CN106216957B - The manufacture method of torsion beam of automobile welded still pipe - Google Patents

The manufacture method of torsion beam of automobile welded still pipe Download PDF

Info

Publication number
CN106216957B
CN106216957B CN201610684761.2A CN201610684761A CN106216957B CN 106216957 B CN106216957 B CN 106216957B CN 201610684761 A CN201610684761 A CN 201610684761A CN 106216957 B CN106216957 B CN 106216957B
Authority
CN
China
Prior art keywords
erw
strip
torsion beam
welded
cold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610684761.2A
Other languages
Chinese (zh)
Other versions
CN106216957A (en
Inventor
王来福
俞峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI SUJIA FASITE AUTO PARTS Co Ltd
Original Assignee
WUXI SUJIA FASITE AUTO PARTS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI SUJIA FASITE AUTO PARTS Co Ltd filed Critical WUXI SUJIA FASITE AUTO PARTS Co Ltd
Priority to CN201610684761.2A priority Critical patent/CN106216957B/en
Publication of CN106216957A publication Critical patent/CN106216957A/en
Application granted granted Critical
Publication of CN106216957B publication Critical patent/CN106216957B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Heat Treatment Of Articles (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Abstract

The present invention relates to a kind of manufacture method of torsion beam of automobile welded still pipe, belong to metal material processing technical field.The manufacture method of torsion beam of automobile welded still pipe, it includes the steps such as strip cutting, pickling processes, cold rolling, roll bending formation and welding, the processing of weld seam sublimate, phosphatization, saponification process, cold drawing treatment and Quenching Treatment.Torsion beam welded still pipe intensity height, the good toughness of manufacture method processing of the present invention, weld strength is high, higher obdurability can be still kept after larger plastic deformation is born, postwelding flattening test reaches 90 degree and the flat fusion line flawless of 0 degree of total head;Flaring test, enlarging rate >=17%, body(Including weld seam)Do not ftracture;Uniform wall thickness after the follow-up thermoforming of product, punching press, stable mechanical property, intensity reach 1500Mpa.

