CN106217334A CN201610817690.9A CN201610817690A CN106217334A CN 106217334 A CN106217334 A CN 106217334A CN 201610817690 A CN201610817690 A CN 201610817690A CN 106217334 A CN106217334 A CN 106217334A
Authority
CN
China
Prior art keywords
workbox
casing
voltage control
control room
room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610817690.9A
Other languages
Chinese (zh)
Inventor
徐宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Guangde Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd
Guangde Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Xuancheng Power Supply Co of State Grid Anhui Electric Power Co Ltd, Guangde Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610817690.9A priority Critical patent/CN106217334A/en
Publication of CN106217334A publication Critical patent/CN106217334A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H3/00Storage means or arrangements for workshops facilitating access to, or handling of, work tools or instruments
    • B25H3/02Boxes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H5/00Tool, instrument or work supports or storage means used in association with vehicles; Workers' supports, e.g. mechanics' creepers

Abstract

The invention discloses the most mobile distribution integrated tool case, including workbox casing;Workbox box house is provided with transformer room, high voltage control room and low voltage control room;Transformer room and low voltage control room are positioned at casing middle position, workbox and tight adjacent formation transformer low voltage control room, and high voltage control room is positioned at casing forward position and the most adjacent with transformer room and low voltage control room;Transformer room is connected with high voltage control room, low voltage control room by electric conductor respectively;The both sides of described workbox casing are respectively arranged with BAIYE openning;The outer top of workbox casing is installed with pull head bolt, is provided with roller bottom it;The afterbody of workbox casing offers two fan chamber doors, and chamber door and casing junction, workbox are provided with the rubber tape of rainwater-proof;Being provided with boom hoisting and Cable hanger in the chamber body of the described transformer low voltage control room relative with chamber door, described boom hoisting includes electric hoisting device and artificial interim emergent boom hoisting.

