CN106208073A - 基于多重约束条件的单一联络线交换功率极限值确定方法 - Google Patents
基于多重约束条件的单一联络线交换功率极限值确定方法 Download PDFInfo
- Publication number
- CN106208073A CN106208073A CN201610570307.4A CN201610570307A CN106208073A CN 106208073 A CN106208073 A CN 106208073A CN 201610570307 A CN201610570307 A CN 201610570307A CN 106208073 A CN106208073 A CN 106208073A
- Authority
- CN
- China
- Prior art keywords
- power
- interconnection
- power grid
- tie line
- area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/04—Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
- H02J3/06—Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
一种基于多重约束条件的单一联络线交换功率极限值确定方法,包括:(1)离线计算电网由联网转为孤网时,孤网运行成功所允许的联络线最大外送功率以及最大受入功率;(2)自电网调度系统定期获得地区电网目前的运行状态;(3)根据系统运行数据,并结合离线计算结果,得出电网由联网变为孤网时运行成功所允许的联络线最大外送功率以及最大受入功率;(4)联络线交换功率的范围确定联络线当前交换功率极限值,根据每获得一次联络线交换功率范围,自动或人工调节联络线功率。本发明正常运行期间将联络线功率控制在按上述方法确定的交换功率极限值范围内,系统发生单一故障后,无论地区电网是否孤网,均不需采取控制措施即可保证地区电网的安全稳定运行,大大提高了地区电网的供电可靠性,同时充分发挥了联络线的功率交换作用。
Description
技术领域
本发明属于电力系统安全稳定控制领域,涉及一种基于多重约束条件下的地区电网与主网间单一联络线实时交换功率极限值的确定方法。
技术背景
在电力系统中,由于受负荷水平、地理条件等因素的影响,存在与主网联系薄弱的地区电网,这些地区电网在担负着地区供电任务的同时,还经过与主网间的联络线与主网交换电力,实现地区电网功率的实时平衡。对于这种与主网联系薄弱的地区电网,联络线的运行状态对地区电网的供电可靠性影响极大。当联络线交换功率较大时,由于联络线故障造成同步稳定破坏或地区电网与主网解列后,解列后的地区电网无法孤立运行成功;同时,当联络线交换功率较大时,由于地区电网内其它故障可能造成联络线过载,不得不采取切机、切负荷措施,甚至解列联络线,威胁地区电网的运行安全。因此,正常运行期间,必须对联络线交换功率进行限制,防止故障后造成同步稳定破坏或联络线过载,同时保证与主网解列后的地区电网能够孤立运行成功,这对于提高地区电网的供电可靠性意义重大。
对于与主网间仅有单一联络线的地区电网,通常对联络线的交换功率限定条件比较简单,只考虑联络线正常运行时不过载,典型运行方式下联络线瞬时故障重合成功后系统能够保持同步稳定运行。当故障引起地区电网孤网,依靠地区电网内配置的高周切机装置或低频低压减负荷装置切除部分电源或负荷,以维持地区电网孤网后的功率平衡;当故障引起联络线过载时,依靠切除地区电网部分电源或负荷,消除联络线过载。当故障造成孤网时,由于切除电源或负荷的数量难以匹配,往往造成电源、负荷的反复切除,最终难以维持地区电网孤网运行;当故障造成联络线过载时,紧急切除电源或负荷将造成部分负荷的非计划停电以及部分电源的非计划停机。无论孤网或联络线过载造成机组及负荷的紧急切除,均会对电网安全稳定运行带来影响。且上述方法是以典型运行方式为基础,预先确定的联络线交换功率限定值,未考虑系统运行方式变化的影响。
发明内容
本发明的目的是提供一种正常运行期间,基于多重约束条件的单回联络线的交换功率极限值确定方法,且极限值随系统运行方式变化及时修正。
为实现上述目的,本发明提供一种基于多重约束条件的单一联络线交换功率极限值确定方法,其特征在于包括下列步骤:
(1)离线计算,确定地区电网在不同运行条件下由联网转为孤网时,不采取任何控制措施情况下能够孤网运行成功所允许的联络线最大外送功率以及最大受入功率;
(2)自电网调度系统定期获得地区电网目前的运行状态,包括:总发电出力、一次调频调节能力、系统频率、各电源出力、各厂站负荷分布;
(3)根据定期获得的系统运行数据,并结合离线计算结果,得出当前运行条件下地区电网由联网变为孤网时,不采取任何控制措施情况下能够孤网运行成功所允许的联络线最大外送功率P1以及最大受入功率P2,确定地区电网在当前条件下单一故障引起的最大电源功率损失值ΔPS和最大负荷功率损失值ΔPL,每获得一次数据,完成一次计算;
(4)设联络线热稳定极限功率为P0,按同时满足式1、式2确定联络线交换功率P3的范围,正值表示外送,负值表示受入;
-P0+ΔPS≦P3≦P0-ΔPL------------------1
-P2≦P3≦P1------------------2
(5)设同时满足式1、式2条件的联络线交换功率P3的范围为Pm≦P3≦Pn,据此确定联络线当前交换功率极限值最小为Pm,最大为Pn,正值表示外送,负值表示受入,根据每获得一次联络线交换功率范围,自动或人工调节联络线功率。
本发明基于多重约束条件的单回联络线的交换功率极限值确定方法,且极限值随系统运行方式变化及时修正。正常运行期间将联络线功率控制在按上述方法确定的交换功率极限值范围内,系统发生单一故障后,无论地区电网是否孤网,均不需采取控制措施即可保证地区电网的安全稳定运行,大大提高了地区电网的供电可靠性,同时充分发挥了联络线的功率交换作用。
具体实施方式