Description

The manufacture method of torsion beam of automobile welded still pipe
Technical field
The present invention relates to a kind of manufacture method of torsion beam of automobile welded still pipe, belongs to metal material processing technology neck Domain.
Background technology
Since reform and opening-up, Chinese Auto Industry development is swift and violent, into after the new century, either yield and sales volume, more It is that explosive growth is presented, after particularly breaking through 18,000,000 to production and marketing in 2010, China has become the vapour of global maximum Car production and consumption state, the automobile market in China is considered as future development market with the largest potentiality.Automobile industry turns into its people Economic important pillar industry, form than more complete industrial system, also turned into and embody the significant of national competitiveness Industry.
But with developing rapidly for automobile industry, a series of problem brought also progressively shows, global warming day Increasingly acute, haze weather is more aobvious serious, and international crude petroleum disparities between supply and demand are progressively deepened, so development of the countries in the world in auto industry On also from the development of simple amount then more focus on the lifting of matter, country participates in signing more than 140《Capital of a country memorandum of agreement》.And I State will keep growth in longer one section of period automobile demand amount from now on, and the energy shortage and environmental pollution thus brought is asked Topic will be protruded more.
In this context, accelerate to cultivate and development saves(Lightweight)Automobile and new-energy automobile, it is both effective alleviation energy Source and environmental pressure, the urgent task of automobile industry sustainable development is promoted, be also to speed up automobile industry transition and upgrade, cultivate newly Point of economic increase and international competitive advantage strategic measure.Therefore, lightweight turns into scheme of greatest concern at present, and automobile is light Quantify to have become the trend that world car develops.Automotive light weight technology produces to automobile fuel saving, reduction discharge, improvement performance, automobile Industry sound development is all significant, is the direction of modern automobile industry technology development.If authoritative studies have shown that vehicle complete vehicle Weight reduction 10%, fuel efficiency can improve 6% ~ 8%, discharge drop 4%;Automobile kerb weight often reduces 100 kilograms, fuel consumption per hundred kilometers 0.3 ~ 0.6 liter can be reduced, CO2 emission can reduce by about 5 grams/kilometer;Vehicle weight reduces by 1%, and oil consumption can reduce by 0.7%.
And torsion beam of automobile suspension is as most widely used automobile suspension system, its technological improvement and lightweight process Also strong influence the development of automobile industry.With the continuous progress of torsion beam of automobile moulding process, technology mode is from initial Sheet material cold stamping, develop to tubing cold stamping, tubing drop stamping and Tube Hydroforming direction, new molding mode makes torsion Product rigidity, flexibility are more preferable than ever for beam product, and dimensional accuracy is higher, and service life is longer, and weight is lighter.
And new moulding process depends on high-quality, high performance welded tube product.Because the technology of domestic automobile steel pipe is entered Step is limited by the research and development of raw material, and entirely adopts longer for chain, it is impossible to directly facing vehicle manufacturer, so in whole automobile Be always weak link in industry supply chain, thus so far the steel pipe of automobile using high quality high added value still rely on mostly into Mouthful.
Therefore, our company combines research, experiment and the talent advantage, the industrialization advantage of Su Jia groups and upper Hypon of colleges and universities The research and development strength of steel group, researches and develops the manufacture of torsion beam of automobile welded still pipe, and the research and development of the product will successfully promote automobile zero The process of domestic part, fill up the domestic blank in the field.
The content of the invention
It is an object of the invention to overcome the deficiencies in the prior art, there is provided a kind of torsion beam of automobile welded still pipe Manufacture method, using the torsion beam of this method processing with welded still pipe intensity is high, good toughness, weld strength is high, bear compared with Higher obdurability can be still kept after big plastic deformation.
According to technical scheme provided by the invention:The manufacture method of torsion beam of automobile welded still pipe, it is characterised in that bag Include following steps:
1), strip cut:By the wide coil of strip of outsourcing, slitting into strip, is produced according to torsion beam with welded still pipe on slitter Diameter needed for product determines the width of strip;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, descaling bath In pickle use hydrochloric acid, strip is first sent into cold rinse bank after overpickling and uses high pressure water washing, is then re-fed into hot water storgae Scald, dried again after going out hot water storgae;
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip welds equal to torsion beam after cold rolling Thickness needed for tube product subtracts 0.05 ~ 0.15mm;
4), roll bending formation and welding:Strip after cold rolling is sent into forming machine round add is made using W brake forming methods Work, Cheng Yuanhou strip are welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 190 ~ 220KW, welding speed It is 1.5 ~ 2mm to spend for 18 ~ 22m/min, amount of compression;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially existed High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be to weld Journey provides gas shield, reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile When ERW not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including the outer hair of welded tube outer surface is removed Burr inside thorn and welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, at progress phosphatization, saponification Reason, the ERW after phosphatization, saponification, which is sent into head rolling machine, carries out dog, welded pipe end diameter is reached required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the end after pinching processing Head, while mandrel is inserted in welded tube, then welded tube is passed through the die hole for being less than welded tube external diameter with tapered minimum-value aperture, make Caliber uniform shrinkage is deformed inside and outside welded tube, is extended on welded tube length direction, and cold-drawn 1 ~ 3 is carried out according to different technological requirements It is secondary, to obtain required size;
8), Quenching Treatment:ERW after cold drawing treatment is sent into glowing furnace, is heated to 820 ~ 840 DEG C, and insulation 30 ~ 50min, then cooled down by way of oil cooling, then ERW is sent into tempering furnace, be heated to 480 ~ 500 DEG C, finally by The mode of water cooling cools down welded tube.
As a further improvement on the present invention, the step 1)In coil of strip material be BR1500HS.
As a further improvement on the present invention, the step 2)In, the concentration of hydrochloric acid is 120 ~ 160g/L in descaling bath;It is cold Flushing temperature in tank is 10 ~ 30 DEG C, and flushing pressure is 8 ~ 10kg/cm2;Temperature is scalded as 90 ~ 100 DEG C in hot water storgae; Strip is 30 ~ 40m/ minutes by the speed of descaling bath, the speed of cold rinse bank and hot water storgae and drying, and drying temperature is 100 ~ 120℃。
As a further improvement on the present invention, the step 6)In phosphating solution be volumetric concentration be 10 ~ 11% zinc calcium phosphorus Change liquid, the temperature of phosphating solution is 65 ~ 75 DEG C, and dip time of the ERW in phosphating solution is 25 ~ 30 minutes.
As a further improvement on the present invention, the step 6)In saponification liquor composition include lubricant, water and soap powder, its In, the mass ratio of lubricant and water is 1:(18~20), soap powder dosage is 50 ~ 60KG/ ton saponification liquors, and saponification liquor temperature is 65 ~ 75 DEG C, dip time of the ERW in saponification liquor is 10 ~ 25 minutes.
As a further improvement on the present invention, the manufacture method also includes surface treatment step, and surface treatment step exists After Quenching Treatment step, the concrete operations of surface treatment step are:First ERW surface is entered using high temperature compressed air Row is blown, and removes cooling water, then rust remover spraying is covered in the surface of ERW, finally right again with high temperature compressed air The surface of ERW is blown, and while rust remover is blown away, high temperature compressed air is by ERW surface residual Rust remover is dried, and one layer of rust remover diaphragm is formed on the surface of welded tube.
The present invention compared with prior art, has the following advantages that:The torsion beam welding steel of manufacture method processing of the present invention Pipe intensity is high, good toughness, and weld strength is high, and higher obdurability can be still kept after larger plastic deformation is born.
Embodiment
With reference to specific embodiment, the invention will be further described.
Embodiment 1
The torsion beam of automobile welded still pipe of Φ 103 × 3.5mm specifications is manufactured, is comprised the following steps:
1), strip cut:Diameter according to needed for torsion beam with welded still pipe product, by thickness 5mm × width of outsourcing The 1280mm coil of strip strip of slitting into width for 322mm on slitter;The material of the strip is BR1500HS;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, descaling bath In pickle use hydrochloric acid, the concentration of hydrochloric acid is 120g/L;Strip is first sent into cold rinse bank after overpickling and uses high pressure water flushing Wash, the flushing temperature in cold rinse bank is 10 DEG C, flushing pressure 10kg/cm2;Then it is re-fed into hot water storgae to scald, scalds temperature For 100 DEG C, dried again after going out hot water storgae, drying temperature is 100 DEG C;Strip in hot water storgae passes through descaling bath, cold rinse bank and heat The speed of tank and the speed of drying are 30m/ minutes,
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip welds equal to torsion beam after cold rolling Thickness needed for tube product subtracts 0.05mm;