Description

The most mobile distribution integrated tool case
Technical field
The present invention relates to power domain, be specifically related to quickly move distribution integrated tool case.
Background technology
The development of the most mobile distribution integrated tool case, after being attached to quickly move distribution integrated apparatus one Position, face, in order to ensure quickly to move the properly functioning of integrated apparatus, based on tool box special cable elbow head, earth lead, connects The particularity that earth polar, components and parts, instrument etc. use, importance and the specific transportation environment of keeping link and design.
In actual field, amount that cable assembly elbow is nose heave is relatively big, and single carrying consumes one's strength more.When operation, due to On-the-spot and the restriction of equipment, the physical demands of operating personnel is relatively big in addition, dimension, Work tool, electromotor, electric welding machine, cable and Cable elbow first-class carrying relative difficulty.
Summary of the invention
For the problems referred to above, the present invention provides the most mobile distribution integrated tool case.
The present invention is achieved through the following technical solutions:
The most mobile distribution integrated tool case, including by the workbox casing that angle steel and I-steel are framing structure;Institute State workbox box house and be provided with transformer room, high voltage control room and low voltage control room;Described transformer room and low voltage control Outdoor shape is equivalently-sized and is positioned at casing middle position, workbox and tight adjacent formation transformer low voltage control room, described high pressure Control room is positioned at casing forward position and the most adjacent with described transformer room and low voltage control room;Described transformer room leads to respectively Cross electric conductor to be connected with described high voltage control room and described low voltage control room;The both sides of described workbox casing are respectively arranged with hundred Leaf openning, described BAIYE openning is relative with described transformer room, described high voltage control room and described low voltage control room respectively; The outer top of described workbox casing is installed with pull head bolt, is provided with roller bottom it;The afterbody of described workbox casing is opened Being provided with two fan chamber doors, described chamber door and casing junction, workbox are provided with the rubber tape of rainwater-proof;Relative with described chamber door Described transformer low voltage control room chamber body on be provided with boom hoisting and Cable hanger, described boom hoisting includes electronic Device for hoisting and artificial interim emergent boom hoisting.
Preferably, described pull head bolt is provided with altogether 6, the most relatively lays respectively at the outer top of workbox casing Front end, middle part and afterbody.
Preferably, a diameter of 12mm of described pull head bolt, it fastens by welding with workbox casing.
Preferably, the surrounding employing 3mm Plate Welding of described workbox casing encloses and forms;Described workbox casing is in just Cube structure.
Preferably, the maximum hoisting weight of the electric hoisting device of described workbox casing is 150kg, and lifting rope is a length of 6m。
Preferably, the inside of described workbox casing is additionally provided with automatically controlled dehumidifier.
Preferably, the inner top of described workbox casing uses Plate Welding to have a skewed slot with fixed hoisting device.
Preferably, described artificial interim emergent boom hoisting is arranged at inside internal box, including vertical position welding from bottom to up in interior Box house deposit heavy prescription pipe support and be welded in this deposit heavy prescription pipe support on rotation pulley.
Preferably, described roller is provided with 4.
Beneficial effects of the present invention:
A kind of the most mobile distribution integrated tool case that embodiments of the invention provide, is provided with on workbox casing Boom hoisting, by boom hoisting and traditional distribution being combined into one of integrated apparatus workbox, and sets bottom workbox It is equipped with roller, is possible not only to move rapidly integrated tool case, and lifting scene is being installed, use the present invention can make to scene The staff of industry reduces labor intensity, and shortens the working time, improves working performance, saves substantial amounts of man power and material; Additionally, the internally installed cable on-hook with weight-bearing function of the present invention, flexible cable individually can be hung up with elbow head, it is to avoid with Loading in mixture of remaining Work tool and the unnecessary potential safety hazards such as insulating properties reduction that scratch cable elbow head causes and the warp caused Ji loss, therefore, has the potential of popularization and application on a large scale.
Accompanying drawing explanation
Utilize accompanying drawing that invention is described further, but the embodiment in accompanying drawing do not constitute any limitation of the invention, For those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain it according to the following drawings Its accompanying drawing.
Fig. 1 is the structural representation of the present invention.
Wherein: 1-transformer room, 2-high voltage control room, 3-low voltage control room, 4-electric hoisting device, 5-Cable hanger, 6-rubber tape, 7-pull head bolt, 8-roller, 9-BAIYE openning, 10-chamber door.
Detailed description of the invention
The invention will be further described with the following Examples.
As it is shown in figure 1, quick mobile distribution integrated tool case, including being the instrument of framing structure by angle steel with I-steel Box body;Described workbox box house is provided with transformer room 1, high voltage control room 2 and low voltage control room 3;Described transformator Room 1 is identical with low voltage control room 3 overall dimensions and is positioned at casing middle position, workbox and tight adjacent formation transformer low voltage Control room, described high voltage control room 2 is positioned at casing forward position and the most adjacent with described transformer room 1 and low voltage control room 3; Described transformer room 1 is connected with described high voltage control room 2 and described low voltage control room 3 by electric conductor respectively;Described workbox The both sides of casing are respectively arranged with BAIYE openning 9, and described BAIYE openning 9 is voltage-controlled with described transformer room 1, described height respectively Room 2 processed is relative with described low voltage control room 3;The outer top of described workbox casing is installed with pull head bolt 7, is provided with bottom it Roller 8;The afterbody of described workbox casing offers two fan chamber doors 10, and described chamber door 10 is provided with casing junction, workbox The rubber tape 6 of rainwater-proof, in some embodiments, chamber door 10 is provided with door lock, and door lock is that interior button rotates lock;With institute State and be provided with boom hoisting and Cable hanger 5, described lifting in the chamber body of the relative described transformer low voltage control room of chamber door 10 Device includes electric hoisting device 4 and artificial interim emergent boom hoisting.
Preferably, described pull head bolt 7 is provided with altogether 6, the most relatively lays respectively at the outer top of workbox casing Front end, middle part and afterbody.
Preferably, a diameter of 12mm of described pull head bolt 7, it fastens by welding with workbox casing.
Preferably, the surrounding employing 3mm Plate Welding of described workbox casing encloses and forms;Described workbox casing is in just Cube structure, additionally, the entirety of workbox casing presents milk yellow;In some embodiments, the height of whole workbox casing Degree is 3~5m, a length of 5~10m, width are 5~10m.
Preferably, the maximum hoisting weight of the electric hoisting device 4 of described workbox casing is 150kg, lifting rope length For 6m, this electric hoisting device 4 uses vertical hanging Electronic control, and is provided power supply or by implementing place by single-phase generator Interim power supply is provided.
Preferably, the inside of described workbox casing is additionally provided with automatically controlled dehumidifier, when integrated apparatus exits, and drag and drop storehouse Storehouse has the local of power supply to open the automatically controlled dehumidifier with safeguard function, to reach to remain the mesh that workbox casing is dried 's.
Preferably, described workbox casing inner top use Plate Welding have a skewed slot with fixed hoisting device, Rectangular tube and bolt.
Preferably, described artificial interim emergent boom hoisting is arranged at inside internal box, including vertical position welding from bottom to up in interior Box house deposit heavy prescription pipe support and be welded in this deposit heavy prescription pipe support on rotation pulley.
Preferably, described roller 8 is provided with 4.
Further, it is necessary to it should be noted that conscientiously check that the steel wire wear of steel wire rope and corrosion reach before using boom hoisting Originally steel wire diameter 40% and more than, or steel wire rope is by serious annealing or local arc burns victims, steel rope fault quantity Seldom, but fracture of wire increase is quickly, and steel wire rope periodically maintains with butter erasing, using according to hoisting synthetic fiber belt of suspension hook Size uses, and has mildew and rot, burn into damage the wounded and bans the use of in hoisting operation, and pine stock, broken lot, heavy wear, disconnected stock occurs in cordage Person prohibits the use of.Have two people to operate during lifting operation, forbid personnel stand in lifting thing below operate casing boom hoisting and Hoisting heavy.Lifting switch up and down proper use of, instrument casing is compact, and placing space is limited, object first put or after put Hang, carry out in order before and after, forbid electromotor to fill gasoline and inflammable thing are deposited in case, keep workbox to be dried neatly.
A kind of the most mobile distribution integrated tool case that embodiments of the invention provide, is provided with on workbox casing Boom hoisting, by boom hoisting and traditional distribution being combined into one of integrated apparatus workbox, and sets bottom workbox It is equipped with roller, is possible not only to move rapidly integrated tool case, and lifting scene is being installed, use the present invention can make to scene The staff of industry reduces labor intensity, and shortens the working time, improves working performance, saves substantial amounts of man power and material; Additionally, the internally installed cable on-hook with weight-bearing function of the present invention, flexible cable individually can be hung up with elbow head, it is to avoid with Loading in mixture of remaining Work tool and the unnecessary potential safety hazards such as insulating properties reduction that scratch cable elbow head causes and the warp caused Ji loss, therefore, has the potential of popularization and application on a large scale.
Last it should be noted that, above example is only in order to illustrate technical scheme, rather than the present invention is protected Protecting the restriction of scope, although having made to explain to the present invention with reference to preferred embodiment, those of ordinary skill in the art should Work as understanding, technical scheme can be modified or equivalent, without deviating from the reality of technical solution of the present invention Matter and scope.

