CN106201891A - A kind of model automatization method of testing and device - Google Patents

A kind of model automatization method of testing and device Download PDF

Info

Publication number
CN106201891A
CN106201891A CN201610571288.7A CN201610571288A CN106201891A CN 106201891 A CN106201891 A CN 106201891A CN 201610571288 A CN201610571288 A CN 201610571288A CN 106201891 A CN106201891 A CN 106201891A
Authority
CN
China
Prior art keywords
test
excel
document
model
simulink
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610571288.7A
Other languages
Chinese (zh)
Inventor
高健
史国军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
EONTRONIX Co Ltd
Original Assignee
EONTRONIX Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by EONTRONIX Co Ltd filed Critical EONTRONIX Co Ltd
Priority to CN201610571288.7A priority Critical patent/CN106201891A/en
Publication of CN106201891A publication Critical patent/CN106201891A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/36Preventing errors by testing or debugging software
    • G06F11/3668Software testing
    • G06F11/3672Test management
    • G06F11/3688Test management for test execution, e.g. scheduling of test suites

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Debugging And Monitoring (AREA)

Abstract

The invention discloses a kind of model automatization method of testing and device, load Simulink model and the parameter of demarcation of required test;Call Excel test document, perform every test case successively according to the time flow relation defined in Excel test document;Judge that test result is the most identical with the expected value in corresponding Excel test file.Therefore, Matlab, Simulink can be integrated by the present invention, and the algorithm quickly can built user carries out emulation testing, and emulation testing is reliable and stable, and generate test result report, then can save research staff in a large number and develop the time of algorithm, and experimental situation is unrestricted.