4), roll bending formation and welding:Strip after cold rolling is sent into forming machine round add is made using W brake forming methods Work, Cheng Yuanhou strip are welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 190KW, and speed of welding is 18m/min, amount of compression 1.5mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially existed High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be to weld Journey provides gas shield, reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile When ERW not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including the outer hair of welded tube outer surface is removed Burr inside thorn and welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, at progress phosphatization, saponification Reason;Phosphating solution in phosphating pond is the zinc calcium phosphorization liquid that volumetric concentration is 10%, and the temperature of phosphating solution is 75 DEG C, and ERW exists Dip time in phosphating solution is 25 minutes;Saponification liquor composition in saponification pond includes lubricant, water and soap powder, wherein, lubrication The mass ratio of agent and water is 1:18, soap powder dosage is 50KG/ ton saponification liquors, and saponification liquor temperature is 75 DEG C, and ERW is in saponification Dip time in liquid is 10 minutes;ERW after phosphatization, saponification, which is sent into head rolling machine, carries out dog, makes welded pipe end straight Footpath reaches required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the end after pinching processing Head, while mandrel is inserted in welded tube, then welded tube is passed through the die hole for being less than welded tube external diameter with tapered minimum-value aperture, make Caliber uniform shrinkage is deformed inside and outside welded tube, is extended on welded tube length direction, and cold-drawn 2 times is carried out according to technological requirement, with To required size;
8), Quenching Treatment:ERW after cold drawing treatment is sent into glowing furnace, is heated to 820 DEG C, is incubated 50min, then Cooled down by way of oil cooling, then ERW is sent into tempering furnace, be heated to 480 DEG C, will welded finally by the mode of water cooling Pipe cools down;
9), surface treatment:First ERW surface is blown using high temperature compressed air, removes cooling water, then will Rust remover sprays the surface for being covered in ERW, and finally the surface of ERW is blown again with high temperature compressed air Gas, while rust remover is blown away, high temperature compressed air dries the rust remover of ERW surface residual, in the table of welded tube Face forms one layer of rust remover diaphragm;
10), verification test:After steel pipe welding prepared by embodiment 1 flattening test reach 90 degree and 0 degree of flat fusion line of total head without Crackle;Flaring test, enlarging rate >=17%, body(Including weld seam)Do not ftracture;Uniform wall thickness after the follow-up thermoforming of product, punching press, Stable mechanical property, intensity reach 1500Mpa.
Embodiment 2
The torsion beam of automobile welded still pipe of Φ 103 × 3.5mm specifications is manufactured, is comprised the following steps:
1), strip cut:Diameter according to needed for torsion beam with welded still pipe product, by thickness 5mm × width of outsourcing The 1280mm coil of strip strip of slitting into width for 322mm on slitter;The material of the strip is BR1500HS;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, descaling bath In pickle use hydrochloric acid, the concentration of hydrochloric acid is 140g/L;Strip is first sent into cold rinse bank after overpickling and uses high pressure water flushing Wash, the flushing temperature in cold rinse bank is 20 DEG C, flushing pressure 9kg/cm2;Then it is re-fed into hot water storgae to scald, scalding temperature is 95 DEG C, dried again after going out hot water storgae, drying temperature is 110 DEG C;Strip in hot water storgae passes through descaling bath, cold rinse bank and hot water storgae Speed and drying speed be 35m/ minutes,
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip welds equal to torsion beam after cold rolling Thickness needed for tube product subtracts 0.10mm;
4), roll bending formation and welding:Strip after cold rolling is sent into forming machine round add is made using W brake forming methods Work, Cheng Yuanhou strip are welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 205KW, and speed of welding is 20m/min, amount of compression 1.8mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially existed High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be to weld Journey provides gas shield, reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile When ERW not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including the outer hair of welded tube outer surface is removed Burr inside thorn and welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, at progress phosphatization, saponification Reason;Phosphating solution in phosphating pond is the zinc calcium phosphorization liquid that volumetric concentration is 11%, and the temperature of phosphating solution is 70 DEG C, and ERW exists Dip time in phosphating solution is 28 minutes;Saponification liquor composition in saponification pond includes lubricant, water and soap powder, wherein, lubrication The mass ratio of agent and water is 1:19, soap powder dosage is 55KG/ ton saponification liquors, and saponification liquor temperature is 70 DEG C, and ERW is in saponification Dip time in liquid is 20 minutes;ERW after phosphatization, saponification, which is sent into head rolling machine, carries out dog, makes welded pipe end straight Footpath reaches required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the end after pinching processing Head, while mandrel is inserted in welded tube, then welded tube is passed through the die hole for being less than welded tube external diameter with tapered minimum-value aperture, make Caliber uniform shrinkage is deformed inside and outside welded tube, is extended on welded tube length direction, and cold-drawn 2 times is carried out according to technological requirement, with To required size;
8), Quenching Treatment:ERW after cold drawing treatment is sent into glowing furnace, is heated to 830 DEG C, is incubated 40min, then Cooled down by way of oil cooling, then ERW is sent into tempering furnace, be heated to 490 DEG C, will welded finally by the mode of water cooling Pipe cools down;
9), surface treatment:First ERW surface is blown using high temperature compressed air, removes cooling water, then will Rust remover sprays the surface for being covered in ERW, and finally the surface of ERW is blown again with high temperature compressed air Gas, while rust remover is blown away, high temperature compressed air dries the rust remover of ERW surface residual, in the table of welded tube Face forms one layer of rust remover diaphragm;
10), verification test:After steel pipe welding prepared by embodiment 2 flattening test reach 90 degree and 0 degree of flat fusion line of total head without Crackle;Flaring test, enlarging rate >=17%, body(Including weld seam)Do not ftracture;Uniform wall thickness after the follow-up thermoforming of product, punching press, Stable mechanical property, intensity reach 1500Mpa.
Embodiment 3
The torsion beam of automobile welded still pipe of Φ 103 × 3.5mm specifications is manufactured, is comprised the following steps:
1), strip cut:Diameter according to needed for torsion beam with welded still pipe product, by thickness 5mm × width of outsourcing The 1280mm coil of strip strip of slitting into width for 322mm on slitter;The material of the strip is BR1500HS;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, descaling bath In pickle use hydrochloric acid, the concentration of hydrochloric acid is 160g/L;Strip is first sent into cold rinse bank after overpickling and uses high pressure water flushing Wash, the flushing temperature in cold rinse bank is 30 DEG C, flushing pressure 8kg/cm2;Then it is re-fed into hot water storgae to scald, scalding temperature is 90 DEG C, dried again after going out hot water storgae, drying temperature is 120 DEG C;Strip in hot water storgae passes through descaling bath, cold rinse bank and hot water storgae Speed and drying speed be 40m/ minutes,
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip welds equal to torsion beam after cold rolling Thickness needed for tube product subtracts 0.15mm;
4), roll bending formation and welding:Strip after cold rolling is sent into forming machine round add is made using W brake forming methods Work, Cheng Yuanhou strip are welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 220KW, and speed of welding is 22m/min, amount of compression 2mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially existed High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be to weld Journey provides gas shield, reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile When ERW not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including the outer hair of welded tube outer surface is removed Burr inside thorn and welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, at progress phosphatization, saponification Reason;Phosphating solution in phosphating pond is the zinc calcium phosphorization liquid that volumetric concentration is 11%, and the temperature of phosphating solution is 65 DEG C, and ERW exists Dip time in phosphating solution is 30 minutes;Saponification liquor composition in saponification pond includes lubricant, water and soap powder, wherein, lubrication The mass ratio of agent and water is 1:20, soap powder dosage is 60KG/ ton saponification liquors, and saponification liquor temperature is 65 DEG C, and ERW is in saponification Dip time in liquid is 25 minutes;ERW after phosphatization, saponification, which is sent into head rolling machine, carries out dog, makes welded pipe end straight Footpath reaches required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the end after pinching processing Head, while mandrel is inserted in welded tube, then welded tube is passed through the die hole for being less than welded tube external diameter with tapered minimum-value aperture, make Caliber uniform shrinkage is deformed inside and outside welded tube, is extended on welded tube length direction, and cold-drawn 2 times is carried out according to technological requirement, with To required size;
8), Quenching Treatment:ERW after cold drawing treatment is sent into glowing furnace, is heated to 840 DEG C, is incubated 30min, then Cooled down by way of oil cooling, then ERW is sent into tempering furnace, be heated to 500 DEG C, will welded finally by the mode of water cooling Pipe cools down;
9), surface treatment:First ERW surface is blown using high temperature compressed air, removes cooling water, then will Rust remover sprays the surface for being covered in ERW, and finally the surface of ERW is blown again with high temperature compressed air Gas, while rust remover is blown away, high temperature compressed air dries the rust remover of ERW surface residual, in the table of welded tube Face forms one layer of rust remover diaphragm;
10), verification test:After steel pipe welding prepared by embodiment 3 flattening test reach 90 degree and 0 degree of flat fusion line of total head without Crackle;Flaring test, enlarging rate >=17%, body(Including weld seam)Do not ftracture;Uniform wall thickness after the follow-up thermoforming of product, punching press, Stable mechanical property, intensity reach 1500Mpa.
Coil of strip used in the present invention can use coil of strip of the commercially available conventional material for BR1500HS, in above-mentioned each implementation The coil of strip for Baoshan Iron and Steel Group's production employed in example
Zinc calcium phosphorization liquid used in the present invention can use commercially available conventional Zinc-calcium series phosphatating liquid, in the various embodiments described above Employed in for Jiangyin brocade it is grand chemical treatment Co., Ltd production zinc calcium phosphorization liquid.
Lubricant used in saponification liquor of the present invention can use commercially available conventional lubricant, in the various embodiments described above The used lubricant for the production of the factory of Shanghai chemical industry seven.

Claims (6)

1. the manufacture method of torsion beam of automobile welded still pipe, it is characterised in that comprise the following steps:
1), strip cut:By the wide coil of strip of outsourcing, slitting is into strip on slitter, according to torsion beam welded still pipe product institute The diameter needed determines the width of strip;
2), pickling processes:By the good strip of slitting successively continually by descaling bath, cold rinse bank and hot water storgae, in descaling bath Pickle uses hydrochloric acid, and strip is first sent into cold rinse bank after overpickling and uses high pressure water washing, is then re-fed into hot water storgae and scalds, Dried again after going out hot water storgae;
3), cold rolling:Strip after pickling carries out cold rolling by milling train, and the thickness of strip is equal to torsion beam welded still pipe after cold rolling Thickness needed for product subtracts 0.05 ~ 0.15mm;
4), roll bending formation and welding:Strip after cold rolling is sent into forming machine round processing is made using W brake forming methods, into Strip after circle is welded into ERW on welding machine, and welding machine parameter setting is:Bonding power is 190 ~ 220KW, and speed of welding is 18 ~ 22m/min, amount of compression are 1.5 ~ 2mm;
5), weld seam sublimate processing:Welding region is rinsed using high pressure nitrogen in welding process is molded, specially in distance High pressure nitrogen fumarole is installed at welding region 50cm, high pressure nitrogen is full of whole welding region, so as to be carried for welding process Supplied gas is protected, and reduces the generation of oxide inclusion in welding process, improves the exclusion efficiency of slag in weld;Meanwhile in vertical masonry joint When welded tube not yet cools down, using the burr of burring knife milling downhand welding pipe commissure, including remove welded tube outer surface outer burr and Burr inside welded tube;
6), phosphatization, saponification process:ERW is immersed in phosphating pond and saponification pond successively, carries out phosphatization, saponification process, phosphorus Change, carry out dog in the ERW feeding head rolling machine after saponification, welded pipe end diameter is reached required size;
7)Cold drawing treatment:ERW is sent into drawbench and carries out cold-drawn, during cold-drawn, clamps the termination after pinching processing, together When mandrel is inserted in welded tube, then make welded tube pass through with tapered minimum-value aperture be less than welded tube external diameter die hole, make welded tube Inside and outside caliber uniform shrinkage is deformed, and is extended on welded tube length direction, and cold-drawn 1 ~ 3 time is carried out according to different technological requirements, To obtain required size;
8), Quenching Treatment:ERW after cold drawing treatment is sent into glowing furnace, is heated to 820 ~ 840 DEG C, is incubated 30 ~ 50min, Then cooled down by way of oil cooling, then ERW is sent into tempering furnace, 480 ~ 500 DEG C are heated to, finally by water cooling Mode cools down welded tube.
2. the manufacture method of torsion beam of automobile welded still pipe as claimed in claim 1, it is characterised in that:The step 1)In Coil of strip material be BR1500HS.
3. the manufacture method of torsion beam of automobile welded still pipe as claimed in claim 1, it is characterised in that:The step 2) In, the concentration of hydrochloric acid is 120 ~ 160g/L in descaling bath;Flushing temperature in cold rinse bank is 10 ~ 30 DEG C, flushing pressure is 8 ~ 10kg/cm2;Temperature is scalded as 90 ~ 100 DEG C in hot water storgae;Strip passes through descaling bath, the speed of cold rinse bank and hot water storgae and baking Dry speed is 30 ~ 40m/ minutes, and drying temperature is 100 ~ 120 DEG C.
4. the manufacture method of torsion beam of automobile welded still pipe as claimed in claim 1, it is characterised in that:The step 6)In Phosphating solution be zinc calcium phosphorization liquid that volumetric concentration is 10 ~ 11%, the temperature of phosphating solution is 65 ~ 75 DEG C, and ERW is in phosphating solution In dip time be 25 ~ 30 minutes.
5. the manufacture method of torsion beam of automobile welded still pipe as claimed in claim 1, it is characterised in that:The step 6)In Saponification liquor composition include lubricant, water and soap powder, wherein, the mass ratio of lubricant and water is 1:(18~20), soap powder dosage is 50 ~ 60KG/ ton saponification liquors, saponification liquor temperature are 65 ~ 75 DEG C, and dip time of the ERW in saponification liquor is 10 ~ 25 minutes.
6. the manufacture method of torsion beam of automobile welded still pipe as claimed in claim 1, it is characterised in that:The manufacture method Also include surface treatment step, after Quenching Treatment step, the concrete operations of surface treatment step are surface treatment step:First ERW surface is blown using high temperature compressed air, removes cooling water, then rust remover spraying is covered in straight weld The surface of pipe, finally the surface of ERW is blown again with high temperature compressed air, while rust remover is blown away, High temperature compressed air dries the rust remover of ERW surface residual, and one layer of rust remover diaphragm is formed on the surface of welded tube.
CN201610684761.2A 2016-08-18 2016-08-18 The manufacture method of torsion beam of automobile welded still pipe Active CN106216957B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610684761.2A CN106216957B (en) 2016-08-18 2016-08-18 The manufacture method of torsion beam of automobile welded still pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610684761.2A CN106216957B (en) 2016-08-18 2016-08-18 The manufacture method of torsion beam of automobile welded still pipe

Publications (2)

Publication Number Publication Date
CN106216957A CN106216957A (en) 2016-12-14
CN106216957B true CN106216957B (en) 2018-01-05

Family

ID=57553306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610684761.2A Active CN106216957B (en) 2016-08-18 2016-08-18 The manufacture method of torsion beam of automobile welded still pipe

Country Status (1)

Country Link
CN (1) CN106216957B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419065B (en) * 2017-07-24 2019-01-01 天人汽车底盘(芜湖)股份有限公司 The closed torsion beam integral quenching technique of car
EP3693096A4 (en) * 2017-10-04 2021-06-23 Nippon Steel Corporation Torsion beam manufacturing method and torsion beam manufacturing device
CN108034802A (en) * 2018-01-11 2018-05-15 江苏神猴钢绳开发有限公司 The heat treatment method and its production equipment of a kind of steel wire
CN108339863A (en) * 2018-02-06 2018-07-31 陈建平 A kind of method of cold-drawn air-conditioner compressor outer housing
CN109366111A (en) * 2018-12-29 2019-02-22 无锡苏嘉法斯特汽车零配件有限公司 A kind of manufacturing method of CP800 torsion beam welded tube
CN110170803A (en) * 2019-06-14 2019-08-27 泰州市长征冷机管件有限公司 A kind of welding procedure for interior exhaust coil pack
CN110757098A (en) * 2019-09-20 2020-02-07 滁州市友邦涂装有限公司 Production process of U-shaped pipe clamp with good wear resistance
CN117415225B (en) * 2023-12-19 2024-02-13 淄博吉利新能源商用车发展有限公司 Spare part equipment of bending for cargo vehicle