Claims (9)

1. the most mobile distribution integrated tool case, it is characterised in that: include that by angle steel and I-steel be the instrument of framing structure Box body;Described workbox box house is provided with transformer room (1), high voltage control room (2) and low voltage control room (3);Described Transformer room (1) is identical with low voltage control room (3) overall dimensions and is positioned at casing middle position, workbox and tight adjacent formation Transformer low voltage control room, described high voltage control room (2) be positioned at casing forward position and with described transformer room (1) and low voltage-controlled Room processed (3) is the most adjacent;Described transformer room (1) is respectively by electric conductor and described high voltage control room (2) and described low voltage-controlled Room processed (3) is connected;The both sides of described workbox casing are respectively arranged with BAIYE openning (9), and described BAIYE openning (9) is respectively Relative with described transformer room (1), described high voltage control room (2) and described low voltage control room (3);Outside described workbox casing Top is installed with pull head bolt (7), is provided with roller (8) bottom it;The afterbody of described workbox casing offers two fan chamber doors (10), described chamber door (10) and casing junction, workbox are provided with the rubber tape (6) of rainwater-proof;With described chamber door (10) phase To described transformer low voltage control room chamber body on be provided with boom hoisting and Cable hanger (5), described boom hoisting includes Electric hoisting device (4) and artificial interim emergent boom hoisting.
Quick mobile distribution integrated tool case the most according to claim 1, it is characterised in that: described pull head bolt (7) It is provided with altogether 6, the most relatively lays respectively at the front end at outer top, middle part and the afterbody of workbox casing.
Quick mobile distribution integrated tool case the most according to claim 1, it is characterised in that: described pull head bolt (7) A diameter of 12mm, it fastens by welding with workbox casing.
Quick mobile distribution integrated tool case the most according to claim 1, it is characterised in that: described workbox casing Surrounding uses 3mm Plate Welding to enclose and forms;Described workbox casing is cube structure.
Quick mobile distribution integrated tool case the most according to claim 1, it is characterised in that: described workbox casing The maximum hoisting weight of electric hoisting device (4) is 150kg, a length of 6m of lifting rope.
Quick mobile distribution integrated tool case the most according to claim 1, it is characterised in that: described workbox casing Inside is additionally provided with automatically controlled dehumidifier.
Quick mobile distribution integrated tool case the most according to claim 1, it is characterised in that: described workbox casing Inner top uses Plate Welding to have a skewed slot with fixed hoisting device.
Quick mobile distribution integrated tool case the most according to claim 1, it is characterised in that: described artificial interim emergent Boom hoisting is arranged at inside internal box, supports including vertical position welding from bottom to up in the heavy prescription pipe of depositing within internal box and is welded in this Deposit the rotation pulley that heavy prescription pipe supports.
Quick mobile distribution integrated tool case the most according to claim 1, it is characterised in that: described roller (8) is arranged There are 4.
CN201610817690.9A 2016-09-12 2016-09-12 The most mobile distribution integrated tool case Pending CN106217334A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610817690.9A CN106217334A (en) 2016-09-12 2016-09-12 The most mobile distribution integrated tool case

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610817690.9A CN106217334A (en) 2016-09-12 2016-09-12 The most mobile distribution integrated tool case

Publications (1)

Publication Number Publication Date
CN106217334A true CN106217334A (en) 2016-12-14

Family

ID=58074842

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610817690.9A Pending CN106217334A (en) 2016-09-12 2016-09-12 The most mobile distribution integrated tool case

Country Status (1)

Country Link
CN (1) CN106217334A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001258111A (en) * 2000-03-14 2001-09-21 Takaoka Electric Mfg Co Ltd Box body of metal closing type switch gear
CN201623386U (en) * 2009-10-27 2010-11-03 泰豪科技(深圳)电力技术有限公司 Movable box-type substation
CN202004342U (en) * 2011-03-15 2011-10-05 广州凯尔特电气科技有限公司 Box-type substation
CN202454943U (en) * 2011-12-29 2012-09-26 厦门市聚力电力设备有限公司 Box type substation
CN203288981U (en) * 2013-06-26 2013-11-13 重庆英拿电力自动化科技有限公司 Box-type transformer station convenient for hoisting
CN203481684U (en) * 2013-10-11 2014-03-12 浙江昌泰电力开关有限公司 Mobile box type substation equipped with centrally installed switchgear
CN203660370U (en) * 2013-11-22 2014-06-18 山东科瑞节能电气有限公司 Whole box type substation
CN205377087U (en) * 2016-01-14 2016-07-06 上海祈德机电设备有限公司 Interim block terminal
CN206105790U (en) * 2016-09-12 2017-04-19 国网安徽省电力公司广德县供电公司 Quick travel distribution integration toolbox

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001258111A (en) * 2000-03-14 2001-09-21 Takaoka Electric Mfg Co Ltd Box body of metal closing type switch gear
CN201623386U (en) * 2009-10-27 2010-11-03 泰豪科技(深圳)电力技术有限公司 Movable box-type substation
CN202004342U (en) * 2011-03-15 2011-10-05 广州凯尔特电气科技有限公司 Box-type substation
CN202454943U (en) * 2011-12-29 2012-09-26 厦门市聚力电力设备有限公司 Box type substation
CN203288981U (en) * 2013-06-26 2013-11-13 重庆英拿电力自动化科技有限公司 Box-type transformer station convenient for hoisting
CN203481684U (en) * 2013-10-11 2014-03-12 浙江昌泰电力开关有限公司 Mobile box type substation equipped with centrally installed switchgear
CN203660370U (en) * 2013-11-22 2014-06-18 山东科瑞节能电气有限公司 Whole box type substation
CN205377087U (en) * 2016-01-14 2016-07-06 上海祈德机电设备有限公司 Interim block terminal
CN206105790U (en) * 2016-09-12 2017-04-19 国网安徽省电力公司广德县供电公司 Quick travel distribution integration toolbox

Similar Documents

Publication Publication Date Title
CN102179017B (en) High-rise building external wall suspension type remote control fire distinguishing device and method
AU2013362821B2 (en) Entwined pipes
CN206105790U (en) Quick travel distribution integration toolbox
CN106217334A (en) The most mobile distribution integrated tool case
CN104444778B (en) A kind of coil of strip lifting device
CN207844982U (en) Has the explosion-proof electric hoist from fire-extinguishing function concurrently
CN208496142U (en) Electric welding machine integrated box
CN105971489B (en) Electric operating ladder
CN205104846U (en) A supplementary strutting arrangement for pole overhead earth wire and OPGW optical cable
CN106115504A (en) A kind of suspender
CN101630049A (en) Aerial optical cable line construction machine
CN108915333A (en) A kind of electric pole having fire-extinguishing function concurrently
CN207732351U (en) A kind of distribution operation insulation operation continuous rope
CN207559284U (en) A kind of multifunctional precast cabin structure
CN207518190U (en) A kind of borehole cable laying apparatus
CN205173916U (en) Mounting structure of transformer substation monitoring camera convenient to overhaul
CN206976931U (en) Supporting wire rack device
CN205753251U (en) Ultra-deep well rig folding tube trunking
CN201508428U (en) Construction tool for overheading optical-cable line
CN207203258U (en) A kind of different concealed smoke-proof pendant wall of plane integral elevating
CN105262005A (en) Auxiliary supporting device for pole overhead ground wire and OPGW optical cable
CN205811075U (en) A kind of safety earth rod
CN105692489A (en) Small hoisting mechanical device for construction
CN204958263U (en) Suspended load formula transformer suspends installation apparatus in midair
CN203961335U (en) Be convenient to rig barracks mobile and lifting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161214