Description

A kind of model automatization method of testing and device
Technical field
The present invention relates to field of computer technology, particularly relate to a kind of based on the survey of Matlab/Simulink model automatization Method for testing and device.
Background technology
At present, in the environment of based on Matlab/Simulink rapid prototype development, generally require the algorithm researched and developed Carrying out certain test, this test process is that conventionally employed HIL tests to control strategy stability and functional a kind of guarantee (hardware-in-the-loop test), this test process advantage is that comparison is true and reliable, shortcoming be need to expend certain material resources and Financial resources (need to build the HIL test environment of complete set according to testing requirement), and this test process consuming time is longer.So Can cause a vicious cycle: user's needs a specific experimental situation take a substantial amount of time verify one wrong Algorithm.
Specifically, general method of testing is manually to add input signal, then by oscillograph or work Make space storage document test result is analyzed.There are four inevitable shortcomings in this process: 1. when input stimulus is believed Time number more, user needs to add different pumping signals in the different moment, this process and loaded down with trivial details;2. when output observation letter Time number more, user adds multiple data storage document equally and is observed relative analysis;3. user needs manually test result It is analyzed, manually completes and mistake is assessed by test result.4. need manually to write test result literary composition after test completes Shelves and test process, and mark the testDate of correspondence.
Summary of the invention
In view of this, it is an object of the invention to propose a kind of model automatization method of testing and device, solve for The model of Matlab/Simulink carries out test and takes time and effort, the problem of poor accuracy.
Model automatization method of testing is provided, including step based on the above-mentioned purpose present invention:
Load Simulink model and the parameter of demarcation of required test;
Call Excel test document, perform every test successively according to the time flow relation defined in Excel test document Use-case;
Judge that test result is the most identical with the expected value in corresponding Excel test file, if identical, this test Use-case passes through and marks PASS, and otherwise this test case is not by then being covered by yellow area and marking FALSE.
In some embodiments of the invention, also include:
Judge whether Excel test document every page has tested;
According to judged result, if every page of test completes, judge test result and the phase in corresponding Excel test file Prestige value is the most identical, otherwise continues to perform every test case successively according to the time flow relation defined in Excel test document.
In some embodiments of the invention, described in call Excel test document, including:
Automatically required Excel test document is called;
By importdata function importing Excel test document to work space, obtain test by length function The number of pages of document Excel test document.
In some embodiments of the invention, it is judged that test result with the expected value in corresponding Excel test file is No identical, including:
Simulink is set and sets up the desired value of model, when setting up Excel and testing form, write input value and expection Value;
The test result of output, after test, is written in Excel test form by the model that Simulink sets up;
Judge that the test result of output is the most identical with described desired value.
In some embodiments of the invention, also include:
The test result of output write in Excel test document newly-built collects in the page, and marks out test and do not lead to The sequence crossed presents.
On the other hand, present invention also offers a kind of model automatization method of testing and device, including:
Loading unit, for loading Simulink model and the parameter of demarcation of required test;
Call unit, is used for calling Excel test document;
Test cell, for performing every test case successively according to the time flow relation defined in Excel test document;
Judging unit, for judging that test result is the most identical with the expected value in corresponding Excel test file, if phase Same then this test case is passed through and marks, and otherwise this test case is not passed through and marks.
In some embodiments of the invention, described judging unit, it is additionally operable to:
Judge whether Excel test document every page has tested;
According to judged result, if every page of test completes, judge test result and the phase in corresponding Excel test file Prestige value is the most identical, otherwise continues to perform every test case successively according to the time flow relation defined in Excel test document.
In some embodiments of the invention, described call unit, it is additionally operable to:
Automatically required Excel test document is called;
By importdata function importing Excel test document to work space, obtain test by length function The number of pages of document Excel test document.
In some embodiments of the invention, described judging unit judges test result and corresponding Excel test file In expected value the most identical, including:
Simulink is set and sets up the desired value of model, when setting up Excel and testing form, write input value and expection Value;
The test result of output, after test, is written in Excel test form by the model that Simulink sets up;
Judge that the test result of output is the most identical with described desired value.
In some embodiments of the invention, also include:
Output unit, newly-built collects in the page for the test result of output write in Excel test document, and marks Outpour the unsanctioned sequence of test to present.
From the above it can be seen that the present invention provide based on Matlab/Simulink model automatization method of testing And device, by loading Simulink model and the parameter of demarcation of required test;Call Excel test document, according to Excel Time flow relation defined in test document performs every test case successively;Judge that test result is tested with corresponding Excel Expected value in document is the most identical.Thus, Matlab, Simulink can be integrated by the present invention, can quickly to The algorithm that family is built carries out emulation testing, and emulation testing is reliable and stable, and generates test result report, then can save in a large number Research staff develops the time of algorithm, and experimental situation is unrestricted.
Accompanying drawing explanation
Fig. 1 is model automated testing method schematic flow sheet in the embodiment of the present invention;
Fig. 2 is the diplex flow schematic diagram that in the embodiment of the present invention, input stimulus module realizes multiple excitation input signal;
Fig. 3 is the diplex flow signal that in the embodiment of the present invention, another input stimulus module realizes multiple excitation input signal Figure;
Fig. 4 is the schematic flow sheet that in the embodiment of the present invention, module composition mechanism carries out test run;
Fig. 5 is the structural representation of model automatic test device in the embodiment of the present invention;
Fig. 6 is the structural representation of another embodiment of the present invention model automatization test device.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearer, below in conjunction with specific embodiment, and reference Accompanying drawing, the present invention is described in more detail.
It should be noted that the statement of all uses " first " and " second " is for distinguishing two in the embodiment of the present invention The entity of individual same names non-equal or the parameter of non-equal, it is seen that " first " " second ", only for the convenience of statement, should not Being interpreted as the restriction to the embodiment of the present invention, this is illustrated by subsequent embodiment the most one by one.
The present invention relates to a kind of for Matlab/Simulink translation and compiling environment, the Simulink model of User Exploitation be entered Row high-speed simulation is tested, and generates corresponding Excel test result report file.Wherein, this method of testing or device can collect Become in SIMULINK library file, i.e. when opening Matlab every time without again adding this method of testing or device extremely Simulink storehouse.And, replace complicated input signal and output storage file, operation by brief input/output module Simply.Further, in test process can needed for automatic loading user test model, and the calibrating parameters relevant to model, from Dynamic loading User Defined Excel test case.Further, enter in strict accordance with User Defined Excel test case time stream Row is tested one by one, and draws test result.It addition, need after test completes according to the desired knot of actual test result and user Fruit contrasts, and writes the same form of Excel, writes PASS, otherwise write FALSE after the step that test is passed through.And At the test result do not passed through, insert this form with yellow background, remind user alerting mode.Further, at test knot Really the most newly-built " test collects " window of Excel, this window clearly demonstrates every page of test result situation, and marks test Date, and this test result eventually through or failure.Further, MIL software data structure uses the one of M language definition Dimension, two dimensional data structure, program calls each data base with the form that event triggers.
In a preferred embodiment, this method of testing or device are applicable to MATLAB 2015a/2015b and institute before There is version.Computer software running environment: win7/win8/xp/windows 2000.Computer hardware running environment: 32/64. Further, this method of testing or device are a kind of integrated plugins based on MATLAB, can be according to MATLAB version difference Continuous updating.
As an embodiment, refering to shown in Fig. 1, in the embodiment of the present invention based on Matlab/Simulink model from Dynamicization method of testing schematic flow sheet, described model automatization method of testing includes:
Step 101, loads Simulink model and the parameter of demarcation of required test.
In an embodiment, Simulink module is added to Simulink storehouse, be i.e. loaded with required test Simulink model.It is preferred that described Simulink module can be self-defining.Preferably, self-defined Simulink storehouse Modular manner and user's Simulink model slitless connection.Wherein, concrete enforcement includes: arrange the self-defined of write The file name of Simulink module, such as: by blkStruct.Name function, blkStruct is standard library function, storehouse letter Number is made up of title Name etc. plurality of kinds of contents.The self-defined Simulink library model title of write is set, such as blkStruct.OpenFcn.Further, write is set and needs the title of display under Simulink library file, such as blkStruct.MaskDisplay.It addition, the Simulink model opening required test in Simulink storehouse can pass through Open_system function.
It addition, automatically load the parameter of associated calibration, specifically: by function run, calibrating parameters is loaded onto work empty Between.Wherein, described demarcation is industry technical term, such as: accelerator pedal passes through sensor acquisition signal, when sky is stepped on when Sensor voltage be 0.3V, 0.3V be not fixing value, different sensors, the parameter of different automobile types be all need to demarcate after Can determine that.These calibration values would generally be written in m file, needs when testing these scalar quantities are also carried in work Make space, participate in computing.Therefore, the parameter of demarcation generally includes tens, and these would generally provide empirical value, and MIL tests Cheng Hou, according to development process, specifically demarcates in the real steering vectors stage.
Step 102, calls Excel test document.
It is preferred that use read-write Excel forms mode, first its list data is read in Matlab work space, then will Mode in operational data write self-defining function realizes data and swaps with outside Excel.Preferably, routine nesting is used Mode realizes calling mutually of intrinsic function.Concrete enforcement includes: automatically calls required Excel test document, passes through Importdata function importing Excel test document, to work space, then obtains test document Excel by length function Number of pages.
Step 103, performs every test case successively according to the time flow relation defined in Excel test document.
In an embodiment, during performing every test case, if a certain data in Excel test document The form that not met is specified, can directly point out certain design parameter to make mistakes, facilitate user to check.It is preferred that can also be according to user Particular demands, such as amendment Excel form, amendment input/output interface etc. adapt to user's request.Preferably, at test process Middle test result is temporarily stored in a specific file.
Wherein, the pumping signal of input is automatically loaded according to the time flow relation of Excel definition.Specifically can arrange t is Time timer in simulation process, i.e. pursues the test case time according to this parameter.Sys be output pumping signal, i.e. this Signal is the input signal of model to be tested.Input1 is the pumping signal title inputing to MIL software test, and data is Tested Excel list data, name is the title of all input signals of this test model.In this embodiment, MIL surveys Examination is the data using Simulink to call Excel at all, if it is A+B=C that SIMULINK establishes a model.So In Excel, need to define data, data include input variable i.e. A and B.Simulink model need input, input fixed Justice is that the title in A and B, Simulink and Excel must keep consistent, and Simulink recalculates A+B's within the time of t Value, as defined in EXCLE during t=0, A=1, B=2, then the result of MIL test is C=3, when the t=1 second, A=10, B= 0, then test result be the name definition of C=10, Excel be name, carry out MIL test time could by Excel with Simulink joins together.
Further, test result output signal is automatically recorded according to the time flow relation of Excel definition.Specifically can set Putting t is time timer in simulation process, i.e. pursues the test case time according to this parameter.U is the test result letter of output Number, i.e. this signal is the output drive signal of model to be tested.Input1 is the pumping signal name inputting out MIL software test Claim.Data is by being tested Excel form expected result data.Name is the title of all input signals of this test model. Cvkl is the file temporarily storing test result.
Preferably, the present invention uses an input stimulus module to realize the multiplexing of multiple excitation input signal, such as Fig. 2 institute Show.Specifically, whether the pumping signal first detecting input exists, if there is no this excitation in the Excel tested Invalidating signal, exits this flow process.If there is then calculating this pumping signal location in Excel form, learn tool Behind body position, it is judged that whether the test Excel form time terminates, and is, exits this flow process, otherwise this pumping signal will be along with The time shaft of Excel form sequentially inputs to model to be measured.It can be seen that it is final according to pumping signal this stream of difference recursive call Journey, thus realize reusing of an input stimulus module multiple pumping signal input.What deserves to be explained is, learn concrete position Postponing, this pumping signal will sequentially input to can be by this pumping signal during model to be measured along with the time shaft of Excel form Volatile data base (as shown in Figure 3) will be sequentially output along with the time shaft of Excel form.
Step 104, it is judged that whether Excel test document every page has tested, if tested, carries out step 105, Otherwise return step 103.
Step 105, it is judged that test result is the most identical with the expected value in corresponding Excel test file, if identical, Carrying out step 106, if differing, carrying out step 107.Concrete implementation process includes:
Step one: the desired value that C is the model that Simulink sets up is set, when setting up Excel form, write input (input) value A and B, such as A=1, B=2.And write desired value C, such as C=3.
Step 2: the test result signal that u is output is set, surveys through MIL (Model in Loop model is in ring test) During examination, u is written in EXCLE again.
Step 3: judge that Simulink desired value C in u with Excel that outputs test result is the most identical, if identical, carry out Step 106, otherwise carries out step 107.
Also, it should be noted after once can testing computing, its result is written to the caching of S IMULINK In space, finally result is all imported in Excel.
Step 106, this test case is passed through and marks, and carries out step 108.
Wherein it is possible to mark PASS at the last string of this test case, represent that this test case is passed through.
Step 107, this test case is not passed through and marks, carrying out step 108.
Wherein it is possible to the last string of this test case mark FALSE, and by this test case with yellow background Mark.
Step 108, presents output the result newly-built collecting in the page in Excel test document.
Wherein, the result of output can include that this Excel test document is passed through and not by the essential information of test case, And the testing time of every test case.
In an embodiment, the result of output is judged and test result is write in Excel test document newly-built Collect in the page, and mark out the unsanctioned sequence of test with yellow.Specifically, first pass through function Stabc and determine Excel On the concrete columns of storage in test document, i.e. the storage position according to test result input correspondence.Then, should corresponding By function xlswrite input test result on the determination row of bar test case, wherein passing through function stm is with yellow flag Error checking sequence.
In one preferably embodiment, the present invention uses block combiner mechanism to carry out test run.As shown in Figure 4, first First, starting principal function, this process calls the data in the Excel test document of the required test of user automatically.Secondly, outside is called Interface, reads Excel data to be tested.Afterwards, the list data in Excel test document is analyzed, preferably divides Analysing whether its data meet basic format requirement (test data are the most complete), if being unsatisfactory for, exiting testing process.If meeting Call input interface function and output interface function the most successively, institute's test model is carried out real-time testing.Finally, model running is treated After completing, the data tested are judged, and by described judged result write Excel test document.It can be seen that The most only need to start principal function and can complete whole control, there is not time-out or emergent stopping in midway.Wherein, during operation Between the Simulink model complexity tested according to user and performed Excel test document together decide on, i.e. when When there is a lot of input, output drive signal in the complicated or performed Excel test document of Simulink model, test process The spent time is longer, otherwise the shortest.
In another aspect of this invention, additionally provide a kind of based on Matlab/Simulink model automatization test device, As it is shown in figure 5, described model automatization test device include successively loading unit 501, call unit 502, test cell 503 with And judging unit 504.Wherein, loading unit 501 loads Simulink model and the parameter of demarcation of required test, calls afterwards Unit 502 calls Excel test document.Then, test cell 503 is according to the time flow relation defined in Excel test document Perform every test case successively.Finally, it is judged that unit 504 judges test result and the phase in corresponding Excel test file Prestige value is the most identical, if identical, this test case is passed through and marks, and otherwise this test case is not passed through and marks.
As an embodiment, Simulink module is added to Simulink storehouse, is i.e. loaded with institute by loading unit 501 The Simulink model that need to test.It is preferred that described Simulink module can be self-defining.Preferably, self-defined Simulink library module mode and user's Simulink model slitless connection.Wherein, concrete enforcement includes: arrange write from The file name of definition Simulink module, such as: by blkStruct.Name function, blkStruct is standard library function, Built-in function is made up of title Name etc. plurality of kinds of contents.The self-defined Simulink library model title of write is set, such as blkStruct.OpenFcn.Further, write is set and needs the title of display under SIMULINK library file, such as blkStruct.MaskDisplay.It addition, open required test Simulink model in Simulink storehouse can pass through open_ System function.
It addition, automatically load the parameter of associated calibration, specifically: by function run, calibrating parameters is loaded onto work empty Between.
As a preferably embodiment, call unit 502 can use read-write Excel forms mode, first by its table Lattice data read in MATLAB work space, then the mode in self-defining function that operational data write realizes data with outside Excel swaps.Preferably, routine nesting mode is used to realize calling mutually of intrinsic function.Concrete enforcement includes: from Move and call required Excel test document, by importdata function importing Excel test document to work space, then The number of pages of test document Excel is obtained by length function.
As another preferably embodiment, the time flow relation that test cell 503 defines according to Excel loads defeated automatically The pumping signal entered.Specifically can arrange t is time timer in simulation process, when i.e. pursuing test case according to this parameter Between.Sys is the pumping signal of output, i.e. this signal is the input signal of model to be tested.Input1 is soft for inputing to MIL The pumping signal title of part test, data is by being tested Excel list data, and name is this test model all input stimulus letter Number title.In this embodiment, MIL test is the data using Simulink to call EXCLE at all, if Simulink Establishing a model is A+B=C.In EXCLE, so need to define data, data include input variable i.e. A and B. The title needing input, input to be defined as in A and B, SIMULINK and EXCLE in Simulink model must keep consistent, Simulink recalculates the value of A+B, as defined in EXCLE during t=0, A=1, B=2 within the time of t, then MIL tests Result be C=3, when the t=1 second, A=10, B=0, then test result be the name definition of C=10, Excel be name, Carry out could being joined together by EXCLE with S IMULINK during MIL test.
Further, test result output signal is automatically recorded according to the time flow relation of Excel definition.Specifically can set Putting t is time timer in simulation process, i.e. pursues the test case time according to this parameter.U is the test result letter of output Number, i.e. this signal is the output drive signal of model to be tested.Input1 is the pumping signal name inputting out MIL software test Claim.Data is by being tested Excel form expected result data.Name is the title of all input signals of this test model. Cvkl is the file temporarily storing test result.
Preferably, an input stimulus module can be used to realize the multiplexing of multiple excitation input signal, specifically: first Whether the pumping signal first detecting input exists in the Excel tested, invalid if there is no this pumping signal, exits this Flow process.If there is then calculating this pumping signal location in Excel form, after learning particular location, it is judged that survey Whether the examination Excel form time terminates, and is to exit this flow process, and otherwise this pumping signal will be along with the time of Excel form Axle sequentially inputs to model to be measured.It can be seen that final according to pumping signal this flow process of difference recursive call, thus realize one Reusing of input stimulus module multiple pumping signal input.What deserves to be explained is, after learning particular location, this pumping signal Will sequentially input to can will be along with Excel table by this pumping signal during model to be measured along with the time shaft of Excel form The time shaft of lattice is sequentially output volatile data base.
In a preferred embodiment, it is judged that unit 504 judge test result with in corresponding Excel test file Expected value is the most identical, and concrete implementation process includes:
Step one: the desired value that C is the model that Simulink sets up is set, when setting up EXCLE form, write input (input) value A and B, such as A=1, B=2.And write desired value C, such as C=3.
Step 2: the test result signal that u is output is set, surveys through MIL (Model in Loop model is in ring test) During examination, u is written in EXCLE again.
Step 3: judge that Simulink desired value C in u with Excel that outputs test result is the most identical, if identical, carry out Step 106, otherwise carries out step 107.
Also, it should be noted after once can testing computing, its result is written to the caching of S IMULINK In space, finally result is all imported in EXCLE.
In another embodiment of device of the present invention, as shown in Figure 6, described model automatization test device also may be used To include output unit 505.Wherein, described output unit 505 is connected with judging unit 504, can be by the test knot of output Newly-built collecting in the page in fruit write Excel test document, and mark out the unsanctioned sequence of test and present.It addition, output Result can include this Excel test document by and not by the essential information of test case, and every test case Testing time.
In an embodiment, the result of output is judged and test result is write in Excel test document newly-built Collect in the page, and mark out the unsanctioned sequence of test with yellow.Specifically, first pass through function Stabc and determine Excel On the concrete columns of storage in test document, i.e. the storage position according to test result input correspondence.Then, should corresponding By function xlswrite input test result on the determination row of bar test case, wherein passing through function stm is with yellow flag Error checking sequence.
It should be noted that at tool based on Matlab/Simulink model automatization test device of the present invention Body implementation content, described above has been described in detail based in Matlab/Simulink model automatization method of testing, Therefore no longer illustrate at this duplicate contents.
In sum, the present invention provide based on Matlab/Simulink model automatization method of testing and device, create Property provide and be automatically performed the open loop of model, closed loop test according to User Defined test case, and automatically generate corresponding survey Test result report, this report can clearly present test model by with the testing procedure not passed through;Meanwhile, the present invention has extensively General, great dissemination;Finally, whole described model automatization method of testing and device are compact, it is easy to control.
Those of ordinary skill in the field are it is understood that the discussion of any of the above embodiment is exemplary only, not It is intended to imply that the scope of the present disclosure (including claim) is limited to these examples;Under the thinking of the present invention, above example Or can also be combined between the technical characteristic in different embodiments, step can realize with random order, and exists such as Other change of the many of the different aspect of the upper described present invention, in order to concisely they do not provide in details.
It addition, for simplifying explanation and discussing, and in order to obscure the invention, can in the accompanying drawing provided To illustrate or can not illustrate and integrated circuit (IC) chip and the known power supply/grounding connection of other parts.Furthermore, it is possible to Device is shown in block diagram form, in order to avoid obscuring the invention, and this have also contemplated that following facts, i.e. about this The details of the embodiment of a little block diagram arrangements be the platform that depends highly on and will implement the present invention (that is, these details should In the range of being completely in the understanding of those skilled in the art).Elaborating that detail (such as, circuit) is to describe the present invention's In the case of exemplary embodiment, it will be apparent to those skilled in the art that can there is no these details In the case of or these details change in the case of implement the present invention.Therefore, these descriptions are considered as explanation Property rather than restrictive.
Although invention has been described to have been incorporated with the specific embodiment of the present invention, but according to retouching above Stating, a lot of replacements, amendment and the modification of these embodiments will be apparent from for those of ordinary skills.Example As, other memory architecture (such as, dynamic ram (DRAM)) can use discussed embodiment.
Embodiments of the invention be intended to fall into all such replacement within the broad range of claims, Amendment and modification.Therefore, all within the spirit and principles in the present invention, any omission of being made, amendment, equivalent, improvement Deng, should be included within the scope of the present invention.