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87104077A (en) * 1987-06-03 1988-12-14 李振明 Cold-drawing technology of high-frequency welded thin-wall steel pipe
EP1001856A1 (en) * 1997-08-06 2000-05-24 SMS Demag AG METHOD FOR PRODUCING WELDED Cu AND Cu ALLOY PIPES
CN101130197A (en) * 2006-09-26 2008-02-27 李永立 Cold drawing and cold rolling production method of high-precision seamless steel tube
CN102764958A (en) * 2012-07-13 2012-11-07 江苏中友精密制管有限公司 Process for manufacturing cold-rolled/cold-drawn precise welded steel pipe
CN103591118A (en) * 2013-11-19 2014-02-19 无锡苏嘉法斯特汽车零配件有限公司 Manufacturing technology of transmission shaft tube
CN103894798A (en) * 2014-03-31 2014-07-02 张家港保税区亚信汽车零部件科技有限公司 Manufacturing method of precisely-welded pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87104077A (en) * 1987-06-03 1988-12-14 李振明 Cold-drawing technology of high-frequency welded thin-wall steel pipe
EP1001856A1 (en) * 1997-08-06 2000-05-24 SMS Demag AG METHOD FOR PRODUCING WELDED Cu AND Cu ALLOY PIPES
CN101130197A (en) * 2006-09-26 2008-02-27 李永立 Cold drawing and cold rolling production method of high-precision seamless steel tube
CN102764958A (en) * 2012-07-13 2012-11-07 江苏中友精密制管有限公司 Process for manufacturing cold-rolled/cold-drawn precise welded steel pipe
CN103591118A (en) * 2013-11-19 2014-02-19 无锡苏嘉法斯特汽车零配件有限公司 Manufacturing technology of transmission shaft tube
CN103894798A (en) * 2014-03-31 2014-07-02 张家港保税区亚信汽车零部件科技有限公司 Manufacturing method of precisely-welded pipe

Also Published As

Publication number Publication date
CN106216957A (en) 2016-12-14

Similar Documents

Publication Publication Date Title
CN106216957B (en) The manufacture method of torsion beam of automobile welded still pipe
CN102527767B (en) Cold drawing welded tube manufacture process for high-accuracy hydraulic oil cylinder
CN101623719B (en) Method for manufacturing stainless steel heat transfer pipe of nuclear heat exchanger
CN102615223B (en) The method of rolling two trapezoid cross section flange ring forging parts simultaneously
US20210346941A1 (en) Novel hollow shaft manufacturing method
CN102218642B (en) Manufacturing method of thick wall steel pipe with small radius-thickness ratio used for building structure
CN104338777A (en) Production method of cold-drawn precision seamless steel pipes
CN102873512A (en) Manufacture method of large-caliber medium-and-thick-wall seamless steel tube for nuclear power plant
CN103591118A (en) Manufacturing technology of transmission shaft tube
CN104551669A (en) Production method of cold-drawn high-precision seamless steel tube
CN101168224A (en) Method for heating and forming cold-formed steel and cold-formed steel produced by same
CN104551667A (en) Cold-rolled high-hardness seamless steel pipe manufacturing method
CN102284486A (en) Process for manufacturing seamless steel tubes by hot rolling
CN106216956B (en) The manufacture method of vehicle transmission central siphon
CN106216959B (en) The manufacture method of automobile frame welded still pipe
CN106181261B (en) The manufacture method of thin-wall high intensity frame tube
CN105458633A (en) Manufacturing method of low-carbon steel coiled tubing
CN105363825A (en) Manufacturing method of cold-drawn high-precision cylinder barrel pipe
CN107755454A (en) A kind of manufacture method of high-strength corrosion-resisting drawn tube for marine settings engineering
CN106216955B (en) special steel transmission shaft tube manufacturing process
CN104174807A (en) Manufacturing method of large-caliber thick-walled titanium tube block
CN110576292B (en) Method for manufacturing automobile bumper
CN102728652A (en) Manufacturing method of dual-metal seamless steel pipe with outer-layer low-carbon steel and inner-layer bearing steel
CN104551540A (en) Production method of cold-drawn precise cylinder tube
CN104759888A (en) Manufacturing method of hot-rolled high-hardness petroleum pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant