete
Globality;Bar Anchorage in hole sidewalls concrete, improve precast concrete with after water the knot of concrete in hole
Closing performance, and can improve switching performance together with the bar connecting in rear pouring concrete, power transmission is direct, and stress is reliable, it is to avoid
Pouring concrete after Bar Anchorage is in hole in prior art, then combined by rear pouring concrete and precast concrete
Situation;Described hole cross section is rectangle or circular or polygon, or other shapes.Described reinforcing bar exposed portion be linear or
U-shaped etc..Having concrete protruding on described second precast reinforced concrete structure, protruding end is stretched out anchor and is connected reinforcing bar;Install first
Precast reinforced concrete structure, fill concrete or grouting material in described hole, then the second prefabricated reinforced concrete structure is installed
Part, the projection of described second precast reinforced concrete structure completely or partially stretches in described hole;It is close that described anchor connects reinforcing bar
Reinforcing bar in first precast reinforced concrete structure hole, or connect, overlap;By the after concrete or grouting material hardening
One precast reinforced coagulation concrete component and the second precast reinforced coagulation concrete component are linked to be entirety.Described second precast reinforced
Concrete component is arranged on the first precast reinforced concrete structure top, or described second precast reinforced concrete structure is installed
In the first precast reinforced concrete structure bottom.Reinforcing bar in described hole is parallel with hole, or with hole oblique.Described hole
In hole, reinforcing bar stretches out hole, or described reinforcing bar does not extends out hole.
Precast reinforced concrete structure method of attachment of the present invention, stretches out reinforcing bar bottom described hole.
Precast reinforced concrete structure method of attachment of the present invention, described precast reinforced concrete structure is vertical member, bag
Include pillar, body of wall etc..
Precast reinforced concrete structure method of attachment of the present invention, described precast reinforced concrete structure is horizontal member, example
Such as beam or plate.
The present invention compared with prior art has the advantage that.
(1) the hole sidewalls anchoring of first precast reinforced concrete structure of the present invention has reinforcing bar, significantly improves in hole
Rear pouring concrete and precast concrete connection integrity;The anchor of the second precast reinforced concrete structure connects reinforcing bar and can take with this reinforcing bar
Connecing or be mechanically connected or weld together, power transmission is directly, reliably;Avoid anchor in prior art connect Bar Anchorage in hole after water
In concrete, then pouring concrete and the situation of precast concrete binding ability power transmission after dependence.
(2) the hole sidewalls anchoring of first precast reinforced concrete structure of the present invention has reinforcing bar, after improve in hole
Pouring concrete and precast concrete connection integrity, when in pouring concrete after having other Bar Anchorage in hole, add
Anchoring property.
(3) second precast reinforced concrete structure of the present invention arranges projection, extend into the first prefabricated reinforced concrete structure
In the hole of part, add shear behavior and the tensile property of junction.
(4) at hole elder generation fill concrete or the grouting material of the first precast reinforced concrete structure, pre-relative to by first
Reinforced concrete member processed and the second precast reinforced concrete structure install after casting concrete in hole again, more convenient execute
Work.And when installing the second precast reinforced concrete structure, projection stretches in hole, compacted concrete or grouting material, can be no longer
Vibrate can ensure between concrete or grouting material and the second precast concrete (including that anchor connects reinforcing bar or concrete) closely knit
Property;The concrete being simultaneously extruded or grouting material are filled in the first precast reinforced concrete structure and the second precast concrete
Between, add the globality between component..
(5) in the precast concrete such as body of wall, floor, perforate causes hole sidewall at plate face under load action
Precast concrete be prone to peel off, the anchor bar at this can be greatly enhanced the globality of precast concrete.
Described precast reinforced concrete structure includes but not limited to precast concrete flat board, pillar, body of wall, beam, T-shaped wall
The element types such as post, L-shaped wall column, cross wall column, trough plate.
Accompanying drawing explanation
Fig. 1 is a kind of embodiment schematic diagram of the present invention.
Fig. 2 is the another kind of embodiment schematic diagram of the present invention.
Fig. 3 is the another kind of embodiment schematic diagram of the present invention.
Fig. 4 is the schematic diagram of the present invention a kind of embodiment of the first precast reinforced concrete structure.
Fig. 5 is the schematic diagram of the present invention the first precast reinforced concrete structure another kind embodiment.
Fig. 6 is the schematic diagram of the present invention the first precast reinforced concrete structure another kind embodiment.
Fig. 7 is the schematic diagram of the present invention the first precast reinforced concrete structure another kind embodiment.
Fig. 8 is the schematic diagram of the present invention the first precast reinforced concrete structure another kind embodiment.
Fig. 9 is the schematic diagram of the present invention the first precast reinforced concrete structure another kind embodiment.
Figure 10 is the schematic diagram of the present invention the first precast reinforced concrete structure another kind embodiment.
Figure 11 is the schematic diagram of the present invention a kind of embodiment of the second precast reinforced concrete structure.
Figure 12 is the schematic diagram of the present invention the second precast reinforced concrete structure another kind embodiment.
Figure 13 is the schematic diagram of the present invention the second precast reinforced concrete structure another kind embodiment.
Figure 14 is the schematic diagram of the present invention the second precast reinforced concrete structure another kind embodiment.
Figure 15 is the schematic diagram of the present invention the second precast reinforced concrete structure another kind embodiment.
Figure 16 is the schematic diagram of the present invention the second precast reinforced concrete structure another kind embodiment.
Labelling implication in accompanying drawing is: 1 first precast reinforced concrete structure 2 second precast reinforced concrete structure 3
Protruding 6 anchors of hole 4 reinforcing bar 5 concrete connect pouring concrete after reinforcing bar 7.
Detailed description of the invention
Below in conjunction with the accompanying drawings and embodiment, precast reinforced concrete structure method of attachment of the present invention is carried out detailed retouching
State.
A kind of embodiment of precast reinforced concrete structure method of attachment that the present invention proposes, such as Fig. 1 or Fig. 2 or Fig. 3, the
Having at least one through hole 3 on one precast reinforced concrete structure 1, arrange reinforcing bar 4 in hole 3, reinforcing bar 4 is anchored at hole
In 3 sidewall concrete;Concrete projection 5 is set on second precast reinforced concrete structure 2, stretches out anchor on protruding 5 and connect reinforcing bar 6;
First precast reinforced concrete structure 1 is installed, fill concrete 7 or filling in the hole 3 of the first precast reinforced concrete structure 1
Slurry;Installing the second precast reinforced concrete structure 2, on the second precast reinforced concrete structure 2, protruding 5 stretch in hole 3, anchor
Even reinforcing bar 6 can overlap with reinforcing bar 4 or be connected or near reinforcing bar 4;Concrete or grouting material are precast reinforced mixed by first after hardening
Solidifying concrete component 1 and the second precast reinforced coagulation concrete component 2 are linked to be entirety.Second prefabricated reinforced concrete structure in Fig. 1
On part 2, protruding 5 parts stretch in hole 3;In Fig. 2, on the second precast reinforced concrete structure 2, projection 5 all stretches in hole 3.
Embodiment illustrated in fig. 3 and Fig. 1 difference are the first precast reinforced coagulation concrete component 1 and the second precast reinforced coagulation concrete
The relative position of component 2 is different.Shown first precast reinforced coagulation concrete component the 1, second precast reinforced coagulation concrete structure
Part 2 is body of wall, pillar etc..Fig. 1 is the sectional view at hole, is not drawn into precast reinforced concrete structure (including that concrete is protruding)
Interior arrangement of reinforcement.
In the precast reinforced concrete structure method of attachment that the present invention proposes, the one of the first precast reinforced concrete structure
Embodiment, such as Fig. 4 or Figure 10, has hole 3 in precast reinforced concrete structure 1, hole 3 is through hole, arranges steel in hole
Muscle 4, reinforcing bar 4 is anchored in hole sidewalls concrete.In figure, dash area is cutting plane, is not drawn into precast reinforced concrete structure
Other reinforcing bars.
In the precast reinforced concrete structure method of attachment that the present invention proposes, another of the first precast reinforced concrete structure
Plant embodiment, such as Fig. 5, in precast reinforced concrete structure 1, have through hole 3, many placing of reinforcements 4, reinforcing bar 4 are set in hole 1
It is anchored in hole sidewalls concrete.In another embodiment, reinforcing bar 4 does not extends out outside hole, such as Fig. 7, Fig. 8.In the present invention
In the another kind of embodiment of the first precast reinforced concrete structure, reinforcing bar 4 exposed portion is U-shaped, such as Fig. 8, such as Fig. 9;At another
In embodiment, reinforcing bar 4 exposed portion is parallel with hole 1, such as Fig. 4;In another embodiment, reinforcing bar 4 exposed portion is oblique with hole 3
Hand over, such as Fig. 8;In another embodiment, the part that reinforcing bar 4 is connected with precast concrete and hole 3 oblique, remainder and hole
3 is parallel, such as Fig. 7.
In the precast reinforced concrete structure method of attachment that the present invention proposes, the one of the second precast reinforced concrete structure
Embodiment, such as Figure 11, the second precast reinforced concrete structure 2 arranges protruding 5, stretches out anchor and connect reinforcing bar 6 on protruding 5, and anchor connects reinforcing bar 6
For U-shaped.In another embodiment, such as Figure 12, the second precast reinforced concrete structure 2 arranges protruding 5, stretches out anchor and connect steel on protruding 5
Muscle 6, anchor connects reinforcing bar 6 for linear.It can be other shape that anchor connects reinforcing bar 6.
In the precast reinforced concrete structure method of attachment that the present invention proposes, another of the second precast reinforced concrete structure
Planting embodiment, such as Figure 13, the second precast reinforced concrete structure 2 arranges protruding 5, and the width of protruding 5 is identical with component thickness.
In the precast reinforced concrete structure method of attachment that the present invention proposes, another of the second precast reinforced concrete structure
Kind of embodiment, such as Figure 14, the second precast reinforced concrete structure 2 arranges protruding 5, the end expanding of protruding 5, be conducive to strengthening with
Rear pouring concrete 7 connection integrity.
In the precast reinforced concrete structure method of attachment that the present invention proposes, another of the second precast reinforced concrete structure
Planting embodiment, such as Figure 15 or 16, the second precast reinforced concrete structure 2 arranges protruding 5, arranges groove on protruding 5, is conducive to increasing
By force with rear pouring concrete 7 connection integrity.The degree of depth of the groove height equal to protruding 5, such as Figure 15, or the height less than protruding 5,
Such as Figure 16.
Claims (7)
1. a precast reinforced concrete structure method of attachment, by the first precast concrete and the second precast concrete
It is linked to be entirety, it is characterised in that on described first precast reinforced concrete structure, have at least one through hole, described hole
Inside arranging reinforcing bar, described Bar Anchorage is in hole sidewalls concrete;Coagulation is had on described second precast reinforced concrete structure
Soil is protruding, and protruding end is stretched out anchor and connected reinforcing bar;First precast reinforced concrete structure is installed, fill concrete in described hole
Or grouting material, then the second precast reinforced concrete structure is installed, described second precast reinforced concrete structure protruding all or
Part stretches in described hole.
Precast reinforced concrete structure method of attachment the most according to claim 1, it is characterised in that reinforcing bar in described hole
Parallel with hole, or with hole oblique.
Precast reinforced concrete structure method of attachment the most according to claim 1, it is characterised in that described second pre-manufactured steel
Reinforced concrete component is arranged on the first precast reinforced concrete structure top.
Precast reinforced concrete structure method of attachment the most according to claim 1, it is characterised in that described second pre-manufactured steel
Reinforced concrete component is arranged on the first precast reinforced concrete structure bottom.
Precast reinforced concrete structure method of attachment the most according to claim 1, it is characterised in that described precast reinforced mixed
Solidifying soil component is vertical member.
Precast reinforced concrete structure method of attachment the most according to claim 5, it is characterised in that described vertical member is
Pillar, or described vertical member is body of wall.
Precast reinforced concrete structure method of attachment the most according to claim 1, it is characterised in that described precast reinforced mixed
Solidifying soil component is horizontal member, and described horizontal member is beam or plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610610898.3A CN106223489A (en) | 2016-07-29 | 2016-07-29 | A kind of precast reinforced concrete structure method of attachment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610610898.3A CN106223489A (en) | 2016-07-29 | 2016-07-29 | A kind of precast reinforced concrete structure method of attachment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106223489A true CN106223489A (en) | 2016-12-14 |
Family
ID=57535469
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610610898.3A Withdrawn CN106223489A (en) | 2016-07-29 | 2016-07-29 | A kind of precast reinforced concrete structure method of attachment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106223489A (en) |
-
2016
- 2016-07-29 CN CN201610610898.3A patent/CN106223489A/en not_active Withdrawn
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106088348A (en) | A kind of precast concrete method of attachment | |
CN107354862A (en) | Prefabricated interlayer steel tube concrete and hollow steel bar concrete assembly bridge pier | |
CN106223477A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN209243750U (en) | The bindiny mechanism of concrete precast pile and pile foundation support table | |
CN106245786A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN106223471A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN106223489A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN106088351A (en) | A kind of precast concrete method of attachment | |
CN106223483A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN106223488A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN109322319A (en) | The bindiny mechanism of concrete precast pile and pile foundation support table | |
CN106193324A (en) | A kind of precast concrete method of attachment | |
CN106223487A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN106223470A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN106223472A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN106088354A (en) | A kind of interlayer connection node | |
CN106223486A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN106245757A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN106223478A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN106223476A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN106223473A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN106088350A (en) | A kind of precast concrete method of attachment | |
CN106088349A (en) | A kind of precast concrete method of attachment | |
CN106223484A (en) | A kind of precast reinforced concrete structure method of attachment | |
CN106193327A (en) | A kind of precast reinforced concrete structure method of attachment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20161214 |
|
WW01 | Invention patent application withdrawn after publication |