(1)离线计算出地区电网在不同总发电出力、不同一次调频调节能力、不同运行频率条件下由联网运行变为孤网运行时,不采取任何控制措施情况下能够孤网运行成功所允许的联络线最大外送功率以及最大受入功率;
(2)自电网调度系统每5分钟获得地区电网目前的运行状态,包括:总发电出力、一次调频调节能力、系统频率、各电源出力、各厂站负荷分布;
(3)根据定期获得的系统总发电出力、一次调频调节能力、系统频率,与离线计算结果匹配,得出当前运行条件下地区电网由联网变为孤网时,不采取任何控制措施情况下能够孤网运行成功所允许的联络线最大外送功率P1以及最大受入功率P2;根据定期获得的地区电网各电源出力及负荷分布,确定地区电网在当前条件下单一故障引起的最大电源功率损失值ΔPS和最大负荷功率损失值ΔPL;
(4)设联络线热稳定极限功率为P0,按同时满足式1、式2确定联络线交换功率P3的范围,正值表示外送,负值表示受入;
-P0+ΔPS≦P3≦P0-ΔPL------------------(3)
-P2≦P3≦P1------------------(4)
(5)设同时满足式3、式4条件的联络线交换功率P3的范围为Pm≦P3≦Pn,据此确定联络线交换功率极限值最小为Pm,最大为Pn,正值表示外送,负值表示受入。
Claims (1)
1.一种基于多重约束条件的单一联络线交换功率极限值确定方法,其特征在于包括下列步骤:
(1)离线计算,确定地区电网在不同运行条件下由联网转为孤网时,不采取任何控制措施情况下能够孤网运行成功所允许的联络线最大外送功率以及最大受入功率;
(2)自电网调度系统定期获得地区电网目前的运行状态,包括:总发电出力、一次调频调节能力、系统频率、各电源出力、各厂站负荷分布;
(3)根据定期获得的系统运行数据,并结合离线计算结果,得出当前运行条件下地区电网由联网变为孤网时,不采取任何控制措施情况下能够孤网运行成功所允许的联络线最大外送功率P1以及最大受入功率P2,确定地区电网在当前条件下单一故障引起的最大电源功率损失值ΔPS和最大负荷功率损失值ΔPL,每获得一次数据,完成一次计算;
(4)设联络线热稳定极限功率为P0,按同时满足式1、式2确定联络线交换功率P3的范围,正值表示外送,负值表示受入;
-P0+ΔPS≦P3≦P0-ΔPL------------------1
-P2≦P3≦P1------------------2
(5)设同时满足式1、式2条件的联络线交换功率P3的范围为Pm≦P3≦Pn,据此确定联络线当前交换功率极限值最小为Pm,最大为Pn,正值表示外送,负值表示受入,根据每获得一次联络线交换功率范围,自动或人工调节联络线功率。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610570307.4A CN106208073B (zh) | 2016-07-20 | 2016-07-20 | 基于多重约束条件的单一联络线交换功率极限值确定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610570307.4A CN106208073B (zh) | 2016-07-20 | 2016-07-20 | 基于多重约束条件的单一联络线交换功率极限值确定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106208073A true CN106208073A (zh) | 2016-12-07 |
CN106208073B CN106208073B (zh) | 2022-10-25 |
Family
ID=57493691
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610570307.4A Active CN106208073B (zh) | 2016-07-20 | 2016-07-20 | 基于多重约束条件的单一联络线交换功率极限值确定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106208073B (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011114899A (ja) * | 2009-11-25 | 2011-06-09 | Fuji Electric Systems Co Ltd | 負荷周波数制御方法及び負荷周波数制御装置 |
CN102510063A (zh) * | 2011-11-07 | 2012-06-20 | 国电南瑞科技股份有限公司 | 互联电网分级调频控制方法 |
US20130268131A1 (en) * | 2012-04-09 | 2013-10-10 | Clemson University | Method and System for Dynamic Stochastic Optimal Electric Power Flow Control |
CN103904694A (zh) * | 2013-12-02 | 2014-07-02 | 云南电力调度控制中心 | 一种多区域协调自动发电控制方法和系统 |
CN103986157A (zh) * | 2014-05-19 | 2014-08-13 | 国家电网公司 | 一种适用于特高压联络线自动发电控制系统的控制方法 |
US20150081129A1 (en) * | 2011-12-28 | 2015-03-19 | State Grid Electric Power Institute | Equipment overload successive approximation adaptive control method based on centralized real-time decision |
CN104538991A (zh) * | 2014-12-27 | 2015-04-22 | 大连理工大学 | 互联电网联络线功率控制方法 |
-
2016
- 2016-07-20 CN CN201610570307.4A patent/CN106208073B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011114899A (ja) * | 2009-11-25 | 2011-06-09 | Fuji Electric Systems Co Ltd | 負荷周波数制御方法及び負荷周波数制御装置 |
CN102510063A (zh) * | 2011-11-07 | 2012-06-20 | 国电南瑞科技股份有限公司 | 互联电网分级调频控制方法 |
US20150081129A1 (en) * | 2011-12-28 | 2015-03-19 | State Grid Electric Power Institute | Equipment overload successive approximation adaptive control method based on centralized real-time decision |
US20130268131A1 (en) * | 2012-04-09 | 2013-10-10 | Clemson University | Method and System for Dynamic Stochastic Optimal Electric Power Flow Control |
CN103904694A (zh) * | 2013-12-02 | 2014-07-02 | 云南电力调度控制中心 | 一种多区域协调自动发电控制方法和系统 |
CN103986157A (zh) * | 2014-05-19 | 2014-08-13 | 国家电网公司 | 一种适用于特高压联络线自动发电控制系统的控制方法 |
CN104538991A (zh) * | 2014-12-27 | 2015-04-22 | 大连理工大学 | 互联电网联络线功率控制方法 |
Non-Patent Citations (1)
Title |
---|
董飞飞等: "基于多重约束的"三华"特高压电网功率交换极限评估", 《高电压技术》 * |
Also Published As
Publication number | Publication date |
---|---|
CN106208073B (zh) | 2022-10-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019192151A1 (zh) | 风电场的功率控制方法、设备和系统 | |
CN104633638B (zh) | 电厂fcb之停机不停炉功能的综合控制方法 | |
Ulbig et al. | Analyzing rotational inertia, grid topology and their role for power system stability | |
US20150137520A1 (en) | Wind-power-plant control upon low-voltage grid faults | |
KR20150033729A (ko) | 전기 발전 장치를 제어하기 위한 방법 | |
CN108695897B (zh) | 光伏电站的功率控制方法、装置、控制器、系统及介质 | |
EP2932093B1 (en) | Method and arrangement for swift power regulation | |
RU2728523C1 (ru) | Способ восстановления сети электроснабжения | |
CN104300583A (zh) | 一种计及设备调节响应特性的微网频率控制方法 | |
CN104362579A (zh) | 提高集群风电场联络线重合闸成功率的方法 | |
CN105391050A (zh) | 高周切机配置方案的校核方法和系统 | |
CN108736511B (zh) | 一种经柔直汇集的风电送出系统故障穿越控制方法及系统 | |
CN103117563B (zh) | 水电厂高频预测切机及预测调速系统 | |
CN108153256B (zh) | 一种多机组燃气蒸汽联合循环电站负荷控制方法 | |
CN107516904B (zh) | 一种应对电源脱网冲击并计及机组调节能力的精准负荷控制方法 | |
CN106208073A (zh) | 基于多重约束条件的单一联络线交换功率极限值确定方法 | |
CN104616709A (zh) | 基于核电机组失步振荡的安全稳定控制方法 | |
CN114069701B (zh) | 一种适用于新能源场站的多时间尺度功率控制系统 | |
CN104637558B (zh) | 核电机组失步振荡的安全稳定控制方法 | |
Smolovik et al. | Special automation for isolated power systems emergency control | |
CN112310970B (zh) | 用于电网的有功协调稳定控制方法、装置及系统 | |
Sauhats et al. | Underfrequency load shedding in large interconnection | |
CN109193806A (zh) | 一种用于评估发电机失磁保护与电网协调关系的方法 | |
JP7430167B2 (ja) | 地域マイクログリッドの復電方法 | |
Fan et al. | Frequency Emergency Control Strategy Considering the Operation Speed of Frequency Regulation resources |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |