CN106223212A - A kind of reinforcement means suffering fired damage bridge - Google Patents

A kind of reinforcement means suffering fired damage bridge Download PDF

Info

Publication number
CN106223212A
CN106223212A CN201610654143.3A CN201610654143A CN106223212A CN 106223212 A CN106223212 A CN 106223212A CN 201610654143 A CN201610654143 A CN 201610654143A CN 106223212 A CN106223212 A CN 106223212A
Authority
CN
China
Prior art keywords
fired
steel plate
steel
bridge
damage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610654143.3A
Other languages
Chinese (zh)
Other versions
CN106223212B (en
Inventor
朱汉华
陈孟冲
李志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO COMMUNICATIONS PLANNING INSTITUTE CO., LTD.
Tibet Ganoderma Lucidum Construction Consulting Group Co., Ltd.
Original Assignee
Ningbo Communications Planning Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Communications Planning Institute Co Ltd filed Critical Ningbo Communications Planning Institute Co Ltd
Priority to CN201610654143.3A priority Critical patent/CN106223212B/en
Publication of CN106223212A publication Critical patent/CN106223212A/en
Application granted granted Critical
Publication of CN106223212B publication Critical patent/CN106223212B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of reinforcement means suffering fired damage bridge, belong to construction method field.The hollow slab girder of the method bridge fired damage or T beam or small box girder, use artificial chisel to cut the concrete of loose peeling below the hollow slab girder of fired damage or T beam or small box girder except mode, use giant to be rinsed well by beam slab lower surface concrete;Lift steel plate or girder steel again, pour high-strength binding material simultaneously, its damage location is strengthened.The reinforcement means of the present invention can be greatly improved vertical rigidity and the globality of fired damage bridge, recovers the operation bearing capacity of bridge as early as possible.Meanwhile, unsupported reinforced construction method, both solved such bridge vertical rigidity and horizontal globality deficiency problem, solving again cannot staking or the highest problem of staking cost below bridge.Meanwhile, there is the advantages such as reinforcing the shortest, the easy construction of operation.

Description

A kind of reinforcement means suffering fired damage bridge
Technical field
The invention belongs to construction method field, be specifically related to a kind of reinforcement means suffering fired damage bridge.
Background technology
In recent years, Chinese Highway bridge construction develops rapidly, below the bridge of the highway bridge particularly combination area of city and country easily Combustion thing causes fire more due to influence factor, it is difficult to controls, also gradually increased by the number of times of fire.Fire not only causes Serious economic loss, and the reinforced concrete structure of bridge is under the physics and chemical action of fire, its intensity and springform The mechanical properties such as amount will go down, and adhesion strength between reinforcing bar to concrete is corresponding to be declined, and the section bearing capacity of bridge also can reduce, Cause bridge security hidden danger, and then affect highway operation safety.Therefore, it is necessary to quickly the degree of injury of bridge structure is just made True judgement, and then take scientific and reasonable restoring and fastening method, recovering as early as possible to be open to traffic, the loss caused by fire drops to Minimum, it is current urgent problem." research of steel plate concrete composite reinforcement method test and practical application of bridge " (Shi Xiong Big, 2012) disclose a kind of bridge reinforcing method that overdoes commonly used in the prior art, predominantly: to burning critical regions beam body Using composite reinforcement, general area beam body uses affixing steel plate reinforcement.Utilize reinforcing bar by Interal fixation on cored slab, exist simultaneously Air-free concrete is used to be filled with between cored slab and steel plate.The method can actually play the effect of reinforcing in theory, but It is that applicant studies discovery, in actual use, on the one hand only covers the base plate overdoed and part abdomen due to its steel plate Plate, during follow-up use, load can gradually concentrate at the unlapped web of steel plate, pacifies the structure of this subregion Entirely cause a hidden trouble;On the other hand, its steel plate uses reinforcing bar to implant beam body and is fixed, and this can weaken the bending rigidity of beam, impact Its bearing capacity.Meanwhile, using air-free concrete to be filled with, the adhesive property between itself and original concrete, steel plate is not enough, Easily lead to come off.Further, above-mentioned construction method needs to lay support, the most time-consumingly, affects operation and is open to traffic speed, Also the area having the erection bracket such as current demand difficult it is not used under bridge.Therefore, await providing one preferably to suffer The reinforcement means of fired damage bridge.
Summary of the invention
It is an object of the invention to solve problems of the prior art, and a kind of fired damage bridge of suffering is provided Reinforcement means, it is possible to make bridge recover as early as possible to be open to traffic in the case of ensureing bridge structure safe.
The technical solution adopted in the present invention is as follows:
Suffer the reinforcement means of fired damage bridge, be directed to bridge fired damage parts be hollow slab girder or T beam or One of small box girder.The reinforcement means main purpose of the present invention is to improve the bridge vertical rigidity after reinforcing and globality, reduces lotus Carry the difference of cross direction profiles ratio and design, improve the bearing capacity of bridge.
The reinforcement means of hollow slab girder is:
1.1 remove deck paving, cut beam slab hinge seam and use bar planting to strengthen;
1.2 use artificial chisel to cut the concrete of peeling loose below the hollow slab girder of fired damage except mode, Use giant to be carried out by beam panel surface concrete, and the reinforcing bar of corrosion is eliminated rust, cleans, then reinforcing bar is prevented Rust processes;
Article 1.3 two, the beam slab hinge seam two ends between bent cap erect hanging device, and lifting rope is by hinge seam lifting H profile steel beam or double Spelling channel-section steel is in place, then connects screw rod, pastes two bar shaped catch, make on H profile steel beam or Two bors d's oeuveres channel-section steel top flange The edge of a wing, bar shaped catch and with between the beam slab bottom surface of hinged seam formed accommodate cavity;Meanwhile, fix at the hinge seam above bent cap Steel plate.This steel plate plays and seals the effect cutting with scissors seam above bent cap, and it can be separately provided and the top flange of girder steel can also be used to prolong Stretch realization;
1.4 pour high-strength binding material in beam slab hinge seam, make high-strength binding material fill up described receiving cavity and hinge Seam, is bonded into entirety by beam slab and girder steel, plays common stress deformation effect;
1.5 other by cut concrete position use polymer mending mortar exfoliation is repaired;
The reinforcement means of T beam is:
2.1 use artificial chisel to cut the concrete of loose peeling below the T beam of fired damage except mode, use height Beam panel surface concrete is carried out by setting-out rifle, and the reinforcing bar of corrosion is eliminated rust, cleaned, then reinforcing bar is made antirust place Reason;
2.2 punching at the wet seam crossing of floorings, erect hanging device, the hole that lifting rope is dug out by wet seam crossing above T beam Hole lifting U-shaped steel plate hoop is in place, makes U-shaped steel plate hoop cover whole base plate and the web of T beam, then connects Screw arbor with nut at both-ends by U-shaped Steel plate hoop is fixed on T beam;
T beam and U-shaped steel plate hoop, to the full high-strength binding material of pressure injection between T beam and U-shaped steel plate hoop, are bonded into entirety by 2.3, Play common stress deformation effect;
2.4 other by cut concrete position use polymer mending mortar exfoliation is repaired;
The reinforcement means of small box girder is:
3.1 use artificial chisel to cut the concrete of peeling loose below the small box girder of fired damage except mode, adopt With giant, beam panel surface concrete is carried out, and the reinforcing bar of corrosion is eliminated rust, cleans, then reinforcing bar is made antirust Process;
3.2 punching at the wet seam crossing of floorings, erect hanging device above small box girder, and lifting rope is dug out by wet seam crossing Hole lifting U-shaped steel plate hoop in place, make U-shaped steel plate hoop cover the whole base plate of small box girder and web, then connect drawing spiral shell U-shaped steel plate hoop is fixed on small box girder by bar;
Small box girder and U-shaped steel plate hoop, to the full high-strength binding material of pressure injection between small box girder and U-shaped steel plate hoop, are bonded by 3.3 Integral, play common stress deformation effect;
3.4 other by cut concrete position use polymer mending mortar exfoliation is repaired.
Heretofore described U-shaped steel plate hoop refers to the structure with the generally U-shaped of Plate Welding or matrix.
In above-mentioned reinforcing process, it is necessary first to the concrete of peeling loose below the hollow slab girder of fired damage is dug Remove.If not carrying out cutting directly reparation, easily making this part come off during follow-up use, affecting globality.Further, Beam slab hinge seam, T beam or the base plate of small box girder and web carried out steel plate/strengthening of steel bridge, to irrigate the high-strength bonding materials such as MPC simultaneously Material, makes steel plate/girder steel, binding material and original beam body form an entirety, common stress deformation, prevents excessive load from gathering Combine in a certain fragile position, cause potential safety hazard.Further, in the present invention, construction to hollow slab girder have employed without support side Formula, i.e. directly sets up hanging device, is winched to by girder steel bottom beam slab, stitch infusion and binding material wherein by hinge at two ends.Should Method can be greatly improved the construction convenience having the unsuitable erection bracket areas such as current demand under bridge.
As preferably, described high-strength binding material should meet following requirement: 1) is not less than with Concrete Bond Strength 2.5Mpa;2) elastic model amount is more than 1000Mpa;3), after mixing and stirring, setting time is more than half an hour;4) bonding within 6 hours Intensity is above standard the half of intensity.
The These parameters selection gist of high-strength binding material is described below.In the present invention, binding material role Be divided into two aspects, one be improve between different hollow slab girder, T beam or the globality structural strength of small box girder;Two is by Two bors d's oeuveres groove Steel or H profile steel beam are bonded in bottom hollow slab girder and T beam or small box girder cladding plate side.1) general concrete breaking resistance is 2Mpa, therefore, Concrete Bond Strength should be not less than 2Mpa, is preferably not less than 2.5Mpa through overtesting, leaves safety coefficient.When Binding material meet this when requiring, even if by too high load between different beam slab, the bonding at hinge seam also will not be broken Bad, contrary destruction occurs on the contrary in beam slab concrete.Therefore, it greatly improves the globality between beam slab.2) it addition, Finding through overtesting, when elastic model amount is more than 1000Mpa, can coordinate girder steel flexural deformation, otherwise elastic model amount is the least Girder steel possibly cannot be pasted on beam slab, T beam or small box girder, causes both to be partially or wholly separated, it is impossible to play raising beam body The effect of rigidity.3) in view of the needs of working procedure, the setting time after mix is difficult to too short, otherwise cannot be at casting process In realize best bond performance.4) in view of the problem of efficiency of construction, the adhesion strength within 6 hours should be above standard intensity Half, otherwise its required time is long, and the operation affecting bridge is open to traffic.
Further, described high-strength binding material is epoxy resin mortar or MPC composite.This bi-material can be preferable Be applied to the reinforcing of bridge, and easy construction.
As preferably, described Two bors d's oeuveres channel-section steel uses two hot-rolled steel channels to become an entirety with upper and lower Plate Welding, passes through Connect below the beam slab hinge seam that screw rod is fixed between two bent caps, and the upper steel plate of Two bors d's oeuveres channel-section steel extends over above bent cap Hinge seam;Two bors d's oeuveres channel-section steel or H profile steel beam meet following condition: 1) with the top flange width of beam base plate bonding not less than 150mm, height is not Less than 150mm, thickness of slab is no less than 6mm;2) Q345 or Q235 steel is used;3) weathering steel, carbon steel and low-alloy high-strength are used Steel;4) upper surface of girder steel top flange, factory's ball blast Sa2.5 level, if on-the-spot discovery is got rusty, should manual ball blast to St3.0 level.Throw The effect of ball is to increase the adhesion strength of binding material.
Further, when described Two bors d's oeuveres channel-section steel or H profile steel beam use carbon steel or Hi-Stren steel, except top flange Outward, long-lasting anticorrosive coating all should be used, be otherwise easily caused remainder corrosion, affect the rigidity of girder steel, ultimately result in bridge Beam reinforcement performance is decayed.
As preferably, described connection screw rod uses Ribbed Bar, and reinforcing bar grade is not less than HRBF400, and bar diameter is not Less than 16mm, spacing is not more than 0.5m.
As preferably, described U-shaped steel plate hoop is satisfied to be required as follows: 1) using Plate Welding to form, steel plate thickness is the least In 6mm;2) Q345 or Q235 steel is used;3) weathering steel, carbon steel or Hi-Stren steel can be used, both after using Time, exposed face all should use long-acting type anticorrosive coating;(4) meet and at diaphragm, after steel plate bending, wrap up diaphragm outer surface, and use Crab-bolt is fixed;(5) U-shaped steel plate hoop inner surface, factory's ball blast Sa2.5 level, if on-the-spot discovery is got rusty, should manual ball blast to St3.0 Level.
As preferably, described Screw arbor with nut at both-ends meets following requirement: using Ribbed Bar, reinforcing bar grade is not less than HRBF400, bar diameter is not less than 16mm, and spacing is 0.5m~1.0m.
As preferably, described U-shaped steel plate hoop by segmental hoisting in place after, then be welded into entirety.The method is for U Shape steel plate hoop weight is excessive, the situation of lifting difficulty and improve, can be split as U-shaped steel plate hoop suitably lifting is some Sheet, lifts the most successively, the most in place after be welded and fixed.
As preferably, described U-shaped steel plate hoop extends to the top board lower position of T beam or small box girder, and U-shaped steel plate hoop with The full high-strength binding material of pressure injection between top board.When burnt area is less, cause damage the most serious on the top board of T beam or small box girder Time, only the concrete of its loose peeling can be cut, with polymer mending mortar, exfoliation be repaiied the most again Multiple.When top board damage exceed to a certain degree time, then need by cover web U-shaped steel plate hoop continue extend, wrap further Wrap up in top board bottom, the fuller high-strength binding material of pressure injection, improve globality.
The reinforcement means of the present invention can be greatly improved vertical rigidity and the globality of fired damage bridge, recovers bridge as early as possible The operation bearing capacity of beam.Meanwhile, unsupported reinforced construction method, both solved such bridge vertical rigidity and horizontal globality Not enough problem, solving again cannot staking or the highest problem of staking cost below bridge.Meanwhile, there is reinforcing operation time-consuming The advantages such as short, easy construction.
Accompanying drawing explanation
Fig. 1 is to suffer fired damage cored slab Scheme of Strengthening cross-sectional view in the present invention;
Fig. 2 is to suffer fired damage cored slab Scheme of Strengthening elevation (in figure dimensional units: centimetre) in the present invention;
Fig. 3 is to suffer fired damage T beam Scheme of Strengthening cross-sectional view in the present invention;
Fig. 4 is to suffer fired damage small box girder Scheme of Strengthening cross-sectional view in the present invention;
Fig. 5 is to suffer fired damage T beam (or small box girder) Scheme of Strengthening elevation (dimensional units: centimetre) in the present invention.
Detailed description of the invention
With detailed description of the invention the present invention it is further elaborated below in conjunction with the accompanying drawings and illustrates.In this detailed description of the invention Provide a kind of reinforcement means preferably suffering fired damage bridge.But each technical characteristic following is the most conflicting Under premise, all can carry out respective combination.
In the present embodiment, bridge to be reinforced is hollow slab girder or T beam or small box girder sets up and forms.Bridge bottom suffers fire Burn, cause the base plate of hollow slab girder or T beam or the web of small box girder, base plate and top board all to receive damage in various degree.Adopt With the reinforcement means of the present invention, it is reinforced, specific as follows:
1, assessment component damage degree
It is first according to " fire-damaged building structure standard of perfection " pertinent regulations every damage to suffering to burn concrete component Wound is analyzed, and mainly includes the degree of injury of concrete material, reinforcing bar and the degree of injury of presstressed reinforcing steel mechanical property, reinforcing bar With the degree of injury etc. of Concrete Bond Strength, then infer element bearing capacity percent loss.Each structure of concrete on fire bridge The drag computational methods of part are identical with original design computational methods, and simply material parameter is varied from, reinforcing bar and concrete strength Reduce, the reduction of the element bearing capacity in turn resulted in.
2, the necessity that economic judgement is reinforced
After the theoretical analysis, if element bearing capacity have lost 20%~30%, this method can be used to carry out consolidation process; If bearing capacity loss is beyond 30%, change beam slab possibility more economical reliably.
3, consolidation process
(1) hollow slab girder
1.1 remove deck paving, cut beam slab hinge seam and use bar planting to strengthen;Increase bar planting to adapt to high-strength bonding Material (uses MPC composite) in the present embodiment, prevent cracking, increase the synergism between veneer, improve bridge overall Bearing capacity.
1.2 use artificial chisel to cut by the concrete of loose peeling below fire hollow slab girder except mode, use height Beam panel surface concrete is carried out by setting-out rifle, and the reinforcing bar of corrosion is eliminated rust, cleaned, then reinforcing bar is made antirust place Reason.
1.3 hollow slab girder hinge seam two ends erect hanging device, and after lifting rope passes hinge seam, two ends lifting Two bors d's oeuveres channel-section steel (also may be used Use H profile steel beam) in place to cutting with scissors immediately below seam, then connection screw rod is connected to Two bors d's oeuveres channel-section steel top flange through hinge seam, connects The top of screw rod may pass through one piece of upper steel plate, then fixes with nut screwing clamping.Before the high-strength binding material poured is stable, even Connect screw rod and can play interim fixation.In addition, it is necessary to paste two bar shaped catch on Two bors d's oeuveres channel-section steel top flange, catch can use Rubber strip etc..Bar shaped catch is arranged in the same direction with Two bors d's oeuveres channel-section steel girder steel.Adjust and connect screw position and height, make bar shaped catch top Contact beam slab ground, Two bors d's oeuveres channel-section steel top flange, bar shaped catch and with between the beam slab bottom surface of hinged seam formed accommodate cavity, can lead to Cross hinge seam infusion and binding material in this cavity.Below Two bors d's oeuveres channel-section steel principal set up hinge seam between two bent caps, play anti- Curved effect.Stitching for the hinge above bent cap, find in practice of construction, between bent cap and beam slab, gap is too small herein, is difficult to set Putting girder steel, and herein owing to being supported by bent cap, act primarily as shearing resistance effect, Hollow screws disclosure satisfy that bending resistance requirement.Therefore, Construction method at this is, hangs in steel plate between bent cap and Hollow screws, and steel plate bottom can be supported with backing plate, then steel Plate is fixed by connecting screw rod.Steel plate top also can arrange two bar shaped catch as girder steel, is formed and above girder steel Accommodate the cavity that is connected of cavity, can the most integrated poured binding material.Steel plate can not also use and be separately provided, and only prolongs The Two bors d's oeuveres channel-section steel top flange stretched realizes.Bridge hollow board structure after reinforcing is as shown in Fig. 1~2.
1.4 pour MPC composite in beam slab hinge seam so that it is fill up described receiving cavity and hinge seam, by beam slab and Girder steel is bonded into entirety, plays common stress deformation effect.
1.5 other by cut concrete position use polymer mending mortar exfoliation is repaired, have by specification Close and require to perform.
1.6 rebuild deck paving.
The footing health preservings such as 1.7 deck pavings, hinge seam 24 days.
1.8 are open to traffic transportation monitoring and feed back.
(2) T beam
2.1 use artificial chisel to cut by the concrete of loose peeling below fire T beam except mode, use giant Beam panel surface concrete is carried out, and the reinforcing bar of corrosion is eliminated rust, cleans, then reinforcing bar is made antirust treatment.
2.2 punching at the wet seam crossing of floorings, erect simple and easy hoisting equipment, and the hole that lifting rope is dug out by wet seam crossing hangs Dress U-shaped steel plate hoop is in place, then connects Screw arbor with nut at both-ends;Owing to U-shaped steel plate hoop weight is relatively big, integral hoisting difficulty, therefore pass through Be divided into some pieces, lift successively in place after, then be welded into entirety.Further, since cored slab base plate also receives damage, because of U-shaped steel plate hoop is extended to the top board lower position of T beam or small box girder by this, will also fix upper steel plate, then at U-shaped on base plate Between steel plate hoop and top board, pressure injection expires high-strength binding material in the lump.
2.3, to the full high-strength binding material MPC of pressure injection between T beam and U-shaped steel plate hoop etc., are bonded into T beam and U-shaped steel plate hoop Entirety, plays common stress deformation effect.
2.4 other positions use the concrete that high-strength fast cohesion compound mending mortar reparation is peeled off, by the relevant requirement of specification Perform.
2.5 repair floorings wet seam hole and deck paving;T girder construction after reinforcing is as shown in Figures 3 and 5.
2.6 repair and footing health preserving 24 days.
2.7 are open to traffic transportation monitoring and feed back.
(2) small box girder
3.1 use artificial chisel to cut by the concrete of loose peeling below fire small box girder except mode, use high pressure Beam panel surface concrete is carried out by hydraulic giant, and the reinforcing bar of corrosion is eliminated rust, cleaned, then reinforcing bar is made antirust treatment.
3.2 punching at the wet seam crossing of floorings, erect hanging device above small box girder, and lifting rope is dug out by wet seam crossing Hole lifting U-shaped steel plate hoop in place, make U-shaped steel plate hoop cover the whole base plate of small box girder and web, then connect drawing spiral shell U-shaped steel plate hoop is fixed on small box girder by bar.
3.3 (can certainly use to the full high-strength binding material epoxy resin mortar of pressure injection between small box girder and U-shaped steel plate hoop MPC), small box girder and U-shaped steel plate hoop are bonded into entirety, play common stress deformation effect.
3.4 other positions use the concrete that high-strength fast cohesion compound mending mortar reparation is peeled off, by the relevant requirement of specification Perform.
3.5 repair floorings wet seam hole and deck paving;Small box girder structure after reinforcing is as shown in Figures 4 and 5.
3.6 repair and footing health preserving 24 days.
3.7 are open to traffic transportation monitoring and feed back.
In above-mentioned construction method, material and parameter for steel plate, binding material and connector have strict requirements, Need to meet corresponding intensity.Specific as follows:
The requirement of Two bors d's oeuveres channel-section steel: (1) can use two hot-rolled steel channels to become an entirety with upper and lower Plate Welding;(2) combination In cross section, top flange width is not less than 150mm, and deck-molding is no less than 150mm, and thickness of slab is no less than 6mm;(3) Q345 and Q235 can be used Steel, preferably Q235;(4) weathering steel, carbon steel and Hi-Stren steel can be used, when use after both time, in addition to top flange, Long-acting type anticorrosive coating all should be used;(5) upper surface of girder steel top flange, factory's ball blast Sa2.5 level, if on-the-spot discovery is got rusty, Should manual ball blast to St3.0 level.
Connect the requirement of screw rod: using Ribbed Bar, reinforcing bar grade is not less than HRBF400, bar diameter 16mm, and spacing is not More than 0.5m.
The requirement of U-shaped steel plate hoop: (1) uses Plate Welding to form, and steel plate thickness is not less than 6mm;(2) can use Q345 and Q235 steel, preferably Q235;(3) weathering steel, carbon steel and Hi-Stren steel can be used, when use after both time, exposed face Long-acting type anticorrosive coating all should be used;(4) if full wafer u tie lifting weight is relatively big, sectional processing and fabricating, on-site hoisting is just Entirety it is welded into after Wei;(5) meet and at diaphragm, after steel plate bending, wrap up diaphragm outer surface, and fix by crab-bolt;(6) U-shaped steel Plate hoop inner surface, factory's ball blast Sa2.5 level, if on-the-spot discovery is got rusty, should manual ball blast to St3.0 level.
The requirement of Screw arbor with nut at both-ends: using Ribbed Bar, reinforcing bar grade is not less than HRBF400, bar diameter is not less than 16mm, Spacing is generally 0.5m~1.0m.
The requirement of high-strength binding material: (1) and Concrete Bond Strength are not less than 2.5Mpa, and destroy generation at concrete In;(2) elastic model amount is more than 1000Mpa;(3), after mixing and stirring, solidification practice is more than half an hour;Bonding within (4) 6 hours is strong Spend the half of the intensity that is above standard;Such as: epoxy resin mortar, MPC composite etc..
The performance parameter of above three parts is also the crucial Fundamentals realizing reinforcing axle casing globality, any one Parts are defective all may be caused the globality of bridge impaired or cause potential potential safety hazard.
After being repaired bridge by said method, during the transportation monitoring that is open to traffic, feedback is good, and bridge is whole Body is enhanced, and is fully able to meet the condition that is open to traffic.
Embodiment described above is the one preferably scheme of the present invention, and so it is not intended to limiting the invention.Have Close the those of ordinary skill of technical field, without departing from the spirit and scope of the present invention, it is also possible to make various change Change and modification.The technical scheme that the most all modes taking equivalent or equivalent transformation are obtained, all falls within the guarantor of the present invention In the range of protecting.

Claims (10)

1. suffering a reinforcement means for fired damage bridge, bridge fired damage parts is hollow slab girder or T beam or small box girder; It is characterized in that including:
The reinforcement means of hollow slab girder is:
1.1 remove deck paving, cut beam slab hinge seam and use bar planting to strengthen;
1.2 use artificial chisel to cut the concrete of peeling loose below the hollow slab girder of fired damage except mode, use Beam panel surface concrete is carried out by giant, and the reinforcing bar of corrosion is eliminated rust, cleaned, then reinforcing bar is made antirust place Reason;
Article 1.3 two, the beam slab hinge seam two ends between bent cap erect hanging device, and lifting rope is by hinge seam lifting H profile steel beam or Two bors d's oeuveres groove Steel is in place, then connects screw rod, pastes two bar shaped catch, make top flange, bar shaped on H profile steel beam or Two bors d's oeuveres channel-section steel top flange Catch and with between the beam slab bottom surface of hinged seam formed accommodate cavity;Meanwhile, fixation steel plate at the hinge seam above bent cap;
1.4 pour high-strength binding material in beam slab hinge seam, make high-strength binding material fill up described receiving cavity and hinge seam, will Beam slab and girder steel are bonded into entirety, play common stress deformation effect;
1.5 other by cut concrete position use polymer mending mortar exfoliation is repaired;
The reinforcement means of T beam is:
2.1 use artificial chisel to cut the concrete of loose peeling below the T beam of fired damage except mode, use water under high pressure Beam panel surface concrete is carried out by rifle, and the reinforcing bar of corrosion is eliminated rust, cleaned, then reinforcing bar is made antirust treatment;
2.2 punching at the wet seam crossing of floorings, erect hanging device above T beam, and the hole that lifting rope is dug out by wet seam crossing hangs Dress U-shaped steel plate hoop is in place, makes U-shaped steel plate hoop cover whole base plate and the web of T beam, then connects Screw arbor with nut at both-ends by U-shaped steel plate Hoop is fixed on T beam;
T beam and U-shaped steel plate hoop, to the full high-strength binding material of pressure injection between T beam and U-shaped steel plate hoop, are bonded into entirety, play by 2.3 Common stress deformation effect;
2.4 other by cut concrete position use polymer mending mortar exfoliation is repaired;
The reinforcement means of small box girder is:
3.1 use artificial chisel to cut the concrete of peeling loose below the small box girder of fired damage except mode, use height Beam panel surface concrete is carried out by setting-out rifle, and the reinforcing bar of corrosion is eliminated rust, cleaned, then reinforcing bar is made antirust place Reason;
3.2 punching at the wet seam crossing of floorings, erect hanging device, the hole that lifting rope is dug out by wet seam crossing above small box girder Hole lifting U-shaped steel plate hoop is in place, makes U-shaped steel plate hoop cover whole base plate and the web of small box girder, then connects Screw arbor with nut at both-ends by U Shape steel plate hoop is fixed on small box girder;
Small box girder and U-shaped steel plate hoop, to the full high-strength binding material of pressure injection between small box girder and U-shaped steel plate hoop, are bonded into whole by 3.3 Body, plays common stress deformation effect;
3.4 other by cut concrete position use polymer mending mortar exfoliation is repaired.
Suffer the reinforcement means of fired damage bridge the most as claimed in claim 1, it is characterised in that described high-strength bonding material Material should meet following requirement: 1) with Concrete Bond Strength not less than 2.5Mpa;2) elastic model amount is more than 1000Mpa;3) mix With rear, setting time is more than half an hour;4) adhesion strength within 6 hours is above standard the half of intensity.
Suffer the reinforcement means of fired damage bridge the most as claimed in claim 2, it is characterised in that described high-strength bonding material Material is epoxy resin mortar or MPC composite.
Suffer the reinforcement means of fired damage bridge the most as claimed in claim 1, it is characterised in that described Two bors d's oeuveres channel-section steel is adopted Becoming an entirety with two hot-rolled steel channels with upper and lower Plate Welding, the beam slab being fixed between two bent caps by connecting screw rod cuts with scissors Below seam, and the upper steel plate of Two bors d's oeuveres channel-section steel extends over the hinge seam above bent cap;Two bors d's oeuveres channel-section steel or H profile steel beam meet following bar Part: 1) with the top flange width of beam base plate bonding not less than 150mm, high no less than 150mm, thickness of slab is no less than 6mm;2) use Q345 or Q235 steel;3) weathering steel, carbon steel and Hi-Stren steel are used;4) upper surface of girder steel top flange, factory throws Ball Sa2.5 level, if on-the-spot discovery is got rusty, should manual ball blast to St3.0 level.
Suffer the reinforcement means of fired damage bridge the most as claimed in claim 4, it is characterised in that described Two bors d's oeuveres channel-section steel or When H profile steel beam uses carbon steel or Hi-Stren steel, in addition to top flange, long-lasting anticorrosive coating all should be used.
Suffer the reinforcement means of fired damage bridge the most as claimed in claim 1, it is characterised in that described connection screw rod is adopted By Ribbed Bar, reinforcing bar grade is not less than HRBF400, and bar diameter is not less than 16mm, and spacing is not more than 0.5m.
Suffer the reinforcement means of fired damage bridge the most as claimed in claim 1, it is characterised in that described U-shaped steel plate hoop Meet and require as follows: 1) use Plate Welding to form, steel plate thickness is not less than 6mm;2) Q345 or Q235 steel is used;3) can use Weathering steel, carbon steel or Hi-Stren steel, when use after both time, exposed face all should use long-acting type anticorrosive coating;(4) Meet and at diaphragm, after steel plate bending, wrap up diaphragm outer surface, and fix by crab-bolt;(5) U-shaped steel plate hoop inner surface, factory's ball blast Sa2.5 level, if on-the-spot discovery is got rusty, should manual ball blast to St3.0 level.
Suffer the reinforcement means of fired damage bridge the most as claimed in claim 1, it is characterised in that described Screw arbor with nut at both-ends is full Foot is following to be required: using Ribbed Bar, reinforcing bar grade is not less than HRBF400, and bar diameter is not less than 16mm, spacing be 0.5m~ 1.0m。
Suffer the reinforcement means of fired damage bridge the most as claimed in claim 1, it is characterised in that described U-shaped steel plate hoop By segmental hoisting in place after, then be welded into entirety.
Suffer the reinforcement means of fired damage bridge the most as claimed in claim 1, it is characterised in that described U-shaped steel plate hoop Extend to the top board lower position of T beam or small box girder, and the full high-strength binding material of pressure injection between U-shaped steel plate hoop and top board.
CN201610654143.3A 2016-08-11 2016-08-11 A kind of reinforcement means by fired damage bridge Active CN106223212B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610654143.3A CN106223212B (en) 2016-08-11 2016-08-11 A kind of reinforcement means by fired damage bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610654143.3A CN106223212B (en) 2016-08-11 2016-08-11 A kind of reinforcement means by fired damage bridge

Publications (2)

Publication Number Publication Date
CN106223212A true CN106223212A (en) 2016-12-14
CN106223212B CN106223212B (en) 2017-12-15

Family

ID=57547474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610654143.3A Active CN106223212B (en) 2016-08-11 2016-08-11 A kind of reinforcement means by fired damage bridge

Country Status (1)

Country Link
CN (1) CN106223212B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988203A (en) * 2017-05-19 2017-07-28 重庆工商职业学院 With the concrete hollow slab bridge for laterally strengthening bridge deck pavement
CN107620263A (en) * 2017-10-26 2018-01-23 南京林业大学 A kind of reinforcement means for strengthening bridge lateral contact
CN108547222A (en) * 2018-04-24 2018-09-18 上海申继交通科技有限公司 The reparation structure and its construction method of a kind of hollow slab girder bridge floor system damage
CN108755459A (en) * 2018-08-10 2018-11-06 山东交通学院 A kind of compound anti-bend reinforced construction of old Hollow Slab Beam Bridge steel wire rope MPC and construction method
CN109468965A (en) * 2018-12-04 2019-03-15 浙江交通职业技术学院 A kind of concrete-bridge bracing means and reinforcement means by Fire-damaged
CN109594484A (en) * 2017-09-30 2019-04-09 郑州市交通规划勘察设计研究院 Bridge strengthening device, ruggedized construction, reinforced construction method and reinforcement and repair method
CN109989359A (en) * 2019-03-08 2019-07-09 苏交科集团股份有限公司 A kind of hollow slab girder reinforcement means and structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001064916A (en) * 1999-08-31 2001-03-13 Kyobashi Kogyo Kk Reinforcement of bridge including joint
KR20050054406A (en) * 2003-12-04 2005-06-10 이창남 Strengthening method of continuous girder and beam applying post tensioning
CN203007819U (en) * 2013-01-20 2013-06-19 青岛理工大学 Assembled plate girder bridge hinge joint reinforcing opposite-pulling device
CN203361030U (en) * 2013-06-25 2013-12-25 西安公路研究院 Box beam or T-shaped beam reinforcing structure combining unbonded pre-stress and steel plate concrete
CN103898841A (en) * 2014-04-23 2014-07-02 魏志新 Hollow slab bridge reinforcing method
CN204023425U (en) * 2014-09-25 2014-12-17 广东工业大学 The U-shaped hoop reinforcing construction of T-shaped beam bridge steel plate

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001064916A (en) * 1999-08-31 2001-03-13 Kyobashi Kogyo Kk Reinforcement of bridge including joint
KR20050054406A (en) * 2003-12-04 2005-06-10 이창남 Strengthening method of continuous girder and beam applying post tensioning
CN203007819U (en) * 2013-01-20 2013-06-19 青岛理工大学 Assembled plate girder bridge hinge joint reinforcing opposite-pulling device
CN203361030U (en) * 2013-06-25 2013-12-25 西安公路研究院 Box beam or T-shaped beam reinforcing structure combining unbonded pre-stress and steel plate concrete
CN103898841A (en) * 2014-04-23 2014-07-02 魏志新 Hollow slab bridge reinforcing method
CN204023425U (en) * 2014-09-25 2014-12-17 广东工业大学 The U-shaped hoop reinforcing construction of T-shaped beam bridge steel plate

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988203A (en) * 2017-05-19 2017-07-28 重庆工商职业学院 With the concrete hollow slab bridge for laterally strengthening bridge deck pavement
CN109594484A (en) * 2017-09-30 2019-04-09 郑州市交通规划勘察设计研究院 Bridge strengthening device, ruggedized construction, reinforced construction method and reinforcement and repair method
CN107620263A (en) * 2017-10-26 2018-01-23 南京林业大学 A kind of reinforcement means for strengthening bridge lateral contact
CN108547222A (en) * 2018-04-24 2018-09-18 上海申继交通科技有限公司 The reparation structure and its construction method of a kind of hollow slab girder bridge floor system damage
CN108755459A (en) * 2018-08-10 2018-11-06 山东交通学院 A kind of compound anti-bend reinforced construction of old Hollow Slab Beam Bridge steel wire rope MPC and construction method
CN109468965A (en) * 2018-12-04 2019-03-15 浙江交通职业技术学院 A kind of concrete-bridge bracing means and reinforcement means by Fire-damaged
CN109468965B (en) * 2018-12-04 2024-05-17 浙江交通职业技术学院 Concrete bridge reinforcing device and reinforcing method for fire damage
CN109989359A (en) * 2019-03-08 2019-07-09 苏交科集团股份有限公司 A kind of hollow slab girder reinforcement means and structure

Also Published As

Publication number Publication date
CN106223212B (en) 2017-12-15

Similar Documents

Publication Publication Date Title
CN106223212A (en) A kind of reinforcement means suffering fired damage bridge
AU2014268098B2 (en) Method for pre-stressing a steel structure, and steel structure pre-stressed using said method
CN104947803B (en) A kind of prefabricated sheet-pile mortise and tenon type connecting node and installation method
CN106400954A (en) Steel beam-steel pipe concrete column joint based on damage control concept
CN106121111B (en) The adjustable type steel bar truss floor support plate of the removable thickness of end template and construction method
CN106049255A (en) Simple-support variant-continuous structure of steel-ultrahigh performance concrete light composite beam and construction method for same
CN108678508A (en) The I-shaped energy consumption connector of Coupled Shear Wall structure
CN102587681B (en) Building reinforced structure and reinforcing method
CN104652242B (en) Derrick connecting structure used for reinforcing PSC (Pre-stressed Concrete) continuous box girder bridge and construction method
CN108193607A (en) Fabricated prestressed truss for reinforcement and construction method thereof
CN106087739A (en) A kind of combination U rib shaped steel floorings and preparation method thereof
CN103883154A (en) Method for field welding and strengthening of power transmission line steel angle tower leg
CN111485491A (en) Orthotropic steel bridge deck plate tough concrete composite structure and construction method
CN110241973A (en) A kind of steel-wood-concrete combination beam and its construction method
CN105464399A (en) Prefabricated checkered plate steel truss strengthening reinforced concrete frame beam structure and strengthening method
CN103291082A (en) Wood beam reinforcing body external pre-stress construction method
CN110528778A (en) A kind of Steel-concrete Combined Beam Structures that Novel tensile is cut and its manufacture craft
CN205387771U (en) C shaped steel sound insulation floor
CN110284725A (en) A kind of reinforced concrete frame node negative moment of girder assembly steel construction and its reinforcement means
CN106087782B (en) A kind of remodeling method of bridge floor floating bowstring arch bridge
CN109372284A (en) A kind of means to save the situation of broken stone bolt
CN204212406U (en) A kind of one-sided strengthening construction big steelmoulds
CN211114417U (en) Novel steel-concrete composite beam structure of tensile shear
CN206873663U (en) The low damage slab-wall structure of full prefabricated PC
CN205617580U (en) Assembled primary and secondary roof beam connection structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190823

Address after: 315 000 No. 72 Songzhaoqiao Road, Ningbo City, Zhejiang Province

Co-patentee after: Tibet Ganoderma Lucidum Construction Consulting Group Co., Ltd.

Patentee after: NINGBO COMMUNICATIONS PLANNING INSTITUTE CO., LTD.

Address before: 315 000 No. 72 Songzhaoqiao Road, Ningbo City, Zhejiang Province

Patentee before: NINGBO COMMUNICATIONS PLANNING INSTITUTE CO., LTD.