CN106203892A - A kind of shop intelligent engineering construction method - Google Patents

A kind of shop intelligent engineering construction method Download PDF

Info

Publication number
CN106203892A
CN106203892A CN201610614147.9A CN201610614147A CN106203892A CN 106203892 A CN106203892 A CN 106203892A CN 201610614147 A CN201610614147 A CN 201610614147A CN 106203892 A CN106203892 A CN 106203892A
Authority
CN
China
Prior art keywords
construction method
intelligent engineering
pipe
shop intelligent
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610614147.9A
Other languages
Chinese (zh)
Inventor
刘玉伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGXI ANXUN TECHNOLOGY INVESTMENT Co Ltd
Original Assignee
GUANGXI ANXUN TECHNOLOGY INVESTMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI ANXUN TECHNOLOGY INVESTMENT Co Ltd filed Critical GUANGXI ANXUN TECHNOLOGY INVESTMENT Co Ltd
Priority to CN201610614147.9A priority Critical patent/CN106203892A/en
Publication of CN106203892A publication Critical patent/CN106203892A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Installation Of Indoor Wiring (AREA)

Abstract

The present invention discloses the construction method of a kind of shop intelligent engineering, it is characterized in that, comprising the steps, tube seat is constructed, and processes line pipe groove of going forward side by side and installs, need processing and fabricating field, when tube seat vertical demixing is installed, cable should be arranged from top to bottom by following regulation order, instrument signal circuit, safety interlocking circuit, AC and DC supply line;Electric wire cable lays, pipeline laying in using hidden pipe or bright pipe, furred ceiling, in skirting;Equipment is installed, and is powered the installation of system, power-supply device installation and monitoring system successively and installs;Line test, debugging, the acceptance of work.

Description

A kind of shop intelligent engineering construction method
Technical field
The invention belongs to technical field of buildings, particularly shop intelligent engineering construction method.
Background technology
Intelligent building refers to utilize system integration method, by intelligent type computer technology, communication technology, control technology, many Medium technique and modern architecture art organically combine, and by the automatic monitoring to equipment, the management to information resources, to user Information service and the optimum organization of architectural environment, the investment obtained is reasonable, is suitable for information technology needs and has peace Entirely, the modern architecture thing of efficient, comfortable, convenient and flexible feature, how Fast Installation becomes what intelligent engineering was faced Problem.
Summary of the invention
It is contemplated that overcome the defect of prior art, it is provided that a kind of shop intelligent engineering construction method, have antirust Performance is good, stay-in-grade feature.
In order to solve above-mentioned technical problem, the present invention provides techniques below scheme:
The construction method of a kind of shop intelligent engineering, it is characterised in that comprise the steps, tube seat is constructed, is processed and carry out Tube seat is installed, and needs processing and fabricating field, and when tube seat vertical demixing is installed, cable should be arranged from top to bottom by following regulation order, Instrument signal circuit, safety interlocking circuit, AC and DC supply line;Electric wire cable lays, and uses hidden pipe or bright pipe, furred ceiling In, pipeline laying in skirting;Equipment is installed, and is powered the installation of system, power-supply device installation and monitoring system peace successively Dress;Line test, Networked E-Journals, the acceptance of work.
Further, second step, electric wire cable does outward appearance and checking, and measures insulation resistance before laying.
Further, second step, hidden pipe applies and is placed in many dirt and the moist raceway for wiring in place, the mouth of pipe, pipe junction all should Making encapsulation process, the chest in the electric wire embedment wall of hidden pipe or concrete, the clear distance from surface is no less than 15mm.
Further, in the 3rd step, the installation of power-supply device, consumer unit is fixedly mounted on concrete walls, post or on the basis of, Employing expansion bolt is fixed;The exposed electrical body of the power supply unit installed in instrument box is mutual or between other exposed electric conductors Distance should >=4mm.
Further, the 3rd step, the high-definition camera of monitoring system, data wire and power line are installed.
Compared with prior art, the present invention has a following beneficial effect:
Benefit of the invention is, can provide data when breaking down in time, quickly finds and fix a breakdown, loss being reduced to Minimum.Having perfect quality management system, operational excellence, possess technology, safety, manage, occurrences in human life, finance, archives etc. manage System.Monitoring system occurs in that the behavior violating predefined analysis rule in the scene, and system can trigger the linkage rule pre-seted Then, thus reach the function of active warning.
Detailed description of the invention
The most peering the preferred embodiments of the present invention illustrate, it will be appreciated that preferred embodiment described herein is only For instruction and explanation of the present invention, it is not intended to limit the present invention.
The construction method of a kind of shop of embodiment intelligent engineering, comprises the steps, tube seat is constructed, and processes and carries out Tube seat is installed, and needs processing and fabricating field, and when tube seat vertical demixing is installed, cable should be arranged from top to bottom by following regulation order, Instrument signal circuit, safety interlocking circuit, AC and DC supply line;Electric wire cable lays, and uses hidden pipe or bright pipe, furred ceiling In, pipeline laying in skirting;Second step, electric wire cable does outward appearance and checking, and measures insulation resistance before laying.Second Step, hidden pipe applies and is placed in many dirt and encapsulation process all should be made in the moist raceway for wiring in place, the mouth of pipe, pipe junction, the electricity of hidden pipe Chest in line embedment wall or concrete, the clear distance from surface is no less than 15mm.Equipment is installed, and is powered system successively Install, power-supply device installs and monitoring system is installed;In 3rd step, the installation of power-supply device, consumer unit is fixedly mounted on coagulation On cob wall, post or on the basis of, use expansion bolt fix;The exposed electrical body of the power supply unit installed in instrument box each other or Distance between other exposed electric conductors answers >=4mm.3rd step, the high-definition camera of monitoring system, data wire and power line peace Dress.Line test, Networked E-Journals, the acceptance of work.
The foregoing is only explanation embodiments of the present invention, be not limited to the present invention, for the technology of this area For personnel, all within the spirit and principles in the present invention, any modification, equivalent substitution and improvement etc. made, should be included in Within protection scope of the present invention.

Claims (5)

1. the construction method of a shop intelligent engineering, it is characterised in that comprise the steps, tube seat construction, processing is gone forward side by side Line pipe groove is installed, and needs processing and fabricating field, and when tube seat vertical demixing is installed, cable should be arranged from top to bottom by following regulation order Row, instrument signal circuit, safety interlocking circuit, AC and DC supply line;Electric wire cable lays, and uses hidden pipe or bright pipe, hangs Pipeline laying in top, in skirting;Equipment is installed, and is powered the installation of system, power-supply device installation and monitoring system successively Install;Line test, debugging, the acceptance of work.
The most according to claim 1, the construction method of shop intelligent engineering, it is characterised in that second step, electric wire cable lays Before do outward appearance and checking, and measure insulation resistance.
The construction method of shop intelligent engineering the most according to claim 1, it is characterised in that second step, the electric wire of hidden pipe Chest in embedment wall or concrete, the clear distance from surface is no less than 15mm.
The construction method of shop intelligent engineering the most according to claim 1, it is characterised in that in the 3rd step, power-supply device Installation, consumer unit is fixedly mounted on concrete walls, post or on the basis of, use expansion bolt fix;Install in instrument box The exposed electrical body of power supply unit is mutual or distance between other exposed electric conductors should >=4mm.
The construction method of shop intelligent engineering the most according to claim 1, it is characterised in that the 3rd step, monitoring system High-definition camera, data wire and power line are installed.
CN201610614147.9A 2016-07-29 2016-07-29 A kind of shop intelligent engineering construction method Pending CN106203892A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610614147.9A CN106203892A (en) 2016-07-29 2016-07-29 A kind of shop intelligent engineering construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610614147.9A CN106203892A (en) 2016-07-29 2016-07-29 A kind of shop intelligent engineering construction method

Publications (1)

Publication Number Publication Date
CN106203892A true CN106203892A (en) 2016-12-07

Family

ID=57498129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610614147.9A Pending CN106203892A (en) 2016-07-29 2016-07-29 A kind of shop intelligent engineering construction method

Country Status (1)

Country Link
CN (1) CN106203892A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108769580A (en) * 2018-05-18 2018-11-06 南京天方电子工程有限公司 A kind of installation method of monitoring system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李小波: ""浅淡住宅小区智能化设计及施工管理"", 《机电工程技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108769580A (en) * 2018-05-18 2018-11-06 南京天方电子工程有限公司 A kind of installation method of monitoring system

Similar Documents

Publication Publication Date Title
CN107807593B (en) Power distribution room master control device, master control system and detection control method
CN111582165B (en) Monitoring system for power distribution station room
CN103887882B (en) A kind of prefabricated cover half blocking secondary device system for transformer station
CN105578133A (en) Cell monitoring method based on cloud platform and system thereof
CN206671852U (en) A kind of integrated monitoring platform for intelligent building construction
CN106602707A (en) Remote electric power monitoring system
CN106203892A (en) A kind of shop intelligent engineering construction method
CN106569461A (en) Distributed power control device
CN112507428A (en) Intelligent data machine room building method and system
CN104166398A (en) Machine room
CN205070369U (en) 330kV crosslinked cable trench structure
CN106207875A (en) A kind of home intelligence engineering construction method
CN106597998A (en) Collecting-distributing type power alarm monitoring method
CN106602713A (en) Centralized-distributed power alarm control system
CN104362733A (en) Prefabricated uninterruptible power supply system
CN213021956U (en) Temperature detection system of power distribution cabinet
CN204992780U (en) Distributing type electric power detecting system
CN210573452U (en) Outdoor electrical control cabinet capable of alarming, dehumidifying and cooling
CN114638485A (en) Full-service ubiquitous power Internet of things danger coefficient induction and fault repair system
CN204290470U (en) A kind of prefabricated uninterruptible power system
CN108802571B (en) Fault early warning method based on spread spectrum acquisition and tangent linear variance and implementation system thereof
CN208078476U (en) A kind of capacitor box with dedusting function
JP2012235595A (en) Wiring system and building
CN207601598U (en) A kind of switching station's security context monitoring integrated system based on double layer network
CN106571678A (en) Remote power detection method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207

RJ01 Rejection of invention patent application after publication