Claims (10)

1. a model automatization method of testing, it is characterised in that include step:
Load Simulink model and the parameter of demarcation of required test;
Call Excel test document, perform every test successively according to the time flow relation defined in Excel test document and use Example;
Judge that test result is the most identical with the expected value in corresponding Excel test file, if identical, this test case By and mark, otherwise this test case not by and mark.
Method the most according to claim 1, it is characterised in that also include:
Judge whether Excel test document every page has tested;
According to judged result, if every page of test completes, judge test result and the expected value in corresponding Excel test file The most identical, otherwise continue to perform every test case successively according to the time flow relation defined in Excel test document.
Method the most according to claim 1 and 2, it is characterised in that described in call Excel test document, including:
Automatically required Excel test document is called;
By importdata function importing Excel test document to work space, obtain test document by length function The number of pages of Excel test document.
Method the most according to claim 3, it is characterised in that judge test result with in corresponding Excel test file Expected value the most identical, including:
Simulink is set and sets up the desired value of model, when setting up Excel and testing form, write input value and desired value;
The test result of output, after test, is written in EXCLE test form by the model that Simulink sets up;
Judge that the test result of output is the most identical with described desired value.
Method the most according to claim 1, it is characterised in that also include:
The test result of output write in Excel test document newly-built collects in the page, and it is unsanctioned to mark out test Sequence presents.
6. a model automatization test device, it is characterised in that including:
Loading unit, for loading Simulink model and the parameter of demarcation of required test;
Call unit, is used for calling Excel test document;
Test cell, for performing every test case successively according to the time flow relation defined in Excel test document;
Judging unit, for judging that test result is the most identical with the expected value in corresponding Excel test file, if identical, This test case is passed through and marks, and otherwise this test case is not passed through and marks.
Device the most according to claim 6, it is characterised in that described judging unit, is additionally operable to:
Judge whether Excel test document every page has tested;
According to judged result, if every page of test completes, judge test result and the expected value in corresponding Excel test file The most identical, otherwise continue to perform every test case successively according to the time flow relation defined in Excel test document.
8., according to the device described in claim 6 or 7, it is characterised in that described call unit, it is additionally operable to:
Automatically required Excel test document is called;
By importdata function importing Excel test document to work space, obtain test document by length function The number of pages of Excel test document.
Device the most according to claim 8, it is characterised in that described judging unit judges that test result is with corresponding Expected value in Excel test file is the most identical, including:
Simulink is set and sets up the desired value of model, when setting up EXCLE and testing form, write input value and desired value;
The test result of output, after test, is written in EXCLE test form by the model that Simulink sets up;
Judge that the test result of output is the most identical with described desired value.
Device the most according to claim 6, it is characterised in that also include:
Output unit, newly-built collects in the page for the test result of output write in Excel test document, and marks out Test unsanctioned sequence to present.
CN201610571288.7A 2016-07-19 2016-07-19 A kind of model automatization method of testing and device Pending CN106201891A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610571288.7A CN106201891A (en) 2016-07-19 2016-07-19 A kind of model automatization method of testing and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610571288.7A CN106201891A (en) 2016-07-19 2016-07-19 A kind of model automatization method of testing and device

Publications (1)

Publication Number Publication Date
CN106201891A true CN106201891A (en) 2016-12-07

Family

ID=57494514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610571288.7A Pending CN106201891A (en) 2016-07-19 2016-07-19 A kind of model automatization method of testing and device

Country Status (1)

Country Link
CN (1) CN106201891A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106844203A (en) * 2017-01-04 2017-06-13 重庆长安汽车股份有限公司 A kind of prototype software test result analysis method and device
CN106951606A (en) * 2017-03-03 2017-07-14 浙江仕善汽车科技股份有限公司 A kind of customized method of implementation model normalized checking
CN106989939A (en) * 2017-03-29 2017-07-28 江铃汽车股份有限公司 A kind of method and system of suspension K&C test bed testing comparative analyses
CN107064703A (en) * 2016-12-23 2017-08-18 惠州市亿能电子有限公司 A kind of high-voltaghe compartment automatic testing method and its system
CN107357735A (en) * 2017-07-20 2017-11-17 万帮充电设备有限公司 Discount method of testing and device
CN109165170A (en) * 2018-10-16 2019-01-08 杭州安恒信息技术股份有限公司 A kind of method and system automating request for test
CN112084667A (en) * 2020-09-14 2020-12-15 北京世冠金洋科技发展有限公司 Test case generation method and device and electronic equipment
CN112199297A (en) * 2020-10-30 2021-01-08 久瓴(江苏)数字智能科技有限公司 Data testing method and device, nonvolatile storage medium and processor
CN112559326A (en) * 2020-12-03 2021-03-26 北京车和家信息技术有限公司 Testing method and device for fusion calibration, vehicle-mounted system and vehicle
CN114076885A (en) * 2020-08-11 2022-02-22 合肥本源量子计算科技有限责任公司 Quantum chip testing method and device
CN114817001A (en) * 2022-03-31 2022-07-29 重庆长安新能源汽车科技有限公司 Automatic testing tool and automatic testing method for Simulink model
CN112559326B (en) * 2020-12-03 2024-07-05 北京车和家信息技术有限公司 Fusion calibration testing method and device, vehicle-mounted system and vehicle

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1947567A2 (en) * 2006-12-20 2008-07-23 Deutsche Telekom AG Device and method for automatically testing model-based functions
CN101739334A (en) * 2008-11-21 2010-06-16 上海科梁信息工程有限公司 Automatic testing method of embedded software
CN101968770A (en) * 2010-11-01 2011-02-09 北京航空航天大学 Reusable embedded software testing and developing method and system
CN102890499A (en) * 2012-09-21 2013-01-23 北京智行鸿远汽车技术有限公司 Method for loop testing of vehicle control unit software of pure electric automobile
CN103034227A (en) * 2012-09-20 2013-04-10 北京智行鸿远汽车技术有限公司 Testing method in circuit of battery electric vehicle vehicle-control unit model
CN104391791A (en) * 2014-11-21 2015-03-04 北京经纬恒润科技有限公司 Method and device for testing embedded control algorithm

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1947567A2 (en) * 2006-12-20 2008-07-23 Deutsche Telekom AG Device and method for automatically testing model-based functions
CN101739334A (en) * 2008-11-21 2010-06-16 上海科梁信息工程有限公司 Automatic testing method of embedded software
CN101968770A (en) * 2010-11-01 2011-02-09 北京航空航天大学 Reusable embedded software testing and developing method and system
CN103034227A (en) * 2012-09-20 2013-04-10 北京智行鸿远汽车技术有限公司 Testing method in circuit of battery electric vehicle vehicle-control unit model
CN102890499A (en) * 2012-09-21 2013-01-23 北京智行鸿远汽车技术有限公司 Method for loop testing of vehicle control unit software of pure electric automobile
CN104391791A (en) * 2014-11-21 2015-03-04 北京经纬恒润科技有限公司 Method and device for testing embedded control algorithm

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107064703A (en) * 2016-12-23 2017-08-18 惠州市亿能电子有限公司 A kind of high-voltaghe compartment automatic testing method and its system
CN106844203A (en) * 2017-01-04 2017-06-13 重庆长安汽车股份有限公司 A kind of prototype software test result analysis method and device
CN106951606A (en) * 2017-03-03 2017-07-14 浙江仕善汽车科技股份有限公司 A kind of customized method of implementation model normalized checking
CN106989939B (en) * 2017-03-29 2019-11-19 江铃汽车股份有限公司 A kind of method and system of suspension K & C test bed testing comparative analysis
CN106989939A (en) * 2017-03-29 2017-07-28 江铃汽车股份有限公司 A kind of method and system of suspension K&C test bed testing comparative analyses
CN107357735A (en) * 2017-07-20 2017-11-17 万帮充电设备有限公司 Discount method of testing and device
CN109165170A (en) * 2018-10-16 2019-01-08 杭州安恒信息技术股份有限公司 A kind of method and system automating request for test
CN109165170B (en) * 2018-10-16 2022-03-11 杭州安恒信息技术股份有限公司 Method and system for automatic request test
CN114076885A (en) * 2020-08-11 2022-02-22 合肥本源量子计算科技有限责任公司 Quantum chip testing method and device
CN114076885B (en) * 2020-08-11 2023-12-12 本源量子计算科技(合肥)股份有限公司 Quantum chip testing method and device
CN112084667A (en) * 2020-09-14 2020-12-15 北京世冠金洋科技发展有限公司 Test case generation method and device and electronic equipment
CN112199297A (en) * 2020-10-30 2021-01-08 久瓴(江苏)数字智能科技有限公司 Data testing method and device, nonvolatile storage medium and processor
CN112559326A (en) * 2020-12-03 2021-03-26 北京车和家信息技术有限公司 Testing method and device for fusion calibration, vehicle-mounted system and vehicle
CN112559326B (en) * 2020-12-03 2024-07-05 北京车和家信息技术有限公司 Fusion calibration testing method and device, vehicle-mounted system and vehicle
CN114817001A (en) * 2022-03-31 2022-07-29 重庆长安新能源汽车科技有限公司 Automatic testing tool and automatic testing method for Simulink model

Similar Documents

Publication Publication Date Title
CN106201891A (en) A kind of model automatization method of testing and device
US8799875B2 (en) Streamlining unit testing through hot code swapping
US9027002B2 (en) Method of converting source code and source code conversion program
CN106649103B (en) A kind of method and system of Android application program Automated Black Box Testing
DE69826659T2 (en) CHEAP, EASY TO USE SOFTWARE FOR AN AUTOMATIC TEST SYSTEM
US7970601B2 (en) Method of creating a requirement description for testing an embedded system
CN107797929A (en) The statistical method and device of FPGA emulation testing function coverage
De Lucia et al. An Eclipse plug-in for the detection of design pattern instances through static and dynamic analysis
CN105975269B (en) A kind of requirements verification method based on procedural model
CN104239206B (en) Webpage method of testing and device
CN104899141B (en) A kind of test cases selection and extending method of network-oriented application system
CN107168879A (en) The generation method and device of centralized configuration management System Test Report
CN104239219A (en) Software defect positioning technology on-line evaluating and experimenting platform and method based on coverage
CN111680463A (en) File checking method and device
CN103885341B (en) Performance analysis system based on automotive performance simulator and method
CN106844221A (en) A kind of method for realizing virtual checking system coverage rate analysis
García-Valls et al. An extensible collaborative framework for monitoring software quality in critical systems
CN114185781A (en) Logic test case automatic generation method and device based on control logic diagram
CN108595317A (en) A kind of embedded automated testing method of safety computer of rail transit
Vimalaraj et al. Automated programming assignment marking tool
CN111488723B (en) Script-based automatic simulation verification method for SOC chip storage controller
Juhnke et al. Challenges concerning test case specifications in automotive software testing
Albrecht et al. Towards a framework for mining students' programming assignments
CN117371370A (en) Power module testing method and device and storage medium
Schick Realization of unit tests in the automotive sector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161207

RJ01 Rejection of invention patent application after publication